Vous êtes sur la page 1sur 18

SM CENTER LAS PIAS

Engineering Weekly Report November 19-25 November, 2012

Prepared by: Julius O. Salacup Resident Engineer SM Center Las Pias


SM EDD OPERATIONS
Engineering Design & Development

SMPN GENERAL INFORMATION SHEET

ALABANG-ZAPOTE ROAD, BRGY. PAMPLONA DOS, LAS PIAS CITY

DATE OF OPENING:

OCTOBER 02, 2009

LAND AREA:

28,626 sq. m.

CFA:

40,267 sq. m.

TOTAL LEASABLE AREA:

16,308.54 sq. m.

FOOD TENANTS:

12

NON-FOOD TENANTS:

41

OPEN PARKING:

311 slots

MOTORCYCEL PARKING:

80 slots

PARKING FOR PWD:

6 slots

CINEMA SEATING CAPACITY (NO CINEMA)

CINEMA N/A

CINEMA N/A

CINEMA N/A

CINEMA N/A

SM CENTER LAS PIAS WEEKLY REPORT (19NOV TO 25NOV 2012)

Engineering Design & Development

SMPN GENERAL INFORMATION SHEET


ALABANG-ZAPOTE ROAD, BRGY. PAMPLONA DOS, LAS PIAS CITY ELECTRICITY DISTRIBUTOR: SUBSTATION CAPACITY: GENSETS CAPACITY: DIESEL TANK CAPACITY: CHILLERS CAPACITY: COOLING TOWER CAPACITY: TOTAL NO OF AHU: TOTAL NO OF FCU: TOTAL NO OF KEF: TOTAL NO OF KSF: TOTAL NO OF FAF: TOTAL NO OF EF: TOTAL NO OF SF TOTAL NO OF SEF: TOTAL NO OF PB: TOTAL NO OF LEF: WALKALATOR: (HYUNDAI): FREIGHT ELEVATORS (HYUNDAI): PASSENGER ELEVATORS (HYUNDAI): 2x7.5Hp; 4x15Hp; 1200kg cap. 1x15Hp; 60m/min. 1200kg cap. MERALCO CKT. #49xd 1x3MVA; 13.5KV/460V; 3; 60Hz; ELETTROMECCANICA COLOMBO 2x21.25MVA; 460V; 3; 60Hz; CAT 2x4642gal. (9284L GROSS) 2x500TR; CVHF485; 275KW; TRANE 2x500TR; 50Hp; BAC 24 UNITS 5 UNITS 8UNITS 6 UNITS 7 UNITS 6 UNITS 2 UNITS 4 UNITS STP CAPACITY: PRIMARY AERATION BLOWERS: SECONDARY AERATION BLOWERS: TTP FILTER PUMPS LPG FARM CAPACITY: FDAS CPS PUMP (POTABLE): CPS PUMP (NON-POTABLE): FIRE PUMP: JOCKEY PUMP: CISTERN TANK CAPACITY: FIRE TANK CAPACITY: NON-POTABLE TANK CAPACITY: SBR TYPE; 142 cu.m. 1x7.5Hp TECO 2x7.5Hp TECO 2x2Hp 8x250kg(MACRO) ADDRESSABLE TYPE 2x7.5Hp 2x7.5Hp 1x75Hp 1x5Hp 363.8cu.m. 459.8cu.m. 21 cu.m. SYNCHRO PANEL:Ed. Ent. SHOCKBLOCK: YES

SM CENTER LAS PIAS WEEKLY REPORT (19NOV TO 25NOV 2012)

Engineering Design & Development

REPORT OUTLINE:

1. 2. 3. 4. 5.

FACILITIES STATUS UPDATES. EQUIPMENTS BREAKDOWN REPORT. SMR UPDATES. UTILITIES CONSUMPTION, PRODUCTION AND DELIVERIES UPDATES. ENGINEERING AND MAINTENANCE ACTIVITIES SUMMARY AND UPDATES. (BUILDING AND PERIMETER) 6. BUSTED LIGHTS MONITORING UPDATES. 7. COMFORT ROOMS MONITORING UPDATES. 8. ISSUES AND NEEDS LIST.

SM CENTER LAS PIAS WEEKLY REPORT (19NOV TO 25NOV 2012)

Engineering Design & Development

1. FACILITIES STATUS UPDATES.


CATEGORY POWER INTERRUPTIONS WATER SUPPLY INTERRUPTIONS GAS SUPPLY INTERRUPTIONS TOTAL INCIDENTS:
19NOV 20NOV 21NOV 22NOV 23NOV 24NOV 25NOV

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

DESCRIPTION OF INTERRUPTION INCIDENTS


CATEGORY POWER INTERRUPTIONS WATER SUPPLY INTERRUPTIONS GAS SUPPLY INTERRUPTIONS . DESCRIPTION

SM CENTER LAS PIAS WEEKLY REPORT (19NOV TO 25NOV 2012)

Engineering Design & Development

2. EQUIPMNENTS BREAKDOWN REPORT.


EQUIPMENT DESCRIPTION
FREIGHT ELEVATOR 1 (HYPERMARKET) CAUSE OF DOWNTIME
DATE OF DOWNTIME DAYS NONOPERATIONAL

STATUS/REMARKS Already had a quotation, the document is foregoing for the rectification of the said elevator

DAMAGE CAR DOOR

25SEP2012

63

SM CENTER LAS PIAS WEEKLY REPORT (19NOV TO 25NOV 2012)

Engineering Design & Development

3. SMR UPDATES.
RECEIVED SMR 11NOV TO 18NOV2012 COMPLETED SMR 1JAN2012 TO 25NOV2012 TOTAL RECEIVED SMR 1JAN2012 TO 25NOV2012 PENDING 2012 PROJECTS FOR SMR PREPARATION

25

39

SMR BREAKDOWN
CATEGORY / NATURE OF WORKS ELECTRICAL AND AUXILLIARY PLUMBING AND SANITARY AIR CONDITIONING AND VENTILATION LPG SUPPLY CIVIL AND WATERPROOFING PUMPS AND MOTORS FDAS COMPLETED SMR 1JAN2012 TO 25NOV2012 13 3 9 0 2 7 0 TOTAL RECEIVED SMR 1JAN2012 TO 25NOV2012 14 4 10 0 4 7 1 PENDING 2012 PROJECTS FOR SMR PREPARATION 1 1 1 0 2 0 1

SM CENTER LAS PIAS WEEKLY REPORT (19NOV TO 25NOV 2012

Engineering Design & Development

4. UTILITIES CONSUMPTION, PRODUCTION AND DELIVERIES UPDATES


DESCRIPTION ELECTRICITY CONSUMPTION DIESEL FUEL CONSUMPTION DIESEL FUEL DELIVERIES POTABLE WATER CONSUMPTION RE-USE WATER CONSUMPTION RE-USE WATER PRODUCTION COOLING TOWER POTABLE WATER CONSUMPTION COOLING TOWER RE-USE WATER CONSUMPTION LPG CONSUMPTION LPG DELIVERIES 319 cu.m. 116 cu.m. 120 cu. m. 0 cu.m. 39 cu.m. 585kg 367 cu.m. 116 cu.m. 125 cu. m 0 cu.m. 39 cu.m. 545kg 235 cu.m. 110 cu.m. 117 cu. m 0 cu.m. 49 cu.m. 478kg 366 cu.m. 112 cu.m. 115 cu. m 8 cu.m. 37 cu.m. 446kg 356 cu.m. 112 cu.m. 123cu. m 11 cu.m. 33 cu.m. 395kg 415 cu.m. 118 cu.m. 124 cu. m 12 cu.m. 38 cu.m. 378kg 376 cu.m. 116 cu.m. 118 cu. m 12 cu.m. 38 cu.m. 389 kg 1530.7 Li
19NOV 20NOV 21NOV 22NOV 23NOV 24NOV 25NOV

10kWh

10kWh 43.81Li

9kWh

10kWh

10kWh

9kWh

11kWh

SM CENTER LAS PIAS WEEKLY REPORT (19NOV TO 25NOV 2012)

Engineering Design & Development

5. ENGINEERING AND MAINTENANCE ACTIVITIES SUMMARY - TENANTS


CATEGORY ELECTRICAL AND AUXILLIARY PLUMBING AND SANITARY AIR CONDITIONING AND VENTILATION LPG SUPPLY WATER LEAKS
TENANT SERVICE CALLS SERVICE REQUESTS

2 0 0 0 0

0 0 0 0 0

5. ENGINEERING AND MAINTENANCE ACTIVITIES SUMMARY BUILDING AND PERIMETER


CATEGORY ELECTRICAL AND AUXILLIARY PLUMBING AND SANITARY AIR CONDITIONING AND VENTILATION LPG SUPPLY CIVIL
NEW INSTALLATION PREVENTIVE CORRECTIVE

1 0 0 0 0

0 0 0 0 0

0 0 0 0 0

SM CENTER LAS PIAS WEEKLY REPORT (19NOV TO 25NOV 2012)

Engineering Design & Development

5. ENGINEERING AND MAINTENANCE ACTIVITIES UPDATES BUILDING AND PERIMETER AND TENANT

DESCRIPTION
Hyundai PM of Elevator

DESCRIPTION
Hyundai PM of Elevator

SM CENTER LAS PIAS WEEKLY REPORT (19NOV TO 25NOV 2012)

Engineering Design & Development

5. ENGINEERING AND MAINTENANCE ACTIVITIES UPDATES BUILDING AND PERIMETER AND TENANT

DESCRIPTION
Rectification of busted light inside the Elevator

DESCRIPTION
Rectification of busted light inside the Elevator

SM CENTER LAS PIAS WEEKLY REPORT (19NOV TO 25NOV 2012)

Engineering Design & Development

5. ENGINEERING AND MAINTENANCE ACTIVITIES UPDATES BUILDING AND PERIMETER TENANT

DESCRIPTION
Rectification of the damaged Diffuser at STP Chamber
SM CENTER LAS PIAS WEEKLY REPORT (19NOV TO 25NOV 2012)

DESCRIPTION
Rectification of the damaged Diffuser at STP Chamber
Engineering Design & Development

5. ENGINEERING AND MAINTENANCE ACTIVITIES UPDATES BUILDING AND PERIMETER AND TENANT

DESCRIPTION
Re-painting of Gen-Set base platform

DESCRIPTION
Re-painting of Gen-Set base platform

SM CENTER LAS PIAS WEEKLY REPORT (19NOV TO 25NOV 2012)

Engineering Design & Development

6. BUSTED LIGHT MONITORING UPDATES


LOCATION MALL INTERIOR AREA
MALL AREA 1F MALL AREA 2F TENANT FRONT SIGNAGES AD BOXES OFFICES UTILITY ROOMS COMFORT ROOMS ELEVATORS MALL NIGHT LIGHTS TENANT NIGHT LIGHTS BACK ALLEYS, HALLWAYS AND STAIRCASES. TOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

QTTY. OF BUSTED LIGHTS

QTTY OF REPLACED BUSTED LIGHTS

REMARKS

SM CENTER LAS PIAS WEEKLY REPORT (19NOV TO 25NOV 2012)

Engineering Design & Development

6. BUSTED LIGHT MONITORING UPDATES


LOCATION
MALL EXTERIOR AREA CANOPY LIGHTS, AL FRESCO LIGHTS. SM LOGO (FAADE) LIGHTED SIGNAGES (FAADE) DROPDOWN SIGNAGES ACCENT LIGHTS SM LOGO (PYLON TOWER) SIGNAGES (PYLON TOWER) CINEMA SIGNAGES COVERED WALKWAYS AND PEDESTRIAN OVERPASS 0 1 0 0 0 0 5 N/A 0 0 1 0 0 0 0 0 N/A 0 Defective emergency lights at covered car park and one 36W lighting 2fluorescent lamp, already withdraw battery Defective wiring, already request for quotation There are some busted LED in SM logo, that had been replaced last Nov. 22, 2012

QTTY. OF BUSTED LIGHTS

QTTY OF REPLACED BUSTED LIGHTS

REMARKS

PARKING LIGHTS

25

PARKING TOWER LIGHTS TRANSPORTATION TERMINAL LIGHTS PEDESTRIAN OVERPASS TOTAL:

0 0 0 31

0 0 0 4

SM CENTER LAS PIAS WEEKLY REPORT (19NOV TO 25NOV 2012)

Engineering Design & Development

7. COMFORT ROOMS MONITORING UPDATES


EVENT CENTER FOODCOURT RDU1 CINEMA 1&2 CINEMA 3&4 EMPLOYEE CR SCMC ADMIN

LOCATION

DF ELECTRICAL WIRINGS GENERAL LIGHTS PLUMBING AND SANITARY AIRCONDITIONING & VENTILATION CIVIL

RDF

DF

RDF

DF

RDF

DF

RDF

DF

RDF

DF

RDF

0 0 0 0 0

0 0 0 0 0

n/a n/a n/a n/a n/a

n/a n/a n/a n/a n/a

0 0 0 0 0

0 0 0 0 0

n/a n/a n/a n/a n/a

n/a n/a n/a n/a n/a

n/a n/a n/a n/a n/a

n/a n/a 0 n/a n/a

0 0 1 0 0

0 0 0 0 0

Employees CR SCMC ADMIN: .

SM CENTER LAS PIAS WEEKLY REPORT (19NOV TO 25NOV 2012)

Engineering Design & Development

8. ISSUES AND NEEDS LIST


DESCRIPTION
REPLACEMENT OF THE BURN-OUT DRUM EXTENSION BY SOUTHERNSTAR(JANITORIAL) DEFECTIVE LADDER LIFT BY (TRIPPLE SEVEN AND SOUHTERNSTAR) GATE PASSING OF THE COOLING TOWER TROUBLE SHOOTING OF PYLON TOWER SPOT LIGHTS STATUS REMARKS ALREADY SENT MESSAGE TO BAOS FOR THE REPLACEMENT OF THE SAID EXTENSION ALREADY SENT MESSAGE TO BAOS FOR THE REPLACEMENT OF THE SAID EXTENSION GATE VALVE ALREADY RECTIFIED LAST WEEK QUOTATION ALREADY SENT AND THE DOCUMENTS IS ONPROCESS

NOT YET REPLACED

NO INITIATED REPAIR GATE VALVE IS ALREADY AVAILABLE ALREADY REQUESTED FOR QUOTATION

SM CENTER LAS PIAS WEEKLY REPORT (19NOV TO 25NOV 2012)

Engineering Design & Development

END OF PRESENTATION
-THANK YOU-

SM CENTER LAS PIAS WEEKLY REPORT (19NOV TO 25NOV 2012)

Engineering Design & Development

Vous aimerez peut-être aussi