ANALISIS DE FLETE TERRESTRE

OBRA DEPARTAMENTO PROVINCIA DISTRITO N 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 :"CONSTRUCCION CARRETERA HUAYACCA ANTACANCHA COCHAMARCA" : HUANCAVELICA : CASTROVIRREYNA : AURAHUA DESCRIPCION DE LOS MATERIALES UND CANTIDAD PESO UNIT.(KG) TRASPORTADOS EN CAMION (KG) 1,358.65 1,222.44 354.40 16.00 24,229.11 22.40 1,080.00 3,360.00 1,200.00 960.00 640.00 100.00 120.00 775.00 160.00 225.00 826.00 202,862.70 342.00 1,685.55 0.48 28.00 12.04 36.36 2.10 252.00 175.00 257.04 2,790.24 512.00 5,096.00 3,080.00 1,920.00 980.00 16.55 360.00 42.00 7.60 103.36 4.64 66.40 588.00 113.40 30.24 30.00 16.00 192.00 901.10 240.24 11.61 10.00 250.00 15.00 24.00 450.00 240.00 240.00 150.00 5.00 10.00 70.00 10.00 260,877.65 PESO TOTAL DE MATERIAL PESO CARGA CAMION NUMERO DE VIAJES = TRANSPORTE DE MATERIALES 33 + 1 34 260,877.65 8,000.00 32.6

KG ALAMBRE NEGRO RECOCIDO # 16 KG ALAMBRE NEGRO RECOCIDO # 8 KG CLAVOS UND PERNO C/TUERCA-ARANDELA 3/4"X4" KG ACERO DE REFUERZO FY=4200 GRADO 60 KG FIERRO CO. FY=4200 KG/CM2 UND BARROTES DE 2"X2"x1' UND PIE DERECHO 4"x4"x13' UND PIE DERECHO 4"x4"x8' UND BARROTES DE 2"X2"x5' UND BARROTES DE 2"X2"x2' UND BARROTES DE 2"X3"x5' UND BARROTES DE 2"X1.5"x1.5' UND SOLERA DE 4"X4"x5' UND SOLERA DE 3"X2"x1.5' UND SOLERA DE 4"X2"x14' UND LADRILLO ARCILLA CORRIENTE REX 6x12x25 CM BOL CEMENTO PORTLAND TIPO I (42.5KG) BOL YESO DE 28 Kg UND BARRENO 5' X 1/8" L PEGAMENTO PARA PVC KG SOLDADURA CELLOCORD P 3/16" GLN IMPRIMANTE M CAUCHO NATURAL DE 0.45x0.60x1" (NEOPRENE) UND HOJA DE SIERRA UND CILINDRO VACIO ABIERTO KG FERTILIZANTE FOLIAR M ANGULO DE FIERRO DE 4"x4"X1/2" P3 MADERA NACIONAL P/ENCOFRADO-CARP UND TABLA DE 1"X10"X10' UND TABLONES DE MADERA DE 2"x10"x10' UND TABLONES DE MADERA DE 2"x8"x10' UND TABLONES DE MADERA DE 2"x8"x15' UND TABLONES DE MADERA DE 2"x8"x21' P3 ESTACA DE MADERA PLN TRIPLAY DE 4'x8'x 8 mm KG CLAVOS DE 3/4" GLN THINER GLN PINTURA ESMALTE SINTETICO GLN PINTURA AL OLEO MATE GLN PINTURA ANTICORROSIVA CALAMINAS GALVANIZADAS 1.83mX1.085mx 0.3mm UND M PLANCHA DE ACERO DE 7" x 1/2" M PLANCHA DE ACERO DE 1" X 1/2"' M3 TEKNOPORT DE 1" PZA PLANCHA DE ACERO DE 1/16"x0.90x0.60 PZAMET Y ACC PLANCHA MET. 1/16"x0.60x0.60 SEG. DISEO C/SOPORTE M TUBO Fo.GALV. DE 2" M TUBERIA PVC SAP CLASE -10, DIAM 6" M TUBERIA PVC C-7.5 DE 3" UND MIRAS Y JALONES UND MEZCLADORA DE CONCRETO DE 9 -11P3 UND MOTOSIERRA UND PROBETAS P/TESTIGOS UND COMPRESORA NEUMATICA 196 HP 600-690 PCM UND COMPACTADOR VIBR. TIPO PLANCHA 4 HP UND MARTILLO NEUMATICO DE 25 Kg. UND MOTOSOLDADORA DE 250 AMP. UND TALADRO A PERCUSION 3/4" DOS VELOC. UND TEODOLITO UND VIBRADOR DE CONCRETO DE 1.5 UND NIVEL TOPOGRAFICO PESO TOTAL DE LOS MATERIALES (KG) = NUMERO DE VIAJES =

1358.65 1222.44 354.4 16 24229.11 22.4 720 280 160 160 160 40 80 155 80 30 236 4773.24 13.68 112.37 0.48 28 3.01 8.08 14 21 175 30.24 2232.19 64 364 280 80 28 13.79 60 42 1.9 25.84 1.16 16.6 84 15.12 15.12 10 4 48 360.44 46.2 3.87 2 1 1 4 1 2 4 1 1 1 2 1

1 1 1 1 1 1 1.5 12 7.5 6 4 2.5 1.5 5 2 7.5 3.5 42.5 25 15 1 1 4 4.5 0.15 12 1 8.5 1.25 8 14 11 24 35 1.2 6 1 4 4 4 4 7 7.5 2 3 4 4 2.5 5.2 3 5 250 15 6 450 120 60 150 5 10 35 10

DESCRIPCION

TIPO DE CARRETERA

LONGITUD (Km)

VELOCIDAD

TIEMPO

(HORAS)

1 2

Chincha - Aurahua Aurahua - Chocoro

Carretera afirmada Trocha Carrozable

145.00 11.00

25.00 20.00

5.80 0.55 6.35 120.00 34.00 25,908.00

TIEMPO TOTAL DE MOVILIZACION POR VIAJE COSTO DE ALQUILER HORARIO DE CAMION CARAGA DE 10 TN. S/. NUMERO DE VIAJES REQUERIDOS POR PESO Y VOLUMEN CALCULO DE COSTO DE TRANSPORTE DE MATERIALES S/. =

MOVILIZACION DE RETORNO DEL CAMION DE CARGA

N 1 2

DESCRIPCION Chincha - Aurahua Aurahua - Chocoro

TIPO DE CARRETERA Carretera afirmada Trocha Carrozable TIEMPO TOTAL DE MOVILIZACION POR VIAJE COSTO DE OPERACIN HORARIA S/. NUMERO DE VIAJES DE RETORNO ()

LONGITUD (Km) 145.00 11.00

VELOCIDAD 30.00 25.00

TIEMPO

(HORAS)

4.83 0.44 5.27 15.50 34.00 2,779.05

COSTO MOVILIZACION DE RETORNO DE LOS CAMIONES S/. =

COSTO TOTAL DE TRANSPORTE DE MATERIALES S/. =

28,687.05

ANALISIS DE MOVILIZACION DE EQUIPO


OBRA : DEPARTAMENTO PROVINCIA DISTRITO N 1 2 3 4 5 :"CONSTRUCCION CARRETERA HUAYACCA ANTACANCHA COCHAMARCA" : HUANCAVELICA : CASTROVIRREYNA : AURAHUA DESCRIPCION DEL EQUIPO RODILLO LISO VIBR. AUTOP. 70 - 100 HP CARGADOR S/LLANTAS 125 - 155 HP TRACTOR SOBRE ORUGAS 190-240 HP MOTONIVELADORA DE 125 HP COMPRESORA NEUMATICA 335 - 375 PCM PESO TOTAL DE LA MAQUINARIA A MOVILIZAR = NUMERO DE VIAJES = PESO TOTAL MAQUINARIAS PESO CARGA PLATAFORMA NUMERO DE VIAJES = MOVILIZACION DE EQUIPO EN PLATAFORMA TIEMPO (HORAS) 1.27 6.00 7.27 180.00 4.00 5,231.00 3+1 4 57.92 20.00 2.90 CANTIDAD 1.00 1.00 1.00 1.00 1.00 PESO UNIT.(TN) 7.30 16.59 20.52 11.52 2.00 TRASPORTADOS EN PLATAFORMA (TN) 7.30 16.59 20.52 11.52 2.00 57.92 OBSERVACIONES MOV. CON CAMION PLATAFORMA MOV. CON CAMION PLATAFORMA MOV. CON CAMION PLATAFORMA MOV. CON CAMION PLATAFORMA MOV. CON CAMION PLATAFORMA TN

DESCRIPCION

TIPO DE CARRETERA

LONGITUD (Km)

VELOCIDAD

1 2

AYACUCHO - HUANTA HUANTA - HUAYANAY

CARRETERA ASFALTADA CARRETERA AFIRMADA

44.30 120.00

35.00 20.00

TIEMPO TOTAL DE MOVILIZACION POR VIAJE COSTO DE ALQUILER HORARIO DE CAMION PLATAFORMA DE 30 TN. S/. NUMERO DE VIAJES REQUERIDOS POR PESO Y VOLUMEN CALCULO DE COSTO DE MOVILIZACION DE EQUIPO S/. =

MOVILIZACION DE EQUIPO AUTOPROPULSADO TIEMPO (HORAS) 1.11 4.80 5.91 60.00 4.00 1,418.00

N 1 2

DESCRIPCION AYACUCHO - HUANTA HUANTA - HUAYANAY

TIPO DE CARRETERA CARRETERA ASFALTADA CARRETERA AFIRMADA

LONGITUD (Km) 44.30 120.00

VELOCIDAD 40.00 25.00

TIEMPO TOTAL DE MOVILIZACION POR VIAJE COSTO DE OPERACIN HORARIA S/. NUMERO DE UNIDADES () COSTO MOVILIZACION DE EQUIPO AUTOPROPULSADO S/. = COSTO TOTAL DE MOVILIZACION DE EQUIPO S/. =

6,649.00