Vous êtes sur la page 1sur 9
STANDARD OPERATING PROCEDURE ‘Sonsulting Siemtss, WATER SAMPLING FORM. Engin cors and Contractors HF-FORM430 Project Name: E1 Paso Ri Sample Team Members): DS, TW. Laboratory Used: SIT New Site: ves Site Type: sping ther Flow Method: Marsh Neteney Voumeine Flame Wer sina Weather Conditions: cam esse wey Jotner Flow oF Description ear pe cousy —overast Ait Temperature: sc | Flow gem et _ Staff Gage: Field Parameter Stabilization Saator Rational Para Tine uctlon Tuoisty Temperature oF Notes Aevkiany) Potential) OisoWved Oxygen fn S6.tunbosion) int) fe «Zoo 350 AGG 7350. Ave 72a EZ AP AY. Turbidity: clear ‘rosea Sample Method: grab compost
baler che (crete) sight very (ceserbe) ae Field Parameters ower uteted Somole Dishes uantity Sue __Fitecor Unfit. Preservative Pearametor _ Adora Nios On (my For HNO3 IT. Metals 0 (ma) For For RAW [TOs S¢ (umhosiem) “Turbidity (ot) Four 14,0 Tmp. (6) Four Four UF Four ote: Comments: cr ‘Sample Team Member Signature: LP AFILEStTos\980TAOMINVISOMSECS O90 sHIEL\tOTIOW@340120 r-FORM-430 (198) AS ie, STANDARD OPERATING PROCEDURE, Consulting Sientists, WATER SAMPLING FORM Engineers and Contractors HE-FORM-430 Project Name: fi Paso it Site Designation: 974) ~ Project Code: A4TFCTOAORSI0G01 ‘Sample Code Number: EPRI = 7 ‘Sample Team Memberts): DS.TW Sample Date: Aref Laboratory Used: STI Sample Ti e: 9 n0 rans For Groundwater Samples If Duplicate Sample Collected, Please Record Below Duplicate Sample Cove = Site Spl swat aoa Barter (03 Site Conditions ater Yin 6 (a 340) z New Sie: Ye Gis) Phototaken: ves wo Acta Vl Removed (9) De Site Type ORY sce wer paces wate ‘ir te Recovery oe paso ad CARER? demesic wel abt 2009 For Surface Water Samples seving_ ote: [Flow Method: aan Metiney Volanaric Fine We Cximate Weather Conditions: cam ereece windy JOther Flow or Description: rar p.clousy overcast, Ai Temperature: te Flow: Field Parametor Stabilization Staff Gage ‘Sxsaon Reduction Turbidity Temperature Potential mv) Oissoived Oxygen ing) ___pH___—S.C.tumhosem) ares coy Zoe ZS 330 z 7350 ae Ave 7 as 2 00 | AY. Turbidity: evar moderate Sample Method: p72 cxmposite ERB baler ober (orci) stone vey (describe) ae e =f. Field Parameters Bottles Collected Sampo Ductcate Quanity See Fiero Unt Preservative Paramatr Aiea Notes on (mv Fox NOS _[T. Metals 0 (maf) For RAW [TOS pH Fo UF SC umostem) For uF Turbine Foe uF 40 tmp. °0) Fo UF olor For uF other, For uF Four oS Comments: ‘Sample Team Member Signature: HIFILES t051980TAOMINESOPISECS avH-<90 sHELLIOTOAOSA0120, He-FORW 430 (1798) SEA NIRE SE ERATING PROCEDURE WATER SAMPLING FORM HE-FORM-430, Consulting Svieniss, Engineers and Contractors Project Name: Ei Pass Ri Site Designation: wy Project Code: A4TFCTS@OKS104401 ‘Sample Code Number: £ ‘Sample Team Member(s): DS, TW. __—_—_ Sample Time: 2 tea For Groundwater Samples W Duplicate Sample Collected, Ploase Record Below ‘Duvicate Sample Code Dupheate Sample Tena. J] se it Casing Diameter (10°) Water tum (9 (ga x3=(ga) Actual Vol. Removed (gal) Site Consitions New Site: Yes (Ms) Phototaken: = Yes—o Site Type ORY sutcawatrprocss wate TGATIEON comeste wal aot sexo E For Surface Water Samplos, 900g. her Flow Method: Marsh cBimay Vouretne Flume Wee Eslmale Weather Conditions: cain ueeze windy Other Flow or Description oprecin rain era lear p ceudy overcast a Air Temperature: *c Flow gom Staff Gage: Field Parameter Stabilization ‘Sxlaaton ‘Raaional Pare Reduetion Turpidity Temperature ‘Notes Potala inv) Dissolved Oxygen ing) pH S.C. ummoatmy wa oy Zoo SOT J6h0 420 SS | 2660 AS eo | Feeo a ere Sample Method: gab compute GD) wer awe ston 7 (seer) ae Field Paramotors Botties sane Corte Fe eYpti Pesnatve Parameter hasten Neos oP (min Fer 29 (mat) F oH 3€ moien) Tritt Ho-Tme ) cote ner: Comments ‘Sample Team Member Signature: ep HAFILEStTo5a0014OMINSOPISECE OFH-490 4MEL\IOTIOWCSA0120 He-FORI430 (198)

Vous aimerez peut-être aussi