STRUCTURAL INFRASTRUC. PACKAGE-LIST OF MATERIAL BASIC DESIN 192205673.xls.

ms_office SECTION SECTION TITLE


STRUCTRUAL EXCAVATION AND BACKFILL 02220 1 1

EMAD ANWAR

ITEM

SUBITEM

ITEM NEME

DESCRIPTION

UNIT

QTY

UNCLASSIFIED EXCAVATION TO REQUIRED FOR FOUNDATION LEVEL TO RECEIVE STRUCTURAL FILL. THE PRICE SHALL INCLUDE DEWATERING , SIDES SUPPORT AND NECESSARY BOREHOLES UP TO 15 M DEPTH (SAMPLING & TESTING) & DISPOSAL OF EXCAVATED SURPLUS MATERIAL OFF SITE TO PLACE OF DUMP APPROVED BY THE OWNER.

CM

88

02220

STRUCTRUAL EXCAVATION AND BACKFILL

BACKFILLING WITH SOIL BY APPROVED MATERIAL CLASS A-1-B AS PER ASTM D-3282 & ACCORDING TO SPECIFICATIONS FROM EXCAVATED LEVEL UP TO REQUIRED LEVEL.

AROUND FOUNDATION AND UPTO REQUIED LEVEL .AS PER DRAWINGS

CM

75

02220

STRUCTRUAL EXCAVATION AND BACKFILL TERMITE CONTROL

GRANULAR SELECTED FILL MATERIAL. 3 1 TERMITE CONTROL .THIS PRICE SHALL INCUDE CONVEYING, SPRAYING ACCORDING TO SPECIFICATIONS. 1 1

150 MM THICK. UNDER SLAB ON GRADE.

CM

50

2281

UNDER FOUNDATION ,GRADE BEAM & SLAB ON GRADE AS PER DRAWINGS .

SM

293

CAST IN PLACE CONCRETE 03300 1 1

UNREINFORCED CONCRETE FC`=21 MPA , 100 MM THICK.UNDER CEMENT TYPE I AS PER DRAWING. THE PRICE FOUNDATION SHALL INCLUDE FORMS, MIXING, CONVEYING, PLACING, CURING AND TESTING ACCORDING TO SPECIFICATIONS.

CM

CAST IN PLACE CONCRETE 03300 1 2

DITTO .

50 MM THICK. UNDER GRADE BEAMS

CM

CAST IN PLACE CONCRETE 03300 2 1

REINFORCED CONCRETE FC`=35 MPA, CEMENT TYPE I & 7 % MICROSILICA FUMES . THE PRICE SHALL INCLUDE FORMS, RFT, JOINTS, MIXING, CONVEYING, PLACING, CURING AND TESTING ACCORDING TO SPECIFICATIONS. DITTO .

150 MM THICK ,FOR SLAB ON GRADE AS PER DRAWING .

SM

327

CAST IN PLACE CONCRETE 03300 2 2

FOR FOUNDATIONS, IN CONTACT WITH EARTH & AS PER DRAWINGS. FOR GRADE BEAMS FOR COLUMNS FOR ROOF BEAMS AND SOLD SLABS

CM

137

03300 03300 03300

CAST IN PLACE CONCRETE CAST IN PLACE CONCRETE CAST IN PLACE CONCRETE

2 2 2

3 4 5

DITTO DITTO DITTO

CM CM CM

21 7 47

R/RIAZ RIZ/COMMU.STRVTURAL/192205673.xls.ms_office

1of4

STRUCTURAL INFRASTRUC. PACKAGE-LIST OF MATERIAL BASIC DESIN 192205673.xls.ms_office SECTION SECTION TITLE
LIGHT WEIGHT CONCRETE FILL

EMAD ANWAR

ITEM

SUBITEM

ITEM NEME
LIGHT WEIGHT SCREED CONCRETE SCREED ,DRY DENSITY SHALL NOT BE GREATER THAN 1040KG/M3 . THE PRICE SHALL INCLUDE,AGGREGAT AS REQUIRED MANUFACTURE, FORMS, MIXING, CONVEYING, PLACING CURING,TESTING ACCORDING TO SPECIFICATIONS &DRAWINGS . ELASTIC SHEET MEMBRANE LAYER POLYETHYLENE HIGH DENSITY . RATE INCLUDES ANY MATERIAL OR ACITIVITY REQUIRED TO FINISH THE WORK AS PER SPECIFICATIONS AND DRAWINGS.

DESCRIPTION
FILL OVER THE ROOF FOR ROOF SLOPE .(100 MM THK ) AVERAGE.

UNIT

QTY

03521

CM

196

SHEET MEMBRANE WATER-PROOFING 07110 1 1

POLYETHYLENE SHEET (0.15 MIL) UNDER THE FOOTING ,GRADE BEAMS &SLABS ON GRADE

SM

247

07160

BITUMINOUS, CEMENTITIOUS, EPOXY, DAMPROFING & WATERPROOFING

(2) BITUMINOUS COATS . THE PRICE SHALL INCLUDE CONVEYING ,PAINTING , AND ANY MATERIAL OR ACTIVITY REQUERD TO FINSH THIS WORK AS PER DRAWINGS AND ACCORDING TO SPECIFICATIONS.

FOR SIDES IN CONTACT WITH EARTH FOR FOUNDATIONS & GRADE BEAMS

SM

194

R/RIAZ RIZ/COMMU.STRVTURAL/192205673.xls.ms_office

2of4

192205673.xls.ms_office

KJO-INFRASTRUC.( BILL OF QUANTITY FOR 192205673.xls.ms_office )

EMAD ANWAR

BUILDING- SURROUNDING

57.5

THICKNESS

0.14

F. NO build. level found. depth width length height Number width length height lateral area reinf.conc.area unreinf.conc.zise reinf.conc.zise excavation G.B. No width length height Number H.area of GB lat. area of GB GB. conc.zise GB excavation

F1 0.3 1.5 1.5 1.5 0.5 4 1.7 1.7 0.1 12 9 1.156 4.5 17.34 GB1 0.35 97 0.6 1 33.95 116.4 20.37 16.01

F2 0.3 1.5 1.85 1.85 0.5 6 2.05 2.05 0.1 22.2 20.54 2.522 10.27 37.82

FOOTINGS TABEL F3 F4 F5 F6 F7 0.3 0.3 0.3 0.3 0.3 1.5 1.5 1.5 1.5 1.5 2.15 2.15 0.5 2 2.35 0.2 0.2 0.2 0.2 2.35 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 8.6 0 0 0 0 9.245 0 0 0 0 1.105 0 0 0 0 4.623 0 0 0 0 16.57 0 0 0 0 GRADE BEAMS TABEL GB2 GB3 GB4 GB5 GB6 GB7

F8 0.3 1.5

F9 0.3 1.5

F10 0.3 1.5

F11 0.3 1.5

total

12 0.2 0.2 0.1 0 0 0 0 0 GB8 0.2 0.2 0.1 0 0 0 0 0 0.2 0.2 0.1 0 0 0 0 0 0.2 0.2 0.1 0 0 0 0 0

42.8 38.78 4.782 19.39 71.73 S.NO width length thicknees Number H. area of S S. conc.zise P.C.H.Core

GB9 GB10 total 97

0 0 0 0 C2

COL. No C1 width 0.3 height 0.3 length 4.8 Neck length 0.9 Number 12 lat. area of neck 12.96 neck conc.zise 0.972 col. conc.zise 5.184 B.NO width height length Number H. area of B B. conc.zise B1 0.2 0.6 56.5 1 11.3 5.198

0 0 0 0 0 0 0 0 0 0 0 0 COLUMN TABEL C3 C4 C5

0 0 0 0

0 0 0 0 W

0 0 0 0

0 0 0 0

0 0 0 0

33.95 116.4 20.37 16.01 total

ITEM Excavation Backfilling termit control Unreinfoced concr.. foundations Unreinfoced conc. grade beams Reinfoced conc. slab on grade Light weight concrete Reinfoced concrete for foundations Reinfoced concrete for columns Reinfoced conc. neck of columns Reinfoced concr. grade beams Reinf. Conc. for R. Beams &S.Slab 2Coats Bituminous Moisture Barrier polyethytene sheet Precast concrete hollow core planks Pre-Engineered Space frame joint sealant joint sealant for floor&roof expan.H joint sealant for expansion .v SLABS TABEL S1 s2 S3 S4 S5 S6 5.333 6.125 0.14 6 195.988 0 0 0 0 0 27.4383 0 0 0 0 0 195.988 0 0 0 0 0 total.h.area for SLABS TABEL

87.735 74.0442 292.268 4.782 2.6675 162.038 195.988 19.39 5.184 0.972 20.37 46.4453 193.69 246.506

194

M3 M3 M2 M3 M3 M2 M2 M3 M3 M3 M3 M3 M2 M2 M2 M2 M M M total

S7

0 0 0

195.9878 27.43829 195.9878


195.9878

0 0 0 B2 0.35 0.6 40.5 1 14.18 6.521

0 0 0 B3 0.15 1 56.5 1 8.475 7.289

0 0 0 B4

0 0 0 B5

0 0 0 B6

0 0 0 B7

0 0 0 B8

12 H. area of S 0 12.96 S. conc.zise 0 0.972 P.C.H.Core 0 5.184 BEAMS TABEL B9 B10 B11 B12 0 0 0

0 0 0

0 0 0 0 0 0 0 0 0 total .conc.zise B14 B15 B16

0 0 0

0 0 0

0 0 0

0 0 0 27.43829 slab thickness 0.14 total 33.95 19.007

B13

B17

B18

B19

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

11/29/2013

BILL OF QUANTITY

192205673.xls.ms_office

KJO-INFRASTRUC.( BILL OF QUANTITY FOR 192205673.xls.ms_office )

EMAD ANWAR

11/29/2013

BILL OF QUANTITY

Vous aimerez peut-être aussi