SIEVE ANALYSIS

Name of Project Contract / Job No.: Client Contractor Sample No. Sample Descript. Location Source Sampling Method
Sieve size (mm) 0.600 0.300 0.150 Pan 42.5 359.5 48

: Barka Batching Plant : LO120015 : General : Larsen & Toubro (Oman) LLC : FA012 : Dune Sand : Barka Batching Plant : Baushar : BS 812 Part 102
Wt. retained in gms % Retained 0 9.4 79.9 10.7 Cumulative % Retained 0 9.4 89.3 100.0

Date of Sampling : 10.09.13 Date of Testing Test Method Sampled By Weight of Sample:
% Passing (PA) 100 90.6 10.7 0

: 10.09.13 : BS 1377 Part 2 : LTO


450 gms

Specification Limits

Remarks: Prepared By: LTO Checked By: LTO

Reviwed By:LTO

Engineer: QA/QC
Date:

Sr Engineer QA/QC Date:

Material Engineer Date:

SIEVE ANALYSIS

SIEVE ANALYSIS
Name of Project Contract / Job No.: Client Contractor Sample No. Sample Descript. Location Source Sampling Method
Sieve size (mm) 10.0 5.0 2.36 1.18 0.600 0.300 0.150 Pan

: Barka Batching Plant : LO120015 : General : Larsen & Toubro (Oman) LLC : FA012 :Natural Washed Sand : Barka Batching Plant : Oman Rocks : BS 812 Part 102
Wt. retained in gms NIL 3.0 94.5 170.0 374.0 350.5 169.0 40 % Retained 0 0.3 7.9 14.2 31.2 29.2 14.1 3.3 Cumulative % Retained 0 0.25 8.1 22.3 53.5 82.7 96.8 100.1

Date of Sampling : 09.09.13 Date of Testing Test Method Sampled By Weight of Sample:
% Passing (PA) 100 99.8 91.9 77.7 46.5 17.3 3.3 0

: 09.09.13 : BS 1377 Part 2 : LTO


1200 gms

Specification Limits 100 100 60- 100 30- 90 15- 54 5- 40 -

Remarks: Prepared By: LTO Checked By: LTO

Reviwed By:LTO

Engineer: QA/QC
Date:

Sr Engineer QA/QC Date:

Material Engineer Date:

SIEVE ANALYSIS

SIEVE ANALYSIS
Name of Project Contract / Job No.: Client Contractor Sample No. Sample Descript. Location Source Sampling Method
Sieve size (mm) 14.0 10.0 5.0 2.36 Pan

: Barka Batching Plant : LO120015 : General : Larsen & Toubro (Oman) LLC :CA012 : 10MM : Barka Batching Plant :AFI : BS 812 Part 102
Wt. retained in gms NIL 46 3756.5 148 49.5 % Retained 0 1.2 93.9 3.7 1.2 Cumulative % Retained 0 1.2 95.1 98.8 100

Date of Sampling :09.09.13 Date of Testing Test Method Sampled By Weight of Sample:
% Passing (PA) 100 98.9 4.9 1.2 0.0

: 09.09.13 : BS 1377 Part 2 :LTO


4000 gms

Specification Limits 100 85- 100 0- 25 0- 5

Remarks: Prepared By: LTO Checked By: LTO

Reviwed By:LTO

Engineer: QA/QC
Date:

Sr Engineer QA/QC Date:

Material Engineer Date:

SIEVE ANALYSIS

SIEVE ANALYSIS
Name of Project Contract / Job No.: Client Contractor Sample No. Sample Descript. Location Source Sampling Method
Sieve size (mm) 37.5 20.0 14.0 10.0 5.0 Pan

: Barka Batching Plant : LO120015 : General : Larsen & Toubro (Oman) LLC :FA012 : 20MM : Barka Batching Plant :AFI : BS 812 Part 102
Wt. retained in gms 0 29.5 2650.0 1162.0 119.0 39.5 % Retained 0 0.7 66.3 29.1 3.0 0.9875 Cumulative % Retained 0 0.7 67.0 96.0 99.0 100

Date of Sampling : 09.09.13 Date of Testing Test Method Sampled By Weight of Sample:
% Passing (PA) 100 99.3 33.0 4.0 1.0 0

: 09.09.13 : BS 1377 Part 2 :LTO


4000 gms

Specification Limits 100 85- 100 0- 70 0- 25 0- 5

Remarks: Prepared By: LTO Checked By: LTO

Reviwed By:LTO

Engineer: QA/QC
Date:

Sr Engineer QA/QC Date:

Material Engineer Date: