II.
TOTAL COST(PHP)
REMARKS
45,000.00
LABOR INCLUDED
III.
DESCRIPTION BAGS OF CEMENT SAND CU. M. GRAVEL CU. M 10MM DIAMETER REBARS G.I. TIES
SUB-TOTAL
QUANTITY 58 4 7 165 1
REMARKS
b. SLABS ON FILL DESCRIPTION BAGS OF CEMENT SAND CU. M. GRAVEL CU. M 10MM DIAMETER REBARS G.I. TIES
SUB-TOTAL
REMARKS
c. BEAMS AND GIRDERS DESCRIPTION BAGS OF CEMENT SAND CU. M. GRAVEL CU. M 10MM DIAMETER REBARS G.I. TIES
SUB-TOTAL
REMARKS
d. FORMWORKS DESCRIPTION COCO LUMBER 2 X 4 X 12 COCO LUMBER 2 X 3 X 12 ORDINARY PLYWOOD CONCRETE WIRE NAILS
SUB-TOTAL
REMARKS
IV.
MASONRY WORKS DESCRIPTION QUANTITY 200 15 UNIT COST (PHP) 220.00 700.00 TOTAL COST(PHP) 44,000.00 10,500.00 54,000.00 REMARKS
V.
CARPENTRY WORKS a. CIELING DESCRIPTION GYPSUM BOARD FIBER CEMENT BOARD CIELING EAVES CIELING FRAMING METAL ACCESSORIES
SUB-TOTAL
QUANTITY 40 20 40SQM 1 1
REMARKS
VI.
ROOFING WORKS a. ROOFING ( COLORSTEEL SYSTEMS CORP.) DESCRIPTION QUANTITY 131.10 15 17 4 1,500 1,000 5 UNIT COST (PHP) 473.72 680.80 837.38 2,100.00 0.90 0.35 115 TOTAL COST(PHP) 62,104.69 10,212.00 10,212.00 14,235.46 8,400.00 1,350.00 575.00 97,227.15 REMARKS LABOR/INSTALLATION INCLUDED
CSC SUPREME RIDGE ROLL SPANISH GUTTER STAINLESS SMOKED (VALLEY GUTTER) TEK SCREW 55MM STEEL BLIND RIVETS SILICON SEALANT
SUB-TOTAL
b. ROOF FRAMING DESCRIPTION C- PURLING 2 X 4 C- PURLING 2 X 3 4.5 X 2 X 2 ANGLE BAR 12MM PLAIN ROUND BAR CUTTING BLADE/ WELDING MATERIAL RED LEAD PRIMER/ PAINT
SUB-TOTAL
QUANTITY
TOTAL COST(PHP)
1 SET
20,000.00
20,000.00
20,000.00
VII.
ELECTRICAL WORKS DESCRIPTION QUANTITY 4 2 8 4 25 1 1 22 16 1 SET UNIT COST (PHP) 360.00 380.00 1,200.00 1,100.00 140.00 30.00 2,000.00 900.00 800.00 4,000.00 TOTAL COST(PHP) 1,440.00 760.00 9,600.00 4,400.00 3,500.00 30.00 2,000.00 19,800.00 12,800.00 4,000.00 58,330.00 REMARKS
CONVENIENCE OUTLETS SWITCH OUTLETS DODGEWIRES ROYAL CORD PVC CONDUIT UTILITY BOX PANELBOX CIRCUIT BREAKER FLUORESCENT LIGHTS ELECTRICAL ACCESSORIES
SUB-TOTAL
QUANTITY 6
TOTAL COST(PHP) 2,700.00 2,700.00 TOTAL COST (PHP) PER DAY 1,600.00 1,200.00 2,800.00
REMARKS
IX.
LABOR QUANTITY 4 8 WORKER COST (PHP) PER DAY 400.00 300.00 NUMBER OF DAYS 120 120 336,000.00
KAREN ANDRES BOB CALUMBA ERL CHRISTIAN ALORA PREPARED BY ARCH. ROSAURO JAMANDRI INSTRUCTOR