BARI-BRAHMANA-1 Effect on Service(No/ Degrade/Do wn

S.N DOCKET o. No. Problem Description 1 3297 DG PROBLEM 2 3306 A/C PROBLAM 3 3323 SITE VISIT 4 3349 DG PROBLAM 5 3374 BATTERY PROBLAM 6 3424 SITE VISIT 7 3450 MAINS PROBLAM 8 3583 SITE VISIT 9 3635 SITE VISIT 10 3648 MCV FAULTY 11 3663 CONTT FAULTY 12 3668 CONTT FAULTY 13 3736 SITE VISIT 14 3797 SITE VISIT 15 3801 MODULE FAULTY 16 3822 SITE VISIT 17 3842 D G faulty

Fault Categor y Major/ Minor/ Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor

Date Time of Fault reporting by BSNL 11/4/2013 16/4/13 22/4/13 26/4/2013 30/4/2013 10/5/2013 20/5/2013 24/6/2013 8/7/2013 15/7/2013 2o/7/2013 21/7/2013 13/08/2013 5/9/2013 7/9/2013 16/9/2013 21/9/2013

Attended Fault on Date & Time by Bidders 11/4/2013 16/4/13 22/4/13 26/4/2013 30/4/2013 10/5/2013 20/5/2013 24/6/2013 8/7/2013 15/7/2013 2o/7/2013 21/7/2013 13/08/2013 5/9/2013 7/9/2013 16/9/2013 21/9/2013

Total Time taken for Fault rectification 3 hrs 4 hrs 2 hrs 4 hrs 4 hrs 1 hrs 1 hrs 1 hrs 1 hrs 3 hrs 4 hrs 2 hrs 1 hrs 1 hrs 5 hrs 2 hrs 4 hrs

Call Status (Pending/Att ended/Compl eted) COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED

Solution Provided DG CONDUCTOR REPLACED FALT RECTIFIED FILL THE GAS CHANGE THE CAPASTER ENGINE OIL FILL UP 1.5.LTRS FEED PUMP REPLACED BATTERY CHARGER change MODULE REPAIRED CONTT COIL CHANGED TERMINAL CLEAN & FILL THE WATER A C REPAIR REPLACE THE MCVOF POWER PLANT CONTT COIL REPAIR CHANGE THE CONECTER TOP UP MOBIL OIL LUBE OIL TOP UP&CON COIL REPLACED MODULE REPAIR BATTERY WATER FILLED REPLACE THE DIESAL PIPE

Rema rks OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK

BARI BRAHMANA-2 Fault Category Effect on Major/Min Service(No or/Non /Degrade/ Service Down affecting Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Attended Fault on Total Time Date & taken for Time by Fault Bidders rectificatio Engg n 22/4/13 1 hrs 24/4/13 1 hrs 2/5/2013 1 hrs 10/5/2013 1 hrs 18/5/2013 3 hrs 31/5/2013 4 hrs 24/6/2013 2 hrs 10/7/2013 1 hrs 15/7/2013 1 hrs 20/7/2013 5 hrs 13/08/2013 2 hrs 24/8/2013 4 hrs 16/9/2013 1 hrs 18/9/2013 6 hrs 28/9/2013 1 hrs

S.N DOCKET o. No. Problem Description 1 3324 SITE VISIT 2 3338 PIPE LIKEGE 3 3387 DG FCANOPY FAN 4 3423 SITE VISIT 5 3445 MAINS PROBLAM 6 3492 ENGINE OIL LOW 7 3584 SITE VISIT 8 3640 SITE VISIT 9 3647 D G SERVICE 10 3664 A C PROBLAM 11 3737 SITE VISIT 12 3764 CONNECTOR FAULTY 13 3823 SITE VISIT 14 3830 D G SERVICE 15 3857 SITE VISIT

Date Time of Fault reporting by BSNL 22/4/13 24/4/13 2/5/2013 10/5/2013 18/5/2013 31/5/2013 24/6/2013 10/7/2013 15/7/2013 20/7/2013 13/08/2013 24/8/2013 16/9/2013 18/9/2013 28/9/2013

Call Status (Pending/Atten ded/Completed ) completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed

Solution Provided LIGHT ROD REPLACED FUEL PIPE CHANGED CHANGE THE CONDENSOR ENGINE OIL FILL UP 1.5.LTRS MAINS COND.COIL CHANGE 2 LITER ENGINE OIL FILLED TERMINAL CLEAN & FILL THE WATER BATTERY TERMINAL REPLACED & WATER FILLED OIL & FILLTERS CHANGED MCV REPLACED BATTERY REPLACED CONNECTOR COIL REPLACED BATTERY WATER FILLED D G SERVICE OIL FILTERS CHANGE 1430 HRS BATTERY WATER FILLED

Rem arks OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK

ANCHOR HOUSE Fault Category Effect on Major/Mi Service(No/ nor/Non Degrade/D Service own affecting Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Attended Fault on Date & Total Time Time by taken for Bidders Fault Engg rectification 10/4/2013 1 hrs 14/4/13 1 hrs 23/4/13 1 hrs 23/4/13 3 hrs 25/4/13 4 hrs 27/4/2013 2 hrs 29/4/2013 2 hrs 6/5/2013 3 hrs 8/5/2013 4 hrs 9/5/2013 2 hrs 12/5/2013 4 hrs 17/5/2013 4 hrs 18/5/2013 1 hrs 21/5/2013 1 hrs 7/6/2013 1 hrs 27/6/2013 1 hrs 7/7/2013 3 hrs 19/7/20123 4 hrs 20/7/2013 2 hrs 6/8/2013 1 hrs 8/9/2013 1 hrs 10/9/2013 5 hrs 18/9/2013 2 hrs 22/9/2013 4 hrs

S.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 26

DOCKET No. 3295 3304 3334 3337 3343 3360 3371 3400 3408 3417 3428 3442 3444 3453 3515 3590 3631 3657 3666 3711 3806 3811 3831 3843

Problem Description DG SERVICE DUE A/C PROBLAM SITE VISIT mains problam DG PROBLAM MAIN CONN PROBLAM AVR PROBLAM BATTERY PROBLAM BATTERY PROBLAM SITE VISIT DG PROBLAM DG PROBLAM DG BATTERY PROBLEM SELF PROBLAM SITE VISIT D.G PROBLAM SITE VISIT MODULE FAULTY MADULE FAULTY SITE VISIT SITE VISIT D G PROBLAM SITE VISIT D G BATTERY PROBLAM

Date Time of Fault reporting by BSNL 10/4/2013 14/4/13 23/4/13 23/4/13 25/4/13 27/4/2013 29/4/2013 6/5/2013 8/5/2013 9/5/2013 12/5/2013 17/5/2013 18/5/2013 21/5/2013 7/6/2013 27/6/2013 7/7/2013 19/7/20123 20/7/2013 6/8/2013 8/9/2013 10/9/2013 18/9/2013 22/9/2013

Call Status (Pending/Att ended/Comp leted) COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED

Solution Provided OIL AND FILTER CHANGE AT 662 Hrs PHAUSE PROBLAM A/C CONNECTION SHIFT TO ANOTHER PHASE V BELT CHANGE((A43) Red FAUSE not coming from pole INFORM TTA DG TERMINATOR CLEANED CHANGE THE CONNECTOR BY PASS THE SITE & REPAIR 1 MODULE BATTER TERMINAL CHANGE REPAIR THE CHARGER BATTERY TERMINAL REPLACED NEW BATTERY FITTED FOUND OK NEW BATTERY FITTED REPAIRED THE SELF LIGHT ROD REPLACED AIR FILTER REPLACMENT FOUND OK REPAIR THE MODULE REPAIR THE MODULE TWO NOS MODULE REPAIR MODULE REPAIR WIRE REPLACE SITE OK CHANGE THE BATTERY

Remarks ok OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK

APNA VIHAR Fault Category Effect on Major/Mi Service(N nor/Non o/Degrad Service e/Down affecting Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Attended Fault on Date & Time by Bidders Engg 25/4/13 9/5/2013 9/6/2013 17/6/2013 22/7/2013 6/8/2013 20/8/2013 16/9/2013 21/9/2013 3/10/2013

S.No. 1 2 3 4 5 6 7 8 9 10

DOCKET No. 3344 3415 3523 3550 3670 3714 3757 3824 3841 3868

Problem Description SITE VISIT SITE VISIT MAINS PROBLEM SITE VISIT SITE VISIT SITE VISIT MCB FAULTY SITE VISIT A C FAULTY CONNECTER FAULTY

Date Time of Fault reporting by BSNL 25/4/13 9/5/2013 9/6/2013 17/6/2013 22/7/2013 6/8/2013 20/8/2013 16/9/2013 21/9/2013 3/10/2013

Total Time taken for Fault rectification 3 hrs 4 hrs 2 hrs 2 hrs 3 hrs 4 hrs 2 hrs 4 hrs 4 hrs 1 hrs

Call Status (Pending/Att ended/Comp leted) completed completed completed completed completed completed completed completed completed completed

Solution Provided FUSE BURNT & REPLACED MAINS CONACTOR COIL REPLACED CONTT COIL CHANGED TERMINAL CLEAN & FILL THE WATER MODULE REPAIR MCB REPLACED BATTERY CRARGER FITTED REPAIR THE A C GAS FILLED REPLACE THE COIL

Remarks OK OK OK OK OK OK OK OK OK OK

BAHU-FORT Fault Category Effect on Major/Mino Service(No/ r/Non Degrade/Do Service wn affecting Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Attended Date Time of Fault on Fault Date & Time reporting by by Bidders BSNL Engg 21/4/2013 21/4/2013 29/4/2013 29/4/2013 3/5/2013 3/5/2013 8/5/2013 8/5/2013 21/5/2013 21/5/2013 22/5/2013 22/5/2013 28/5/2013 28/5/2013 6/6/2013 6/6/2013 11/6/2013 13/6/2013 23/6/2013 29/6/2013 16/7/2013 4/8/2013 12/8/2013 16/8/2013 18/8/2013 23/8/2013 25/8/2013 1/9/2013 2/9/2013 6/9/2013 9/9/2013 17/9/2013 18/9/2013 19/9/2013 20/9/2013 26/9/2013 11/6/2013 13/6/2013 23/6/2013 29/6/2013 16/7/2013 4/8/2013 12/8/2013 16/8/2013 18/8/2013 23/8/2013 25/8/2013 1/9/2013 2/9/2013 6/9/2013 9/9/2013 17/9/2013 18/9/2013 19/9/2013 20/9/2013 26/9/2013

DOCKET S.No. No. Problem Description 1 3322 SITE VISIT 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 3366 POWER PLANT WIRE BURNT 3393 MODULE PROBLAM 3410 BATTERY PROBLAM 3454 SITES VISIT 3458 BATTERY CHARGER FAULTY 3482 BATTERY PROBLAM 3511 SITE VISIT 3529 BATTERY PROBLAM 3538 3572 3595 3650 3704 3730 DG PROBLEM MODULE FAULTY POWER PLANT MODULE FAULTY SITE VISIT SITE VISIT

3746 MODULE FAULTY 3752 MODULE FAULTY 3763 MODULE FAULTY 3767 MODULE FAULTY 3787 MAINS PROBLEM 3792 DG PROBLEM 3798 MAINS PROBLAM 3807 MAINS PROBLAM 3827 MODULE FAULTY 3832 SITE VISIT 3835 MODULE REPAIR 3837 LVD PROBLAM 3854 MODULE FAULTY

Total Time taken for Fault rectification 1 hrs 1 hrs 1 hrs 3 hrs 4 hrs 2 hrs 2 hrs 3 hrs 4 hrs 2 hrs 4 hrs 4 hrs 1 hrs 1 hrs 1 hrs 1 hrs 3 hrs 4 hrs 2 hrs 1 hrs 1 hrs 5 hrs 2 hrs 4 hrs 1 hrs 1 hrs 5 hrs 2 hrs

Call Status (Pending/Att ended/Comp leted) Solution Provided Completed TERMINAL CLEAN & FILL THE WATER Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed REPAIR THE WIRING & TAPPING REPAIR THE MODULE NEW BATTERY CHARGER FITTED FOUND OK REPAIR THE BATTERY CHARGER BATTERY CHARGER REPLACED TERMINAL CLEAN & FILL THE WATER NEW BATTERY FITTED CONTT COIL CHANGED MODULE REPAIRED NEW POWER PLANT INSTALED REPAIR THE MODULE MODULE REPAIR TOP UP MOBIL OIL MODULE REPAIR MODULE REPAIR MODULE FAULTY MODULE REPAIR CONNECTOR COIL REPLACED CHANGE OVER REPLACED NEW FITTED SITE OK new change over switch fitted REPAIR THE MODULE TOP UP MOBIL OIL REPAIR THE MODULE REPAIR THE LVD REPAIR THE MODULE

Remarks OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK

BAKSHI NAGAR Fault Category Effect on Major/Mi Service(No/ nor/Non Degrade/Do Service wn affecting Minor Minor Minor Minor Minor Minor Total Time taken for Fault rectificati on 3 hrs 1 hrs 1 hrs 1 hrs 1 hrs 1 hrs

S.No. 1 2 3 4 5 6

DOCKET No. 3312 3368 3381 3495 3609 3749

Problem Description DG SERVICE DUE SITE VISIT SITES VISIT SITE VISIT SITE VISIT SITE VISIT

Date Time of Fault reporting by BSNL 20/4/13 29/4/2013 1/5/2013 1/6/2013 3/7/2013 17/8/2013

Attended Fault on Date & Time by Bidders Engg 20/4/13 29/4/2013 1/5/2013 1/6/2013 3/7/2013 17/8/2013

Call Status (Pending/Atte nded/Complet ed) COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED

Solution Provided OIL & FILLTERS CHANGE AT 707 hrs TERMINAL CLEAN & FILL THE WATER SITE OK BATTERY WATER FILLED

Rem arks OK OK OK OK OK OK

BANTALAB Fault Category Effect on Major/Min Service(No or/Non /Degrade/ Service Down affecting Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor

S.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DOCKET No. 3352 3383 3462 3465 3475 3488 3513 3525 3579 3589 3600 3703 3729 3765 3844

Problem Description SITE VISIT SITES VISIT MAINS PROBLEM SITES VISIT MAINS PROBLEM BATTERY CHARGER FAULTY MAINS PROBLEM MAINS PROBLEM SITE VISIT MAINS PROBLEM SITE VISIT D G PROBLAM SITE VISIT D.G PROBLAM MADULE FAULTY

Date Time of Fault reporting by BSNL 19/4/2013 1/5/2013 23/5/2013 23/5/2013 25/5/2013 3O/5/2013 6/6/2013 10/6/2013 24/6/2013 26/6/2013 1/7/2013 2/8/2013 10/8/2013 24/8/2013 23/9/2013

Attended Fault on Date & Time by Bidders Engg 19/4/2013 1/5/2013 23/5/2013 23/5/2013 25/5/2013 3O/5/2013 6/6/2013 10/6/2013 24/6/2013 26/6/2013 1/7/2013 2/8/2013 10/8/2013 24/8/2013 23/9/2013

Total Time taken for Fault rectification 1 hrs 1 hrs 1 hrs 3 hrs 4 hrs 2 hrs 2 hrs 3 hrs 4 hrs 2 hrs 4 hrs 4 hrs 1 hrs 1 hrs 1 hrs

Call Status (Pending/Atte nded/Comple ted) completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed

Solution Provided OK TAPING THE WIRING CONTT COIL CHANGED LIGHT ROD REPLACED CONTT COIL CHANGED REPAIR THE BATTERY CHARGER CONTT COIL CHANGED AVR FAULTY TERMINAL CLEAN & FILL THE WATER ok MODULE REPAIR CONTT REPLACED SITE OK CONNECTOR COIL REPLACED REPAIR THE MODULE

Remarks OK OK OK OK OK OK OK OK OK OK OK OK OK OK

BATRA Fault Category Effect on Major/Mi Service(N nor/Non o/Degrad Service e/Down affecting Minor Minor Minor Minor Minor Minor Minor Attended Fault on Date Time Date & of Fault Time by reporting by Bidders BSNL Engg 21/4/2013 21/4/2013 4/5/2013 4/5/2013 21/5/2013 21/5/2013 21/6/2013 21/6/2013 12/7/2013 12/7/2013 23/7/2013 23/7/2013 17/8/2013 17/8/2013

S.No. 1 2 3 4 5 6 7

DOCKET No. 3321 3394 3455 3566 3643 3675 3750

Problem Description SITE VISIT 4 POLL MCV FAULTY SITES VISIT SITE VISIT MODULE FAULTY SITE VISIT SITE VISIT

Total Time taken for Fault rectification 1 hrs 3 hrs 4 hrs 2 hrs 2 hrs 3 hrs 4 hrs

Call Status (Pending/At tended/Co mpleted) completed completed completed completed completed completed completed

Solution Provided TERMINAL CLEAN & FILL THE WATER REPLACED THE MCV LIGHT ROD REPLACED TERMINAL CLEAN & FILL THE WATER REPAIR THE MODULE OK A.C LEAKING DONE

Remarks OK OK OK OK OK OK OK

BHAGWATI NAGAR

DOCKET S.No. No. Problem Description 1 3369 SITE VISIT 2 3390 MODULE FAULTY 3 3398 SITE VISIT 4 3402 MODULE FAULTY 5 3496 SITE VISIT 6 3610 SITE VISIT 7 3758 D G STARTING PROBLAM 8 3759 MODULE FAULTY 9 3785 SITE VISIT 10 3790 RECTIFIER PROBLEM 11 3861 CONNECTER FAULTY

Fault Category Effect on Major/M Service(No/ inor/Non Degrade/D Service own affecting Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor

Date Time of Fault reporting by BSNL 29/4/2013 3/5/2013 5/5/2013 6/5/2013 1/6/2013 3/7/2013 20/8/2013 21/8/2013 31/8/2013 2/9/2013 30/9/2013

Attended Fault on Date & Time by Bidders Engg 29/4/2013 3/5/2013 5/5/2013 6/5/2013 1/6/2013 3/7/2013 20/8/2013 21/8/2013 31/8/2013 2/9/2013 30/9/2013

Total Time taken for Fault rectification 1 hrs 1 hrs 1 hrs 3 hrs 4 hrs 2 hrs 2 hrs 3 hrs 4 hrs 2 hrs 4 hrs

Call Status (Pending/At tended/Com pleted) completed completed completed completed completed completed completed completed completed completed completed

Solution Provided FOUND OK REPALR THE 1 NO OF MODULE BATTERY CHARGER FUSE CHANGE REPAIR THE MODULE FOUND OK TERMINAL CLEANED & WATER FILLED WIRE REPLACED MADULE REPAIR D G SERVICE OIL & FILLTER CHANGE 936 HRS REPAIR REPLACE THE COIL

Remarks OK OK OK OK OK OK OK OK OK OK OK

BHAWANI NAGAR Fault Effect on Category Service(No/ Major/M Degrade/Do inor/Non wn Service Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor

DOCKET S.No. No. Problem Description 1 3384 SITES VISIT 2 3395 BATTERY CHARGER FAULTY 3 3403 DG SERVICE DUE 4 3490 MODULE FAULTY 5 3494 MODULE FAULTY 6 3546 MODULE FAULTY 7 3578 SITE VISIT 8 3591 D.G PROBLAM 9 3613 SITE VISIT 10 3773 SITE VISIT 11 3845 MADULE FAULTY 12 3849 MADULE FAULTY 13 3852 MODULE FAULTY 14 3867 MODULE FAULTY

Date Time of Fault reporting by BSNL 1/5/2013 4/5/2013 6/5/2013 31/5/2013 1/6/2013 16/6/2013 24/6/2013 27/6/2013 3/7/2013 27/8/2013 23/9/2013 25/9/2013 26/9/2013 3/10/2013

Attended Fault on Date & Time by Bidders Engg 1/5/2013 4/5/2013 6/5/2013 31/5/2013 1/6/2013 16/6/2013 24/6/2013 27/6/2013 3/7/2013 27/8/2013 23/9/2013 25/9/2013 26/9/2013 3/10/2013

Total Time taken for Fault rectification 1 hrs 1 hrs 1 hrs 3 hrs 4 hrs 2 hrs 2 hrs 3 hrs 4 hrs 2 hrs 4 hrs 4 hrs 1 hrs 1 hrs

Call Status (Pending/Atten ded/Completed ) completed completed completed completed completed completed completed completed completed completed completed completed completed completed

Solution Provided LIGHT ROD REPLACED REPLACED THE BATTERY CHARGER OIL & FILLTERS CHANGE AT 1196 HRS TWO MODULE FITTED MODULE REPAIRED MODULE REPAIRED TUBE ROD REPLACED NEW BATTERY FITTED MODULE REPAIR CONNECTOR COIL REPLACED REPAIR THE MODULE REPAIR THE MODULE REPAIR THE MODULE REPAIR THE MODULE

Remarks OK OK OK OK OK OK OK OK OK OK OK OK OK OK

BSF
Fault Category Effect on Major/Mi Service(No nor/Non /Degrade/ Service Down affecting Minor Minor Minor Minor Minor

S.No. 1 2 3 4 5

DOCKET No. 3288 3431 3576 3611 3780

Problem Description SITE VISIT SITES VISIT SITE VISIT SITE VISIT SITE VISIT

Date Time of Fault reporting by BSNL 5/4/2013 13/5/2013 23/6/2013 3/7/2013 29/8/2013

Attended Fault on Date & Time by Bidders Engg 5/4/2013 13/5/2013 23/6/2013 3/7/2013 29/8/2013

Total Time taken for Fault rectification 1 hrs 2.5 hrs 3 hrs 3 hrs 3 hrs

Call Status (Pending/Atte nded/Complet ed) COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED

Solution Provided MODULE REPAIR MODULE REPAIR SITE OK SITE OK MODULE REPAIR

Remarks OK OK OK OK OK

BUN Fault Effect on Category Service(No/ Major/Minor Degrade/D /Non Service own affecting MINOR MINOR MINOR MINOR

S.No. 1 2 3 4

DOCKET No. 3361 3456 3565 3751

Problem Description SITE VISIT SITES VISIT SITE VISIT SITE VISIT

Date Time of Fault reporting by BSNL 27/4/2013 21/5/2013 21/6/2013 17/8/2013

Attended Fault on Date & Time by Bidders Engg 27/4/2013 21/5/2013 21/6/2013 17/8/2013

Total Time taken for Fault rectification 2 hrs 5 hrs 6 hrs 4 hrs

Call Status (Pending/Atte nded/Complet ed) completed completed completed completed

Solution Provided SITE OK LIGHT ROD REPLACED TERMINAL CLEAN & FILL THE WATER BATTERY WATER FILLED

Remarks OK OK OK OK OK

CHATTHA Fault Catego ry Major/ Minor/ Effect on Non Service(N Service o/Degrad affecti e/Down ng Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor

S.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

DOCKET No. 3305 3328 3421 3425 3443 3477 3503 3507 3509 3517 3524 3535 3567 3674 3685 3740 3789

Problem Description MAINS PROBLAM SITE VISIT SITE VISIT BATTERY PROBLAM MODULE PROBLAM MAINS PROBLEM MAINS PROBLAM MAINS PROBLEM MODULE FAULTY MODULE PROBLAM MODULE FAULTY MODULE FAULTY SITE VISIT SITE VISIT CONTT FAULTY SITE VISIT DG SERVICE DUE

Date Time of Fault reporting by BSNL 16/4/13 22/4/13 10/5/2013 11/5/2013 18/5/2013 27/5/2013 3/6/2013 4/6/2013 5/6/2013 8/6/2013 10/6/2013 12/6/2013 21/6/2013 23/7/2013 27/7/2013 14/08/2013 2/9/2013

Attended Fault on Date & Time by Bidders Engg 16/4/13 22/4/13 10/5/2013 11/5/2013 18/5/2013 27/5/2013 3/6/2013 4/6/2013 5/6/2013 8/6/2013 10/6/2013 12/6/2013 21/6/2013 23/7/2013 27/7/2013 14/08/2013 2/9/2013

Total Time taken for Fault rectification 3 hrs 4 hrs 2 hrs 2 hrs 3 hrs 4 hrs 2 hrs 4 hrs 4 hrs 1 hrs 1 hrs 1 hrs 1 hrs 3 hrs 4 hrs 2 hrs 1 hrs

Call Status (Pending/At tended/Co mpleted) completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed

Solution Provided MAINS CONDUCTORCOIL REPLACED MAINS CONDUCTORCOIL REPLACED ENGINE OIL FILL UP 1.5.LTRS REPLACE THE BATTRY CHARGER&CLEAN THE TERMINAL REPAIR THE MODULE CONTT COIL CHANGED MAINS CONTT COIL REPLACED CONTT COIL CHANGED MODULE REPAIRED MODULE REPAIRED MODULE REPAIRED MODULE REPAIRED TERMINAL CLEAN & FILL THE WATER MODULE REPAIR CONTT REPAIR MODULE REPAIR 2500 HRS

Remarks OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK

CHINAR WIRE Fault Category Effect on Major/Mi Service(N nor/Non o/Degrad Service e/Down affecting Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor

S.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

DOCKET No. 3309 3336 3438 3448 3463 3468 3514 3568 3630 3644 3671 3731 3779 3786 3794 3829 3834

Problem Description MODULE FAULTY SITE VISIT MAINS PROBLAM DG PROBLAM SITES VISIT MAINS PROBLEM SITE VISIT MODULE FAULTY SITE VISIT D G PROBLAM SITE VISIT SITE VISIT CHARGER FAULTY DG PROBLEM D G STARTING PROBLAM MCV FAULTY MODULE REPAIR

Date Time of Fault reporting by BSNL 18/4/13 23/4/13 15/5/2013 20/5/2013 23/5/2013 24/5/2013 7/6/2013 22/6/2013 7/7/2013 12/7/2013 22/7/2013 12/8/2013 29/8/2013 1/9/2013 3/9/2013 18/9/2013 19/9/2013

Attended Fault on Date & Time by Bidders Engg 18/4/13 23/4/13 15/5/2013 20/5/2013 23/5/2013 24/5/2013 7/6/2013 22/6/2013 7/7/2013 12/7/2013 22/7/2013 12/8/2013 29/8/2013 1/9/2013 3/9/2013 18/9/2013 19/9/2013

Total Time taken for Fault rectification 5 hrs 2 hrs 2 hrs 2 hrs 3 hrs 4 hrs 2 hrs 4 hrs 4 hrs 1 hrs 1 hrs 1 hrs 1 hrs 3 hrs 4 hrs 2 hrs 1 hrs

Call Status (Pending/Att ended/Compl eted) completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed

Solution Provided REPAIR THE MODULE A/C FILL THE GAS A/C, CONDUCTOR COIL CHANGED STARTING SWITCH REPLACED TERMINAL CLEAN & FILL THE WATER MAINS & DG CONTT COIL CHANGED ENGINE OIL FILL UP 1.5.LTRS REPAIR THE MODULE REPLACE G C U & HOUR METER NEW FITTED D G OK OK MODULE REPAIR MODULE REPAIR CHARGER REPLACED CHARGER REPLACED MCV REPLACED REPAIR THE MODULE

Remarks OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK

CTSD Fault Category Effect on Major/Mi Service(N nor/Non o/Degrad Service e/Down affecting Minor Minor Minor Minor Minor Minor Minor Attended Fault on Date & Time by Bidders Engg 29/4/2013 5/8/2013 9/5/2013 1/6/2013 2/7/2013 20/7/2013 27/8/2013 Total Time taken for Fault rectificati on 1 hrs 1 hrs 1 hrs 1 hrs 3 hrs 4 hrs 2 hrs

S.No. 1 2 3 4 5 6 7 8

DOCKET No. 3370 3707 3413 3497 3608 3660 3774

Problem Description SITE VISIT WIRING OF PANEL BURNT DG SERVICE DUE SITE VISIT SITE VISIT DG PROBLEM SITE VISIT

Date Time of Fault reporting by BSNL 29/4/2013 5/8/2013 9/5/2013 1/6/2013 2/7/2013 20/7/2013 27/8/2013

Call Status (Pending/Attend ed/Completed) completed completed completed completed completed completed completed

Solution Provided OK NEW WIRING FITTED OIL & FILTER CHANGE AT 2545 HRS OK TERMINAL CLEANED & WATER FILLED SELECTOR SWITCH REPAIR CHARGER REPAIR

Remarks OK OK OK OK OK OK OK OK OK

DC OFFICE Fault Category Effect on Major/Mi Service(N nor/Non o/Degrad Service e/Down affecting Minor Minor Minor Minor Minor Minor Minor Minor Attended Fault on Date & Time by Bidders Engg 30/4/2013 14/5/2013 27/5/2013 4/6/2013 18/6/2013 1/7/2013 4/7/2013 12/9/2013

S.No. 1 2 3 4 5 6 7 8

DOCKET No. 3377 3436 3480 3505 3557 3597 3614 3818

Problem Description SITE VISIT SITES VISIT MCB FAULTY MCB FAULTY SITE VISIT MADULE FAULTY SITE VISIT SITE VISIT

Date Time of Fault reporting by BSNL 30/4/2013 14/5/2013 27/5/2013 4/6/2013 18/6/2013 1/7/2013 4/7/2013 12/9/2013

Total Time taken for Fault rectification 1HOR 1HOR 3HOR 3HOR 1HOR 5HOR 1HOR 1HOR

Call Status (Pending/Att ended/Comp leted) completed completed completed completed completed completed completed completed

Solution Provided TERMINAL CLEAN & FILL THE WATER MODULE REPAIRED 4 POLE MCV 63 Amp NEW FITTED 4 POLE MCV 63 Amp NEW FITTED REPAIR THE MADULE MODULE REPAIR MODULE REPAIR

Remarks OK OK OK OK OK OK OK OK

DIGIANA Fault Category Effect on Major/Mi Service(N nor/Non o/Degrad Service e/Down affecting Minor Minor Minor Minor Minor Minor Attended Fault on Date & Time by Bidders Engg 23/4/13 21/5/2013 19/6/2013 29/7/2013 16/8/2013 17/9/2013

S.No. 1 2 3 4 5 6

DOCKET No. 3335 3452 3559 3692 3745 3826

Problem Description SITE VISIT SITE VISIT SITE VISIT SITE VISIT SITE VISIT SITE VISIT

Date Time of Fault reporting by BSNL 23/4/13 21/5/2013 19/6/2013 29/7/2013 16/8/2013 17/9/2013

Total Time taken for Fault rectification 1HOURS 3HOURS 3HOURS 1HOURS 2HOURS 4HOURS

Call Status (Pending/At tended/Co mpleted) completed completed completed completed completed completed

Solution Provided SITE OK TERMINAL CLEAN & FILL THE WATER TERMINAL CLEAN & FILL THE WATER BATTERY WATER FILLED EXHAST FAN CAPASTER REPLACE

Remarks OK OK OK OK OK OK

DURGA NAGAR Fault Category Major/Mi Effect on nor/Non Service(No/De Service grade/Down affecting Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Attended Fault on Date & Time by Bidders Engg 9/4/2013 11/4/2013 19/4/2013 27/4/2013 1/5/2013 2/5/2013 13/5/2013 7/6/2013 8/6/2013 16/6/2013 24/6/2013 27/6/2013 1/7/2013 19/8/2013 11/9/2013

S.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

DOCKET No. 3292 3298 3353 3358 3382 3386 3433 3516 3519 3547 3580 3592 3601 3756 3813

Problem Description MODULE FAULTY MODULE FAULTY SITE VISIT MODULE FAULTY MAINS PROBLEM DG SERVICE DUE SITES VISIT POWER PLANT INSTALLED MAINS PROBLEM DG PROBLEM SITE VISIT D.G PROBLAM SITE VISIT SITE VISIT dg problam

Date Time of Fault reporting by BSNL 9/4/2013 11/4/2013 19/4/2013 27/4/2013 1/5/2013 2/5/2013 13/5/2013 7/6/2013 8/6/2013 16/6/2013 24/6/2013 27/6/2013 1/7/2013 19/8/2013 11/9/2013

Total Time taken for Fault rectification 5 hrs 5 hrs 2 hrs 2 hrs 3 hrs 4 hrs 2 hrs 4 hrs 4 hrs 1 hrs 1 hrs 2 hrs 4 hrs 4 hrs 1 hrs

Call Status (Pending/At tended/Co mpleted) completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed

Solution Provided REPAIR THE MODULE REPAIR THE MODULE TERMINAL CLEAN & FILL THE WATER REPAIR MODULE FAUSE CHANGE SITE OK OIL& FILTERS CHANGE (3555) hrs TERMINAL CLEAN & FILL THE WATER PP INSTALLED CONTT COIL CHANGED CONTT COIL CHANGED TUBE ROD REPLACED NEW BATTERY CHARGER FITTED SITE OK BATTERY WATER FILLED new battery fitted

Remarks OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK

S.No. 1 2 3 4 5 6 7 8 9 10 11

Fault Catego ry Effect on Major/ Service(N Minor/ DOCKET Problem o/Degrade Non No. Description /Down Service 3290 DG PROBLEM Minor 3348 SITE VISIT Minor 3472 SITES VISIT Minor 3489 MAINS PROBLAM Minor 3537 MAINS PROBLEM Minor 3561 SITE VISIT Minor 3637 site visit Minor 3761 SITE VISIT Minor 3839 SITE VISIT Minor
FRUIT MANDI

Total Attended Time Fault on taken Date Time Date & for of Fault Time by Fault reporting by Bidders rectific BSNL Engg ation 8/4/2013 8/4/2013 5 hrs 25/4/13 25/4/13 2 hrs 25/5/2013 25/5/2013 2 hrs 30/5/2013 30/5/2013 2 hrs 13/6/2013 13/6/2013 3 hrs 20/6/2013 20/6/2013 4 hrs 9/7/2013 9/7/2013 2 hrs
4 hrs

20/9/2013

20/9/2013 4 hrs

Call Status (Pending/At tended/Co mpleted) completed completed completed completed completed completed completed completed completed

Solution Provided FUSE BURNT & REPLACED LIGHT ROD REPLACED BATTERY WATER FILLED MCV THREE POLE REPLACED,CONTT COIL REPLACED& TAPPING CONTT COIL CHANGED TERMINAL CLEAN & FILL THE WATER battery water filled MODULE REPAIR SITE OK

Remarks ok ok ok ok ok ok ok ok ok ok

GOL GUJRAL Fault Categor Effect y on Major/ Service( Minor/N No/Degr on ade/Do Service wn affecting Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor

DOCKET S.No. No. Problem Description 1 3302 DG PROBLAM 2 3310 dG PROBLEM AC 3 3317 SITE VISIT 4 3333 MODULE FAULTY 5 3385 DG SERVICE DUE 6 3464 SITES VISIT 7 3471 BATTERY PROBLAM 8 3506 DG PROBLEM 9 3582 MAINS PROBLEM 10 3586 SITE VISIT 11 3629 SITE VISIT 12 3642 CONACTOR FAULTY 13 3669 D G PROBLAM 14 3678 MADULE FAULTY 15 3698 D G PROBLAM 16 3741 SITE VISIT 17 18

Date Time of Fault reporting by BSNL 13/4/13 20/4/13 21/4/2013 23/4/13 2/5/2013 23/5/2013 24/5/2013 4/6/2013 24/6/2013 25/6/2013 6/7/2013 11/7/2013 21/7/2013 24/7/2013 1/8/2013 14/08/2013

Attended Fault on Date & Time by Bidders Engg 13/4/13 20/4/13 21/4/2013 23/4/13 2/5/2013 23/5/2013 24/5/2013 4/6/2013 24/6/2013 25/6/2013 6/7/2013 11/7/2013 21/7/2013 24/7/2013 1/8/2013 14/08/2013

Total Time taken for Fault rectification 5 hrs 2 hrs 2 hrs 2 hrs 3 hrs 4 hrs 2 hrs 4 hrs 4 hrs 5 hrs 2 hrs 2 hrs 2 hrs 3 hrs 4 hrs 2 hrs

Call Status (Pending/Atte nded/Comple ted) completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed

Solution Provided DG OK ONLY GCU OFF DUE TO OWNER DID NOT ON THE GCU DG OK ONLY GCU OFF due to owner TERMINAL CLEAN & FILL THE WATER REPAIR MODULE OIL&FILTERS CHANGE (437) hrs REPLACE THE TERMINALS&FILL THE BATTERY WATER CHARGER REPAIR FOUND OK CONNECTOR REPAIR MODULE REPAIRED CONACTOR REPAIR REWIND THE ALTERNATER MADULE REPAIR CHARGER WIRE TITEND MODULE REPAIR

Remarks ok ok ok ok ok ok ok ok ok ok ok ok ok ok ok ok

GREATER KALASH Fault Category Effect on Major/Mi Service(N nor/Non o/Degrad Service e/Down affecting Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Attended Fault on Date & Time by Bidders Engg 10/4/2013 18/4/13 25/4/13 28/4/2013 30/4/2013 8/5/2013 9/5/2013 14/5/2013 15/5/2013 30/5/13 18/6/2013 25/6/2013 28/6/2013 20/7/2013 1/8/2013 6/8/2013 9/8/2013 26/8/2013 10/9/2013 19/9/2013 25/9/2013

S.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

DOCKET No. 3294 3308 3345 3362 3375 3409 3416 3437 3439 3487 3554 3588 3594 3646 3665 3697 3713 3723 3772 3812 3833 3850

Problem Description DG SERVICE DUE MODULE FAULTY SITE VISIT MAINS & DG CONN. FAULTY MODULE PROBLAM DG PROBLAM SITE VISIT MODULE PROBLAM MODULE PROBLAM MAINS PROBLAM SITE VISIT MAINS PROBLEM D.G .PROBLAM SITE VISIT MADULE FAULTY MADULE FAULTY SITE VISIT L V D FAULTY CONNECTOR FAULTY SITE VISIT CONACTER FAULTY A.C.FAULTY

Date Time of Fault reporting by BSNL 10/4/2013 18/4/13 25/4/13 28/4/2013 30/4/2013 8/5/2013 9/5/2013 14/5/2013 15/5/2013 30/5/13 18/6/2013 25/6/2013 28/6/2013 20/7/2013 1/8/2013 6/8/2013 9/8/2013 26/8/2013 10/9/2013 19/9/2013 25/9/2013

Total Time taken for Fault rectification 3 hrs 4 hrs 2 hrs 2 hrs 3 hrs 4 hrs 2 hrs 4 hrs 4 hrs 1 hrs 1 hrs 1 hrs 1 hrs 3 hrs 4 hrs 2 hrs 1 hrs 1 hrs 1 hrs 3 hrs 4 hrs 2 hrs

Call Status (Pending/At tended/Com pleted) completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed

Solution Provided OIL AND FILTER CHANGE AT 864 Hrs REPAIR THE MODULE BATTERY TERMINAL REPLACED MAINS CONDUCTOR &DG,S COIL REPLACED REPLACED THE MODULE REPAIR THE CONNECTER COIL BATTERY LEAD & TERMINAL REPLACED CHANGE THE MODUL REPAIR THE MODULE PANEL FUSE FITTED TERMINAL CLEAN & FILL THE WATER NEW CONNEC TOR REPLACED ARMATURE REPAIRED REPAIR THE MODULE MADULE REPAIR TWO NOS BATTERY TERMINAL CLEAN & FILL THE WATER L V D REPAIR CONNECTOR COIL REPLACED BATTERY WATER FILLED REPAIR THE CONNECTER GAS FLLED

Remarks OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK

HOTEL SAVOY Fault Category Effect on Major/Mi Service(N nor/Non o/Degrad Service e/Down affecting Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor

S.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14

DOCKET No. 3325 3418 3526 3598 3616 3645 3649 3653 3656 3738 3753 3762 3768 3791

Problem Description SITE VISIT SITES VISIT SITE VISIT MADULE FAULTY SITE VISIT SITE VISIT MODULE FAULTY MODULE FAULTY MODULE FAULTY MODULE FAULTY SITE VISIT D G STARTING PROBLAM MODULE FAULTY DG PROBLEM

Date Time of Fault reporting by BSNL 22/4/13 9/5/2013 10/6/2013 1/7/2013 4/7/2013 13/7/2013 15/7/2013 17/7/2013 18/7/2013 14/8/2013 18/8/2013 23/8/2013 25/8/2013

Attended Fault on Date & Time by Bidders Engg 22/4/13 9/5/2013 10/6/2013 1/7/2013 4/7/2013 13/7/2013 15/7/2013 17/7/2013 18/7/2013 14/8/2013 18/8/2013 23/8/2013 25/8/2013

Total Time taken for Fault rectification 2 hrs 2 hrs 2 hrs 1 hrs 3 hrs 4 hrs 1 hrs 1 hrs 2 hrs 3 hrs 2 hrs 3 hrs 3 hrs 4 hrs

Call Status (Pending/Att ended/Comp leted) completed completed completed completed completed completed completed completed completed completed completed completed completed completed

Solution Provided LIGHT ROD REPLACED BATTERY TERMINAL REPLACED REPAIR THE MADULE SITE OK MADULE REPAIR REPAIR THE MODULE REPAIR THE MODULE REPAIR THE MODULE TWO MODULE REPAIR BATTERY WATER FILLED 3 MODULE REPAIR BUT BATTERY BANK FAULTY OK

Remarks OK OK OK OK OK OK OK OK OK OK OK OK OK OK

I-Q PLOT Fault Category Effect on Major/Mi Service(N nor/Non o/Degrad Service e/Down affecting Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Attended Fault on Date & Time by Bidders Engg 7/8/2013 12/8/2013 21/4/2013 10/5/2013 24/5/2013 20/6/2013 25/6/2013 1/7/2013 11/7/2013 18/7/2013

S.No. 1 2 3 4 5 6 7 8 9 10

DOCKET No. 3715 3732 3320 3420 3467 3562 3585 3596 3641 3655

Problem Description D G PROBLAM SITE VISIT SITE VISIT SITES VISIT SITES VISIT SITE VISIT SITE VISIT D.G .PROBLAM MODULE FAULTY SITE VISIT

Date Time of Fault reporting by BSNL 7/8/2013 12/8/2013 21/4/2013 10/5/2013 24/5/2013 20/6/2013 25/6/2013 1/7/2013 11/7/2013 18/7/2013

Total Time taken for Fault rectification 4 hrs 1 hrs 3 hrs 4 hrs 1 hrs 1 hrs 2 hrs 3 hrs 2 hrs 3.5 hrs

Call Status (Pending/Att ended/Com pleted) completed completed completed completed completed completed completed completed completed completed

Solution Provided NEW BATTERY FITTED WIRING REPLACED TERMINAL CLEAN & FILL THE WATER OIL &,FILTER CHANGE AT 610 HRS TERMINAL CLEAN & FILL THE WATER 1 LTR MOBILE FILLED BATTERY WATER FILLED FAN REPLACED REPAIR THE MODULE

Remarks ok ok ok ok ok ok ok ok ok ok

INTEROGATION Fault Category Effect on Major/Mi Service(N nor/Non o/Degrad Service e/Down affecting Minor Minor Minor Minor Minor Minor Minor Minor Attended Fault on Date & Time by Bidders Engg 21/4/2013 24/4/13 7/5/2013 9/5/2013 20/5/2013 29/5/2013 2/6/2013 12/6/2013

S.No. 1 2 3 4 5 6 7 8

DOCKET No. 3316 3341 3404 3414 3449 3485 3500 3532

Problem Description SITE VISIT BATTERY PROBLAM DG BATTERY PROBLEM DG SERVICE DUE SITE VISIT MAINS PROBLAM SITE VISIT POWER PLANT INSTALLED

Date Time of Fault reporting by BSNL 21/4/2013 24/4/13 7/5/2013 9/5/2013 20/5/2013 29/5/2013 2/6/2013 12/6/2013

Total Time taken for Fault rectification 1 hrs 3 hrs 4 hrs 1 hrs 1 hrs 2 hrs 3 hrs 2 hrs

Call Status (Pending/Att ended/Comp leted) completed completed completed completed completed completed completed completed

Solution Provided TERMINAL CLEAN & FILL THE WATER BATTERY CHARGER REPAIRED REPAIR THE CHARGER OIL & FILTER CHANGE AT 1562 HRS TERMINAL CLEAN & FILL THE WATER MAINS CONTT COIL REPLACED PP INSTALLED

Remarks OK OK OK OK OK OK OK OK

UNIVERSITY

DOCKET Problem S.No. No. Description 1 3332 SITE VISIT 2 3379 SITE VISIT 3 3502 MODULE FAULTY 4 3563 SITE VISIT 5 3636 site visit 6 3688 SMPS FAULTY 7 3725 SITE VISIT 8 3748 D G FAULTY 9 3793 DG PROBLEM 10 3810 d g switch faulty 11 3838 SITE VISIT

Fault Category Major/ Effect on Minor/N Service(No/ on Degrade/Do Service wn affecting Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor

Date Time of Fault reporting by BSNL 23/4/13 1/5/2013 3/6/2013 20/6/2013 9/7/2013 28/7/2013 9/8/2013 17/8/2013 3/9/2013 10/9/2013 20/9/2013

Attended Fault on Date & Time by Bidders Engg 23/4/13 1/5/2013 3/6/2013 20/6/2013 9/7/2013 28/7/2013 9/8/2013 17/8/2013 3/9/2013 10/9/2013 20/9/2013

Total Time taken for Fault rectificatio n 2.5 hrs 1.5 hrs 1 hrs 3 hrs 4 hrs 1 hrs 1 hrs 2 hrs 3 hrs 2 hrs 3 hrs

Call Status (Pending/At tended/Com pleted) completed completed completed completed completed completed completed completed completed completed completed

Solution Provided TERMINAL CLEAN & FILL THE WATER BATTERY TERMINAL REPLACED MODULE REPAIRED & CONTT REPAIR OK battery water filled SMPS NEW INSTALLED SITE OK NEW STARTER SWITCH FITTED PUSH BUTTON CHANGED replace the switch MODULE REPAIR

Remarks OK OK OK OK OK OK OK OK OK OK OK

JK BANK Effect on Servic e(No/ Degra de/Do wn

S.No. 1 2 3 4 5 6 7 8

DOCKET No. 3315 3342 3451 3476 3499 3533 3543 3604

Problem Description SITE VISIT MODULE FAULTY SITE VISIT MODULE FAULTY SITE VISIT MODULE FAULTY MODULE FAULTY SITE VISIT

Fault Category Major/Mi nor/Non Service affecting Minor Minor Minor Minor Minor Minor Minor Minor

Date Time of Fault reporting by BSNL 21/4/2013 25/4/2013 20/5/2013 27/5/2013 2/6/2013 12/6/2013 14/6/2013 2/7/2013

Attended Fault on Date & Time by Bidders Engg 21/4/2013 25/4/2013 20/5/2013 27/5/2013 2/6/2013 12/6/2013 14/6/2013 2/7/2013

Total Time taken for Fault rectificatio n 1 hrs 3 hrs 4 hrs 1 hrs 1 hrs 2 hrs 3 hrs 2 hrs

Call Status (Pending/Atte nded/Complet ed) completed completed completed completed completed completed completed completed

Solution Provided TERMINAL CLEAN & FILL THE WATER MODULE REPAIRED SELF STARTER REPAIRED MODULE REPAIRED MODULE REPAIRED MODULE REPAIRED TERMINAL CLEANED & WATER FILLED

Remarks OK OK OK OK OK OK OK OK

KANAK MANDI Fault Category Effect on Major/Mi Service(N nor/Non Problem o/Degrad Service Description e/Down affecting SITE VISIT Minor SITES VISIT Minor SITE VISIT Minor SITE VISIT Minor SITE VISIT Minor MODULE FAULTY Minor SITE VISIT Minor SITE VISIT Minor Attended Fault on Date & Time by Bidders Engg 22/4/13 5/5/2013 10/6/2013 4/7/2013 30/7/2013 19/8/2013 24/8/13 9/9/2013

S.No. 1 2 3 4 5 6 7 8

DOCKET No. 3327 3399 3527 3615 3693 3755 3766 3808

Date Time of Fault reporting by BSNL 22/4/13 5/5/2013 10/6/2013 4/7/2013 30/7/2013 19/8/2013 24/8/13 9/9/2013

Total Time taken for Fault rectification 2 hrs 1 hrs 3 hrs 4 hrs 1 hrs 1 hrs 2 hrs 3 hrs

Call Status (Pending/At tended/Co mpleted) completed completed completed completed completed completed completed completed

Solution Provided LIGHT ROD REPLACED TERMINAL CLEAN & FILL THE WATER SITE OK MADULE REPAIR MODULE REPAIR BATTERY WATER FILLED D G SERVICE OIL & FILTERS CHANGE

HRS

Remarks OK OK OK OK OK OK OK OK

KINGSWAY Fault Category Effect on Major/Mi Service(N nor/Non o/Degrad Service e/Down affecting Minor

S.No. 1 2 3 4 5 6 7 8 9 10

DOCKET No. 3291 3326 3419 3531 3627 3717 3744 3816 3617 3659

Problem Description DG PROBLEM SITE VISIT SITES VISIT SITE VISIT D G PROBLAM D G PROBLAM SITE VISIT SITE VISIT SITE VISIT DG PROBLEM

Date Time of Fault reporting by BSNL 8/4/2013 22/4/13 9/5/2013 10/6/2013 6/7/2013 7/8/2013 16/8/2013 12/9/2013 4/7/2013 19/7/2013

Attended Fault on Date & Time by Bidders Engg 8/4/2013 22/4/13 9/5/2013 10/6/2013 6/7/2013 7/8/2013 16/8/2013 12/9/2013 4/7/2013 19/7/2013

Total Time taken for Fault rectification 1 hrs 3 hrs 4 hrs 1 hrs 1 hrs 2 hrs 3 hrs 2 hrs 1 hrs 3 hrs

Call Status (Pending/Att ended/Comp leted) completed completed completed completed completed completed completed completed completed completed

Solution Provided REPLACE THE BATTERY TERMINAL LIGHT ROD REPLACED LIGHT ROD REPLACED BATTERY WATER FILLED NEW BATTERY FITTED BATTERY CRARGER FITTED MAINS PROBLAM SITE OK BATTERY WATER FILLED SITE OK DG FOUND OK POWER DISCONNECT

Remarks ok ok ok ok ok ok ok ok ok ok

LOWER MUTHI Fault Category Effect on Major/Mi Service(N nor/Non o/Degrad Service e/Down affecting Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor

S.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

DOCKET No. 3339 3354 3411 3429 3478 3510 3518 3520 3539 3542 3606 3651 3658 3661 3686 3726 3856 3860

Problem Description DG PROBLAM SITE VISIT DG SERVICE DUE SITES VISIT BATTERY PROBLAM SITE VISIT BATTERY PROBLAM BATTERY PROBLAM MODULE FAULTY BATTERY PROBLAM SITE VISIT MODULE FAULTY MODULE FAULTY DG PROBLEM CONTT FAULTY SITE VISIT D G PROBLAM HOWER METER

Date Time of Fault reporting by BSNL 24/4/13 19/4/2013 8/5/2013 12/5/2013 27/5/2013 5/6/2013 8/6/2013 9/6/2013 13/6/2013 14/6/2013 2/7/2013 16/7/2013 19/7/2013 20/7/2013 27/7/2013 10/8/2013 28/9/2013 30/9/2013

Attended Fault on Date & Time by Bidders Engg 24/4/13 19/4/2013 8/5/2013 12/5/2013 27/5/2013 5/6/2013 8/6/2013 9/6/2013 13/6/2013 14/6/2013 2/7/2013 16/7/2013 19/7/2013 20/7/2013 27/7/2013 10/8/2013 28/9/2013 30/9/2013

Total Time taken for Fault rectification 1 hrs 3 hrs 4 hrs 1 hrs 1 hrs 2 hrs 3 hrs 2 hrs 4 hrs 3 hrs 3 hrs 1 hrs 1 hrs 3 hrs 4 hrs 1 hrs 1 hrs 2 hrs

Call Status (Pending/Att ended/Compl eted) completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed

Solution Provided BATTERY CHARGER change TERMINAL CLEAN & FILL THE WATER OIL & FILTER CHANGE AT 444 HRS TERMINAL CLEAN & FILL THE WATER BATTERY CHARGER REPAIRED CLEAN THE TERMINAL BATTERY CHARGER REPAIRED NEW CHARGER FITTED MODULE REPAIRED NEW BATTERY FITTED TERMINAL CLEANED & WATER FILLED REPAIR THE MODULE REPAIR THE MODULE STARTING RELAY REPAIR CONTT REPAIR SITE OK D G ARMATURE BURNT & REPAIR THE ARMATURE REPLACE THE WIRE

Remarks OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK

MAHAJAN HALL Fault Category Effect on Major/Mi Service(N nor/Non o/Degrad Service e/Down affecting Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Attended Fault on Date & Time by Bidders Engg 13/4/13 3/5/2013 6/5/2013 16/5/2013 11/6/2013 13/6/2013 27/6/2013 4/7/2013 18/8/2013 26/8/2013 12/9/2013 24/9/2013

S.No. 1 2 3 4 5 6 7 8 9 10 11 12

DOCKET No. 3303 3392 3401 3440 3530 3541 3593 3618 3754 3770 3817 3848

Problem Description SITE VISIT BATRY CHARGR PROBLAM DG SERVICE DUE SITES VISIT SITE VISIT CHRARGER FAULTY CHARGER FAULTY SITE VISIT SITE VISIT DG PROBLEM SITE VISIT site visit

Date Time of Fault reporting by BSNL 13/4/13 3/5/2013 6/5/2013 16/5/2013 11/6/2013 13/6/2013 27/6/2013 4/7/2013 18/8/2013 26/8/2013 12/9/2013 24/9/2013

Total Time taken for Fault rectification 1 hrs 3 hrs 4 hrs 1 hrs 1 hrs 2 hrs 3 hrs 2 hrs 4 hrs 3 hrs 3 hrs 1 hrs

Call Status (Pending/At tended/Co mpleted) completed completed completed completed completed completed completed completed completed completed completed completed

Solution Provided A/C MOTOR BURNT & REPAIR BOTH A/C OK BATTERY TERMINAL REPLACED OIL & FILLTERS CHANGE AT 368 hrs LIGHT ROD REPLACED TERMINAL CLEANED & WATER FILLED CHARGER REPAIR BATTERY CHARGER REPAIRED TERMINAL CLEANED & WATER FILLED BATTERY WATER FILLED AIR IN THE PUMP SITE OK SITE OK REPAIR THE charger

Remarks ok ok ok ok ok ok ok ok ok ok ok ok

MUTHI Fault Category Effect on Major/Mi Service(No nor/Non DOCKET /Degrade/ Service No. Problem Description Down affecting 3355 SITE VISIT Minor 3359 BATTERY PROBLAM Minor 3422 SITES VISIT Minor 3512 MODULE FAULTY Minor 3521 SITE VISIT Minor 3607 SITE VISIT Minor 3628 SITE VISIT Minor 3680 MADULE FAULTY Minor 3683 MADULE FAULTY Minor 3728 SITE VISIT Minor 3802 MODULE FAULTY Minor 3847 MADULE FAULTY Minor 3858 HOWER METER Minor

S.No. 1 2 3 4 5 6 7 8 9 10 11 12 13

Date Time of Fault reporting by BSNL 19/4/2013 27/4/2013 10/5/2013 6/6/2013 9/6/2013 2/7/2013 6/7/2013 25/7/2013 26/7/2013 10/8/2013 7/9/2012 24/9/2013 29/9/2013

Attended Fault on Date & Time by Bidders Engg 19/4/2013 27/4/2013 10/5/2013 6/6/2013 9/6/2013 2/7/2013 6/7/2013 25/7/2013 26/7/2013 10/8/2013 7/9/2012 24/9/2013 29/9/2013

Total Time taken for Fault rectification 2 hrs 3 hrs 4 hrs 4 hrs 3 hrs 4 hrs 1 hrs 1 hrs 2 hrs 3 hrs 4 hrs 4 hrs 3 hrs

Call Status (Pending/At tended/Co mpleted) completed completed completed completed completed completed completed completed completed completed completed completed completed

Solution Provided LIGHT ROD REPLACED REPLACED THE TERMINAL 2 NO OK MODULE REPAIRED 2 NO FUSE CHANGED TERMINAL CLEANED & WATER FILLED BATTERY TERMINAL REPLACE TWO NOS MADULE REPAIR MADULE REPAIR MODULE REPAIR MODULE REPAIR REPAIR THE MODULE REPLACE THE HOWER METER

Remarks OK OK OK OK OK OK OK OK OK OK OK OK OK

NAI BASTI Fault Category Effect on Major/Mi Service(N nor/Non o/Degrad Service e/Down affecting MINOR MINOR MINOR Attended Fault on Date & Date Time of Time by Fault reporting Bidders by BSNL Engg 23/4/13 23/4/13 24/5/2013 24/5/2013 19/6/2013 19/6/2013

S.No. 1 2 3

DOCKET No. 3329 3470 3560

Problem Description SITE VISIT SITES VISIT SITE VISIT

Total Time taken for Fault rectification 2 hrs 2 hrs 2 hrs

Call Status (Pending/Atten ded/Completed ) completed completed completed

Solution Provided TERMINAL CLEAN & FILL THE WATER TERMINAL CLEAN & FILL THE WATER OWNER DID'NT ALLOW

Remarks OK OK OK OK

OLD JANIPUR Fault Category Effect on Major/Mi Service(N nor/Non o/Degrad Service e/Down affecting Minor Minor Minor Minor Minor Minor Minor

S.No. 1 2 3 4 5 6 7

DOCKET No. 3356 3427 3469 3544 3555 3602 3742

Problem Description SITE VISIT SITES VISIT MAINS PROBLEM MODULE FAULTY SITE VISIT SITE VISIT SITE VISIT

Date Time of Fault reporting by BSNL 19/4/2013 11/5/2013 24/5/2013 14/6/2013 18/6/2013 1/7/2013 15/08/2013

Attended Fault on Date & Time by Bidders Engg 19/4/2013 11/5/2013 24/5/2013 14/6/2013 18/6/2013 1/7/2013 15/08/2013

Total Time taken for Fault rectification 1 hrs 2 hrs 3 hrs 4 hrs 4 hrs 3 hrs 2 hrs

Call Status (Pending/Atte nded/Complet ed) completed completed completed completed completed completed completed

Solution Provided TERMINAL CLEAN & FILL THE WATER LIGHT ROD REPLACED 4 POLE MCV 63 Amp NEW FITTED MODULE REPAIRED OWNER DID'NT ALLOW TO CHECK OWNER DID'NT ALLOW TO CHECK LANDLORD NOT AVAILABLE

Remarks OK OK OK OK OK OK OK

PALOURA TOP Fault Category Effect on Major/Mi Service(N nor/Non o/Degrad Service e/Down affecting Minor Minor Minor Minor Minor Minor Attended Date Time of Fault on Fault Date & Time reporting by by Bidders BSNL Engg 13/5/2013 13/5/2013 22/6/2013 22/6/2013 23/6/2013 23/6/2013 1/7/2013 1/7/2013 5/8/2013 5/8/2013 27/8/2013 27/8/2013

S.No. 1 2 3 4 5 6 7

DOCKET No. 3432 3570 3577 3603 3708 3778

Problem Description SITES VISIT AC FAULTY SITE VISIT SITE VISIT MAINS PROBLEM SITE VISIT

Total Time taken for Fault rectification 1 hrs 2 hrs 3 hrs 4 hrs 4 hrs 3 hrs

Call Status (Pending/Att ended/Comp leted) completed completed completed completed completed completed

Solution Provided TERMINAL CLEAN & FILL THE WATER GAS FILLED BOTH AC WORKING TERMINAL CLEAN & FILL THE WATER TERMINAL CLEANED & WATER FILLED CONTT REPLACED MODULE REPAIR

Remarks OK OK OK OK OK OK OK OK

panjtirthi Fault Category Effect on Major/Mi Service(N nor/Non o/Degrad Service e/Down affecting Minor Minor Minor Minor Minor Minor Attended Date Time Fault on of Fault Date & Time reporting by by Bidders BSNL Engg 30/4/2013 30/4/2013 21/5/2013 21/5/2013 18/6/2013 18/6/2013 4/7/2013 4/7/2013 8/8/2013 8/8/2013 13/9/13 13/9/13

S.No. 1 2 3 4 5 6

DOCKET No. 3376 3457 3556 3619 3721 3819

Problem Description SITE VISIT SITES VISIT SITE VISIT SITE VISIT SITE VISIT SITE VISIT

Total Time taken for Fault rectification 1 hrs 1.5 hrs 3 hrs 5 hrs 2.5 hrs 2 hrs

Call Status (Pending/At tended/Com pleted) completed completed completed completed completed completed

Solution Provided TERMINAL CLEAN & FILL THE WATER OK MODULE REPAIR MODULE REPAIR SITE OK SITE OK

Remarks OK OK OK OK OK OK OK

peer mitha Fault Category Major/Min Effect on or/Non Service(No/Degr Service ade/Down affecting Minor Minor Minor Minor Attended Date Time Fault on of Fault Date & Time reporting by by Bidders BSNL Engg 20/4/13 20/4/13 13/4/13 13/4/13 23/5/2013 23/5/2013 5/5/2013 5/5/2013

S.No. 1 2 3 4

DOCKET No. 3311 3363 3466 3399A

Problem Description A/C PROBLAM SITE VISIT SITES VISIT SITE VISIT

Total Time taken for Fault rectification 4 hrs 3 hrs 3 hrs 3 hrs

Call Status (Pending/At tended/Com pleted) completed completed completed completed

Solution Provided A/C SERVICE DONE& FILL THE GAS BOTH A/C,S A/C GAS LEAKED 7 FILL THE GAS BOTH A/C OK TERMINAL CLEAN & FILL THE WATER LIGHT ROD REPLACED

Remarks OK OK OK OK

PREET NAGAR Fault Category Effect on Major/Mi Service(N nor/Non o/Degrad Service e/Down affecting Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor

S.No. 1 2 3 4 5 6 7 8 9 10

DOCKET No. 3319 3474 3558 3620 3633 3716 3733 3825 3865 1975A

Problem Description SITE VISIT SITES VISIT SITE VISIT SITE VISIT SITE VISIT D G PROBLAM SITE VISIT SITE VISIT CONNECTER FAULTY SITE VISIT

Date Time of Fault reporting by BSNL 21/4/2013 25/5/2013 19/6/2013 5/7/2013 7/7/2013 7/8/2013 12/8/2013 16/9/2013 2/10/2013 4/1/2013

Attended Fault on Date & Time by Bidders Engg 21/4/2013 25/5/2013 19/6/2013 5/7/2013 7/7/2013 7/8/2013 12/8/2013 16/9/2013 2/10/2013 4/1/2013

Total Time taken for Fault rectification 3 hrs 1 hrs 2 hrs 3 hrs 4 hrs 4 hrs 3 hrs 4 hrs 1 hrs 1 hrs

Call Status (Pending/A ttended/Co mpleted) completed completed completed completed completed completed completed completed completed completed

Solution Provided TERMINAL CLEAN & FILL THE WATER TERMINAL CLEAN & FILL THE WATER TERMINAL CLEAN & FILL THE WATER BATTERY TERMINAL REPLACED TWO MODULE REPAIR NEW BATTERY FITTED CHARGER REPAIR TOP UP MOBIL OIL REPLACE THE CONNECTER MODULE REPAIRED

Remarks ok ok ok ok ok ok ok ok ok ok ok

RAJPURA MANGORTA Fault Category Effect on Major/Mi Service(N nor/Non o/Degrad Service e/Down affecting Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Minor Attended Fault on Date & Time by Bidders Engg 9/4/2013 11/4/2013 28/4/2013 30/4/2013 1/5/2013 7/5/2013 11/5/2013 2/6/2013 13/6/2013 16/6/2013 22/6/2013 3/7/2013 26/7/2013 27/8/2013 29/8/2013 13/9/13 28/9/2013

S.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

DOCKET No. 3293 3299 3364 3373 3378 3407 3426 3498 3540 3545 3569 3612 3682 3777 3781 3820 3855

Problem Description MODULE FAULTY MODULE FAULTY SITES VISIT BATTERY PROBLAM BATTERY PROBLAM SITE VISIT BATTERY CHARGER FAULTY SITE VISIT MAINS PROBLEM DG PROBLEM AC FAULTY SITE VISIT AMF PANAL BURNT SITE VISIT MODULE FAULTY panel burn MODULE FAULTY

Date Time of Fault reporting by BSNL 9/4/2013 11/4/2013 28/4/2013 30/4/2013 1/5/2013 7/5/2013 11/5/2013 2/6/2013 13/6/2013 16/6/2013 22/6/2013 3/7/2013 26/7/2013 27/8/2013 29/8/2013 13/9/13 28/9/2013

Total Time taken for Fault rectification 2 hrs 3 hrs 1 hrs 2 hrs 3 hrs 4 hrs 4 hrs 3 hrs 4 hrs 1 hrs 1 hrs 1 hrs 1 hrs 3 hrs 2 hrs 7 hrs 3 hrs

Call Status (Pending/At tended/Co mpleted) completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed

Solution Provided REPAIR THE MODULE REPAIR THE MODULE BATTERY WATER FILLED NEW BATTERY FITTED BATTERY CHARGER change REPLACED THE TERMINAL 2 NO BATTERY CHARGER FUSE CHANGED TERMINAL CLEAN AND WATER FILLED MODULE REPAIRED DIESEL PIPE CHANGED GAS FILLED BOTH AC WORKING MODULE REPAIR REPLACE 1 MCV63A,1MCV 10A,1 CONNECT&WIRING TERMINAL CLEAN AND WATER FILLED MODULE REPAIR replace mcv 4pole 63amp,wiring,2 no,s connectr. REPAIR THE MODULE

Remarks OK ok OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK

RAWALPINDI Fault Category Effect on Major/Mi Service(N nor/Non o/Degrad Service e/Down affecting Minor Minor Minor Minor Minor Minor Minor

S.No. 1 2 3 4 5 6 7

DOCKET No. 3314 3479 3491 3493 3639 3734 3814

Problem Description SITE VISIT SITES VISIT MODULE FAULTY MCV FAULTY SITE VISIT SITE VISIT D G SERVICE

Date Time of Fault reporting by BSNL 20/4/13 27/5/2013 31/5/2013 1/6/2013 9/7/2013 13/08/2013 11/9/2013

Attended Fault on Date & Time by Bidders Engg 20/4/13 27/5/2013 31/5/2013 1/6/2013 9/7/2013 13/08/2013 11/9/2013

Total Time taken for Fault rectification 1 hrs 6 hrs 2 hrs 4 hrs 3 HRS 2 hrs 4 hrs

Call Status (Pending/Att ended/Compl eted) completed completed completed completed completed completed completed

Solution Provided SITE OK 4 POLE MCV 63 Amp NEW FITTED REPAIR THE MODULE 4 POLE MCV AC SERVICING7 BOTH PANNEL WIRING TAPING OK MODULE REPAIR D G SERVICE OIL & FILTERS CHANGE 27 HRS

Remarks ok ok ok ok ok ok ok

REHARI CHUNGI Fault Category Effect on Major/Mi Service(N nor/Non o/Degrad Service Problem Description e/Down affecting A/c FAULTY Minor SITE VISIT Minor BATTERY CHARGER Minor BATTERY PROBLAM Minor SELF PROBLAM Minor STARTING PROBLEM DG Minor SELF PROBLAM Minor DG SELF PROBLAM Minor BATTERY CHARGER FAULTY Minor SITE VISIT Minor DG SERVICE DUE Minor DG PROBLEM Minor SITE VISIT Minor AVR PROBLAM Minor BATTERT PROBLEM Minor SITE VISIT Minor SITE VISIT Minor SITE VISIT Minor MAINS FAULTY Minor Attended Date Time Fault on of Fault Date & Time reporting by by Bidders BSNL Engg 12/4/2013 12/4/2013 12/4/2013 12/4/2013 17/4/13 17/4/13 24/4/13 24/4/13 26/4/2013 26/4/2013 28/4/2013 28/4/2013 29/4/2013 29/4/2013 1/5/2013 1/5/2013 3/5/2013 3/5/2013 4/5/2013 4/5/2013 7/5/2013 7/5/2013 25/5/2013 25/5/2013 2/6/2013 2/6/2013 12/6/2013 12/6/2013 16/6/2013 16/6/2013 5/7/2013 5/7/2013 8/8/2013 8/8/2013 9/8/2013 9/8/2013 15/8/2013 15/8/2013

S.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

DOCKET No. 3300 3301 3307 3340 3351 3365 3372 3380 3391 3396 3405 3473 3501 3534 3548 3622 3719 3724 3743

Total Time taken for Fault rectification 2 hrs 3 hrs 1 hrs 2 hrs 3 hrs 4 hrs 4 hrs 3 hrs 4 hrs 1 hrs 1 hrs 1 hrs 1 hrs 4 hrs 2 hrs 3 hrs 2 hrs 2 hrs 3 hrs

Call Status (Pending/At tended/Co mpleted) completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed

Solution Provided GAS FILLED, FAN MOTOR REPAIR & NEW CAPISTER FITTED ok REPAIR THE BATTERY CHARGER BATTERY CHARGER REPAIRED REPLACED THE START SWITCH AMREGENCT STOP WIRE CHANGE OK REPLACED THE SELF ARMATUR SELF ARMATURE REPLACED REPAIR THE CHARGER BATTERY TERMINAL REPLACED OIL & FILTER CHANGE AT 1013 HRS DG ALTERNATOR & BATTERY CHARGER REPLACE DG AVR REPLACED NEW BATTERY FITTED TERMINAL CLEANED & WATER FILLED MODULE REPAIR CONTT REPLACED NUTAL REPAIR

Remarks ok ok ok ok ok ok ok ok ok ok ok ok ok ok ok ok ok ok ok

SANJAY NAGAR Fault Category Effect on Major/Mi Service(N nor/Non DOCKET o/Degrad Service No. Problem Description e/Down affecting 3331 SITE VISIT Minor 3430 SITES VISIT Minor 3483 SITES VISIT Minor 3504 SITE VISIT Minor Minor 3624 BATTERY PROBLEM Minor 3632 SITE VISIT Minor 3654 MODULE FAULTY Minor 3673 MADULE FAULTY Minor 3684 MODULE FAULTY Minor 3700 D G PROBLAM Minor 3706 CHARGER FAULTY Minor 3735 SITE VISIT Minor 3782 MODULE FAULTY Minor 3784 MODULE FAULTY Minor 3803 charger faulty Minor 3840 SITE VISIT Minor 3853 MODULE FAULTY Minor 3863 SITE VISIT Attended Fault on Date & Time by Bidders Engg 23/4/13 12/5/2013 28/5/2013 3/6/2013 6/7/2013 7/7/2013 17/7/2013 23/7/2013 27/7/2013 2/8/2013 5/8/2013 13/08/2013 30/08/2013 30/08/2013 7/9/2013 20/9/2013 26/9/2013 30/9/2013

S.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Date Time of Fault reporting by BSNL 23/4/13 12/5/2013 28/5/2013 3/6/2013 6/7/2013 7/7/2013 17/7/2013 23/7/2013 27/7/2013 2/8/2013 5/8/2013 13/08/2013 30/08/2013 30/08/2013 7/9/2013 20/9/2013 26/9/2013 30/9/2013

Total Time taken for Fault rectification 2 hrs 3 hrs 1 hrs 2 hrs 3 hrs 4 hrs 4 hrs 3 hrs 4 hrs 1 hrs 1 hrs 1 hrs 1 hrs 3 hrs 4 hrs 2 hrs 2 hrs 1 hrs

Call Status (Pending/Att ended/Comp leted) completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed

Solution Provided TERMINAL CLEAN & FILL THE WATER TERMINAL CLEAN & FILL THE WATER TERMINAL CLEAN & FILL THE WATER OK NEW BATTERY FITTED NEW BATTERY CHARGER,REPAIR MODULE REPAIR THE MODULE MADULE REPAIR MADULE REPAIR NEW CHARGER FITTED CHARGER REPAIR BATTERY WATER FILLED MODULE REPAIR MODULE REPAIR repair the charger BATTERY WATER FILLED REPAIR THE MODULE BATTERY WATER FILLED

Remarks OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK

SARWAL Fault Category Effect on Major/Mi Service(N nor/Non DOCKET o/Degrad Service No. Problem Description e/Down affecting 3116A SITE VISIT Minor 3367 SITE VISIT Minor 3397 MODULE PROBLAM Minor 3406 DG SERVICE DUE Minor 3461 SITE VISIT Minor 3522 SITE VISIT Minor SITE VISIT Minor 3623 Minor 3679 MADULE FAULTY Minor 3720 SITE VISIT Attended Fault on Date & Time by Bidders Engg 13/02/2013 29/4/2013 4/5/2013 7/5/2013 22/5/2013 9/6/2013 5/7/2013 24/7/2013 8/8/2013 Total Time taken for Fault rectificatio n 2 hrs 3 hrs 4 hrs 1 hrs 1 hrs 1 hrs 1 hrs 3 hrs 4 hrs

S.No. 1 2 3 4 5 6 7 8 9

Date Time of Fault reporting by BSNL 13/02/2013 29/4/2013 4/5/2013 7/5/2013 22/5/2013 9/6/2013 5/7/2013 24/7/2013 8/8/2013

Call Status (Pending/At tended/Co mpleted) completed completed completed completed completed completed completed completed completed

Solution Provided FUSE BURNT & REPLACED OK REPAIR THE MODULE OIL & FILTER CHANGE AT 160 HRS SELF STARTER REPAIR & WIRING REPAIR TERMINAL CLEAN & FILL THE WATER TERMINAL CLEANED & WATER FILLED MADULE REPAIR BATTERY WATER FILLED

Remarks ok ok ok ok ok ok ok ok ok ok

SDO OFFICE Fault Category Effect on Major/Mi Service(N nor/Non DOCKET o/Degrad Service No. Problem Description e/Down affecting 3330 SITE VISIT Minor 3412 SITE VISIT Minor 3434 BATTERY PROBLAM Minor 3508 MODULE FAULTY Minor 3536 SITE VISIT Minor Minor 3677 SITE VISIT Minor 3769 DG PROBLEM Minor 3771 SITE VISIT

S.No. 1 2 3 4 5 6 7 8

Date Time of Fault reporting by BSNL 23/4/13 8/5/2013 14/5/2013 5/6/2013 12/6/2013 24/7/2013 25/8/2013 26/08/2013

Attended Fault on Date & Time by Bidders Engg 23/4/13 8/5/2013 14/5/2013 5/6/2013 12/6/2013 24/7/2013 25/8/2013 26/08/2013

Total Time taken for Fault rectification 2 hrs 3 hrs 3 hrs 4 hrs 2 hrs 1 hrs 2 hrs 2 hrs

Call Status (Pending/Att ended/Comp leted) completed completed completed completed completed completed completed completed

Solution Provided TERMINAL CLEAN & FILL THE WATER BATTERY WATER FILLED TERMINAL CLEAN & FILL THE WATER MODULE REPAIRED BATTERY WATER FILLED BATTERY POOL&TERMINAL REPLACED SILENCER AND AIR FILTER CLEANED MODULE CHANGED

Remarks OK OK OK OK OK OK OK OK

SOAP FACTORY Fault Category Effect on Major/Mi Service(N nor/Non o/Degrad Service e/Down affecting Minor Minor Minor Minor Minor Minor Minor Minor Minor Attended Fault on Date & Time by Bidders Engg 4/1/2013 10/3/2013 5/5/2013 22/6/2013 20/7/2013 27/7/2013 8/9/2013 9/9/2013 23/9/2013

S.No. 1 2 3 4 5 6 7 8 9

DOCKET No. 1973A 3200A 3398A 3571 3662 3687 3804 3809 3846

Problem Description SITE VISIT SITE VISIT SITE VISIT AC FAULTY MAINS PROBLEM CONTT FAULTY MAINS PROBLAM MAINS PROBLAM SITE VISIT

Date Time of Fault reporting by BSNL 4/1/2013 10/3/2013 5/5/2013 22/6/2013 20/7/2013 27/7/2013 8/9/2013 9/9/2013 23/9/2013

Total Time taken for Fault rectification 4 hrs 2 hrs 2 hrs 3 hrs 4 hrs 1 hrs 1 hrs 1 hrs 1 hrs

Call Status (Pending/Att ended/Comp leted) completed completed completed completed completed completed completed completed completed

Solution Provided OIL LEAKAGE FROM FILTER FUSE BURNT & REPLACED OK GAS FILLED BOTH AC WORKING CONTT COIL REPAIR C0NTT REPAIR replace the wire WIRE REPLACE WIRE REPLACE P P TO BTS

Remarks OK OK OK OK OK OK OK OK OK