Académique Documents
Professionnel Documents
Culture Documents
Surveyor:
Approved:
Date: 1/August/201 3
SITE INFORMATION
Site Name Site Address Site ID Site Owner Site type
Longitude
Pole/Rooftop Height:
tower
Altitude
Site security:
Site key:
360Degree Photos
SURVEY PARTICIPANTS
Name Name Position Position Huawei Engineer AIRTEL Engineer Tel Tel E-mail E-mail
2013-08-01
Page 1, Total3
Surveyor:
Approved:
Date: 1/August/201 3
PHOTOS
Photos required: Photos required include the following: Photos for whole tower/poles(for roof tops) Photo of the proposed antenna installation positions Panoramic view photos (0, 90,180 and 270 degrees) Photo to indicate that there is no obstacle in the MW Path
2013-08-01
Page 2, Total3
Surveyor:
Approved:
Date: 1/August/201 3
2013-08-01
Page 3, Total3