PROPIETARIO
OBRA
UBICACIN DE LA OBRA
FECHA
Item
Descripcin
:
:
:
:
Unidad
Metrado
Precio
Parcial
Total
1.00
1.01
1.02
TRABAJOS PRELIMINARES
Limpieza de terreno manual
Trazo, niveles y replanteo preliminar
m
m
279.08
279.08
1.69
200.00
471.64
-
471.64
2.00
2.01
2.02
2.03
MOVIMIENTO DE TIERRAS
Excavacin para cimientos hasta 1.00 m terreno
normal
Relleno con material propio
Eliminacin de desmonte
m
m
m
17.63
1.94
15.69
16.88
11.25
19.48
297.61
21.84
305.64
625.09
3.00
3.01
3.02
3.03
3.04
3.05
m
m
m
m
m
14.69
3.99
53.20
269.10
269.10
97.56
147.53
17.91
4.39
15.51
1,433.40
588.64
952.81
1,181.35
4,173.74
8,329.95
4.00
4.01
4.02
4.03
4.04
4.05
4.06
m
m
Kg
m
m
Kg
3.63
42.63
398.23
1.90
25.38
201.43
241.19
25.88
2.59
241.19
25.88
2.59
875.52
1,103.26
1,031.42
459.11
656.83
521.70
4,647.84
5.00
5.03
90.00
26.77
2,409.30
2,409.30
COSTO DIRECTO
GASTOS GENERALES Y UTILIDAD (15%)
16,483.82
2,472.57
SUB TOTAL
IGV 19%
18,956.39
3,601.71
TOTAL DE PRESUPUESTO
22,558.10
Pgina 1
09/12/2005