Académique Documents
Professionnel Documents
Culture Documents
BPMIGAS NORAD PETRAD INTSOK CCOP Seminar on Stranded Gas 11 13 May 2009 Sheraton Mustika Yogyakarta Kjell Garvik VP Sales & Marketing Asia Pacific
Agenda
Subsea Technology Field Architecture and Aker Solutions Subsea Project references Subsea Processing and Boosting
Slide 3
part of Aker
FEED
EPC
Inst. Maint.
Removal
Slide 4
part of Aker
Technology leadership in business segments Combine offerings to create new business opportunities
CAPEX
FEED and exploration Subsea technology deliveries
OPEX
Subsea Lifecycle services Well intervention & oilfield services
SURF
Slide 5
part of Aker
Subsea systems
Surface products
Marine operations
Well services
Geo services
Slide 6
part of Aker
part of Aker
Subsea Structures
XMTs
Ea rly
90 s
500 m.
M id
90
1,000 m.
90
1st subsea completion was in 1947 in 40 ft water Subsea completions designed for water depths of up to 3,000 meters Deepwater completions will make up over 50% of the subsea wells
M id
2,000 m.
La te
90 s
3,000 m.
Ea rly
Slide 9 2008 Aker Solutions part of Aker
20 00 s
Subsea trees
We have field proven technology
for subsea trees, with experience dating back to the 1950s subsea trees for customers worldwide
We offer:
4, 5 and 7 systems Trees with pressure ratings up to 16 500 psi Trees suitable for temperature ranges between - 33 C to 175 C Trees suitable for water depths up to 3 000 metres
Slide 10 2008 Aker Solutions part of Aker
Why Standardisation ?
Provides a predictable product and enhances Aker Solutions ABILITIES (MRP) to deliver at the right quality, at the right time and at the right price
12-May-09
Slide 11
part of Aker
12-May-09
Slide 12
part of Aker
Standard Configurable Tree leads to RapidSolution program - our answer to the market
Standardised tree Stocking program Delivery capacity
PROJECT EXECUTION
SYSTEM ENG
A&T
SIT
10
11
12
13
14
15
16
17
18
19
20
21
22
MONTHS
12-May-09
Slide 14
part of Aker
Shallow water
Deep water
2 months
6 months
Slide 15
6 months
2008 Aker Solutions
Tool pool
part of Aker
SCT RS - REVB.ppsx
State-of the art machining, assembly and test plant for Subsea Trees and Controls Total of 31 XMT delivered or in process since 2007/2008
Slide 16
part of Aker
Control systems
We have delivered over 900 control
We offer:
iCon subsea control modules iCon subsea electronic modules Flow measurement systems Pressure protecting systems (HIPPS) Topside equipment
Slide 17
part of Aker
Product lines
Topside HPU
Topside EPUs
Distribution System
SEM
Instrumentation
Slide 18
part of Aker
Multiplexed Electro-Hydraulic
Master Control Station Electrical Power Unit Hydraulic Power Unit
Umbilical
Signal Power Hydraulic
Subsea Distribution Unit Subsea Control Module Subsea Control Module Tree
Subsea Electronics Module
Tree
Slide 19
part of Aker
Tree
Tree
Slide 20
part of Aker
We offer: Electro-hydraulic umbilicals Direct hydraulic umbilicals Carbon fibre enhanced deepwater dynamic umbilicals Integrated production umbilicals Direct Heating Power cables
Slide 21 2008 Aker Solutions part of Aker
experience in delivering reliable and cost-efficient tie-in solutions and tools special purpose designs
We offer:
Connectors Diverless connection systems being Horizontal (GHO) or Vertical (VCM/VCS) Tools Jumper spools Supplementary equipment
Slide 22
part of Aker
We offer:
Overtrawlable templates and manifolds Deepwater cluster manifolds Open satellite protection structures Process Modules PLETS / PLEMS
Slide 23 2008 Aker Solutions part of Aker
Installation support to operators Tools for installation and maintenance Service bases around the world providing: Preparation of subsea equipment Storage of equipment Storage of tools Offshore maintenance of tools and equipment Personnel Service and upgrades of subsea equipment
Well stimulation Rental hub: tie-in, connection and intervention tools Wellhead tools
Agenda
Subsea Technology Field Architecture and Aker Solutions Subsea Project references Subsea Processing and Boosting
Slide 25
part of Aker
Operational parameters changes over the life of field, hence flexible system architecture is required
Maximizing oil recovery during the lifetime require flexible system architecture to accommodate:
Phased field development Piggy back adjacent fields & new discoveries Changing reservoir conditions Converting well service Equipment upgrading Etc.
Field Development
Field in Operation
Slide 26
part of Aker
Boosted Production
Time [years]
Slide 27 2008 Aker Solutions part of Aker
Slide 28
part of Aker
Subsea Scope: 11 Manifolds 19 Trees w/Controls Top Side Controls System 160 km Umbilicals & Power Cables Tie-in System, 195 tie-in points Tooling Installation & Aftermarket Services
Slide 29
part of Aker
7 horizontal XMTs Water dept Tree size Temp rating Design life
Producer or injector 2 000 meters 5 X 2 rated 10 000 psi Class U 20 year HH material class Dropped object protection
Structure:
12-May-09
Slide 30
part of Aker
67 PXMT, GIXMT, WIXMT 1500 meters 5 bore/ 7 prod tubing 5000 psi Dropped object protection
12-May-09
Slide 31
part of Aker
High pressure / high temperature Projects & Deepwater Umbilical - HW Power Cable Project
Kristin
StatoilHydro HP = 15 000 psi HT = 170C
Morvin
StatoilHydro HP = 15 000 psi HT = 170C
Chinook/ Cascade
Petrobras 2 700 m water depth 70 km high voltage power cables as well as static and dynamic steel tube umbilicals to be installed in the Gulf of Mexico
Delivery of subsea production Delivery of subsea production system with system in the North Sea 15 subsea trees in the North Sea
Slide 32
part of Aker
Agenda
Subsea Technology Field Architecture and Aker Solutions Subsea Project references Subsea Processing and Boosting
Slide 33
part of Aker
Slide 34
part of Aker
Boosting
Award winning technology proven
to increase oil recovery potentially by several million barrels of oil per well.
Major awards
We offer:
MultiBooster LiquidBooster GasBooster
2006 OTC Spotlight on new technology and ONS innovation award MultiBooster
Slide 35
part of Aker
Processing
Our process systems range from
simple two-phase separation through to much more complex needs. Our aim is to help unlock the recovery potential of new and existing field developments.
We offer:
DeepBooster FlexSep SeaBooster system Power distribution Condition monitoring
Slide 36
part of Aker
Tyrihans
StatoilHydro SeaBooster Delivery of a raw subsea seawater injection system in the North Sea
Ormen Lange
StatoilHydro Subsea compression Delivery of subsea compression pilot for Ormen Lange in the North Sea
Lyell
CNR International MultiBooster Worlds first twin-screw multiphase pump in operation on the UK Continental Shelf.
King
BP MultiBooster Two multiphase pumps installed at 1 700m with 28km step-out in the Gulf of Mexico
Exceeding expectations
Slide 37
part of Aker
Aker Solutions is the only company in the world that can manufacture and deliver complete subsea solutions, including umbilicals.
CREATING OPPORTUNITIES
Slide 38
part of Aker
Copyright
Copyright of all published material including photographs, drawings and images in this document remains vested in Aker Solutions and third party contributors as appropriate. Accordingly, neither the whole nor any part of this document shall be reproduced in any form nor used in any manner without express prior permission and applicable acknowledgements. No trademark, copyright or other notice shall be altered or removed from any reproduction.
Disclaimer
This Presentation includes and is based, inter alia, on forward-looking information and statements that are subject to risks and uncertainties that could cause actual results to differ. These statements and this Presentation are based on current expectations, estimates and projections about global economic conditions, the economic conditions of the regions and industries that are major markets for Aker Solutions ASA and Aker Solutions ASAs (including subsidiaries and affiliates) lines of business. These expectations, estimates and projections are generally identifiable by statements containing words such as expects, believes, estimates or similar expressions. Important factors that could cause actual results to differ materially from those expectations include, among others, economic and market conditions in the geographic areas and industries that are or will be major markets for Aker Solutions businesses, oil prices, market acceptance of new products and services, changes in governmental regulations, interest rates, fluctuations in currency exchange rates and such other factors as may be discussed from time to time in the Presentation. Although Aker Solutions ASA believes that its expectations and the Presentation are based upon reasonable assumptions, it can give no assurance that those expectations will be achieved or that the actual results will be as set out in the Presentation. Aker Solutions ASA is making no representation or warranty, expressed or implied, as to the accuracy, reliability or completeness of the Presentation, and neither Aker Solutions ASA nor any of its directors, officers or employees will have any liability to you or any other persons resulting from your use. Aker Solutions consists of many legally independent entities, constituting their own separate identities. Aker Solutions is used as the common brand or trade mark for most of these entities. In this presentation we may sometimes use Aker Solutions, we or us when we refer to Aker Solutions companies in general or where no useful purpose is served by identifying any particular Aker Solutions company.
Slide 39
part of Aker