FORMATO N 02

VALORIZACIN FINAL DE OBRA


PROYECTO
COMPONENTE
META
SUB. META
MODALIDAD DE EJECUCIN
MONTO VALOR REFERENCIAL

: 2-00051 APOYO SOCIAL Y OBRAS DE EMERGENCIA


: 2-00208 ATENCIN OBRAS DE INTERES SOCIAL
: 00001 ATENCIN OBRAS DE INTERES SOCIAL AYACUCHO
: MEJORAMIENTO DE CANAL DE IRRIGACION " SAN JOSE DE VIACA"
: ADMINISTRACIN DIRECTA
: S/. 349,267.70

DESCRIPCIN

ITEM

01.00.00

OBRAS PROVISIONALES

01.01.00

OBRAS PROVISIONALES

01.01.01

CONSTRUCCION CAMPAMENTO DE OBRA

01.01.02

CARTEL DE OBRA

01.02.00

TRABAJOS PRELIMINARES

01.02.01

TRABAJOS PRELIMINARES

01.02.01.01

TRANSPORTE DE MATERIALES, EQUIPO Y HERR.

01.02.01.02

TRASLADO DE MATERIALES DE PUNTA DE CARRETERA A OBRA

02.00.00

CONSTRUCCION DE CANAL RECTANGULAR CARAVISTA

02.01.00

CONSTRUCCION DE CANAL CARAVISTA

02.01.01

TRABAJOS PRELIMINARES

02.01.01.02

TRAZO NIVELACION Y REPLANTEO DE CANALES

02.01.02

MOVIMIENTO DE TIERRA

02.01.02.01

EXCAVACION DE MATERIAL SUELTO

02.01.02.02

EXCAVACION EN ROCA SUELTA

02.01.02.03

NIVELACION INTERIOR APISONADO MANUAL

02.01.02.04

RELLENO CON MATERIAL SELECCIONADO

02.01.03

DEMOLICIN DE OBRAS DE CONCRETO

02.01.03.01

DEMOLICION DE CONCRETO DEL CANAL EXISTENTE

02.01.04

OBRAS DE CONCRETO SIMPLE

02.01.04.01

ENCOFRADO Y DESENCOFRADO DE CANALES (CERCHAS)

02.01.04.02

CONCRETO F'C=175 KG/CM2 PARA CANALES

02.01.05

REVOQUES Y ENLUCIDOS

02.01.05.01

PICADO Y REVESTIMIENTO DE CANAL EXISTENTE, 1:3, e = 1.5 cm

02.01.06

JUNTAS ASFALTICAS

02.01.06.01

JUNTA DE DILATACION CON ASFALTO e=1",C/3m.

02.01.07

SUMINISTRO E INSTALACIN DE COMPUERTA MTALICA

02.01.07.01

COMPUERTA METALICA

03.00.00

CONSTRUCCIN DE OBRAS DE ARTE

03.01.00

CONSTRUCCION DE DESARENADOR

03.01.01

TRABAJOS PRELIMINARES

03.01.01.01

LIMPIEZA MANUAL DE TERRENO

03.01.01.02

TRAZO Y REPLANTEO

03.01.02

MOVIMIENTO DE TIERRA

03.01.02.01

EXCAVACION MANUAL

03.01.03

DEMOLICIN DE OBRAS DE CONCRETO

03.01.03.01

DEMOLICION DE CONCRETO DEL CANAL EXISTENTE

03.01.04

OBRAS DE CONCRETO SIMPLE

03.01.04.01

ENCOFRADO Y DESENCOFRADO

03.01.04.02

CONCRETO F'C=175 KG/CM2

03.01.05

SUMINISTRO E INSTALACIN DE COMPUERTA MTALICA

03.01.05.01

SUMINIST. Y COLOCAC. DE COMPUERTA TIPO ARMCO

04.00.00

TOMA LATERALES (6 Unidades)

04.01.00

TRABAJOS PRELIMINARES

PROGRAMADO
METRADO
COSTO : S/.

PRINCIPAL
Metrado
Monto

EJECUTADO
MAY. METRADOS
OBRAS ADICIONALES
Metrado
Monto
Metrado
Monto

TOTAL VALORIZADO
Metrado
Monto

UNID.

CANTIDAD

P. U

P. PARCIAL

m2
Glb

25.00
1.00

62.09
1,062.01

1,552.25
1,062.01

25.00
1.00

1,552.25
1,062.01

25.00
1.00

1,552.25
1,062.01

VJE
m3

6.00
600.00

680.51
62.72

4,083.06
37,632.00

6.00
510.00

4,083.06
31,987.20

6.00
510.00

4,083.06
31,987.20

KM

10.06

1,825.69

18,366.44

8.70

15,883.50

8.70

15,883.50

m3
m3
m2
m3

813.25
116.16
1,792.00
463.68

17.04
32.34
3.41
14.61

13,857.78
3,756.61
6,110.72
6,774.36

755.78
100.40
1,510.00
340.80

12,878.49
3,246.94
5,149.10
4,979.09

755.78
100.40
1,510.00
340.80

12,878.49
3,246.94
5,149.10
4,979.09

m3

17.02

80.99

1,378.45

17.02

1,378.45

17.02

1,378.45

m2
m3

4,250.96
363.91

12.86
339.42

54,667.35
123,518.33

2,835.00
244.70

36,458.10
83,054.72

2,835.00
244.70

36,458.10
83,054.72

m2

273.55

23.67

6,474.93

273.55

6,474.93

273.55

6,474.93

1,186.36

9.03

10,712.83

827.96

7,476.48

827.96

7,476.48

Glb

1.00

2,992.72

2,992.72

1.00

2,992.72

1.00

2,992.72

m2
m2

6.75
6.75

0.20
1.38

1.35
9.32

6.75
6.75

1.35
9.32

6.75
6.75

1.35
9.32

m3

27.39

20.91

572.72

27.39

572.72

27.39

572.72

m3

5.20

80.99

421.15

5.20

421.15

5.20

421.15

m2
m3

33.62
4.07

13.97
303.96

469.67
1,237.12

33.62
4.07

469.67
1,237.12

33.62
4.07

469.67
1,237.12

und

1.00

513.61

513.61

1.00

513.61

1.00

513.61

DEDUCTIVO DE
OBRA
Metrado
Monto

FORMATO N 02

VALORIZACIN FINAL DE OBRA


PROYECTO
COMPONENTE
META
SUB. META
MODALIDAD DE EJECUCIN
MONTO VALOR REFERENCIAL

: 2-00051 APOYO SOCIAL Y OBRAS DE EMERGENCIA


: 2-00208 ATENCIN OBRAS DE INTERES SOCIAL
: 00001 ATENCIN OBRAS DE INTERES SOCIAL AYACUCHO
: MEJORAMIENTO DE CANAL DE IRRIGACION " SAN JOSE DE VIACA"
: ADMINISTRACIN DIRECTA
: S/. 349,267.70

DESCRIPCIN

ITEM
04.01.01

LIMPIEZA DE TERRENO NORMAL

04.01.02

TRAZO Y REPLANTEO

04.02.00

MOVIMIENTO DE TIERRA

04.02.01

EXCAVACION MANUAL

04.02.02

NIVELACION INTERIOR APISONADO MANUAL

04.03.00

OBRAS DE CONCRETO SIMPLE

04.03.01

ENCOFRADO Y DESENCOFRADO NORMAL

04.03.02

CONCRETO F'C=175 KG/CM2

05.00.00

DISEO Y PRUEBAS DE CONTROL DE CALIDAD

05.01.00

DISEO DE MEZCLA Y PRUEBAS DE CONCRETO

05.01.01

DISEO DE MEZCLA PARA CONCRETO F'c = 175Kg/cm2

05.01.02

PRUEBA DE RESISTENCIA DE CONCRETO F'c = 175Kg/cm2

06.00.00

IMPREVISTOS DE EMERGENCIA

06.01.00

PROVISIN DE AGUA

06.01.01

BOMBEO DE AGUA

PROGRAMADO
METRADO
COSTO : S/.

PRINCIPAL
Metrado
Monto
18.00
5.94
18.00
24.84

EJECUTADO
MAY. METRADOS
OBRAS ADICIONALES
Metrado
Monto
Metrado
Monto

TOTAL VALORIZADO
Metrado
Monto
18.00
5.94
18.00
24.84

UNID.

CANTIDAD

P. U

P. PARCIAL

m2
m2

18.00
18.00

0.33
1.38

5.94
24.84

m3
m2

8.78
4.95

20.91
3.41

183.59
16.88

8.78
4.95

183.59
16.88

8.78
4.95

183.59
16.88

m2
m3

13.44
2.74

58.32
303.96

783.82
832.85

13.44
2.74

783.82
832.85

13.44
2.74

783.82
832.85

Glb
Glb

1.00
1.00

1,300.00
1,200.00

1,300.00
1,200.00

1.00
1.00

1,300.00
1,200.00

1.00
1.00

1,300.00
1,200.00

DIA

60.00

120.00

7,200.00
307,712.70
41,555.00

60.00

7,200.00
233,429.89
41,555.00

60.00

7,200.00
233,429.89
41,555.00

COSTO DIRECTO

S/.

GASTOS GENERALES ( 13.50448% C.D )


COSTO TOTAL VALORIZADO

S/.
S/.

349,267.70

274,984.89

274,984.89

DEDUCTIVO DE
OBRA
Metrado
Monto