CONTRACT DOCUMENT
*45T6

FH

ISSUED FOR CONSTRUCTION


DEMOLITION ! GENERAL NOTES,
1.) THE EXACT LOCATION OF SERVICES, AUTHORITY SERVICES AND CONNECTION POINTS ARE APPROXIMATE ONLY AND HAVE BEEN PLOTTED FROM RECORD DRAWINGS. 2.) WHERE THE EXISTING SERVICES ARE TO BE CUT BACK TO ALLOW DEMOLITION AND/OR REMOVAL OF EXISTING SERVICES AND STRUCTURE, THEY SHALL BE DONE SO IN A MANNER THAT ALLOWS THE CONTINUATION OF THE SERVICES TO THE NEW WORKS WHERE REQUIRED. .) EXISTING SERVICES THAT INTERFACE WITH NEW WORKS BEING CONSTRUCTED UNDER THIS CONTRACT SHALL BE RELOCATED ! PLOTTED ON "AS CONSTRUCTED" DRAWINGS. #.) FULLY SEAL SERVICE PENETRATIONS NO LONGER REQUIRED TO THE SATISFACTION OF THE SUPERINTENDENT. $.) WHERE EXISTING SERVICES ARE TO REMAIN, THEY SHALL REMAIN OPERATIONAL AT ALL TIMES WHERE POSSIBLE TO MAINTAIN SCHOOL OPERATIONS. %.) ANY DAMAGE CAUSED BY THESE WORKS TO EXISTING SERVICES SHALL BE IMMEDIATELY BROUGHT TO THE SUPERINTENDENT"S ATTENTION AND RECTIFIED. &.) ALL TEMPORARY SERVICES PROVIDED SHALL BE REMOVED, CUT AND SEALED TO WATER CORPORATION REQUIREMENTS UPON PERMANENT CONNECTION BEING MADE. '.) EXISTING SERVICES SHALL BE LOCATED, IDENTIFIED AND PEGGED ON SITE RELATED TO NEW WORKS PRIOR TO COMMENCEMENT. LOCATE SERVICES BY DIGGING WHERE NECESSARY. ANY DAMAGE CAUSED BY THIS CONTRACT TO THE EXISTING SERVICES SHALL BE MADE GOOD IMMEDIATELY TO THE SUPERINTENDENT"S SATISFACTION. SHOW ALL FINAL LOCATIONS IN (AS CONSTRUCTED( DRAWINGS EXISTING AND NEW RELATED TO WORKS. ).) MAKE GOOD ALL AREAS AND SURFACES AFFECTED BY DEMOLITION WORKS TO THE SATISFACTION OF THE SUPERINTENDENT. 1*.) LIAISE WITH SCHOOL PRINCIPLE REGARDING TEMPORARY DISCONNECTION OF SERVICES DURING THE CONTRACT. 11.) REFER TO HYDRAULIC DRAWINGS FOR ALL IN GROUND SERVICES AND CONNECTION TO EXISTING SERVICES FOR NEW WORKS. 12.) REFER TO CIVIL ENGINEERS DRAWINGS FOR NEW ACCESS ROADS AND EXTERNAL CIVIL WORKS. 1 .) ALL HA+ARDOUS MATERIALS REMOVAL METHODS TO COMPLY WITH DEPARTMENT OF EDUCATION ASBESTOS MANAGEMENT PLAN. REFER TO HA+MAT REPORT FOR DETAILS.

581

580

5 .4 1 3

. 29 4 9 .8 29 0.0 3

3 5 778.5 28.4 . 28 2 01

9 .0 1 30 0.1 3

5 .2 1 3 7 .0 0 3 7 4 .0 .0 0 0 33

0 .4 8 2

0 .1 0 3

1 .1 0 3

4 .26 31

5 .2 1 3

6 7 .5 1.5 1 3 3

2 .9 9 2

506 539

2 .9 9 2

538

3 5 .0 0.0 0 3 3

7 .4 31

579

3 .9 8 2

WA

2 .9 8 2

4 .7 8 2

WA .00 29 WA

9 .1 9 2

5 .9 9 28 .9 29

WA

25

27

3 .1 9 2

7 .8 9 2

1 .0 8 2

7 .6 29

6 .8 9 2

4 .6 9 2

526 527

0 .1 8 2

S S

WA

7 .3 8 2

6 .7 9 2

PROVIDE PROTECTION FOR EXISTING FACILITIES SHOWN HATCHED

517 1

TOP OF BRICK PLANTER TO BE REMOVED TO MAKE WAY FOR PROPOSED WALKWAY

6 .6 29

8 .0 0 3 518

WA

2 .4 .45 9 2 29

.4 29

4 .5 9 2

9 .6 9 2

4 .7 29

29

28

WA

5 .7 29

9 .8 9 2

2 .8

502

503 504 505

DN

6 .7 9 9 8 2 .

1 .9 9 2

29

1 .9 9 2

FH

SUGGESTED MINIMUM EXTENT OF SITE FENCING DURING CONSTRUCTION. CONTRACTOR TO MAKE THEIR OWN SITE ASSESSMENT DURING TENDER AND INCLUDE SITE ALLOWANCE IN THEIR SUBMISSION

WO R

KS

BASKETBALL FENCING TO BE REMOVED PROPOSED BUILDING PAD PROPOSED BUILDING PAD

GREY HATCH AREA, EXTENT OF EARTHWORKS REFER TO SITE PLAN AND FLOOR PLAN FOR PROPOSED SPOT LEVEL AND RL TO DETERMINE CUT AND FILL REQUIRED

CROSS HATCH AREA, EXTENT OF CONCRETE PAD TO BE REMOVED PROPOSED BUILDING ENVELOPE BASKETBALL FENCING TO BE REMOVED PROPOSED BUILDING ENVELOPE

DRAINAGE TO BE REMOVED

PROPOSED BUILDING ENVELOPE

PROPOSED BUILDING ENVELOPE

HATCH AREA, EXTENT OF CONCRETE PATH TO BE REMOVED

PROPOSED BUILDING ENVELOPE

PROPOSED BUILDING PAD

BASKETBALL RING HOOPS TO BE REMOVED AND HAND OVER TO SCHOOL FOR FUTURE USE PROPOSED BUILDING PAD

GREY HATCH AREA, EXTENT OF EARTHWORKS REFER TO SITE PLAN, FLOOR PLAN AND SECTION FOR PROPOSED SPOT LEVEL AND RL TO DETERMINE CUT AND FILL REQUIRED

BASKETBALL RING HOOPS TO BE REMOVED AND HAND OVER TO SCHOOL FOR FUTURE USE

BASKETBALL FENCING TO BE REMOVED

BASKETBALL FENCING TO BE REMOVED

SUGGESTED MINIMUM EXTENT OF SITE FENCING DURING CONSTRUCTION. CONTRACTOR TO MAKE THEIR OWN SITE ASSESSMENT DURING TENDER AND INCLUDE SITE ALLOWANCE IN THEIR SUBMISSION

PROPOSED BUILDING ENVELOPE

8 .5 6 2

9 .5 6 2

461

RO AD

8 .6 6 2

PROPOSED BUILDING PAD

PROPOSED BUILDING PAD

4 .0 4 2

FENCE TO BE RETAIN. CONTRACTOR TO REPLACE ANY FENCE SACRIFICED DIURING THE CONSTRUCTION

23
H TC HA T EN XT ,E EA AR OF

CROSS HATCH AREA, INDICATING AFFECTED AREA DURING PROPPING TILT UP PANEL CONTRACTOR IS RESPONSIBLE TO PREPARE THE SITE TO ENGINEERS SATISFACTION AND ALLOW ANY REMEDIATION FOR DAMAGE OCCUR TO LANDSCAPING / FENCE ! COURTS

FENCE TO BE RETAIN. CONTRACTOR TO REPLACE ANY FENCE SACRIFICED DIURING THE CONSTRUCTION

FENCE TO BE RETAIN. CONTRACTOR TO REPLACE ANY FENCE SACRIFICED DIURING THE CONSTRUCTION

KS

5 .0 2 2

26

PR OP OS ED

RETAINING WALL TO BE REMOVED. PROVIDE TEMPORARY SUPPORT DURING THE REMAINDER DURATION OF THE CONTRACT

PROVIDE PROTECTION FOR EXISTING FACILITIES SHOWN HATCHED

1#.) PREPARE GROUND AND COMPACT AS SPECIFIED FOR FINAL LEVELS REFER TO SLAB LAYOUT AND FLOOR PLANS

OF NT XTE A, E ARE CH HAT C CON


PR OP OS ED

D OVE REM BE TO ATH EP RET


RO AD WO R

25 24 23

1 O REV

*'/*'/1 21/*$/1 DATE

ISSUE FOR CONSTRUCTION ISSUE FOR TENDER DESCRIPTION

1
A .*1

D79.:161.2 P:52
1 , 2**

SUGGESTED MINIMUM EXTENT OF SITE FENCING DURING CONSTRUCTION. CONTRACTOR TO MAKE THEIR OWN SITE ASSESSMENT DURING TENDER AND INCLUDE SITE ALLOWANCE IN THEIR SUBMISSION

22

TE RE NC CO TH PA

DOCUMENTATION BY,

23

TO BE VE MO RE D

architects and urban designers


2 / 234 Pier St, Perth Western Australia Tel (08) 9481 14 ! "a# (08) 9324 181$
Web %%%&'c(&net A)* 4 28 +$ 240 ! A,* 009 210 44

EXISTING BASKETBALL COURTS TO BE USED FOR BUILDER"S COMPOUND DURING CONSTRUCTION. CONTRACTOR RESPONSIBLE TO PREPARE THE COURT TO SUIT ITS INTENDED PURPOSED DURING CONSTRUCTION AND REMEDIATION POST CONSTRUCTION. ANY BASKETBALL RING HOOPS THAT"RE ON THE WAY MAY BE REMOVED DURING CONSTRUCTION AND REINSTATED AFTER CONSTRUCTION COMPLETED

Government of Western Australia


Department of Finance
Building Management and Works

-OHN CURTIN COLLEGE OF THE ARTS


LACE R TO REP ONTRACTO C . IN A T E BE R FENCE TO SACRIFICED ANY FENCE RUCTION HE CONST DIURING T

YEAR & PRO-ECT DEMOLITION PLAN


DRAWN CHECKED APPROVED EP/PVG GR GR DATE 2&.11.2*12 DF FILE N.. 2*1 /* %2& -CCA1.*2A%8REV81 DRAWING N.. DESIGNED PRINCIPAL GR REDUCTION * 2$

SCALE A0 123145673 / B1 DF PRO- N.. 12%#%

CD A1.*2
2/*'/2*1 ,2 ,21 PM

Vous aimerez peut-être aussi