Vous êtes sur la page 1sur 1

Date: Letter of Equivalency - Confirmation of Verification Evidence Report (COVER) [Insert name of LDC] acknowledges that the embedded

generation facility connection of [Insert H1 CIA Project Reference] does not materially adversely affect the safety, reliability and efficiency of the distribution system and meets the technical requirements specified in Appendix F.2 of the Distribution System Code, in accordance with section 6.2.25 of the Distribution System Code. [Insert name of LDC] verifies that the embedded generation facility connection of [Insert H1 CIA Project Reference] has been properly commissioned in accordance with Appendix F.1 of the Distribution System Code and the requirements specified within the CIA. Existing feeder protections are confirmed to be suitable within the stated terms of the CIA. Please reference the project data below for your operational schedules. Generator/ Site Name of Facility (Generator) OPA Contract Number (if applicable) Legal Address

LDC Operating Designation Proposed Energization Date 3-Phase or Phase (Red, White or Blue) Fuel Type (Wind, Solar, Bio, Hydro) Capacity (MW) Voltage Level at PCC Supplying Transformer Station Name Bus Supply Feeder(s) Designation(s) Supply Point Switch between H1 & LDC Municipal Station Information* Name Bus Feeder(s) Designation(s) *If appropriate for connection Instructions: The letter is to be provided on LDC letterhead (remove HONI logo above) by a LDC employee or agent acting on behalf of the LDC. The equivalency letter needs to be signed by a Professional Engineer registered in the Province of Ontario or an LDC Officer. Please file with the Business Call Centre at DXGENERATIONCONNECTIONS@hydroone.com along with a copy to the applicable control authority Outage Planner identified in your Connection Agreement Operating Schedule A/D. Unless otherwise specified for M designated feeders, this will be the Network Operating Division, for F designated feeders, this will be the appropriate Provincial Lines Zone Scheduler. Please check your Schedule for the appropriate contact numbers and email addresses. If telemetry (i.e. monitoring) and/or teleprotection is required between Hydro One Networks Inc. and the generator facility, the LDC shall complete and submit a Teleprotection Verification Report (TVR) including a Single Line Diagram (SLD).

Signature Name Title Professional Engineers Ontario ID (if applicable)

Rev. 2.3 May 8, 2013

Vous aimerez peut-être aussi