N2 DYKE PRESENT LEVEL NO.OF RAISINGS CARRIED OUT CURRENT STATUS RL:194.00M
S2 DYKE RL:194.00M
N1 DYKE RL:198.50M
S1 DYKE RL:198.50M
TWO
TWO
The constructional methods for an ash dyke can be grouped into three broad categories:(a)Upstream Construction Method (b)Downstream Construction Method (c)Centreline Construction Method (a) Upstream Construction Method:- This is most referred design as the earthwork quantity required is minimum.
(b) Downstream Construction Method:- After the pond gets filled upto the first stage of construction, the pond height is increased by depositing the earth / fly ash on the downstream face of the dyke. (c)Centreline Construction Method:- In this method, after the pond gets filled up to the first stage, material is placed for raising height of the dyke on either side of centre line of the dyke such that the center line of the dyke remains at the same location
BLANKETS (FILTERS USED AT RSTPS) SAND BLANKET BOTTOM ASH BLANKET CHIPS AND BOTTOM ASH BLANKET
CHIMNEY
Spreading
SAND BLANKET (500MM) BOTTOM ASH BLANKET (500MM) STONE CHIPS BLANKET (150MM) STONE AGGREGATE (150MM) STONE BOULDER PITCHING (300MM)
DOWNSTREAM PROTECTION
TURFING
DECANT WELL
BASE COURSE