FMS Proposal
System to monitor and analyze the production process using one branch of software, hardware and peopleware to collect data from the plant floor and improve productivity in real time. This system allows performance indicators statistics analysis in real time related to quantities produced, downtimes and machines losses:
Quality; Efficiency; Utilization; Productivity; Non Planed Stops; Planed Stops.
Implementation methodology considering people behavior as the main part of productive improvement process.
2
DATA COLLECT
LINES STATUS FOLLOWING THE RHYTHM VARIATION STRATIFY THE CAUSE OF STOPS AND VARIATION TENDENCY ANALIZE
IMPROVEMENT ACTION
IMPROVEMENT ACTION
IMPROVEMENT ACTION
IMPROVEMENT ACTION
Brainstorms;
Better Priorizations; Quick Actions;
Action Groups.
.
4
Evaluation
Effective
Discarded
AVAILABLE TIME
OPERATIONAL TIME
RUNNING TIME
TIME LOST BY SPEED LOSS TIME LOST BY REWORKING PIECES TIME LOST BY PIECES SCRAPPED
AVAILABLE TIME
RUNNING TIME
TIME LOST BY SPEED LOSS TIME LOST BY REWORKING PIECES TIME LOST BY PIECES SCRAPPED
Overall Equipment Effectiveness OEE = FTT x Performance x Availability Asset Effectiveness AE = OEE x TIME AVAILABLE
TOTAL TIME
8
FORMULAS
NET PRODUCTIVE TIME / (GROSS PRODUCTIVE TIME) GROSS PRODUCTIVE TIME / RUNNING TIME RUNNING TIME / TIME AVAILABLE FTT * Performance * Availability
T P M
OEE * Available Time/Total Time (TIME LOST BY SCRAPPING + TIME LOST BY REWORKING) (GROSS PRODUCTIVE TIME)
EFFICIENCY
F M S
PLANNED STOPS
AVAILABLE TIME
OPERATIONAL TIME
PLANNED STOPS
RUNNING TIME
UNPLANNED STOPS
QUALITY =
AVAILABLE TIME
OPERATIONAL TIME
RUNNING TIME
UNPLANNED STOPS
EFFICIENCY =
AVAILABLE TIME
OPERATIONAL TIME
RUNNING TIME
UNPLANNED STOPS
USAGE =
AVAILABLE TIME
OPERATIONAL TIME
RUNNING TIME
UNPLANNED STOPS
PRODUCTIVITY =
AVAILABLE TIME
OPERATIONAL TIME
RUNNING TIME
UNPLANNED STOPS
UNPLANNED STOPS =
AVAILABLE TIME
OPERATIONAL TIME
RUNNING TIME
UNPLANNED STOPS
PLANNED STOPS =
AVAILABLE TIME
OPERATIONAL TIME
RUNNING TIME
UNPLANNED STOPS
FTT =
AVAILABLE TIME
OPERATIONAL TIME
RUNNING TIME
UNPLANNED STOPS
PERFORMANCE =
RUNNING TIME
17
AVAILABLE TIME
OPERATIONAL TIME
RUNNING TIME
UNPLANNED STOPS
AVAILABILITY =
AVAILABLE TIME
OPERATIONAL TIME
RUNNING TIME
TIME LOST BY SPEED LOSS TIME LOST BY REWORKING PIECES TIME LOST BY PIECES SCRAPPED
OEE =
AVAILABLE TIME
19
AVAILABLE TIME
OPERATIONAL TIME
RUNNING TIME
TIME LOST BY SPEED LOSS TIME LOST BY REWORKING PIECES TIME LOST BY PIECES SCRAPPED
AE = OEE x AE =
AVAILABLE TIME
TOTAL TIME
NET PRODUCTIVE TIME X AVAILABLE TIME
AVAILABLE TIME
AE =
TOTAL TIME
NET PRODUCTIVE TIME
TOTAL TIME
20
Areas
Area A
Area B
Sectors
Sector A
Sector B
Sector C
Sector D
Groups
Group A
Group B
Group C
Group D
Group E
Group F .
Resources
R1
R2
R3
R4
R5
R6
R7
R8
R9
R10
21
Consolidation Hierarchy
Visualization by Management Level
Managers .
Supervisors
Resources
22