: CLIENT : UNIT :
S.R. M.
HORIZONTAL THREE PHASE SEPRATOR SIZING CALCULATION SHEET (SUBMERGED WIER) Input Data Volumetric Flow Rate Density Viscosity Particle Dia. Oil in Vapor Oil in Water Water in Oil Light Droplet Terminal Velocity CRe2 Drag Coefficient Terminal Velocity Heavy Droplet Terminal Velocity CRe2 Drag Coefficient Terminal Velocity Trial Diameter Inlet Nozzle Size Hv/D Ratio Vapor Space Maximum Liquid Level Height V Vessel lC Cross sectional ti lA Area Heavy Phase Compartment Weir Height BTM - LILL LILL - LIL LIL - NIL NIL - HIL HIL - HHIL HHIL - Wier Total Liquid level Height Light Droplet Rising Time heavy phase Cross Sec. Area Heavy Phase Velocity Lmin light drop through heavy phase Heavy Phase Comp. Length BTM - LILL Hold up Time LLIL - LIL Hold up time LIL - NIL Hold up Time NIL - HIL hold up Time HIL - HHIL hold up Time Heavy Phase Hold up Time Unit m3/hr kg/m3 CP micron micron micron Vapor 13880 14.3 0.012 200 100 200 Light Phase Heavy Phase 590.7 1003.2 765 1135 1.53 0.6
------m/sec
15 40.84 0.003
------m/sec mm mm ---mm mm m2 2
2500 1000 350 600 250 200 100 2500 10.1 7.1 0.039 23558 26700 4.56 2.36 4.48 1.96 1.59 6.45
www.chemwork.org
S.R. M.
HORIZONTAL THREE PHASE SEPRATOR SIZING CALCULATION SHEET (SUBMERGED WIER) Light Phase Compartment BTM - LLLL LLLL - LLL LLL - NLL NLL - HLL HLL - HHLL Total Liquid level Height Light Phase Comp. Length Heavy Droplet Settling time Light phase Cross Sec. Area Light Phase Velocity Lmin heavy drop through light phase BTM - LLLL Hold up Time LLLL - LLL Hold up Time LLL - NLL hold up Time NLL - HLL hold up Time HLL - HHLL hold up Time Light Phase Hold up Time Vapor Side K vlaue Terminal Velocity Mesh Pad Correction Factor Drop out Time Av Cross sectional Area Vapor Velocity Lmin light phase thr. vapor Vessel Length L/D
1100 700 1000 100 100 3000 2500 2.2 4.2 0.039 5087 0.83 0.80 6.15 1.47 1.46 7.62
2000
3000 2900 2800 2500 HHIL NIL LIL 2400 1950 1000 1800 1100
5000
2250
26700
2500