Vous êtes sur la page 1sur 1

6.

ALL INDIA REGIONWISE GENERATING INSTALLED CAPACITY (MW) OF POWER


UTILITIES INCLUDING ALLOCATED SHARES IN JOINT AND CENTRAL SECTOR
UTILITIES

SL.
NO.
1
2
3
4
5
6

REGION
Northern
Western
Southern
Eastern
N. Eastern
Islands
All India

COAL
33,173.50
51,044.51
25,182.50
23,727.88
60.00
0.00
133,188.39

THERMAL
GAS
DSL
5,031.26
12.99
8,988.31
17.48
4,962.78
939.32
190.00
17.20
1,208.50
142.74
0.00
70.02
20,380.85
1,199.75

(As on 31-08-2013 )
HYDRO R.E.S.@
TOTAL

Nuclear
TOTAL
38,217.75
60,050.30
31,084.60
23,935.08
1,411.24
70.02
154,768.99

(MNRE)

(Renewable)

1,620.00
1,840.00
1,320.00
0.00
0.00
0.00
4,780.00

15,467.75
7,447.50
11,353.03
4,113.12
1,242.00
0.00
39,623.40

5,643.60
9,401.50
12,420.56
459.91
252.68
6.10
28,184.35

60,949.10
78,739.30
56,178.19
28,508.11
2,905.92
76.12
227,356.73

Captive Generation Capcity in Industries having demand of 1 MW or above, Grid interactive(as on 31-03-2011)=34,444.12 MW

Renewable Energy Sources (RES) includes Small Hydro Project(SHP),Biomass Power(BP), Urban & Industrial
waste Power(U&I), Wind Energy and Solar Power.

Note:-

UNITS COMMISSIONED, DERATED & DECOMMISSIONED DURING Aug.'13


1.Alaktara TPP Unit 1(600 MW) in Chattisgarh commissioned on 13-08-2013 by KSK Mahanandi.
2. EMCO Warora TPP Unit 2 (300 MW) in Maharashtra commissioned on 27/08/2013 by GMR EMCO Energy Ltd.
3. Rokhia GT (21MW) in Tripura commissioned on 31.08.2013 by Govt. of Tripura
NIL

Thermal

Hydro

ALL INDIA GENERATING INSTALLED CAPACITY ( MW ) (As on 31-08-2013 )


250000
227,357
225000
200000
175000

154,769

150000
125000
100000
75000
39,623

50000

34,444

28,184
25000

4,780

0
Thermal

Nuclear
Thermal

Hydro
Nuclear

Hydro

RES
RES

Total

ENERGY SAVED IS ENERGY PRODUCED

Total
Captive

Captive

Vous aimerez peut-être aussi