Vous êtes sur la page 1sur 1

Dhofar Power Company SAOG

Mott MacDona Id

Appendix 6Bl Engineering Documents to be submitted by Contractor


Clause Reference
6.1.2 6.2.8 6.2.11 6.2.14 6.2.15 6.3.2 6.3.4 6.3.5 6.4.3 6.4.4 6.4.11 6.4.20 6.5.5 6.6.3 6.6.4 6.6.5 6.6.7 6.6.9 6.6.9 6.6.10 6.6.11 6.6.11 6.6.12 6.6.16 6.6.17 6.6.18 6.6.18

Document Description
Installation Method Statement Drilled Shaft Foundation Method Statement Concrete Specification Installation Criteria Design Submissions Potential Alkali Reactivity - Test Results Reinforcing Bar Couplers Spacers Temporary Support Details Use of Explosives Concrete daily returns Working area reinstatement Protection of Buried steelwork Reinforcement - test certificates Inspection prior to concreting Trial mixes - Test results Works cubes - Test results Foundation incorrect setting Foundation Setting Out - records Imported backfill- details Foundation Tests - test proposals Foundation Tests - test results Anchor foundation - Routine test records Integrity Testing - test records Earth Resistance Tests - test records Protective coating - Routine tests Protective coatings - test records

Comment

Details of system Details of system If requested Details of charges If requested Programme of work Q.C. proposals If requested Inspection record

Remedial Measure

If requested If requested

If requested

Construction of 132kV Overhead line between Awqad GSS & SFZ GSS and Associated Works (Package-1) Volume 2 Overhead Line Specification
'----_.

Rev. No. Date

:A : December 2010 :Page 29 of 32

Section 6 Foundations __...... _...._-

-,.... _. ... _. -_.


~

Page

Vous aimerez peut-être aussi