Vous êtes sur la page 1sur 10

MG ING LUIS DIAZ HUIZA

CIP#36994
TELF.4754256-99004184

ANALISIS DE COSTO
PARTIDA: 1.01.01
DESCRIPCIN: CONCRETO FC=175 KG/M2 . COLUMNA
CUADRILLA: 0.1 CAP +1 OP + 1 OF + 5 P
RENDIMIENTO: 6M3/DIA

IU
004
005
021

MATERIALES

UND

CANT.

Arena gruesa
Piedra chancada
Cemento

M3.
M3.
Bls.

0.5100
0.7600
8.6600

UND.: M3
FECHA: AGO 2012
ELABORADO POR: DHL

P.UNIT
30.00
45.00
15.25

P.PARCIAL
15.30
34.20
132.07

IMPORTE

181.57
IU
047
047
047
047

MANO DE OBRA
Cap.
Op.
Ofic.
Ay.

UND

CANT.

H-H
H-H
H-H
H-H

0.1333
1.3333
1.3333
6.6667

P.UNIT
18.47
15.92
13.65
12.31

P.PARCIAL
2.46
21.23
18.20
82.07

IMPORTE

123.96
IU
048
048
037

MAQUINARIA-EQUIPO
Mezcladora de 11p3.
Vibradora
Herr.

UND
H-M
H-M
%

CANT.
0.6700
0.6700
4.0000

P.UNIT
P.PARCIAL
20.00
13.40
15.00
10.05
123.96
4.96

IMPORTE

28.41
P. UNIT.

333.94

MG ING LUIS DIAZ HUIZA


CIP#36994
TELF.4754256-99004184

ANALISIS DE COSTO
PARTIDA: 1.01.02
DESCRIPCIN: ENCOF/DESENC - COLUMNA
CUADRILLA: 0.1 CAP +1 OP + 1 OF
RENDIMIENTO: 12 M2/DIA

IU
002
043
002

MATERIALES
Alambre negro N8
Madera tornillo
Clavo

UND.: M2
FECHA: AGO 2012
ELABORADO POR: DHL

UND

CANT.

Kg.
p2.
Kg.

0.2000
4.4800
0.2000

P.UNIT P.PARCIAL
3.50
0.70
4.20
18.82
3.50
0.70

IMPORTE

20.22
IU

MANO DE OBRA

047
047
047

Cap.
Op.
Ofic.

UND

CANT.

H-H
H-H
H-H

0.0667
0.6667
0.6667

P.UNIT P.PARCIAL
18.47
1.23
15.92
10.61
13.65
9.10

IMPORTE

20.94
IU
037

MAQUINARIA-EQUIPO
Herr.

UND
%

CANT.
4.0000

P.UNIT P.PARCIAL
20.94
0.84

IMPORTE
0.84

P. UNIT.

42.0

MG ING LUIS DIAZ HUIZA


CIP#36994
TELF.4754256-99004184

ANALISIS DE COSTO
PARTIDA: 1.01.03
DESCRIPCIN: ACERO CORRUGADO - COLUMNA
CUADRILLA: 0.3 CAP +1 OP + 1 OF
RENDIMIENTO: 240 KG/DIA

IU
003
002

MATERIALES
Fierro de construccin
Alambre N16

UND

CANT.

Kg.
Kg.

1.0700
0.0250

UND.: KG
FECHA: AGO 2012
ELABORADO POR: DHL

P.UNIT
3.40
3.50

P.PARCIAL
3.64
0.09

IMPORTE

3.73
IU
047
047
047

MANO DE OBRA
Cap.
Op.
Ofic.

UND
H-H
H-H
H-H

CANT.
0.0100
0.0333
0.0333

P.UNIT
P.PARCIAL
18.47
0.18
15.92
0.53
13.65
0.45

IMPORTE

1.16
IU
037

MAQUINARIA-EQUIPO
Herr.

UND
%

CANT.
4.0000

P.UNIT
P.PARCIAL
1.16
0.05

IMPORTE
0.05

IGUAL PARA ACERO EN VIGAS Y LOSA ALIGERADA

P. UNIT.

4.94

MG ING LUIS DIAZ HUIZA


CIP#36994
TELF.4754256-99004184

ANALISIS DE COSTO
PARTIDA: 1.02.01
DESCRIPCIN: CONCRETO FC>175 KG/M2 - VIGA
CUADRILLA: 0.1 CAP +1 OP + 0.5 OF + 5 P
RENDIMIENTO: 7M3/DIA

IU
004
005
021

MATERIALES

UND

CANT.

Arena gruesa
Piedra chancada
Cemento

M3.
M3.
Bls.

0.5100
0.7600
8.6600

UND.: M3
FECHA: AGO 2012
ELABORADO POR:DHL

P.UNIT P.PARCIAL
30.00
15.30
45.00
34.20
15.25
132.07

IMPORTE

181.57
IU
047
047
047
047

MANO DE OBRA
Cap.
Op.
Ofic.
Ay.

UND

CANT.

H-H
H-H
H-H
H-H

0.1143
1.1429
0.5714
5.7143

P.UNIT P.PARCIAL
18.47
2.11
15.92
18.19
13.65
7.80
12.31
70.34

IMPORTE

98.44
IU
048
048
048
037

MAQUINARIA-EQUIPO UND

CANT.

Mezcladora de 11p3.
Winche
Vibradora
Herr.

0.4000
0.4000
0.4000
4.0000

H-M
H-M
H-M
%

P.UNIT P.PARCIAL
20.00
8.00
18.00
7.20
15.00
6.00
98.44
3.94

IMPORTE

25.14
P. UNIT.

305.15

MG ING LUIS DIAZ HUIZA


CIP#36994
TELF.4754256-99004184

ANALISIS DE COSTO
PARTIDA: 1.02.02
DESCRIPCIN: ENCOFRADO Y DESENCO - VIGA
CUADRILLA: 0.1 CAP +1 OP + 1OF
RENDIMIENTO: 10M2/DIA

IU
002
002
043

MATERIALES

UND

CANT.

Alambre N8
Clavo
Madera tornillo

Kg.
Kg.
p2.

0.1000
0.1800
4.6200

UND.: M2
FECHA: AGO 2012
ELABORADO POR:DHL

P.UNIT P.PARCIAL
3.50
0.35
3.50
0.63
4.20
19.40

IMPORTE

20.38
IU
047
047
047

MANO DE OBRA
Cap.
Op.
Ofic.

UND
H-H
H-H
H-H

CANT.
0.0800
0.8000
0.8000

P.UNIT P.PARCIAL
18.47
1.48
15.92
12.74
13.65
10.92

IMPORTE

25.14
IU
037

MAQUINARIA-EQUIPO
Herr.

UND
%

CANT.
4.0000

P.UNIT P.PARCIAL
25.14
1.01

IMPORTE
1.01

P. UNIT.

46.53

MG ING LUIS DIAZ HUIZA


CIP#36994
TELF.4754256-99004184

ANALISIS DE COSTO
PARTIDA: 1.03.01
DESCRIPCIN: CONCRETO FC>175 KG/M2 - LOSA
CUADRILLA: 0.2 CAP +1.5 OP + 1 OF + 6.5 P
RENDIMIENTO: 12.5M3/DIA

IU
004
005
021

MATERIALES

UND

CANT.

Arena gruesa
Piedra chancada
Cemento

M3.
M3.
Bls.

0.5100
0.7600
8.6600

UND.: M3
FECHA: AGO 2012
ELABORADO POR: DHL

P.UNIT P.PARCIAL
30.00
15.30
45.00
34.20
15.25
132.07

IMPORTE

181.57
IU
047
047
047
047

MANO DE OBRA
Cap.
Op.
Ofic.
Ay.

UND
H-H
H-H
H-H
H-H

CANT.
0.1280
0.9600
0.6400
4.1600

P.UNIT P.PARCIAL
18.47
2.36
15.92
15.28
13.65
8.74
12.31
51.21

IMPORTE

77.59
IU
048
048
048
037

MAQUINARIA-EQUIPO
Mezcladora de 11p3.
Winche
Vibradora
Herr.

UND
H-M
H-M
H-M
%

CANT.
0.3200
0.3200
0.3200
4.0000

P.UNIT P.PARCIAL
20.00
6.40
18.00
5.76
15.00
4.80
77.59
3.10

IMPORTE

20.06
P. UNIT.

279.22

MG ING LUIS DIAZ HUIZA


CIP#36994
TELF.4754256-99004184

ANALISIS DE COSTO
PARTIDA: 1.03.02
DESCRIPCIN: ENCOFRADO Y DESC.- LOSA
CUADRILLA: 0.1 CAP +1 OP + 1 OF
RENDIMIENTO: 15M2/DIA

IU
002
002
043

UND.: M2
FECHA: AGO 2012
ELABORADO POR: DHL

MATERIALES

UND

CANT.

Alambre N8
Clavo
Madera tornillo

Kg.
Kg.
P2.

0.1000
0.1000
3.5600

P.UNIT P.PARCIAL
3.50
0.35
3.50
0.35
4.20
14.95

IMPORTE

15.65
IU
047
047
047

MANO DE OBRA
Cap.
Op.
Ofic.

UND
H-H
H-H
H-H

CANT.
0.0533
0.5333
0.5333

P.UNIT P.PARCIAL
18.47
0.98
15.92
8.49
13.65
7.28

IMPORTE

16.75
IU
037

MAQUINARIA-EQUIPO
Herr.

UND
%

CANT.
4.0000

P.UNIT P.PARCIAL
16.75
0.67

IMPORTE
0.67

P. UNIT.

33.07

MG ING LUIS DIAZ HUIZA


CIP#36994
TELF.4754256-99004184

ANALISIS DE COSTO
PARTIDA: 1.03.04
DESCRIPCIN: LADRILLO .15x.30x.30- LOSA ALIG.
CUADRILLA: 0.1 CAP +1 P
RENDIMIENTO: 160UND/DIA

IU
017

MATERIALES

UND

CANT.

Ladrillo arcilla 15x30x30

Und.

1.0900

UND.: UND
FECHA: AGO 2012
ELABORADO POR: DHL

P.UNIT
1.80

P.PARCIAL
1.96

IMPORTE
1.96

IU
047
047

MANO DE OBRA
Cap.
Ay.

UND
H-H
H-H

CANT.
0.0050
0.0500

P.UNIT
P.PARCIAL
18.47
0.09
12.31
0.62

IMPORTE

0.71
IU
037

MAQUINARIA-EQUIPO UND

CANT.

P.UNIT

P.PARCIAL

P. UNIT.

IMPORTE

2.67

MG ING LUIS DIAZ HUIZA


CIP#36994
TELF.4754256-99004184

ANALISIS DE COSTO
PARTIDA: 2.01
DESCRIPCIN: LADRILLO KK 18H SOGA - MURO
CUADRILLA: 0.1 CAP +1 OP + 0.8 P
RENDIMIENTO: 9.40M2/DIA

IU
017
004
021
043
002

UND

CANT.

Lad.K.K. 18H mquina 9x13x24


Und.
Arena gruesa
M3.
Cemento
Bls.
Madera tornillo
p2.
Clavo
Kg.

MATERIALES

37.0000
0.0290
0.2360
0.3300
0.0110

UND.: M2
FECHA: AGO 2012
ELABORADO POR: DHL

P.UNIT P.PARCIAL
0.50
18.50
30.00
0.87
15.25
3.60
4.20
1.39
3.50
0.04

IMPORTE

24.39
IU
047
047
047

MANO DE OBRA
Cap.
Op.
Ay.

UND
H-H
H-H
H-H

CANT.
0.0851
0.8511
0.6809

P.UNIT P.PARCIAL
18.47
1.57
15.92
13.55
12.31
8.38

IMPORTE

23.50
IU
037

MAQUINARIA-EQUIPO
Herr.

UND
%

CANT.
4.0000

P.UNIT P.PARCIAL
23.50
0.94

IMPORTE

0.94
P. UNIT.

48.84

MG ING LUIS DIAZ HUIZA


CIP#36994
TELF.4754256-99004184

ANALISIS DE COSTO
PARTIDA: 2.02
DESCRIPCIN: LADRILLO KK 18H CABEZA - MURO
CUADRILLA: 0.1 CAP +1 OP + 0.8 P
RENDIMIENTO: 7M2/DIA

IU
002
017
004
021
043

UND

CANT.

Clavo
Kg.
Lad.K.K. 18H mquina 9x13x24
Und.
Arena gruesa
M3.
Cemento
Bls.
Madera tornillo
p2.

MATERIALES

0.0110
68.0000
0.0580
0.4000
0.3300

UND.: M2
FECHA: AGO 2012
ELABORADO POR: DHL

P.UNIT P.PARCIAL
3.50
0.04
0.50
34.00
30.00
1.74
15.25
6.10
4.20
1.39

IMPORTE

43.26
IU
047
047
047

MANO DE OBRA
Cap.
Op.
Ay.

UND
H-H
H-H
H-H

CANT.
0.1143
1.1429
0.9143

P.UNIT P.PARCIAL
18.47
2.11
15.92
18.19
12.31
11.26

IMPORTE

31.56
IU
037

MAQUINARIA-EQUIPO
Herr.

UND
%

CANT.
4.0000

P.UNIT P.PARCIAL
31.56
1.26

IMPORTE

1.26
P. UNIT.

76.09