CROSS SECTION
ASSUMPTIONS:
TRIBUTARY AREA
14.00 m
6.50 m
2
AREA
91.00 m
L
S
WIDTH
DEPTH
AREA
BEAM
0.40 m
0.50 m
2
0.20 m
WIDTH
DEPTH
COLUMN
0.40
0.40
AREA
QUANTITY
0.16
4.00
A. DEADLOADS
LEVEL 5
height =
3.00 m
0.24 kPa
Finishing
SUBTOTAL
0.77 kPa
0.10 m
2
0.20 m
2
91.00 m
2
91.00 m
LEVEL 4 to LEVEL 1
height =
3.00 m
Slab
Beam
3
23.54 kN/m
3
23.54 kN/m
91.00 m
40.00 m
Column
2
0.24 m
0.24 kPa
Finishing
0.24 kPa
Perimeter Wall
2.10 kPa
91.91 m
2
91.91 m
Partition Wall
SUBTOTAL
2.60 kPa
2
91.91 m
0.10 m
2
0.20 m
LEVEL GROUND
height =
3
23.54 kN/m
2
91.00 m
12.00 m
91.00 m
40.00 m
0.00 m
Slab
Beam
3
23.54 kN/m
3
23.54 kN/m
2
Finishing
0.24 kPa
Perimeter Wall
2.10 kPa
91.91 m
2
91.91 m
Partition Wall
SUBTOTAL
2.60 kPa
2
91.91 m
B. SUMMARY OF LOADINGS
LEVEL 5
LEVEL 4
LEVEL 3
LEVEL 2
LEVEL 1
LEVEL GROUND
TOTAL, W
91.91
946.20
946.20
946.20
946.20
856.57
4733.30
Essential
Hazardous
Special Occupancy
C. ELEVATIONS
kN
kN
kN
kN
kN
kN
kN
LEVEL 5
LEVEL 4
LEVEL 3
LEVEL 2
LEVEL 1
LEVEL GROUND
TOTAL, h
I
1.50
1.25
1.00
Ip
1.50
1.50
1.00
3.00
3.00
3.00
3.00
3.00
0.00
15.00
8.50
IV
V
Standard Occupancy
Miscellaneous Structures
Occupancy Category:
1.00
1.00
Ca
Cv
0.40
0.56
1.00
Na
Nv
1.
1.00
1.00
A
1.00
1.00
NUMERICAL COEFFICIENT, Ct
Steel
0.09
Rein. Concrete
0.07
Others
0.05
Z
Type
Ct
T = fundamental period of vibration, in seconds, of the structure for the direction under consideration
T = Ct (hn)
T=
use T =
2.
The Total design base shear shall be determined from the following equation:
V=
V=
Cv I W
RT
559.69 kN
The design base shear shall not exceed the following equation:
use
V = 2.5 x Ca x I
W
R
V=
556.86 EXCEEDED
V=
556.86 kN
The Total design base shearshall not be less than the following:
V = 0.11 Ca I W
V=
208.27 kN
556.86
>
208.27 OK
In addition, for Seismic Zone 4, the total base shear shall not be less than the following:
0.40
Rein. Concrete
0.07
V = 0.80 ZNv IW
R
V=
178.19
kN
556.86
3.
>
178.19 OK
Fx :=
21.72 kN
( V - Ft) Wx hx
Ft = 0.25V
Ft =
139.21
use
Level
5.00
4.00
3.00
2.00
1.00
GROUND
TOTAL
V-Ft
556.86
556.86
556.86
556.86
556.86
556.86
139.21 kN
>
Ft =
Wx
91.91
946.20
946.20
946.20
946.20
856.57
21.72 OK
0.00 kN
hx
15.00
12.00
9.00
6.00
3.00
0.00
Earthquake Forces, Fx
Wxhx
1378.65
11354.46
8515.84
5677.23
2838.61
0.00
29764.79
OK
Fx
25.79 kN
212.43 kN
159.32 kN
106.21 kN
53.11 kN
0.00
kN
556.86 kN
Wi hi
5.00
4.00
3.00
2.00
1.00
25.79
212.43
159.32
106.21
53.11
kN
kN
kN
kN
kN
COMPUTATION OF SHEAR
Level
5.00
4.00
3.00
2.00
1.00
25.79
25.79
238.22
397.54
503.75
+
+
+
+
Shear Forces, V
=
212.43
=
159.32
=
106.21
=
53.11
=
25.79
238.22
397.54
503.75
556.86
kN
kN
kN
kN
kN
COMPUTATION OF MOMENT
Level
5.00
4.00
3.00
2.00
1.00
4779.59
2230.48
796.60
159.32
+
+
+
+
25.79
212.43
159.32
106.21
53.11
Moment, M
x
15.00
x
12.00
x
9.00
x
6.00
x
3.00
=
=
=
=
=
5166.48
4779.59
2230.48
796.60
159.32
kN.m
kN.m
kN.m
kN.m
kN.m
EISMIC ANALYSIS
CROSS SECTION
COLUMN
m
m
m2
A. DEADLOADS
21.84 kN
70.07 kN
91.91 kN
214.21 kN
188.32 kN
67.80 kN
21.84 kN
22.06 kN
193.01 kN
238.97 kN
946.20 kN
214.21 kN
188.32 kN
22.06 kN
193.01 kN
238.97 kN
856.57 kN
C. ELEVATIONS
m
m
m
m
m
m
m
Rein. Concrete
x1
x2
x3
3.00 m
1.00 m
3.00 m
AB
AE
BC
BF
BA
CD
CG
CB
DC
DH
Horizontal Shear
21.49
4.30
12.90
8.60
21.49
4.30
8.60
12.90
4.30
4.30
EA
EF
EI
FE
FB
FG
FJ
GF
GC
HORIZONTAL SHEAR
4.30
177.02
39.70
177.02
8.60
106.21
79.41
106.21
8.60
y5
y4
y3
y2
y1
6.45
12.90
12.90
6.45
59.55
119.11
1.50
1.50
1.50
1.50
1.50
m
m
m
m
m
Vertical Shear
2.15
2.15
6.45
4.30
2.15
2.15
-4.30
6.45
2.15
2.15
VERTICAL SHEAR
2.15
22.00
24.15
22.00
4.30
66.00
48.30
66.00
-4.30
F5
F4
F3
F2
F1
6.45
6.45
6.45
66.00
66.00
25.79
212.43
159.32
106.21
53.11
kN
kN
kN
kN
kN
V5
V4
V3
V2
V1
4.30
39.70
66.26
83.96
92.81
kN
kN
kN
kN
kN
GH
GK
HG
HD
HL
35.40
79.41
35.40
4.30
39.70
IE
IJ
IM
JI
JF
JK
JN
KJ
KG
KL
KO
LK
LH
LP
HORIZONTAL SHEAR
39.70
132.77
66.26
132.77
79.41
79.66
132.51
79.66
79.41
26.55
132.51
26.55
39.70
66.26
MI
MN
MQ
NM
NJ
NO
NR
HORIZONTAL SHEAR
66.26
88.51
83.96
88.51
132.51
53.11
167.92
119.11
59.55
99.38
198.77
198.77
99.38
125.94
251.88
22.00
-48.30
22.00
2.15
24.15
VERTICAL SHEAR
24.15
52.98
77.13
52.98
48.30
158.94
154.26
158.94
-48.30
52.98
-154.26
52.98
24.15
77.13
VERTICAL SHEAR
77.13
75.11
152.24
75.11
154.26
225.32
154.26
66.00
158.94
158.94
158.94
225.32
225.32
ON
OK
OP
OS
PO
PL
PT
QM
QR
QU
RQ
RN
RS
RV
SR
SO
ST
SW
TS
TP
TX
53.11
132.51
17.70
167.92
17.70
66.26
83.96
HORIZONTAL SHEAR
83.96
44.26
92.81
44.26
167.92
26.55
185.62
26.55
167.92
8.85
185.62
8.85
83.96
92.81
251.88
125.94
139.21
278.43
278.43
139.21
225.32
-154.26
75.11
-304.48
75.11
77.13
152.24
VERTICAL SHEAR
152.24
88.38
240.62
88.38
154.26
265.15
331.03
265.15
-304.48
88.38
-481.24
88.38
152.24
240.62
225.32
265.15
265.15
265.15
2V5
2V4
2V3
2V2
2V1
8.60
79.41
132.51
167.92
185.62
kN
kN
kN
kN
kN
PORTAL METHOD
CROSS SECTION
2.15
21.49
53.11
2.15
4.30
2.15
6.45
21.49
2.15
177.02
106.21
24.15
39.70
24.15
177.02
22.00
159.32
77.13
66.26
77.13
75.11
88.51
152.24
88.51
152.24
154.26
177.02
154.26
88.38
44.26
25.79
240.62
92.81
240.62
53.11
44.26
88.38
331.03
185.62
331.03
17.70
75.11
152.24
88.51
152.24
88.38
8.85
481.24
185.62
481.24
77.13
66.26
77.13
75.11
17.70
26.55
265.15
26.55
52.98
304.48
177.02
304.48
265.15
26.55
24.15
39.70
24.15
52.98
26.55
53.11
225.32
35.40
22.00
154.26
132.51
154.26
225.32
2.15
4.30
2.15
22.00
35.40
79.66
158.94
4.30
2.15
48.30
79.41
48.30
158.94
79.66
88.51
75.11
247.83
66.00
154.26
132.51
154.26
21.49
4.30
8.60
4.30
66.00
247.83
132.77
52.98
212.43
6.45
48.30
79.41
48.30
52.98
132.77
12.90
4.30
8.60
4.30
22.00
2.15
12.90
8.85
88.38
240.62
92.81
240.62
92.81
185.62
185.62
92.81
240.62
331.03
331.03
240.62
6.00
2.00
6.00
3.00
3.00
3.00
3.00
3.00
MOMENT
CROSS SECTION
6.45
6.45
6.45
12.90
66.00
59.55
66.00
119.11
158.94
99.38
119.11
158.94
251.88
225.32
125.94
179.11
225.32
251.88
265.15
139.21
12.90
228.28
265.15
278.43
261.70
6.45
6.45
66.00
59.55
158.94
99.38
225.32
125.94
265.15
139.21
SEISMIC ANALYSIS
LONGITUDINAL SECTION
ASSUMPTIONS:
L
S
TRIBUTARY AREA
34.00 m
4.00 m
AREA
136.00
m2
WIDTH
DEPTH
BEAM
0.40
0.50
AREA
0.20
m
m
WIDTH
DEPTH
m2
COLUMN
0.40
0.40
AREA
QUANTITY
0.16
6.00
A. DEADLOADS
LEVEL 5
height =
3.00
0.24
kPa
136.00
m2
Finishing
SUBTOTAL
0.77
kPa
136.00
m2
Slab
0.10
23.54
kN/m3
136.00
Beam
0.20
m2
23.54
kN/m3
58.00
LEVEL 4 to LEVEL 1
height =
3.00
Column
0.24
m2
23.54
0.24
kPa
136.00
m2
Finishing
0.24
kPa
137.36
m2
Perimeter Wall
2.10
kPa
137.36
m2
Partition Wall
SUBTOTAL
2.60
kPa
137.36
m2
Slab
0.10
23.54
Beam
0.20
m2
23.54
Finishing
0.24
kPa
137.36
m2
Perimeter Wall
2.10
kPa
137.36
m2
Partition Wall
SUBTOTAL
2.60
kPa
137.36
m2
LEVEL GROUND
height =
kN/m3
18.00
kN/m3
136.00
kN/m3
58.00
B. SUMMARY OF LOADINGS
LEVEL 5
LEVEL 4
LEVEL 3
LEVEL 2
LEVEL 1
LEVEL GROUND
TOTAL, W
I
II
III
137.36
1,406.10
1,406.10
1,406.10
1,406.10
1,271.77
7,033.52
C. ELEVATIONS
kN
kN
kN
kN
kN
kN
kN
LEVEL 5
LEVEL 4
LEVEL 3
LEVEL 2
LEVEL 1
LEVEL GROUND
TOTAL, h
I
1.50
1.25
1.00
Ip
1.50
1.50
1.00
3.00
3.00
3.00
3.00
3.00
15.00
8.50
IV
V
Standard Occupancy
Miscellaneous Structures
Occupancy Category:
SEISMIC SOURCE TYPE
Na
Nv
1.
1.00
1.00
1.00
1.00
Ca
Cv
0.40
0.56
1.00
NUMERICAL COEFFICIENT, Ct
Steel
0.0853
Rein. Concrete
0.0731
Others
0.0488
A
1.00
1.00
Z
Type
Ct
T = fundamental period of vibration, in seconds, of the structure for the direction under consideration
T = Ct (hn)
use
2.
T=
T=
sec
sec
The Total design base shear shall be determined from the following equation:
V=
V=
Cv I W
RT
831.68
kN
The design base shear shall not exceed the following equation:
V=
use
V=
V=
2.5 x Ca x I
R
827.47
827.47
W
EXCEEDED
kN
The Total design base shearshall not be less than the following:
V=
V=
827.47
0.11 Ca I W
309.48 kN
>
309.48
OK
In addition, for Seismic Zone 4, the total base shear shall not be less than the following:
0.40
Rein. Concrete
0.07310
V=
V=
827.47
3.
0.80 ZNv IW
R
264.79 kN
>
264.79
OK
Level
5
4
3
2
1
GROUND
TOTAL
0.07TV
32.27
Fx :=
kN
Wi hi
0.25V
Ft =
206.87
kN
206.87
use
>
Ft =
32.27
-
OK
kN
V-Ft
827.47
827.47
827.47
827.47
827.47
827.47
Wx
137.36
1,406.10
1,406.10
1,406.10
1,406.10
1,271.77
hx
15.00
12.00
9.00
6.00
3.00
-
Wxhx
2,060.40
16,873.19
12,654.89
8,436.60
4,218.30
42,182.98
OK
( V - Ft) Wx hx
Earthquake Forces, Fx
40.42
330.99
248.24
165.49
82.75
867.89
Fx
kN
kN
kN
kN
kN
kN
kN
5.00
4.00
3.00
2.00
1.00
40.42
330.99
248.24
165.49
82.75
kN
kN
kN
kN
kN
COMPUTATION OF SHEAR
Level
5.00
4.00
3.00
2.00
1.00
40.42
40.42
371.41
619.65
785.14
+
+
+
+
Shear Forces, V
=
330.99
=
248.24
=
165.49
=
82.75
=
40.42
371.41
619.65
785.14
867.89
kN
kN
kN
kN
kN
COMPUTATION OF MOMENT
Level
5.00
4.00
3.00
2.00
1.00
7447.26
3475.39
1241.21
248.24
+
+
+
+
40.42
330.99
248.24
165.49
82.75
Moment, M
x
15.00
x
12.00
x
9.00
x
6.00
x
3.00
=
=
=
=
=
8053.52
7447.26
3475.39
1241.21
248.24
kN.m
kN.m
kN.m
kN.m
kN.m
LUMN
m
m
m2
32.64
kN
104.72
137.36
kN
kN
320.14
kN
273.06
kN
NS
m
m
m
m
m
m
m
101.69
kN
32.64
kN
32.97
kN
288.46
kN
357.14
1,406.10
kN
kN
320.14
kN
273.06
kN
32.97
kN
288.46
kN
357.14
1,271.77
kN
kN
Rein. Concrete
x5
x4
x3
x2
x1
3.50
3.50
3.00
3.50
3.50
m
m
m
m
m
y5
y4
y3
y2
y1
1.50
1.50
1.50
1.50
1.50
m
m
m
m
m
F5
F4
F3
F2
F1
40.42
330.99
248.24
165.49
82.75
kN
kN
kN
kN
kN
AB
AG
BC
BH
BA
CD
CI
CB
DE
DJ
DC
EF
EK
ED
FL
FE
Horizontal Shear
36.38
4.04
28.29
8.08
36.38
20.21
8.08
28.29
12.13
8.08
20.21
4.04
8.08
12.13
4.04
8.08
GH
GM
GA
HI
HN
HG
HB
IJ
IO
IH
IC
JK
JP
JI
JD
HORIZONTAL SHEAR
0.00
37.14
4.04
#REF!
74.28
36.38
8.08
#REF!
74.28
8.08
#REF!
#REF!
74.28
8.08
#REF!
6.06
12.13
12.13
12.13
12.13
12.13
Vertical Shear
1.73
1.73
1.73
0.00
1.73
2.02
0.29
1.73
1.73
-0.29
2.02
1.73
0.00
1.73
1.73
1.73
VERTICAL SHEAR
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
1.73
#REF!
#REF!
#REF!
0.00
#REF!
#REF!
#REF!
0.29
#REF!
6.06
6.06
6.06
Y
6.06
6.06
6.06
#REF!
#REF!
#REF!
#REF!
KL
KQ
KJ
KE
LR
LK
LF
#REF!
74.28
8.08
#REF!
37.14
#REF!
8.08
#REF!
#REF!
#REF!
#REF!
-0.29
#REF!
#REF!
#REF!
0.00
MN
MS
MG
NO
NT
NM
NH
OP
OU
ON
OI
PQ
PV
PO
PJ
QR
QW
QP
QK
RX
RQ
RL
HORIZONTAL SHEAR
VERTICAL SHEAR
#REF!
#REF!
61.96
42.47
37.14
55.71
#REF!
61.96
42.47
123.93
#REF!
12.32
42.47
123.93
185.89
#REF!
12.32
42.47
123.93
#REF!
-37.33
49.55
123.93
185.89
#REF!
-37.33
49.55
123.93
#REF!
-86.98
42.47
123.93
185.89
#REF!
-86.98
42.47
123.93
#REF!
-136.63
42.47
123.93
185.89
#REF!
61.96
42.47
#REF!
12.32
#REF!
ST
SY
SM
TU
TZ
TS
TN
UV
Ua
HORIZONTAL SHEAR
VERTICAL SHEAR
37.14
#REF!
148.95
60.21
78.51
117.77
#REF!
148.95
60.21
123.93
#REF!
115.85
60.21
157.03
235.54
#REF!
115.85
60.21
123.93
#REF!
#REF!
148.66
148.66
148.66
148.66
148.66
#REF!
210.72
210.72
UT
UO
VW
Vb
VU
VP
WX
Wc
WV
WQ
Xd
XW
XR
Yz
Ye
YS
Za
Zf
ZY
ZT
ab
ag
aZ
aU
bc
bh
ba
bV
cd
ci
cb
cW
dj
dc
dX
82.75
157.03
82.75
123.93
49.65
157.03
49.65
123.93
16.55
157.03
16.55
#REF!
-33.10
235.54
235.54
235.54
70.24
#REF!
70.24
#REF!
60.21
#REF!
60.21
#REF!
60.21
#REF!
60.21
#REF!
#REF!
HORIZONTAL SHEAR
VERTICAL SHEAR
78.51
#REF!
74.47
70.84
86.79
130.18
#REF!
74.47
70.84
157.03
#REF!
57.92
70.84
173.58
260.37
#REF!
57.92
70.84
157.03
#REF!
41.37
82.65
173.58
260.37
#REF!
41.37
82.65
157.03
#REF!
24.82
70.84
173.58
260.37
#REF!
24.82
70.84
157.03
#REF!
8.27
70.84
173.58
260.37
#REF!
8.27
70.84
#REF!
#REF!
-8.27
#REF!
210.72
210.72
210.72
#REF!
247.96
247.96
247.96
247.96
247.96
#REF!
V5
V4
V3
V2
V1
4.04
37.14
61.96
78.51
86.79
kN
kN
kN
kN
kN
2V5
2V4
2V3
2V2
2V1
8.08
74.28
123.93
157.03
173.58
kN
kN
kN
kN
kN
PORTAL METHOD
CROSS SECTION
40.42
330.99
248.24
165.49
82.75
7.00
7.00
6.00
7.00
OD
3.00
3.00
3.00
3.00
3.00
7.00
7.00
MOMENT
CROSS SECTION
2.90
2.90
2.90
5.80
31.45
5.80
31.45
28.56
57.11
76.41
57.11
76.41
47.85
95.70
108.64
60.79
108.64
121.57
128.14
67.36
95.70
121.57
128.14
134.72
134.72
MOMENT
CROSS SECTION
2.90
2.90
5.80
31.45
2.90
5.80
31.45
57.11
76.41
31.45
57.11
76.41
95.70
108.64
76.41
95.70
108.64
121.57
128.14
108.64
121.57
128.14
134.72
128.14
134.72
2.90
28.56
47.85
60.79
67.36