VALORIZACION DE OBRA N 07

Agosto
FICHA TECNICA
ENTIDAD EJECUTORA

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI

OBRA

"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y


CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE
ANTACOLPA"

CONTRATISTA
SUPERVISOR

CONSORCIO NEON ASOCIADOS


ING. JULIO VICTOR MARTINEZ QUISPE

MODALIDA DE EJECUCION

SUMA ALZADA

UBICACION

LUGAR
DISTRITO
PROVINCIA
REGION

PRESUPUESTO

ANTACOLPA
CAURI
LAURICOCHA
HUANUCO

BASE

FECHA

CONTRATADO

F.R.

2,812,663.74

2,812,663.74

1.00000

PLAZO

FECHA INICIO

FECHA TERMINO

PLAZO DE EJECUCION

180

06/02/12

03/08/12

AMPLIACION DE PLAZO

DIAS

NUEVA FECHA TERMINO

30

02/09/12

MAX

OTORGADO

0.00
562,532.75

0.00%
20.00%

FECHA

ADELANTO DIRECTO
ADELANTO MATERIALES

562,532.75
1,125,065.50

-.-.-

MES

ACUMULADO

% ACUM.

VALORIZACION

14,444.89

0.51%

2,802,355.46

99.63%

ADICIONAL DE OBRA

10,308.27

TOTAL A RECIBIR POR


EL CONTRATISTA

24,753.16

Presupuesto
Item
0
1
2
3
4
5
6
7
8
9
10
11
12

F 01
01
01.01
01.02
01.03
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06

Descripcin

Und

VAL N

Metrado

C.U.

OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES

Parcial

METRADO

116,599.53

OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES


OBRAS PROVISIONALES PARA TODA LA OBRA
CAMPAMENTO PROVISIONAL DE LA OBRA
glb
1.00 4,868.26
CARTEL DE IDENTIFICACION DE OBRA DE 3.60 xUnd
2.40 M.
1.00 1,044.11
TRABAJOS PRELIMINARES PARA TODA LA OBRA
FLETE TERRESTRE (SISTEMA DE AGUA POTABLE) glb
1.00
##########
FLETE TERRESTRE (SISTEMA DE DESAGUE)
glb
1.00
##########
FLETE TERRESTRE (SISTEMA DE PTAR)
glb
1.00
##########
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
glbY MAQUINARIA
1.00
##########
PUENTE DE MADERA PARA PASE PEATONAL SOBRE
Und ZANJA (PROV.
24.00 DURANTE
340.11
CINTA PLASTICA SEALIZADORA PARA LIMITE DE
m SEGURIDAD
8,701.00
DE OBRA 0.75

4,868.26
1,044.11
22,929.07
24,696.47
37,873.23
10,500.00
8,162.64
6,525.75

01

VAL N
VAL.

0.00

349

F 04

350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536

2
2.01

2.02

2.03

3
3.01

3.02

3.03

1
1.01

1.02

1.03
1.04

1.05
1.06

2
2.01

2.02

2.03
2.04

2.05
2.06

3
3.01

3.02

3.03
3.04

3.05

3.06

3.07

4
4.01

4.02

4.03
4.04

4.05

4.06

4.07

4.08

5
5.01

5.02

5.03
5.04

5.06

5.07

5.08

6
6.01

6.02

6.03
6.04
7
7.01

7.02

7.03
7.04

7.05

03

VAL N
VAL.

METRADO

182,295.52

04

VAL N
VAL.

METRADO

472,792.96

0.00
0.00

05

VAL N
VAL.

METRADO

650,871.04

06

VAL N
VAL.

METRADO

378,347.95

VAL N

07
VAL.

0.00

0.00

0.00

0.00

0.00

0.00

7,890.51
8,396.80

0.35

8,643.76

0.00

0.00

0.00

0.00

1.00

37,873.23

0.00

0.00

0.00

24.00

8,162.64

1.00

10,500.00

0.00

8,025.17

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.55

17.44

0.00

0.00

8.55

17.61

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8,701.00

1.73

0.00

0.00

0.00

0.00

0.00

0.00

6,525.75

0.00

0.00

0.00

0.00

0.00
0.00

0.00

1.73

0.00

358.05

0.00

0.00

0.00

0.00

9.40

257.75

0.00

0.00

0.00

0.00

10.85
9.40

0.00
0.00

0.00

1.00

1,095.96

0.00

0.00

0.00

0.00

1.00

965.59

0.00

0.00

0.00

0.00

1.00
1.00

0.00
0.00

0.00

0.00

0.00

0.00

120.60

0.00

9.40

8.55
8.55

0.00
0.00

7.76
8.55
2.51
6.56

0.00
0.00
0.00
0.00

0.58
1.73

0.00
0.00

2.72
23.73
119.80

0.00
0.00
0.00

10.85

9.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

245.37

0.00

19.84

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.51

111.75

0.00

0.00

0.00

0.00

0.00

6.56

200.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.58

258.00

0.00

0.00

0.00

0.00

0.00

1.73

277.79

0.00

0.00

0.00

2.72

1,264.91

0.00

0.00

0.00

0.00

0.00

23.73

970.08

0.00

0.00

0.00

0.00

0.00

119.80

0.00

10.85

358.05

0.00

0.00

0.00

0.00

0.00

9.40

257.75

627.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

1.00

1,095.96

0.00

0.00

0.00

0.00

1.00

965.59

0.00

0.00

1.00
1.00

0.00

0.00

0.00

0.00

0.00

120.60

0.00

9.40

1.70
1.70

-1.70
-1.70

1.36
1.70
1.70

-1.36
-1.70
-1.70

0.48
7.31
31.41

-0.48
-7.31
-31.41

1.80
4.52

-1.80
-4.52

9.40

1.70

3.47

0.00

0.00

0.00

0.00

-1.70

-3.47

3.50

0.00

0.00

0.00

0.00

-1.70

-3.50

43.00

0.00

0.00

0.00

0.00

-1.36

-43.00

1.70

3.94

0.00

0.00

0.00

0.00

-1.70

-3.94

1.70

52.04

0.00

0.00

0.00

0.00

-1.70

-52.04

0.00

0.00

0.00

0.48

213.52

0.00

-0.48

-213.52

0.00

0.00

0.00

7.31

298.83

0.00

-7.31

-298.83

0.00

31.41

0.00

-31.41

0.00

0.00

164.59

-164.59

0.00

0.00

0.00

1.80

59.40

0.00

-1.80

-59.40

0.00

0.00

0.00

4.52

123.94

0.00

-4.52

-123.94

0.00
0.00

1.00
1.00
1.00

-1.00
-1.00
-1.00

0.00

1.00

84.22

0.00

-1.00

-84.22

0.00

0.00

0.00

1.00

95.81

0.00

-1.00

-95.81

1.00
1.00
1.00

-1.00
-1.00
-1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,168.95

0.00

0.00

0.00

0.00

0.00

2,085.53
2,085.53
2,085.53

0.00
0.00
0.00

0.00

0.00

0.00

1.00

140.59

0.00

-1.00

-140.59

0.00

0.00

0.00

1.00

260.59

0.00

-1.00

-260.59

0.00

0.00

0.00

1.00

193.75

0.00

-1.00

-193.75

0.00

0.00

0.00

1.00

152.42

0.00

-1.00

-152.42

0.00

0.00

2,085.53

4,150.20

0.00

0.00

0.00

0.00

0.00

2,085.53

6,944.81

0.00

0.00

0.00

0.00

0.00

0.00

475.00

8,763.75

0.00

650.00

1,410.50

601.32

0.00

2,085.53

19,791.68

0.00

0.00

0.00

0.00

875.92

33,109.78

0.00

0.00

0.00

0.00
0.00

400.92

7,396.97

0.00

1,304.86

0.00

0.00

0.00

0.00

0.00

0.00

0.00

218.98

6,702.98

0.00

0.00

0.00

0.00

0.00

2,085.53

39,604.21

0.00

0.00

0.00

0.00

0.00

1.00

817.91

0.00

0.00

0.00

2,085.53

0.00

0.00

8,029.29

0.00

0.00
0.00

3.70

7.55

0.00

0.00

0.00

0.00

-3.70

-7.55

3.70

7.62

0.00

0.00

0.00

0.00

-3.70

-7.62

136.91

0.00

0.00

0.00

0.00

-4.33

-136.91

3.70

8.58

0.00

0.00

0.00

0.00

-3.70

-8.58

5.41

165.60

0.00

0.00

0.00

0.00

-5.41

-165.60

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.70

704.52

0.00

0.46

162.96

0.00

1.22

53.77

0.00

1.92

854.07

0.00

0.00

19.39

792.66

0.00

0.00

0.00

0.00

-3.70

-704.52

-0.46

-162.96

-1.22

-53.77

-1.92

-854.07

0.00

-19.39

-792.66

0.00

104.23

546.17

0.00

-104.23

-546.17

0.00

10.61

350.13

0.00

-10.61

-350.13

0.00

0.00

0.00

10.91

299.15

0.00

-10.91

-299.15

0.00

0.00

0.00

1.00

140.59

0.00

-1.00

-140.59

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

260.59

0.00

-1.00

-260.59

875.92
1,251.32
2,085.53
875.92
218.98

0.00
0.00
0.00
0.00
0.00

2,085.53
1.00
2,085.53

0.00
0.00
0.00

3.70
3.70

-3.70
-3.70

4.33
3.70
5.41

-4.33
-3.70
-5.41

3.70
0.46
1.22

-3.70
-0.46
-1.22

1.92
19.39
104.23

-1.92
-19.39
-104.23

10.61
10.91

-10.61
-10.91

1.00
1.00
1.00

-1.00
-1.00
-1.00

0.00

1.00

301.86

0.00

-1.00

-301.86

0.00

1.00

144.08

0.00

-1.00

-144.08

0.00

0.00

0.00

1.00

132.13

0.00

-1.00

-132.13

1.00
1.00

-1.00
-1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.92

0.00

0.00

0.00

0.00

0.00

1.92
1.92

0.00
0.00

0.86
1.92
1.08

0.00
0.00
0.00

1.92
0.11
0.92

0.00
0.00
0.00

0.95
8.87
61.36

0.00
0.00
0.00

6.32
4.18

0.00
0.00

1.00
1.00
1.00

0.00
0.00
0.00

1.00
1.00

0.00
0.00

1.92

3.96

0.86

27.19

0.00

0.00

0.00

0.00

0.00

1.92

4.45

0.00

0.00

0.00

0.00

0.00

1.08

33.06

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.92

0.00

0.00

0.00

0.00

0.00

365.59

0.00

0.00

0.00

0.00

0.00

0.11

45.68

0.00

0.00

0.00

0.00

0.00

0.92

40.54

0.00

0.00

0.00

0.00

0.00

0.95

422.59

0.00

0.00

0.00

0.00

0.00

8.87

390.90

0.00

0.00

0.00

0.00

0.00

61.36

321.53

0.00

0.00

0.00

0.00

0.00

6.32

208.56

0.00

0.00

0.00

0.00

0.00

4.18

114.62

0.00

0.00

0.00

0.00

0.00

1.00

140.59

0.00

0.00

0.00

0.00

0.00

1.00

260.59

0.00

0.00

0.00

0.00

0.00

1.00

301.86

0.00

0.00

0.00

0.00

0.00

1.00

280.93

0.00

0.00

0.00

0.00

0.00

1.00

145.03

0.00

0.00

0.00

0.00

0.00

0.00

1.00

94.43

0.00

0.00

0.00

0.00

0.00

1.00

120.63

0.00

1.00
1.00

0.00

0.00

0.00

0.00

53.63

0.00

0.00

0.00

0.00

0.00

4.18

7.50

15.30

7.50

15.45

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9.00

297.00

0.00

22.50

616.95

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.50
2.00

0.00

0.00

0.00

30.00

384.90

0.00

2.50

63.60

212.43

0.00

241.26

0.00

0.00

0.00

0.00

0.00

1.00

229.24

0.00

0.00

0.00

0.00

0.00

2.00

789.98

0.00

0.00

0.00

0.00

0.00

0.00

1.00

6,646.05

47.90

97.72

0.00

0.00

0.00

0.00

0.00

47.90

98.67

0.00

0.00

0.00

0.00

0.00

57.48

10.85
9.40

0.00

1.70

1.92

0.00
0.00

0.00

0.00

17.44

4.33

0.00
0.00
0.00
0.00
0.00
0.00

0.00

17.61

2,085.53

0.00
0.00

277.79

8.55

1.36

ACTUAL

1.00
1.00
1.00
1.00
24.00
8,701.00

8.55
8.55

8.55

7.76

7.00

1.00
1.00

0.00

0.00
0.00

0.00

8.55

ANTERIOR

-422.59

0.00

0.34
0.34

0.00

0.35

0.00

0.00
0.00
0.00

F 03

1.04

METRADO

1,044.11

0.00

307

1.03

VAL N
VAL.

0.00
1.00

7,013.38
7,655.91

F 02
SISTEMA DE AGUA POTABLE
688,953.41
01
REHABILITACION DE CAPTACION EXISTENTE - TIPO MANANTIAL (01 UND)
01.01
TRABAJOS PRELIMINARES
01.01.01 LIMPIEZA DE TERRENO MANUAL
m2
8.55
2.04
17.44
0.00
01.01.02 TRAZO Y REPLANTEO
m2
8.55
2.06
17.61
0.00
01.02
FILTROS
01.02.01 FILTRO DE GRAVA
m3
1.73
160.57
277.79
0.00
01.03
REVOQUES Y ENLUCIDOS
01.03.01 TARRAJEO CON IMPERMEABILIZANTES
m2
10.85
33.00
358.05
0.00
01.03.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
9.40
27.42
257.75
0.00
01.04
VARIOS
01.04.01 TUBERIA DE REBOSE Y DESAGUE DE 2" SAL PVC und
1.00 1,095.96
1,095.96
0.00
01.04.02 TUBERIA DE SALIDA DE CAPTACION PVC SAP C-10
undDE 1 1/2" 1.00
965.59
965.59
0.00
01.05
PINTURA
01.05.01 PINTURA LATEX EN MUROS 2 MANOS
m2
9.40
12.83
120.60
0.00
02
CONSTRUCCION DE CAPTACION - TIPO MANANTIAL DE LADERA (01 UND)
02.01
TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO MANUAL
m2
8.55
2.04
17.44
0.00
02.01.02 TRAZO Y REPLANTEO
m2
8.55
2.06
17.61
0.00
02.02
MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION MANUAL
m3
7.76
31.62
245.37
0.00
02.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
8.55
2.32
19.84
0.00
02.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO
m3
2.51
44.52
111.75
0.00
02.02.04 ELIMINACION DE MATERIAL EXCEDENTE
m3
6.56
30.61
200.80
0.00
02.03
FILTROS
02.03.01 CONCRETO F'c= 175 KG/CM2
m3
0.58
444.83
258.00
0.00
02.03.02 FILTRO DE GRAVA
m3
1.73
160.57
277.79
0.00
02.04
OBRAS DE CONCRETO ARMADO
02.04.01 CONCRETO EN MUROS REFORZADOS F'C= 210 m3
KG/CM2
2.72
465.04
1,264.91
0.00
02.04.02 ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
m2
23.73
40.88
970.08
0.00
02.04.03 ACERO FY=4200 KG/CM2
Kg
119.80
5.24
627.75
0.00
02.05
REVOQUES Y ENLUCIDOS
02.05.01 TARRAJEO CON IMPERMEABILIZANTES
m2
10.85
33.00
358.05
0.00
02.05.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
9.40
27.42
257.75
0.00
02.06
VARIOS
02.06.01 TUBERIA DE REBOSE Y DESAGUE DE 2" SAL PVC und
1.00 1,095.96
1,095.96
0.00
02.06.02 TUBERIA DE SALIDA DE CAPTACION PVC SAP C-10
undDE 1 1/2" 1.00
965.59
965.59
0.00
02.07
PINTURA
02.07.01 PINTURA LATEX EN MUROS 2 MANOS
m2
9.40
12.83
120.60
0.00
03
CAJA DE REUNION (01 UND)
03.01
TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL
m2
1.70
2.04
3.47
0.00
03.01.02 TRAZO Y REPLANTEO
m2
1.70
2.06
3.50
0.00
03.02
MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION MANUAL
m3
1.36
31.62
43.00
0.00
03.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
1.70
2.32
3.94
0.00
03.02.03 ELIMINACION DE MATERIAL EXCEDENTE
m3
1.70
30.61
52.04
0.00
03.03
OBRAS DE CONCRETO ARMADO
03.03.01 CONCRETO F'c= 175 KG/CM2
m3
0.48
444.83
213.52
0.00
03.03.02 ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
m2
7.31
40.88
298.83
0.00
03.03.03 ACERO FY=4200 KG/CM2
Kg
31.41
5.24
164.59
0.00
03.04
REVOQUES Y ENLUCIDOS
03.04.01 TARRAJEO CON IMPERMEABILIZANTES
m2
1.80
33.00
59.40
0.00
03.04.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
4.52
27.42
123.94
0.00
03.05
VARIOS
03.05.01 TUBERIA DE INGRESO A C.R. PVC SAP C-10 DE 1und
1/2"
1.00
140.59
140.59
0.00
03.05.02 TUBERIA DE SALIDA DE C.R. PVC SAP C-10 DE 1und
1/2"
1.00
260.59
260.59
0.00
03.05.03 TUBERIA DE LIMPIEZA Y DESAGUE DE 2" SAL PVCund
1.00
193.75
193.75
0.00
03.06
CARPINTERIA METALICA 332.45
03.06.01 TAPA METALICA 0.73X0.73X1/8"
und
1.00
152.42
152.42
0.00
03.06.02 TAPA METALICA 0.45X0.36X1/8"
und
1.00
84.22
84.22
0.00
03.06.03 TAPA METALICA 0.46X0.50X1/8"
und
1.00
95.81
95.81
0.00
03.07
PINTURA
03.07.01 PINTURA LATEX EN MUROS 2 MANOS
m2
4.52
12.83
57.99
0.00
04
LINEA DE CONDUCCION
04.01
TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DE LINEA DE CONDUCCION
ml
2,085.53
1.04
2,168.95
0.00
04.01.02 TRAZO, NIVELACION Y REPLANTEO
ml
2,085.53
1.99
4,150.20
0.00
04.01.03 TRAZO, NIVELACION Y REPLANTEO DURANTE LA
mlEJECUCION
2,085.53
DE LA OBRA 3.33
6,944.81
0.00
04.02
MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION DE ZANJA EN TERRENO NORMALm3
COMPACTO
875.92
18.45
16,160.72
0.00
04.02.02 REFINE, NIVELACION DE ZANJA Y CONFORMACION
m2 DE FONDOS
1,251.32
2.17
2,715.36
0.00
04.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL
ml PROPIO
2,085.53
ZARANDEADO
9.49
19,791.68
0.00
04.02.04 RELLENO COMPACTADO C/PLANCHA VIBRAT. HASTA
m3 H=3.00
875.92
M CON MAT/PROPIO
37.80
ZARANDEADO
33,109.78 EN CAPAS DE 20CM 0.00
04.02.05 ELIMINACION DE MATERIAL EXCEDENTE
m3
218.98
30.61
6,702.98
0.00
04.03
TUBERIAS
04.03.01 TUBERIA DE PVC ISO C-10 DE 1 1/2"
ml
2,085.53
18.99
39,604.21
0.00
04.03.02 SUMINISTRO E INSTALACION DE ACCESORIOS PVC
glb RED CONDUCCION
1.00
817.91
817.91
0.00
04.03.03 PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8"ml
A ZANJA2,085.53
TAPADA
3.85
8,029.29
0.00
05
TANQUILLA ROMPERCARGA (01 UND)
05.01
TRABAJOS PRELIMINARES
05.01.01 LIMPIEZA DE TERRENO MANUAL
m2
3.70
2.04
7.55
0.00
05.01.02 TRAZO Y REPLANTEO
m2
3.70
2.06
7.62
0.00
05.02
MOVIMIENTO DE TIERRAS
05.02.01 EXCAVACION MANUAL
m3
4.33
31.62
136.91
0.00
05.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
3.70
2.32
8.58
0.00
05.02.03 ELIMINACION DE MATERIAL EXCEDENTE
m3
5.41
30.61
165.60
0.00
05.03
OBRAS DE CONCRETO SIMPLE
05.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2
3.70
190.41
704.52
0.00
05.03.02 DADOS DE CONCRETO F'c=140 Kg/cm2
m3
0.46
354.25
162.96
0.00
05.03.03 ENCOFRADO Y DESENCOFRADO NORMAL
m2
1.22
44.07
53.77
0.00
05.04
OBRAS DE CONCRETO ARMADO
05.04.01 CONCRETO F'c= 175 KG/CM2
m3
1.92
444.83
854.07
0.00
05.04.02 ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
m2
19.39
40.88
792.66
0.00
05.04.03 ACERO FY=4200 KG/CM2
kg
104.23
5.24
546.17
0.00
05.05
REVOQUES Y ENLUCIDOS
05.05.01 TARRAJEO CON IMPERMEABILIZANTES
m2
10.61
33.00
350.13
0.00
05.05.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
10.91
27.42
299.15
0.00
05.06
TUBERIAS Y ACCESORIOS
05.06.01 TUBERIA DE INGRESO A C.R. PVC SAP C-10 DE 1und
1/2"
1.00
140.59
140.59
0.00
05.06.02 TUBERIA DE SALIDA DE C.R. PVC SAP C-10 DE 1und
1/2"
1.00
260.59
260.59
0.00
05.06.03 TUBERIA DE REBOSE Y LIMPIA DESAGUE DE 2" SAL
undPVC
1.00
301.86
301.86
0.00
05.07
CARPINTERIA METALICA
05.07.01 TAPA METALICA 0.65X0.75X3/16"
und
1.00
144.08
144.08
0.00
05.07.02 TAPA METALICA 0.65X0.65X3/16"
und
1.00
132.13
132.13
0.00
05.08
PINTURA
05.08.01 PINTURA LATEX EN MUROS 2 MANOS
m2
10.91
12.83
139.98
0.00
06
CAMARA ROMPE PRESION (01 UND)
06.01
TRABAJOS PRELIMINARES
06.01.01 LIMPIEZA DE TERRENO MANUAL
m2
1.92
2.04
3.92
0.00
06.01.02 TRAZO Y REPLANTEO
m2
1.92
2.06
3.96
0.00
06.02
MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION MANUAL
m3
0.86
31.62
27.19
0.00
06.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
1.92
2.32
4.45
0.00
06.02.03 ELIMINACION DE MATERIAL EXCEDENTE
m3
1.08
30.61
33.06
0.00
06.03
OBRAS DE CONCRETO SIMPLE
06.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2
1.92
190.41
365.59
0.00
06.03.02 CONCRETO F'C=140 KG/CM2
m3
0.11
415.25
45.68
0.00
06.03.03 ENCOFRADO Y DESENCOFRADO NORMAL
m2
0.92
44.07
40.54
0.00
06.04
OBRAS DE CONCRETO ARMADO
06.04.01 CONCRETO F'c= 175 KG/CM2
m3
0.95
444.83
422.59
0.00
06.04.02 ENCOFRADO Y DESENCOFRADO NORMAL
m2
8.87
44.07
390.90
0.00
06.04.03 ACERO FY=4200 KG/CM2
kg
61.36
5.24
321.53
0.00
06.05
REVOQUES Y ENLUCIDOS
06.05.01 TARRAJEO CON IMPERMEABILIZANTES
m2
6.32
33.00
208.56
0.00
06.05.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
4.18
27.42
114.62
0.00
06.06
SUMINISTRO E INSTALACION DE TUBERIAS
06.06.01 TUBERIA DE INGRESO A C.R. PVC SAP C-10 DE 1und
1/2"
1.00
140.59
140.59
0.00
06.06.02 TUBERIA DE SALIDA DE C.R. PVC SAP C-10 DE 1und
1/2"
1.00
260.59
260.59
0.00
06.06.03 TUBERIA DE REBOSE Y LIMPIA DESAGUE DE 2" SAL
undPVC
1.00
301.86
301.86
0.00
06.07
SUMINISTRO E INSTALACION DE VALVULAS
06.07.01 VALVULA COMPUERTA HD C/ELASTOMERO 2"
und
1.00
280.93
280.93
0.00
06.07.02 VALVULA REDUCTORA DE PRESION 2"
und
1.00
145.03
145.03
0.00
06.08
CARPINTERIA METALICA
06.08.01 TAPA METALICA 0.40X0.45X1/8"
und
1.00
94.43
94.43
0.00
06.08.02 TAPA METALICA 0.60X0.60X1/8"
und
1.00
120.63
120.63
0.00
06.09
PINTURA
06.09.01 PINTURA LATEX EN MUROS 2 MANOS
m2
4.18
12.83
53.63
0.00
07
REHABILITACION DE RESERVORIO EXISTENTE
07.01
TRABAJOS PRELIMINARES
07.01.01 LIMPIEZA DE TERRENO MANUAL
m2
7.50
2.04
15.30
0.00
07.01.02 TRAZO Y REPLANTEO
m2
7.50
2.06
15.45
0.00
07.02
REVOQUES Y ENLUCIDOS
07.02.01 TARRAJEO CON IMPERMEABILIZANTES
m2
9.00
33.00
297.00
0.00
07.02.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
22.50
27.42
616.95
0.00
07.03
PINTURA
07.03.01 PINTURA LATEX EN MUROS 2 MANOS
m2
30.00
12.83
384.90
0.00
07.03.02 PINTURA EN ESTRUCTURAS METALICAS
ml
2.50
25.44
63.60
0.00
07.04
CARPINTERIA METALICA
07.04.01 ESCALERA GATO, TUB F.GVZDO. C/PARANTES DEml1 1/2" SEGUN
2.50
DISEO 84.97
212.43
0.00
07.04.02 TAPA METALICA 0.60X0.60X1/8"
und
2.00
120.63
241.26
0.00
07.05
INSTALACIONES SANITARIAS
07.05.01 TUBERIA DE REBOSE Y DESAGUE DE 2 1/2" SAL PVC
und
1.00
229.24
229.24
0.00
07.05.02 TUBERIA DE SALIDA DE PVC SAP C-10 DE 1 1/2"u nd
2.00
394.99
789.98
0.00
07.05.03 ACCESORIOS DE RESERVORIO
glb
1.00 6,646.05
6,646.05
0.00
08
RESERVORIO CIRCULAR (35 M3)
08.01
TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL
m2
47.90
2.04
97.72
0.00
08.01.02 TRAZO Y REPLANTEO
m2
47.90
2.06
98.67
0.00
08.02
MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION DE CIMIENTOS EN TERENO COMPACTO
m3
57.48
55.34
3,180.94
0.00
08.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
47.90
2.32
111.13
0.00
08.02.03 ELIMINACION MATERIAL EXCEDENTE A MANO m3
D<200M 74.85
30.61
2,291.16
0.00
08.03
OBRAS DE CONCRETO SIMPLE
08.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2
47.90
190.41
9,120.64
0.00
08.04
OBRAS DE CONCRETO ARMADO
08.04.01 LOSA
08.04.01.01CONCRETO F'C=210 KG/CM2 EN LOSA
m3
16.33
361.78
5,907.87
0.00
08.04.01.02ENCOFRADO Y DESENCOFRADO DE LOSA
m2
25.00
48.43
1,210.75
0.00
08.04.01.03ACERO FY=4200 KG/CM2
kg
235.99
5.24
1,236.59
0.00
08.04.02 MUROS REFORZADOS
08.04.02.01CONCRETO F'C=210 KG/CM2 EN MUROS REFORZADO
m3
19.79
452.15
8,948.05
0.00
08.04.02.02ENCOFRADO Y DESENCOFRADO CURVO EN PLACAS
m2
120.44
47.03
5,664.29
0.00
08.04.02.03ACERO FY=4200 KG/CM2
kg
1,258.68
5.24
6,595.48
0.00
08.04.03 CUPULA ESFERICA
08.04.03.01CONCRETO F'C=210 KG/CM2 EN CUPULAS
m3
6.06
480.64
2,912.68
0.00
08.04.03.02ENCOFRADO Y DESENCOFRADO CURVO EN CUPULA
m2
42.32
57.30
2,424.94
0.00
08.04.03.03ACERO FY=4200 KG/CM2
kg
267.91
5.24
1,403.85
0.00
08.04.04 COLUMNAS
08.04.04.01CONCRETO F'C=210 KG/CM2 EN COLUMNAS m3
0.78
461.09
359.65
0.00
08.04.04.02ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
m2
12.50
43.90
548.75
0.00
08.04.04.03ACERO FY=4200 KG/CM2
kg
142.68
5.24
747.64
0.00
08.04.05 VIGAS
08.04.05.01CONCRETO F'C=210 KG/CM2 EN VIGAS COLLARIN
m3
2.10
361.78
759.74
0.00
08.04.05.02ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
m2
15.10
53.50
807.85
0.00
08.04.05.03ACERO FY=4200 KG/CM2
kg
224.45
5.24
1,176.12
0.00
8.05
REVOQUES Y ENLUCIDOS
08.05.01 TARRAJEO CON IMPERMEABILIZANTES
m2
131.74
33.00
4,347.42
0.00
08.05.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
136.84
27.42
3,752.15
0.00
8.06
PISOS Y VEREDAS
08.06.01 CONCRETO F'C=140 KG/CM2 EN VEREDAS
m3
13.56
320.53
4,346.39
0.00
08.06.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2
2.97
46.42
137.87
0.00
8.07
PINTURA
08.07.01 PINTURA LATEX EN MUROS 2 MANOS
m2
136.84
12.83
1,755.66
0.00
08.07.02 PINTURA EN ESTRUCTURAS METALICAS
m
9.60
25.44
244.22
0.00
8.08
CARPINTERIA METALICA
08.08.01 ESCALERA GATO, TUB F.GVZDO. C/PARANTES DEm1 1/2" SEGUN
9.60
DISEO 84.97
815.71
0.00
08.08.02 TAPA METALICA 0.60X0.60X1/8"
u
2.00
120.63
241.26
0.00
8.09
INSTALACIONES SANITARIAS
08.09.01 TUBERIA DE REBOSE Y DESAGUE DE 2 1/2" SAL PVC
u
1.00
229.24
229.24
0.00
08.09.02 TUBERIA DE SALIDA DE PVC SAP C-10 DE 1 1/2"u
1.00
394.99
394.99
0.00
08.09.03 ACCESORIOS DE RESERVORIO
glb
1.00 6,646.05
6,646.05
0.00
9 LINEA DE ADUCCION
9.01 TRABAJOS PRELIMINARES
09.01.01 LIMPIEZA DE LINEA DE ADUCCION
m
1,574.63
1.04
1,637.62
0.00
09.01.02 TRAZO, NIVELACION Y REPLANTEO
m
1,574.63
1.99
3,133.51
0.00
09.01.03 TRAZO, NIVELACION Y REPLANTEO DURANTE LA
m EJECUCION
1,574.63
DE LA OBRA 3.33
5,243.52
0.00
9.02 MOVIMIENTO DE TIERRAS
09.02.01 EXCAVACION DE ZANJA EN TERRENO NORMALm3
COMPACTO
661.34
18.45
12,201.72
0.00
09.02.02 REFINE, NIVELACION DE ZANJA Y CONFORMACION
m2 DE FONDOS
944.78
2.17
2,050.17
0.00
09.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL
m
PROPIO
1,574.63
ZARANDEADO
9.49
14,943.24
0.00
09.02.04 RELLENO COMPACTADO C/PLNACHA VIBRAT. HASTA
m3 H=3.00M
661.34
CON MATERIAL
37.80 PROPIO
24,998.65
ZARANDEADO EN CAPAS DE 20CM
0.00
09.02.05 ELIMINACION DE MATERIAL EXCEDENTE
m3
165.34
30.61
5,061.06
0.00
9.03 TUBERIAS
09.03.01 TUBERIA DE PVC ISO C-10 DE 1 1/2"
m
1,574.63
18.99
29,902.22
0.00
09.03.02 SUMINISTRO E INSTALACION DE ACCESORIOS PVC
glb RED ADUCCION
1.00
642.71
642.71
0.00
09.03.03 PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8"mA ZANJA1,574.63
TAPADA
3.85
6,062.33
0.00
9.04 PASE AEREO
09.04.01 CONCRETO F'c= 175 KG/CM2
m3
0.35
444.83
155.69
0.00
09.04.02 TUBO GALVANIZADO DE 2"
m
30.00
15.00
450.00
0.00
09.04.03 CODO GALVANIZADO DE 2"
u
4.00
40.00
160.00
0.00
09.04.04 CABLE DE ACERO 3/4"
m
30.00
15.00
450.00
0.00
09.04.05 GANCHOS DE FIERRO DE 1/2"
u
6.00
25.00
150.00
0.00
10 RED DE DISTRIBUCION
10.01 TRABAJOS PRELIMINARES
10.01.01 LIMPIEZA DE RED DE DISTRIBUCION
m
4,093.06
1.04
4,256.78
0.00
10.01.02 TRAZO, NIVELACION Y REPLANTEO
m
4,093.06
1.99
8,145.19
0.00
10.01.03 TRAZO, NIVELACION Y REPLANTEO DURANTE LA
m EJECUCION
4,093.06
DE LA OBRA 3.33
13,629.89
0.00
10.02 MOVIMIENTO DE TIERRAS
10.02.01 EXCAVACION DE ZANJA EN TERRENO NORMALm3
COMPACTO
1,719.09
18.45
31,717.21
0.00
10.02.02 REFINE, NIVELACION DE ZANJA Y CONFORMACION
m2 DE FONDOS
2,455.84
2.17
5,329.17
0.00
10.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL
m
PROPIO
4,093.06
ZARANDEADO
9.49
38,843.14
0.00
10.02.04 RELLENO CONPACTADO C/PLANCHA VIBRAT. HASTA
m3 H=3.00
1,719.09
M CON MAT/PROPIO
37.80
ZARANDEADO
64,981.60 EN CAPAS DE 20CM 0.00
10.02.05 ELIMINACION DE MATERIAL EXCEDENTE
m3
429.77
30.61
13,155.26
0.00
10.03 TUBERIAS
10.03.01 TUBERIA DE PVC ISO C-10 DE 1 1/2"
m
1,228.23
18.99
23,324.09
0.00
10.03.02 TUBERIA DE PVC ISO C-10 DE 1"
m
2,864.83
13.74
39,362.76
0.00
10.03.03 SUMINISTRO E INSTALACION DE ACCESORIOS PVC
glb RED DE DISTRIBUCION
1.00
834.78
834.78
0.00
10.03.04 PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8"mA ZANJA4,093.06
TAPADA
3.85
15,758.28
0.00
11 CAJA DE VALVULA DE CONTROL
11.01 TRABAJOS PRELIMINARES
11.01.01 LIMPIEZA DE TERRENO MANUAL
m2
7.20
2.04
14.69
0.00
11.01.02 TRAZO Y REPLANTEO
m2
7.20
2.06
14.83
0.00
11.02 MOVIMIENTO DE TIERRAS
11.02.01 EXCAVACION MANUAL
m3
5.76
31.62
182.13
0.00
11.02.02 ELIMINACION DE MATERIAL EXCEDENTE
m3
7.20
30.61
220.39
0.00
11.03 OBRAS DE CONCRETO SIMPLE
11.03.01 CONCRETO F'c= 175 KG/CM2
m3
2.45
444.83
1,089.83
0.00
11.03.02 ENCOFRADO Y DESENCOFRADO NORMAL
m2
39.05
44.07
1,720.93
0.00
11.04 REVOQUES Y ENLUCIDOS
11.04.01 TARRAJEO CON IMPERMEABILIZANTES
m2
19.85
33.00
655.05
0.00
11.05 CARPINTERIA METALICA
11.05.01 TAPA METALICA 0.40X0.45X1/8"
u
10.00
94.43
944.30
0.00
11.06 PINTURA
11.06.01 PINTURA LATEX EN MUROS 2 MANOS
m2
19.85
12.83
254.68
0.00
11.07 SUMINISTRO E INSTALACION DE VALVULAS
11.07.01 VALVULA ESFERICA DE BRONCE 1"
u
7.00
115.53
808.71
0.00
11.07.02 VALVULA ESFERICA DE BRONCE 1 1/2"
u
3.00
128.53
385.59
0.00
12 VALVULA DE PURGA
12.01 TRABAJOS PRELIMINARES
12.01.01 LIMPIEZA DE TERRENO MANUAL
m2
3.84
2.04
7.83
0.00
12.01.02 TRAZO Y REPLANTEO
m2
3.84
2.06
7.91
0.00
12.02 MOVIMIENTO DE TIERRAS
12.02.01 EXCAVACION MANUAL
m3
5.76
31.62
182.13
0.00
12.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO
m3
5.28
44.52
235.07
0.00
12.02.03 ELIMINACION DE MATERIAL EXCEDENTE
m3
0.60
30.61
18.37
0.00
12.03 OBRAS DE CONCRETO SIMPLE
12.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2
2.56
190.41
487.45
0.00
12.03.02 CONCRETO F'c= 175 KG/CM2
m3
0.26
444.83
115.66
0.00
12.03.03 ENCOFRADO Y DESENCOFRADO NORMAL
m2
3.14
44.07
138.38
0.00
12.04 OBRAS DE CONCRETO ARMADO
12.04.01 CONCRETO F'C=210 KG/CM2
m3
1.48
482.32
713.83
0.00
12.04.02 ENCOFRADO Y DESENCOFRADO NORMAL
m2
17.92
44.07
789.73
0.00
12.04.03 ACERO FY=4200 KG/CM2
kg
83.29
5.24
436.44
0.00
12.05 SUMINISTRO E INSTALACION DE TUBERIAS
12.05.01 TUBERIA PVC SAP ISO 4422 DN 12.7 MM C-10m
6.00
15.95
95.70
0.00
12.05.02 VALVULA DE PURGA 19.10mm (3/4")
u
2.00
87.76
175.52
0.00
12.05.03 ABRAZADERA PVC D=19.1 MM C/SALIDA A 12.70
u MM INC. ACCESORIOS
2.00
902.76
1,805.52
0.00
13 CONEXIONES DOMICILIARIAS DE AGUA POTABLE
13.01 TRABAJOS PRELIMINARES
13.01.01 TRAZO, NIVELACION Y REPLANTEO
m
668.00
1.99
1,329.32
0.00
13.01.02 TRAZO, NIVELACION Y REPLANTEO DURANTE LA
m EJECUCION
668.00
DE LA OBRA 3.33
2,224.44
0.00
13.02 MOVIMIENTO DE TIERRAS
13.02.01 EXCAVACION DE ZANJA HASTA 0.80 M, TERRENO
m3 NORMAL
280.56
18.45
5,176.33
0.00
13.02.02 REFINE, NIVELACION DE ZANJA Y CONFORMACION
m2 DE FONDOS
400.80
2.17
869.74
0.00
13.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL
m
PROPIO
668.00
ZARANDEADO
11.17
7,461.56
0.00
13.02.04 RELLENO CON MATERIAL PROPIO SELECCIONADO
m3
280.56
44.52
12,490.53
0.00
13.03 SUMINISTRO E INSTALACION DE TUBERIAS
13.03.01 TUBERIA DE PVC ISO C-10 DE 1/2"
m
668.00
8.49
5,671.32
0.00
13.03.02 PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8"mA ZANJA TAPADA
668.00
3.85
2,571.80
0.00
13.04 SUMINISTRO E INSTALACION DE ACCESORIOS
13.04.01 SUMINISTRO E INSTALACION DE ACCESORIOS RED
glb SECUNDARIA
1.0001 1,453.00
1,453.00
0.00
13.05 CONEXIONES DOMICILIARIAS
13.05.01 CONEXIONES DOMICILIARIAS P TUB MATRIZ DEu 1 1/2" A 105.00
1/2" INC ACCESORIOS
138.70
14,563.50
0.00
13.05.02 CONEXIONES DOMICILIARIAS P TUB MATRIZ DEu 1" A 1/2" INC.
62.00ACCESORIOS
135.10
8,376.20
0.00
1
1.01
1.01.01
1.01.02
1.02

02

156,504.83

4,868.26

0.31
0.31

13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348

METRADO

19,537.55

1.00

3,180.94

0.00

0.00

0.00

0.00

0.00

7.50
7.50

0.00
0.00
4.18

0.00
0.00

9.00
22.50

0.00
0.00

0.00
0.00

30.00
2.50

2.50
2.00

0.00
0.00

1.00
2.00
1.00

0.00
0.00
0.00

47.90
47.90

0.00
0.00

57.48
47.90
74.85

0.00
0.00
0.00

47.90

111.13

0.00

0.00

0.00

0.00

0.00

74.85

2,291.16

0.00

0.00

0.00

0.00

0.00

9,120.64

0.00

0.00

0.00

0.00

47.90

0.00

0.00

16.33
25.00
235.99

0.00
0.00
0.00

19.79
120.44
1,258.68

0.00
0.00
0.00

6.06
42.32
267.91

0.00
0.00
0.00

0.78
12.50
142.68

0.00
0.00
0.00

0.00

0.00

47.90

16.33

0.00

0.00

0.00

25.00

1,210.75

0.00

0.00

0.00

0.00

235.99

1,236.59

0.00

0.00

0.00

0.00

0.00

0.00

19.79

8,948.05

0.00

0.00

0.00

0.00

0.00

120.44

5,664.29

0.00

0.00

0.00

0.00

0.00

1,258.68

6,595.48

0.00

0.00

0.00

0.00

0.00

0.00

6.06

2,912.68

0.00

0.00

0.00

0.00

0.00

42.32

2,424.94

0.00

0.00

0.00

267.91

1,403.85

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.78

359.65

0.00

12.50

0.00

0.00

142.68

747.64

0.00

0.00

0.00

0.00

0.00

2.10

759.74

0.00

0.00

0.00

548.75

0.00

0.00

0.00

0.00

0.00

15.10

807.85

0.00

0.00

0.00

0.00

0.00

224.45

1,176.12

0.00

0.00

0.00

0.00

0.00

0.00

131.74

4,347.42

0.00

0.00

0.00

0.00

0.00

136.84

3,752.15

0.00

0.00

0.00

1,574.63

5,907.87

0.00
0.00

0.00

13.56

4,346.39

0.00

0.00

0.00

2.97

137.87

0.00

0.00

0.00

0.00

0.00

0.00

0.00

136.84

1,755.66

0.00

0.00

9.60

244.22

815.71

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9.60

0.00

0.00
0.00

0.00

0.00

0.00

0.00

2.00

241.26

0.00

0.00

0.00

0.00

0.00

1.00

229.24

0.00

0.00

0.00

0.00

0.00

1.00

394.99

0.00

0.00

0.00

0.00

0.00

1.00

6,646.05

0.00

0.00

1,637.62

0.00

0.00

0.00

0.00

0.00

1,574.63

3,133.51

0.00

0.00

0.00

0.00

0.00

1,574.63

5,243.52

0.00

0.00

0.00

0.00

0.00

0.00

320.50

5,913.23

340.84

6,288.50

0.00

0.00

0.00

0.00

450.60

977.80

494.18

1,072.37

0.00

0.00

0.00

0.00

1,574.63

14,943.24

661.34

24,998.65

0.00
0.00

0.00

0.00

0.00

165.34

5,061.06

0.00

1,574.63

29,902.22

0.00

0.00

1.00

642.71

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,574.63

0.00

0.00

0.00

0.00

0.00

6,062.33

0.00

0.00

0.00

0.00

0.00

0.35

155.69

0.00

0.00

0.00

0.00

0.00

30.00

450.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

4.00

0.00

0.00

30.00

450.00

0.00

0.00

0.00

0.00

6.00

150.00

160.00

0.00

0.00

0.00

0.00

0.00

4,093.06

4,256.78

0.00

0.00

0.00

0.00

0.00

4,093.06

8,145.19

0.00

0.00

0.00

0.00

0.00

4,093.06

13,629.89

0.00

0.00

0.00
0.00

0.00

820.00

15,129.00

899.09

0.00

0.00

0.00

16,588.21

0.00

0.00

0.00

1,040.00

2,256.80

1,415.84

0.00

2,140.00

20,308.60

1,953.06

18,534.54

820.00

30,996.00

899.09

33,985.60

0.00

251.97

0.00

0.00

0.00

0.00

3,072.37

7,712.80

0.00

0.00

0.00

177.80

0.00

0.00

0.00

5,442.46

0.00

0.00

0.00

620.00

11,773.80

325.00

6,171.75

283.23

5,378.54

0.00

0.00

0.00

1,140.00

15,663.60

880.00

12,091.20

844.83

11,607.96

0.00

1.00

834.78

0.00

0.00

4,093.06

15,758.28

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7.20

0.00

0.00

0.00

0.00

7.20

14.69

0.00

14.83

0.00

0.00

0.00

0.00

0.00

5.76

182.13

0.00

0.00

0.00

0.00

0.00

7.20

220.39

0.00

0.00

0.00

0.00

0.00

2.45

1,089.83

0.00

0.00

0.00

0.00

0.00

39.05

1,720.93

0.00

2.10
15.10
224.45
131.74
136.84

0.00
0.00
0.00
0.00
0.00

13.56
2.97

0.00
0.00

0.00
0.00

136.84
9.60

9.60
2.00

0.00
0.00

1.00
1.00
1.00

0.00
0.00
0.00

1,574.63
1,574.63
1,574.63

0.00
0.00
0.00

661.34
944.78
1,574.63
661.34
165.34

0.00
0.00
0.00
0.00
0.00

1,574.63
1.00
1,574.63

0.00
0.00
0.00

0.35
30.00
4.00
30.00
6.00

0.00
0.00
0.00
0.00
0.00

4,093.06
4,093.06
4,093.06

0.00
0.00
0.00

1,719.09
2,455.84
4,093.06
1,719.09
429.77

0.00
0.00
0.00
0.00
0.00

1,228.23
2,864.83
1.00
4,093.06

0.00
0.00
0.00
0.00

7.20
7.20

0.00
0.00

5.76
7.20

0.00
0.00

2.45
39.05

0.00
0.00

0.00

0.00

0.00

0.00

19.85

655.05

0.00

19.85

0.00

0.00

0.00

0.00

0.00

10.00

944.30

0.00

10.00

0.00

0.00

0.00

0.00

0.00

19.85

254.68

0.00

19.85

0.00

0.00

0.00

0.00

0.00

7.00

808.71

0.00

0.00

0.00

0.00

0.00

3.00

385.59

0.00

7.00
3.00

0.00
0.00

0.00

0.00

0.00

0.00

3.84

7.83

0.00

0.00

0.00

0.00

0.00

3.84

7.91

0.00

0.00

0.00

0.00

0.00

5.76

182.13

0.00

0.00

0.00

0.00

0.00

5.28

235.07

0.00

0.00

0.00

0.00

0.00

0.60

18.37

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.56

487.45

0.00

0.26

115.66

0.00

3.14

138.38

0.00

1.48

713.83

0.00

0.00

0.00

0.00

0.00

17.92

789.73

0.00

0.00

0.00

0.00

0.00

83.29

436.44

0.00

0.00

0.00

0.00

0.00

6.00

95.70

0.00

0.00

0.00

0.00

0.00

2.00

175.52

0.00

0.00

0.00

0.00

0.00

2.00

1,805.52

0.00

0.00

0.00

0.00

668.00

1,329.32

0.00

0.00

0.00

0.00

0.00

668.00

2,224.44

0.00

0.00

0.00

0.00

0.00

280.56

5,176.33

0.00

0.00

0.00

0.00

0.00

400.80

869.74

0.00

0.00

0.00

0.00

0.00

668.00

7,461.56

0.00

0.00

0.00

0.00

0.00

280.56

12,490.53

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.84
3.84

0.00
0.00

5.76
5.28
0.60

0.00
0.00
0.00

2.56
0.26
3.14

0.00
0.00
0.00

1.48
17.92
83.29

0.00
0.00
0.00

6.00
2.00
2.00

0.00
0.00
0.00

668.00
668.00

0.00
0.00

280.56
400.80
668.00
280.56

0.00
0.00
0.00
0.00

668.00
668.00

0.00
0.00

0.00

668.00

5,671.32

0.00

668.00

2,571.80

0.00

0.00

0.00

1.00

1,453.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

105.00

14,563.50

0.00

0.00

0.00

0.00

0.00

62.00

8,376.20

0.00

105.00
62.00

0.00
0.00

4,350.50
4,350.50

0.00
0.00

3,132.35
246.45
172.50
2,610.30
4,350.50
2,479.79
815.72

0.00
0.00
0.00
0.00
0.00
0.00
0.00

659.32
937.32
2,753.86

0.00
0.00
0.00

4,350.50
10.00

0.00
0.00

110.55
110.55

0.00
0.00

178.89
223.61

0.00
0.00

15.00
40.00

0.00
0.00

668.00
668.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

760,879.07

SISTEMA DE ALCANTARILLADO

RED DE ALCANTARILLADO
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO
m
4,350.50
1.99
8,657.50
TRAZO, NIVELACION Y REPLANTEO DURANTE LA
m EJECUCION
4,350.50
DE LA OBRA 3.33
14,487.17
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA EN TERRENO NORMALm3
COMPACTO
3,132.35
41.68
130,556.35
CORTE DE PAVIMENTO RIGIDO C/EQUIPO
m
246.45
7.25
1,786.76
REPOSICION DE PAVIMENTO DE CONCRETO F'C=210
m2
KG/CM2,
172.50
LOSA E=10"
148.26
25,574.85
REFINE, NIVELACION DE ZANJA Y CONFORMACION
m2 DE FONDOS
2,610.30
2.17
5,664.35
PREPARACION DE CAMA DE APOYO CON MATERIAL
m
PROPIO
4,350.50
ZARANDEADO
11.17
48,595.09
RELLENO COMPACTADO C/PLANCHA VIBRAT. HASTA
m3 H=3.00
2,479.79
M CON 37.80
93,736.06
ELIMINACION DE MATERIAL EXCEDENTE
m3
815.72
30.61
24,969.19
SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 110MM
m
659.32
34.07
22,463.03
TUBERIA PVC ALCANT U.F. ISO 4435,S-25 160MM
m
937.32
41.35
38,758.18
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM
m
2,753.86
47.43
130,615.58
VARIOS
PRUEBA HIDRAULICA - ESCORRENTIA DE TUB. AmZANJA ABIERTA
4,350.50
0.84
3,654.42
PRUEBA DE COMPACTACION DE SUELOS (PROCTOR
u
MOD. -10.00
DENSIDAD DE
285.74
2,857.40
BUZONES
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
110.55
2.04
225.52
TRAZO Y REPLANTEO
m2
110.55
2.06
227.73
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
m3
178.89
31.62
5,656.50
ELIMINACION DE MATERIAL EXCEDENTE
m3
223.61
30.61
6,844.70
CONSTRUCCION DE BUZONES
BUZON DE CONCRETO TIPO 1, h= 1.50 m
u
15.00 1,271.79
19,076.85
BUZON DE CONCRETO TIPO 2, h= 1.50 m a 3.00
u M.
40.00 1,522.80
60,912.00
CONEXIONES DOMICILIARIAS DE ALCANTARILLADO
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
668.00
2.04
1,362.72
TRAZO, NIVELACION Y REPLANTEO
m
668.00
1.99
1,329.32
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
m3
480.96
31.62
15,207.96
REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
400.80
2.32
929.86
PREPARACION DE CAMA DE APOYO CON MATERIAL
m
PROPIO
668.00
ZARANDEADO
11.17
7,461.56
RELLENO COMPACTADO C/PLANCHA VIBRAT. HASTA
m3 H=3.00
380.76
M CON MAT/PROPIO
37.80
ZARANDEADO
14,392.73 EN CAPAS DE 20CM
ELIMINACION DE MATERIAL EXCEDENTE
m3
125.25
30.61
3,833.90
CONEXIONES DOMICILIARIAS
CONEXIONES DOMICILIARIAS 4"X6"
u
167.00
425.40
71,041.80

0.00

4,350.50

8,657.50

0.00

0.00

0.00

0.00

0.00

0.00

4,350.50

14,487.17

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

542.50

1,045.00

0.00

0.00

0.00

22,611.40

0.00

0.00

43,555.60

745.00

31,051.60

0.00

246.45

1,786.76

0.00

0.00

0.00

0.00
1,350.00

799.85

172.50

33,337.75

0.00

0.00

0.00

25,574.85

0.00

2,929.50

1,260.30

0.00

0.00

0.00

1,120.00

12,510.40

1,980.00

22,116.60

1,250.50

13,968.09

0.00

0.00

0.00

0.00

520.00

19,656.00

1,450.00

54,810.00

509.79

19,270.06

2,734.85

0.00

0.00

0.00

0.00

0.00

0.00

815.72

24,969.19

0.00

0.00

0.00

0.00

0.00

0.00

659.32

22,463.03

0.00

0.00

0.00

0.00

0.00

0.00

937.32

38,758.18

0.00

0.00

0.00

0.00

2,156.00

102,259.08

597.86

0.00
0.00

0.00

0.00

28,356.50

0.00

0.00

0.00

0.00

0.00

4,350.50

3,654.42

0.00

0.00

0.00

0.00

0.00

10.00

2,857.40

0.00

0.00

110.55

225.52

0.00

0.00

0.00

0.00

0.00

0.00

110.55

227.73

0.00

0.00

0.00

0.00

0.00

0.00

178.89

0.00

178.89

5,656.50

0.00

5,475.82

0.00

44.72

0.00

0.00

0.00

0.00

1,368.88

0.00

0.00

0.00

0.00

15.00

19,076.85

0.00

0.00

0.00

0.00

0.00

0.00

40.00

60,912.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

668.00

1,362.72

0.00

0.00

0.00

0.00

0.00

0.00

668.00

1,329.32

0.00

0.00

480.96

15,207.96

0.00

0.00

0.00

0.00

0.00

0.00

480.96
400.80
668.00
380.76
125.25

71,041.80

0.00

167.00

3.83
3.83

0.00

0.00

0.00

0.00

0.00

0.00

400.80

929.86

0.00

0.00

0.00

0.00

0.00

0.00

668.00

7,461.56

0.00

0.00

0.00

380.76

14,392.73

0.00

0.00

0.00

0.00

125.25

3,833.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

167.00

0.00

307,202.9731

SISTEMA DE PTAR
CAMARA DE REJAS (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
3.83
2.04
TRAZO Y REPLANTEO
m2
3.83
2.06
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
m3
3.06
31.62
REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
3.83
2.32
ELIMINACION DE MATERIAL EXCEDENTE
m3
6.56
30.61
OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2
3.83
190.41
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
m3
2.31
480.64
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
m2
17.18
40.88
ACERO FY=4200 KG/CM2
kg
71.83
5.24
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
m2
8.95
33.00
ACCESORIOS
REJILLA METALICA
u
1.00
37.82
PLANCHA METALICA DE FF DE e=3/4"
u
1.00
84.55
DESARENADOR Y MEDIDOR PARSHALL (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
17.19
2.04
TRAZO Y REPLANTEO
m2
17.19
2.06
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
m3
25.79
31.62
REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
17.19
2.32
ELIMINACION DE MATERIAL EXCEDENTE
m3
32.23
30.61
OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2
17.19
190.41
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
m3
8.71
480.64
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
m2
53.42
40.88
ACERO FY=4200 KG/CM2
kg
224.95
5.24
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
m2
28.14
33.00
ACCESORIOS
COMPUERTAS FIERRO DE 0.63*0.44 M
u
4.00
650.44
BARANDA DE TUBO FO. GDO. PASAMANO 1 1/2"-PARANTE
m
1"
2.10
X 1M.ALT99.33
TANQUE IMHOFF (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
51.41
2.04
TRAZO Y REPLANTEO
m2
51.41
2.06
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
m3
308.43
31.62
REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
51.41
2.32
RELLENO CON MATERIAL PROPIO SELECCIONADO
m3
73.50
16.06
ELIMINACION DE MATERIAL EXCEDENTE
m3
293.66
30.61
OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2
51.41
190.41
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
m3
122.45
482.32
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
m2
487.68
48.43
ACERO FY=4200 KG/CM2
kg
6,029.19
5.24
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
m2
331.67
33.00
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
45.09
27.42
CARPINTERIA METALICA
BARANDA DE TUBO FO. GDO. PASAMANO 1 1/2"-PARANTE
m
14.20
1" X 1M.ALT99.33
ESCALERA TUB F.GVZDO. C/PARANTES DE 2" X PELDAOS
m
DE7.65
3/4"
109.97
INSTALACIONES SANITARIAS
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM
m
8.50
47.43
TEE UPVC UF S-25 DE 8"
u
1.00
146.59
CODO SP PVC UF S-25 DE 8"
u
1.00
254.28
VALVULA DE COMPUERTA DE FIERRO FUNDIDO uMAZZA DE 8" 1.00 1,222.19
PANTALLA DEFLECTORA
u
2.00
126.05
LECHO DE SECADO (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
35.15
2.04
TRAZO Y REPLANTEO
m2
35.15
2.06
MOVIMIENTO DE TIERRAS
EXCAVACION C/MAQ. EN TERRENO NORMAL m3
50.96
6.86
REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
35.15
2.32
ELIMINACION DE MATERIAL EXCEDENTE
m3
63.70
30.61
OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2
35.15
190.41
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
m3
25.25
482.32
ENCOFRADO Y DESENCOFRADO NORMAL
m2
281.33
44.07
ACERO FY=4200 KG/CM2
kg
1,541.20
5.24
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
m2
235.08
33.00
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
57.00
27.42
ESTRUCTURA DE MADERA Y COBERTURA
TIJERAL DE MADERA TIPO 01 L=3.00M
u
5.00
758.57
VIGA DE MADERA 3" X 4"
m
8.95
14.91
CORREAS Y TIRANTES DE MADERA
p2
106.76
5.31
COBERTURA DE CALAMINA 11 CANALES E=3MM
m2
46.98
51.30
INSTALACIONES SANITARIAS
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 100MM
m
23.65
166.77
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 50MM
m
66.70
68.33
CODO PVC SAP 6"X90
u
3.00
146.80
CODO PVC SAP 4"X90
u
2.00
49.45
TEE PVC-SAP 4"* 2"
u
23.00
42.74
TEE PVC-SAP 150mmx150mm
u
2.00
54.16
TEE PVC-SAP 200mmx150mm
u
1.00
41.66
TAPON PVC-SAP 2"
u
23.00
27.00
FILTROS
FILTRO DE GRAVA
m3
12.48
160.57
FILTRO DE ARENA
m3
9.36
192.07
FILTRO DE LADRILLO
m2
31.20
91.03
FILTRO BIOLOGICO (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
14.19
2.04
TRAZO Y REPLANTEO
m2
14.19
2.06
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA HASTA 0.80 M, TERRENO
m3 NORMAL25.54
27.67
REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
14.19
2.32
ELIMINACION DE MATERIAL EXCEDENTE
m3
31.93
30.61
OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2
14.19
190.41
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
m3
20.62
480.64
ENCOFRADO Y DESENCOFRADO NORMAL
m2
117.37
44.07
ACERO FY=4200 KG/CM2
kg
1,043.53
5.24
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
m2
78.04
33.00
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
52.60
27.42
FILTROS
FILTRO DE GRAVA
m3
20.40
160.57
FILTRO DE LADRILLO
m2
12.00
91.03
SISTEMA DE DESINFECCION (HIPOCLORADOR POR GOTEO)
HIPOCLORADOR DIFUSION inc Gancho
u
1.00 3,000.00
TAPA METALICA 0.40X0.45X1/8"
u
1.00
94.43
RED DE ALCANTARILLADO EN PLANTA DE TRATAMIENTO
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO
m
10.75
1.99
TRAZO, NIVELACION Y REPLANTEO DURANTE LA
m EJECUCION10.75
DE LA OBRA 3.33
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS EN TERRENO NORMAL
m3
PARA-TUB. 6"-8"
7.74 HASTA11.45
1.
REFINE, NIVELACION DE ZANJA Y CONFORMACION
m DE FONDOS
6.45
2.17
PREPARACION DE CAMA DE APOYO CON MATERIAL
m
PROPIO
10.75
ZARANDEADO
11.17
RELLENO COMPACTADO C/PLANCHA VIBRAT. HASTA
m
H=3.005.81
M CON MAT/PROPIO
37.80
ELIMINACION DE MATERIAL EXCEDENTE
m3
2.42
30.61
SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM
m
10.75
47.43
BUZONES
BUZON DE CONCRETO TIPO 1, h= 1.50 m
u
1.00 1,271.79
CERCO PERIMETRICO
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
106.01
2.04
TRAZO Y REPLANTEO
m2
106.01
2.06
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
m3
3.78
31.62
ELIMINACION DE MATERIAL EXCEDENTE
m3
4.73
30.61
CERCO PERIMETRICO CON ALAMBRE DE PUAS
ALAMBRE CON PUAS PARA CERCO
m
840.88
5.24

7.81
7.89

0.00

0.00

3.83

7.81

0.00

0.00

0.00

0.00

0.00

0.00

3.83

7.89

0.00

0.00

0.00

0.00

96.76
8.89
200.80

0.00

0.00

3.83

8.89

0.00

0.00

0.00

0.00

0.00

0.00

6.56

200.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

71.83

376.39

0.00

0.00

0.00

0.00

0.00

729.27

0.00

0.00

1,110.28
702.32
376.39

0.00

0.00

0.00

0.00

0.00

0.00

3.06

96.76

0.00

0.00

0.00

0.00

3.83

729.27

0.00

0.00

0.00

2.31

1,110.28

0.00

0.00

0.00

17.18

3.06
3.83
6.56

0.00
0.00
0.00
0.00
0.00

0.00

3.83

0.00

0.00

2.31
0.00
71.83

0.00
17.18
0.00

702.32
0.00

295.35

0.00

0.00

8.95

0.00

37.82
84.55

0.00

0.00

0.00

0.00

0.00

1.00

37.82

0.00

0.00

0.00

0.00

0.00

0.00

1.00

84.55

0.00

1.00
1.00

0.00
0.00

35.07
35.41

0.00

0.00

35.07

0.00

0.00

0.00

0.00

17.19
17.19

0.00
0.00

0.00

0.00

17.19

0.00

0.00

0.00

17.19

0.00

0.00

25.79

0.00

14.87

34.50

0.00

0.00

30.61

936.97

0.00

1.62

49.59

0.00

0.00

25.79
17.19
32.23

0.00
0.00
0.00

0.00

0.00

17.19

3,273.15

0.00

0.00

0.00

0.00

17.19

0.00

4,186.37
2,183.81
1,178.74

0.00

0.00

0.00

0.00

8.71

4,186.37

0.00

0.00

0.00

0.00

0.00

0.00

53.42

2,183.81

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.71
53.42
224.95

0.00
0.00
0.00

928.62

0.00

0.00

28.14

928.62

0.00

0.00

28.14

0.00

2,601.76
208.59

0.00

0.00

0.00

0.00

0.00

4.00

2,601.76

0.00

0.00

0.00

0.00

0.00

0.00

2.10

208.59

0.00

4.00
2.10

0.00
0.00

104.88
105.90

0.00

0.00

51.41

104.88

0.00

0.00

0.00

0.00

0.00

0.00

51.41

105.90

0.00

0.00

0.00

0.00

51.41
51.41

0.00
0.00

0.00

0.00

308.43

9,752.56

0.00

0.00

0.00

0.00

0.00

0.00

51.41

119.27

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00

9,752.56
119.27
1,180.41
8,988.93

224.95

0.00

5.38

1,178.74

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

308.43
51.41
73.50
293.66

9,788.98

0.00

0.00

51.41

0.00

59,060.08

0.00

23,618.34

0.00

122.45
487.68
6,029.19

0.00
0.00
0.00

331.67
45.09

0.00
0.00

14.20
7.65

0.00
0.00

8.50
1.00
1.00
1.00
2.00

0.00
0.00
0.00
0.00
0.00

35.15
35.15

0.00
0.00

50.96
35.15
63.70

0.00
0.00
0.00

0.00

73.50

1,180.41

0.00

0.00

293.66

8,988.93

0.00

0.00

0.00

0.00

0.00

59,060.08
23,618.34
31,592.96

0.00

0.00

0.00

0.00

0.00

122.45

0.00

0.00

0.00

0.00

0.00

487.68

0.00

0.00

331.67

10,945.11

0.00

1,410.49
841.27
403.16
146.59
254.28
1,222.19
252.10

71.71
72.41

0.00

0.00

0.00

0.00

0.00

6,029.19

0.00

0.00

0.00

0.00

9,788.98

10,945.11
1,236.37

0.00

2.32

0.00

0.00

815.48
39.88
986.56

0.00

35.41

295.35

3,273.15

0.00

815.48

8.95

0.00

51.41

31,592.96

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

45.09

1,236.37

0.00

0.00

0.00

0.00

0.00

14.20

1,410.49

0.00

0.00

0.00

0.00

0.00

0.00

7.65

841.27

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.50

403.16

0.00

0.00

0.00

0.00

0.00

0.00

1.00

146.59

0.00

1.00

254.28

0.00

0.00

0.00

0.00

0.00

1.00

1,222.19

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

252.10

0.00

0.00

0.00

0.00

35.15

71.71

0.00

0.00

0.00

0.00

0.00

0.00

35.15

72.41

0.00

0.00

0.00

0.00

349.59
81.55
1,949.86

0.00

0.00

50.96

349.59

0.00

0.00

0.00

0.00

0.00

0.00

35.15

81.55

0.00

0.00

0.00

0.00

63.70

1,949.86

0.00

0.00

0.00

0.00

25.25

12,178.58

0.00

0.00

281.33

12,398.21

0.00

0.00

1,541.20

8,075.89

0.00

0.00

0.00

0.00

0.00

0.00

6,692.91

0.00

0.00

12,178.58
12,398.21
8,075.89

0.00

0.00

0.00

0.00

7,757.64
1,562.94

0.00

0.00

0.00

0.00

235.08

7,757.64

0.00

0.00

0.00

0.00

0.00

0.00

57.00

1,562.94

0.00

0.00

3,792.85
133.44
566.90
2,410.07
3,944.11
4,557.61
440.40
98.90
983.02
108.32
41.66
621.00
2,003.91
1,797.78
2,840.14

0.00

0.00

0.00

35.15

0.00

0.00

0.00

6,692.91

0.00

0.00

35.15

0.00

0.00

25.25
281.33
1,541.20

0.00
0.00
0.00

235.08
57.00

0.00
0.00

5.00
8.95
106.76
46.98

0.00
0.00
0.00
0.00

23.65
66.70
3.00
2.00
23.00
2.00
1.00
23.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

12.48
9.36
31.20

0.00
0.00
0.00

14.19
14.19

0.00
0.00

25.54
14.19
31.93

0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

5.00

3,792.85

0.00

0.00

0.00

0.00

0.00

0.00

8.95

133.44

0.00

0.00

0.00

106.76

0.00

0.00

0.00

566.90

0.00

0.00

0.00

0.00

0.00

0.00

46.98

2,410.07

0.00

0.00

0.00

0.00

0.00

0.00

23.65

3,944.11

0.00

0.00

0.00

66.70

4,557.61

0.00

0.00

0.00

0.00

3.00

440.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

98.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

23.00

983.02

0.00

0.00

0.00

0.00

2.00

108.32

0.00

0.00

0.00

0.00

0.00

0.00

1.00

41.66

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

621.00

0.00

0.00

23.00

0.00

0.00

0.00

0.00

12.48

2,003.91

0.00

0.00

0.00

0.00

0.00

0.00

9.36

1,797.78

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

31.20

2,840.14

0.00

0.00

28.95
29.23

0.00

0.00

14.19

0.00

0.00

14.19

706.69
32.92
977.38

0.00

0.00

14.19

32.92

0.00

0.00

0.00

0.00

0.00

0.00

31.93

977.38

0.00

0.00

0.00

0.00

1,043.53

5,468.10

0.00

0.00

2,701.92

0.00

0.00

9,910.80
5,172.50
5,468.10

0.00

0.00

2,575.32
1,442.29

0.00

0.00

0.00

0.00

0.00

0.00

25.54

28.95

0.00

0.00

0.00

0.00

29.23

0.00

0.00

0.00

0.00

706.69

0.00

0.00

0.00

0.00

14.19

2,701.92

0.00

0.00

0.00

14.19

0.00

0.00

20.62

9,910.80

0.00

0.00

0.00

0.00

117.37

5,172.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

20.62
117.37
1,043.53

0.00
0.00
0.00

0.00

0.00

0.00

78.04

2,575.32

0.00

0.00

0.00

0.00

0.00

0.00

52.60

1,442.29

0.00

0.00

3,275.63
1,092.36

0.00

0.00

0.00

0.00

20.40

3,275.63

0.00

0.00

0.00

0.00

0.00

0.00

12.00

1,092.36

0.00

3,000.00
94.43

0.00

0.00

0.00

0.00

0.00

0.00

1.00

3,000.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

94.43

21.39
35.80

0.00

0.00

0.00

21.39

0.00

0.00

10.75

0.00

0.00

0.00

0.00

10.75

35.80

0.00

0.00

0.00

0.00

0.00

0.00

7.74

88.62

0.00

0.00

0.00

0.00

78.04
52.60

0.00
0.00

20.40
12.00

0.00
0.00

0.00
0.00

1.00
1.00

10.75
10.75

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

2.42

74.08

0.00

0.00

7.74
6.45
10.75
5.81
2.42

509.87

0.00

0.00

0.00

0.00

10.75

509.87

0.00

0.00

10.75

0.00

1,271.79

0.00

0.00

0.00

0.00

1.00

1,271.79

0.00

0.00

1.00

0.00

216.26
218.38

0.00

0.00

0.00

0.00

106.01

216.26

0.00

0.00

0.00

0.00

0.00

0.00

106.01

218.38

0.00

0.00

106.01
106.01

0.00
0.00

119.52
144.79

0.00

0.00

0.00

0.00

3.78

119.52

0.00

0.00

0.00

0.00

0.00

0.00

4.73

144.79

0.00

0.00

3.78
4.73

0.00
0.00

88.62
14.00
120.08
ZARANDEADO
219.62 EN CAPAS DE 20CM
74.08

0.00

6.45

0.00

0.00

0.00

0.00

10.75

120.08

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.81

219.62

14.00

0.00

0.00

0.00

0.00

4,406.21

0.00

0.00

0.00

0.00

840.88

4,406.21

0.00

0.00

840.88

0.00

2.94
1.89
61.20
283.20

415.25
444.83
44.07
5.24

1,220.84
840.73
2,697.08
1,483.97

0.00

0.00

0.00

0.00

2.94

1,220.84

0.00

0.00

0.00

0.00

0.00

0.00

61.20

2,697.08

0.00

0.00

0.00

0.00

0.00

0.00

283.20

1,483.97

0.00

0.00

2.94
1.89
61.20
283.20

0.00
0.00
0.00
0.00

1.00

304.58

304.58

0.00

0.00

0.00

0.00

0.00

0.00

304.58

0.00

1.00

0.00

0.00

0.00

0.00

6.00

3,180.00

0.00

0.00

6.00

0.00

0.00

0.00

0.00

0.00

6.00

5,399.76

0.00

0.00

6.00

0.00

0.00

6.00
1.00
35.77
100.00
1.00

0.00
0.00
0.00
0.00
0.00

COLUMNETAS PARA CERCO PERMIEMTRICO


CONCRETO F'C=140 KG/CM2
m3
CONCRETO F'c= 175 KG/CM2
m3
ENCOFRADO Y DESENCOFRADO NORMAL
m2
ACERO FY=4200 KG/CM2
kg
PUERTA DE INGRESO
PUERTA DE MADERA CON ALAMBRE DE PUAS u

ESTUDIO DE IMPACTO AMBIENTAL


41,141.15
1 MITIGACION AMBIENTAL
1.01 PROGRAMA DE PREVENCIN Y MITIGACIN
01.01.01 LOGSTICA PARA CUMPLIMIENTO DE NORMATIVIDAD SEALADA EN EL PMA
01.01.01.01LOGISTICA PARA CUMPLIMINETO DE NORMATIVIDAD
mes SEALADA
6.00 EN EL 530.00
PMA
3,180.00
01.01.02 SUB PROGRAMA DE MANEJO DEL COMPONENTE FSICO
01.01.02.01SUB PROGRAMA DE MANEJO DEL COMPONENTE
mes
FSICO
6.00
899.96
5,399.76
01.01.03 SUB PROGRAMA DE MANEJO DEL COMPONENTE BIOLGICO
01.01.03.01SUB PROGRAMA DE MANEJO DEL COMPONENTE
mes
BIOLGICO6.00
800.20
4,801.20
01.01.03.02CERCO VIVO DE ARBOLES EN PERIMETRO DE PTAR
glb
1.00 1,310.32
1,310.32
01.01.03.03REVEGETACION DE PASTOS EN CAPTACION
m2
35.77
0.48
17.17
01.01.03.04REVEGETACION DE PASTOS EN PTAR
m2
100.00
0.48
48.00
01.01.03.05REVEGETACION DE COMPENSACIN
glb
1.00 1,000.00
1,000.00
01.01.04 SUB PROGRAMA DE SALUD Y SEGURIDAD LABORAL
01.01.04.01ACCIONES DE SALUD
est
1.00 3,400.00
3,400.00
01.01.04.02ACCIONES EN SEGURIDAD LABORAL
u
1.00 1,400.00
1,400.00
1.02 PROGRAMA DE MONITOREO Y SEGUIMIENTO AMBIENTAL
01.02.01 LOGISTICA PARA LAS ACCIONES DE MONITOREO
mes
6.00
200.00
1,200.00
01.02.02 MONITOREO DE LINEA BASE DE CALIDAD DE AGUA
informe
DEL CUERPO
6.00
RECEPTOR-ANTES
350.00 DE LA2,100.00
MEZCLA
01.02.03 MONITOREO DE LINEA BASE DE CALIDAD DE AGUAS
informe
RESIDUALES
3.00
(DESAGUE)
350.00
1,050.00
01.02.04 MONITOREO DE PRUEBA A LAS AGUAS RESIDUALES
informe
TRATADAS3.00
- EMISOR350.00
ANTES DE MEZCLA
1,050.00
1.03 PROGRAMA DE SEALIZACIN AMBIENTAL
01.03.01 INSTALACION DE SEALES
glb
1.00 1,950.00
1,950.00
1.04 PROGRAMA DE MANEJO AMBIENTAL DE CAMPAMENTOS
01.04.01 DESARME Y ABANDONO DE CAMPAMENTO m2
200.00
1.82
364.00
1.05 PROGRAMA DE EDUCACION AMBIENTAL
01.05.01 CAPACITACION
charla
10.00
150.00
1,500.00
01.05.02 DIFUSION
glb
1.00
650.00
650.00
1.06 PROGRAMA DE MANEJO DE RESIDUOS
01.06.01 RESIDUOS SOLIDOS
est
1.00 1,600.00
1,600.00
01.06.02 AGUAS RESIDUALES DOMESTICAS
est
1.00 1,220.70
1,220.70
1.07 PROGRAMA DE CONTINGENCIA
01.07.01 CONTROL ACCIDENTES
est
1.00 1,750.00
1,750.00
01.07.02 CONTINGENCIA TECNICA
u
15.00
110.00
1,650.00

0.00

0.00

0.00

0.00

1.89

840.73

0.00

0.00

1.00

F 05

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

6.00

4,801.20

1.00

1,310.32

0.00
0.00

0.00

0.00

0.00

0.00

0.00

35.77

17.17

0.00

0.00

0.00

0.00

0.00

0.00

100.00

48.00

0.00

0.00

1.00

1,000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.00
6.00

0.00

0.00

0.00

1.00

3,400.00

0.00

0.00

1.00

1,400.00

0.00

0.00

0.00

1,200.00
2,100.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

1,050.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

1,050.00

0.00

0.00

1.00

1,950.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

0.00
200.00

10.00
1.00

0.00
0.00

1.00
1.00

0.00
0.00

1.00
15.00

0.00
0.00

0.00

0.00

0.00

0.00

10.00

1,500.00

0.00

0.00

0.00

0.00

1.00

650.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00

1.00
0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

6.00
6.00
3.00
3.00

364.00

0.00

0.00

1.00
1.00

1.00

1,600.00

0.00

1.00

1,220.70

0.00

0.00

0.00

0.00

0.00

0.00

1.00

1,750.00

0.00

0.00

0.00

0.00

0.00

0.00

15.00

1,650.00

0.00

537
538
539
540
541
542
543
544

2 SANEAMIENTO FISICO LEGAL


2.01 TRABAJO DE CAMPO
02.01.01 ELABORACION DEL DIAGNOSTICO DE SITUACION
glbACTUAL
02.01.02 LEVANTAMIENTO TOPOPGRAFICO
glb
2.02 TRABAJO DE GABINETE
02.02.01 DIBUJO DE PLANOS
glb
02.02.02 MEMORIA DESCRIPTIVA
glb
02.02.03 PAGO DE TRAMITES
glb

545

F 06
1
1.01
01.01.01
01.01.02
01.01.03
1.02
01.02.01
1.03
01.03.01
01.03.02
1.04
01.04.01
01.04.02
01.04.03
01.04.04
2
02.01
02.01.01
02.01.02
2.02
02.02.01
02.02.02
02.02.03

546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569

1.00
1.00

500.00
1,250.00

500.00
1,250.00

0.00

0.00

0.00

0.00

0.00

1.00

500.00

0.00

0.00

0.00

0.00

0.00

1.00

1,250.00

1.00
1.00
1.00

1,250.00
800.00
700.00

1,250.00
800.00
700.00

1.00

1,250.00

0.00

0.00

0.00

0.00

0.00

1.00

800.00

0.00

0.00

0.00

0.00

0.00

1.00

700.00

1,500.00
2,399.00
1,200.00

1,500.00
2,399.00
1,200.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00
0.00

1.00
1.00

0.00
0.00

1.00
1.00
1.00

0.00
0.00
0.00

0.00
0.00
0.00

1.00
1.00
1.00

39,005.30

FORTALECIMIENTO DE LA UNIDAD DE GESTION


IMPLEMENTACION Y CAPACITACION DE LA JASS
EQUIPOS Y MUEBLES
MULTIFUNCIONAL: IMPRESORA, SCANER, FOTOCOPIADORA,
glb
1.00
FAX
EQUIPO DE COMPUTO
glb
1.00
SILLAS DE COMPUTO Y ESCRITORIO
glb
1.00
MATERIAL DE OFICINA
UTILES DE ESCRITORIO
glb
1.00
CAPACITACION PERSONAL
CAPACITACION PERSONAL TECNICO
glb
1.00
CAPACITACION PERSONAL ADMINISTRATIVO glb
1.00
OTROS
CATEGORIZACION DE CONEXIONES
glb
1.00
SET BASICO PARA DESATORO DE DESAGUE
glb
1.00
LLAVES Y HERRAMIENTAS
glb
1.00
MOTOBOMBA PARA AGUA SUCIA TIPO Honda uWT 20 X SIMILAR
1.00 O
EDUCACION SANITARIA
COSTOS INTANGIBLES
PAGO DE PONENTES
glb
1.00
VIATICOS
glb
1.00
COSTOS TANGIBLES
ALQUILER DE EQUIPOS
glb
1.00
MATERIAL DIDACTICO
glb
1.00
PERSONAL LOGISTICO
glb
1.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

1,500.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

2,399.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

1,200.00

850.00

850.00

0.00

0.00

0.00

0.00

0.00

1.00

850.00

0.00

1.00

0.00

1,500.00
1,500.00

1,500.00
1,500.00

0.00

0.00

0.00

0.00

0.00

1.00

1,500.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

1,500.00

0.00

1.00
1.00

0.00
0.00

800.00
##########
3,500.00
SUPERIOR
6,000.00

800.00
11,756.30
3,500.00
6,000.00

0.00

0.00

0.00

0.00

0.00

1.00

800.00

0.00

1.00

11,756.30

1.00
1.00
1.00
1.00

0.00
0.00
0.00
0.00

4,000.00
650.00

4,000.00
650.00

0.83
0.00

0.17
1.00

350.00
750.00
2,250.00

350.00
750.00
2,250.00

0.00
0.00
0.00

1.00
1.00
1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

3,500.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

6,000.00

0.00

0.83

3,311.06

0.17

688.94

0.00

1.00

650.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

350.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

750.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

2,250.00

RESUMEN DE PLANILLA DE METRADOS N 07

PARTIDA
F 01
01
01.01
01.02
01.03
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 01

: OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES


DESCRIPCION

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACO
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA
UND

OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES


OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
OBRAS PROVISIONALES PARA TODA LA OBRA
CAMPAMENTO PROVISIONAL DE LA OBRA
glb
CARTEL DE IDENTIFICACION DE OBRA DE 3.60 x 2.40 M.
Und
TRABAJOS PRELIMINARES PARA TODA LA OBRA
FLETE TERRESTRE (SISTEMA DE AGUA POTABLE)
glb
FLETE TERRESTRE (SISTEMA DE DESAGUE)
glb
glb
FLETE TERRESTRE (SISTEMA DE PTAR)
glb
MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA
PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA (PROV. DURANTEUnd
m
CINTA PLASTICA SEALIZADORA PARA LIMITE DE SEGURIDAD DE OBRA

METRADO

AVANCE ANTERIOR
%
METRADO

AVANCE MENSUAL
%
METRADO

AVANCE ACUMULADO
%
METRADO

1.00
1.00

100.00%
100.00%

1.00
1.00

0.00%
0.00%

0.00 100.00%
0.00 100.00%

1.00
1.00
1.00
1.00
24.00
8,701.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

1.00
1.00
1.00
1.00
24.00
8,701.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

SALDO
METRADO

1.00
1.00

0.00%
0.00%

0.00
0.00

1.00
1.00
1.00
1.00
24.00
8,701.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

RESUMEN DE PLANILLA DE METRADOS N 07

PARTIDA
F 02
01
01.01
01.01.01
01.01.02
01.02
01.02.01
01.03
01.03.01
01.03.02
01.04
01.04.01
01.04.02
01.05
01.05.01
02
02.01
02.01.01
02.01.02
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.03
02.03.01
02.03.02
02.04
02.04.01
02.04.02
02.04.03
02.05
02.05.01
02.05.02
02.06

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 02

: SISTEMA DE AGUA POTABLE


DESCRIPCION

SISTEMA DE AGUA POTABLE


REHABILITACION DE CAPTACION EXISTENTE - TIPO MANANTIAL (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
FILTROS
FILTRO DE GRAVA
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
VARIOS
TUBERIA DE REBOSE Y DESAGUE DE 2" SAL PVC
TUBERIA DE SALIDA DE CAPTACION PVC SAP C-10 DE 1 1/2"
PINTURA
PINTURA LATEX EN MUROS 2 MANOS
CONSTRUCCION DE CAPTACION - TIPO MANANTIAL DE LADERA (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
RELLENO CON MATERIAL PROPIO SELECCIONADO
ELIMINACION DE MATERIAL EXCEDENTE
FILTROS
CONCRETO F'c= 175 KG/CM2
FILTRO DE GRAVA
OBRAS DE CONCRETO ARMADO
CONCRETO EN MUROS REFORZADOS F'C= 210 KG/CM2
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
ACERO FY=4200 KG/CM2
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
VARIOS

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACO
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA
UND

METRADO

AVANCE ANTERIOR
%
METRADO

AVANCE MENSUAL
%
METRADO

AVANCE ACUMULADO
%
METRADO

SALDO
METRADO

m2
m2

8.55
8.55

100.00%
100.00%

8.55
8.55

0.00%
0.00%

0.00 100.00%
0.00 100.00%

8.55
8.55

0.00%
0.00%

0.00
0.00

m3

1.73

100.00%

1.73

0.00%

0.00 100.00%

1.73

0.00%

0.00

m2
m2

10.85
9.40

100.00%
100.00%

10.85
9.40

0.00%
0.00%

0.00 100.00%
0.00 100.00%

10.85
9.40

0.00%
0.00%

0.00
0.00

und
und

1.00
1.00

100.00%
100.00%

1.00
1.00

0.00%
0.00%

0.00 100.00%
0.00 100.00%

1.00
1.00

0.00%
0.00%

0.00
0.00

m2

9.40

0.00%

0.00

100.00%

9.40 100.00%

9.40

0.00%

0.00

m2
m2

8.55
8.55

100.00%
100.00%

8.55
8.55

0.00%
0.00%

0.00 100.00%
0.00 100.00%

8.55
8.55

0.00%
0.00%

0.00
0.00

m3
m2
m3
m3

7.76
8.55
2.51
6.56

100.00%
100.00%
100.00%
100.00%

7.76
8.55
2.51
6.56

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%

7.76
8.55
2.51
6.56

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

m3
m3

0.58
1.73

100.00%
100.00%

0.58
1.73

0.00%
0.00%

0.00 100.00%
0.00 100.00%

0.58
1.73

0.00%
0.00%

0.00
0.00

m3
m2
Kg

2.72
23.73
119.80

100.00%
100.00%
100.00%

2.72
23.73
119.80

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

2.72
23.73
119.80

0.00%
0.00%
0.00%

0.00
0.00
0.00

m2
m2

10.85
9.40

100.00%
100.00%

10.85
9.40

0.00%
0.00%

0.00 100.00%
0.00 100.00%

10.85
9.40

0.00%
0.00%

0.00
0.00

RESUMEN DE PLANILLA DE METRADOS N 07

PARTIDA
02.06.01
02.06.02
02.07
02.07.01
03
03.01
03.01.01
03.01.02
03.02
03.02.01
03.02.02
03.02.03
03.03
03.03.01
03.03.02
03.03.03
03.04
03.04.01
03.04.02
03.05
03.05.01
03.05.02
03.05.03
03.06
03.06.01
03.06.02
03.06.03
03.07
03.07.01
04
04.01
04.01.01
04.01.02
04.01.03
04.02

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 02

: SISTEMA DE AGUA POTABLE


DESCRIPCION

TUBERIA DE REBOSE Y DESAGUE DE 2" SAL PVC


TUBERIA DE SALIDA DE CAPTACION PVC SAP C-10 DE 1 1/2"
PINTURA
PINTURA LATEX EN MUROS 2 MANOS
CAJA DE REUNION (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO ARMADO
CONCRETO F'c= 175 KG/CM2
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
ACERO FY=4200 KG/CM2
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
VARIOS
TUBERIA DE INGRESO A C.R. PVC SAP C-10 DE 1 1/2"
TUBERIA DE SALIDA DE C.R. PVC SAP C-10 DE 1 1/2"
TUBERIA DE LIMPIEZA Y DESAGUE DE 2" SAL PVC
CARPINTERIA METALICA 332.45
TAPA METALICA 0.73X0.73X1/8"
TAPA METALICA 0.45X0.36X1/8"
TAPA METALICA 0.46X0.50X1/8"
PINTURA
PINTURA LATEX EN MUROS 2 MANOS
LINEA DE CONDUCCION
TRABAJOS PRELIMINARES
LIMPIEZA DE LINEA DE CONDUCCION
TRAZO, NIVELACION Y REPLANTEO
TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA
MOVIMIENTO DE TIERRAS

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACO
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA
UND

METRADO

AVANCE ANTERIOR
%
METRADO

AVANCE MENSUAL
%
METRADO

AVANCE ACUMULADO
%
METRADO

SALDO
METRADO

und
und

1.00
1.00

100.00%
100.00%

1.00
1.00

0.00%
0.00%

0.00 100.00%
0.00 100.00%

1.00
1.00

0.00%
0.00%

0.00
0.00

m2

9.40

0.00%

0.00

100.00%

9.40 100.00%

9.40

0.00%

0.00

m2
m2

1.70
1.70

100.00%
100.00%

1.70
1.70

-100.00%
-100.00%

-1.70
-1.70

0.00%
0.00%

0.00
0.00

100.00%
100.00%

1.70
1.70

m3
m2
m3

1.36
1.70
1.70

100.00%
100.00%
100.00%

1.36
1.70
1.70

-100.00%
-100.00%
-100.00%

-1.36
-1.70
-1.70

0.00%
0.00%
0.00%

0.00
0.00
0.00

100.00%
100.00%
100.00%

1.36
1.70
1.70

m3
m2
Kg

0.48
7.31
31.41

100.00%
100.00%
100.00%

0.48
7.31
31.41

-100.00%
-100.00%
-100.00%

-0.48
-7.31
-31.41

0.00%
0.00%
0.00%

0.00
0.00
0.00

100.00%
100.00%
100.00%

0.48
7.31
31.41

m2
m2

1.80
4.52

100.00%
100.00%

1.80
4.52

-100.00%
-100.00%

-1.80
-4.52

0.00%
0.00%

0.00
0.00

100.00%
100.00%

1.80
4.52

und
und
und

1.00
1.00
1.00

100.00%
100.00%
100.00%

1.00
1.00
1.00

-100.00%
-100.00%
-100.00%

-1.00
-1.00
-1.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

100.00%
100.00%
100.00%

1.00
1.00
1.00

und
und
und

1.00
1.00
1.00

100.00%
100.00%
100.00%

1.00
1.00
1.00

-100.00%
-100.00%
-100.00%

-1.00
-1.00
-1.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

100.00%
100.00%
100.00%

1.00
1.00
1.00

m2

4.52

0.00%

0.00

0.00%

0.00

0.00%

0.00

100.00%

4.52

ml
ml
ml

2,085.53
2,085.53
2,085.53

100.00%
100.00%
100.00%

2,085.53
2,085.53
2,085.53

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

2,085.53
2,085.53
2,085.53

0.00%
0.00%
0.00%

0.00
0.00
0.00

RESUMEN DE PLANILLA DE METRADOS N 07

PARTIDA
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.03
04.03.01
04.03.02
04.03.03
05
05.01
05.01.01
05.01.02
05.02
05.02.01
05.02.02
05.02.03
05.03
05.03.01
05.03.02
05.03.03
05.04
05.04.01
05.04.02
05.04.03
05.05
05.05.01
05.05.02
05.06
05.06.01
05.06.02
05.06.03
05.07
05.07.01
05.07.02

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 02

: SISTEMA DE AGUA POTABLE


DESCRIPCION

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACO
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA
UND

METRADO

AVANCE ANTERIOR
%
METRADO

m3
875.92
100.00%
875.92
EXCAVACION DE ZANJA EN TERRENO NORMAL COMPACTO
m2
1,251.32
100.00%
1,251.32
REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS
2,085.53
100.00%
2,085.53
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO ml
m3 ZARANDEADO
875.92EN CAPAS
100.00%
RELLENO COMPACTADO C/PLANCHA VIBRAT. HASTA H=3.00 M CON MAT/PROPIO
DE 20CM875.92
m3
218.98
100.00%
218.98
ELIMINACION DE MATERIAL EXCEDENTE
TUBERIAS
ml
2,085.53
100.00%
2,085.53
TUBERIA DE PVC ISO C-10 DE 1 1/2"
glb
1.00
100.00%
1.00
SUMINISTRO E INSTALACION DE ACCESORIOS PVC RED CONDUCCION
ml
2,085.53
100.00%
2,085.53
PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8" A ZANJA TAPADA
TANQUILLA ROMPERCARGA (01 UND)
TRABAJOS PRELIMINARES
m2
3.70
100.00%
3.70
LIMPIEZA DE TERRENO MANUAL
m2
3.70
100.00%
3.70
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
m3
4.33
100.00%
4.33
EXCAVACION MANUAL
m2
3.70
100.00%
3.70
REFINE NIVELACION INTERIOR APISONADO MANUAL
m3
5.41
100.00%
5.41
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
m2
3.70
100.00%
3.70
DADOS DE CONCRETO F'c=140 Kg/cm2
m3
0.46
100.00%
0.46
ENCOFRADO Y DESENCOFRADO NORMAL
m2
1.22
100.00%
1.22
OBRAS DE CONCRETO ARMADO
m3
1.92
100.00%
1.92
CONCRETO F'c= 175 KG/CM2
m2
19.39
100.00%
19.39
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
kg
104.23
100.00%
104.23
ACERO FY=4200 KG/CM2
REVOQUES Y ENLUCIDOS
m2
10.61
100.00%
10.61
TARRAJEO CON IMPERMEABILIZANTES
m2
10.91
100.00%
10.91
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
TUBERIAS Y ACCESORIOS
und
1.00
100.00%
1.00
TUBERIA DE INGRESO A C.R. PVC SAP C-10 DE 1 1/2"
und
1.00
100.00%
1.00
TUBERIA DE SALIDA DE C.R. PVC SAP C-10 DE 1 1/2"
und
1.00
100.00%
1.00
TUBERIA DE REBOSE Y LIMPIA DESAGUE DE 2" SAL PVC
CARPINTERIA METALICA
und
1.00
100.00%
1.00
TAPA METALICA 0.65X0.75X3/16"
und
1.00
100.00%
1.00
TAPA METALICA 0.65X0.65X3/16"

AVANCE MENSUAL
%
METRADO

AVANCE ACUMULADO
%
METRADO

SALDO
METRADO

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%

875.92
1,251.32
2,085.53
875.92
218.98

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

2,085.53
1.00
2,085.53

0.00%
0.00%
0.00%

0.00
0.00
0.00

-100.00%
-100.00%

-3.70
-3.70

0.00%
0.00%

0.00
0.00

100.00%
100.00%

3.70
3.70

-100.00%
-100.00%
-100.00%

-4.33
-3.70
-5.41

0.00%
0.00%
0.00%

0.00
0.00
0.00

100.00%
100.00%
100.00%

4.33
3.70
5.41

-100.00%
-100.00%
-100.00%

-3.70
-0.46
-1.22

0.00%
0.00%
0.00%

0.00
0.00
0.00

100.00%
100.00%
100.00%

3.70
0.46
1.22

-100.00%
-100.00%
-100.00%

-1.92
-19.39
-104.23

0.00%
0.00%
0.00%

0.00
0.00
0.00

100.00%
100.00%
100.00%

1.92
19.39
104.23

-100.00%
-100.00%

-10.61
-10.91

0.00%
0.00%

0.00
0.00

100.00%
100.00%

10.61
10.91

-100.00%
-100.00%
-100.00%

-1.00
-1.00
-1.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

100.00%
100.00%
100.00%

1.00
1.00
1.00

-100.00%
-100.00%

-1.00
-1.00

0.00%
0.00%

0.00
0.00

100.00%
100.00%

1.00
1.00

RESUMEN DE PLANILLA DE METRADOS N 07

PARTIDA
05.08
05.08.01
06
06.01
06.01.01
06.01.02
06.02
06.02.01
06.02.02
06.02.03
06.03
06.03.01
06.03.02
06.03.03
06.04
06.04.01
06.04.02
06.04.03
06.05
06.05.01
06.05.02
06.06
06.06.01
06.06.02
06.06.03
06.07
06.07.01
06.07.02
06.08
06.08.01
06.08.02
06.09
06.09.01
07
07.01

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 02

: SISTEMA DE AGUA POTABLE


DESCRIPCION

PINTURA
PINTURA LATEX EN MUROS 2 MANOS
CAMARA ROMPE PRESION (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
CONCRETO F'C=140 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
OBRAS DE CONCRETO ARMADO
CONCRETO F'c= 175 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY=4200 KG/CM2
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA DE INGRESO A C.R. PVC SAP C-10 DE 1 1/2"
TUBERIA DE SALIDA DE C.R. PVC SAP C-10 DE 1 1/2"
TUBERIA DE REBOSE Y LIMPIA DESAGUE DE 2" SAL PVC
SUMINISTRO E INSTALACION DE VALVULAS
VALVULA COMPUERTA HD C/ELASTOMERO 2"
VALVULA REDUCTORA DE PRESION 2"
CARPINTERIA METALICA
TAPA METALICA 0.40X0.45X1/8"
TAPA METALICA 0.60X0.60X1/8"
PINTURA
PINTURA LATEX EN MUROS 2 MANOS
REHABILITACION DE RESERVORIO EXISTENTE
TRABAJOS PRELIMINARES

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACO
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA
UND

METRADO

AVANCE ANTERIOR
%
METRADO

AVANCE MENSUAL
%
METRADO

AVANCE ACUMULADO
%
METRADO

SALDO
METRADO

m2

10.91

0.00%

0.00

0.00%

0.00

0.00%

0.00

100.00%

10.91

m2
m2

1.92
1.92

100.00%
100.00%

1.92
1.92

0.00%
0.00%

0.00 100.00%
0.00 100.00%

1.92
1.92

0.00%
0.00%

0.00
0.00

m3
m2
m3

0.86
1.92
1.08

100.00%
100.00%
100.00%

0.86
1.92
1.08

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

0.86
1.92
1.08

0.00%
0.00%
0.00%

0.00
0.00
0.00

m2
m3
m2

1.92
0.11
0.92

100.00%
100.00%
100.00%

1.92
0.11
0.92

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

1.92
0.11
0.92

0.00%
0.00%
0.00%

0.00
0.00
0.00

m3
m2
kg

0.95
8.87
61.36

100.00%
100.00%
100.00%

0.95
8.87
61.36

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

0.95
8.87
61.36

0.00%
0.00%
0.00%

0.00
0.00
0.00

m2
m2

6.32
4.18

100.00%
100.00%

6.32
4.18

0.00%
0.00%

0.00 100.00%
0.00 100.00%

6.32
4.18

0.00%
0.00%

0.00
0.00

und
und
und

1.00
1.00
1.00

100.00%
100.00%
100.00%

1.00
1.00
1.00

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

1.00
1.00
1.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

und
und

1.00
1.00

100.00%
100.00%

1.00
1.00

0.00%
0.00%

0.00 100.00%
0.00 100.00%

1.00
1.00

0.00%
0.00%

0.00
0.00

und
und

1.00
1.00

100.00%
100.00%

1.00
1.00

0.00%
0.00%

0.00 100.00%
0.00 100.00%

1.00
1.00

0.00%
0.00%

0.00
0.00

m2

4.18

0.00%

0.00

100.00%

4.18 100.00%

4.18

0.00%

0.00

RESUMEN DE PLANILLA DE METRADOS N 07

PARTIDA
07.01.01
07.01.02
07.02
07.02.01
07.02.02
07.03
07.03.01
07.03.02
07.04
07.04.01
07.04.02
07.05
07.05.01
07.05.02
07.05.03
08
08.01
08.01.01
08.01.02
08.02
08.02.01
08.02.02
08.02.03
08.03
08.03.01
08.04
08.04.01
08.04.01.01
08.04.01.02
08.04.01.03
08.04.02
08.04.02.01
08.04.02.02
08.04.02.03
08.04.03

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 02

: SISTEMA DE AGUA POTABLE


DESCRIPCION

LIMPIEZA DE TERRENO MANUAL


TRAZO Y REPLANTEO
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
PINTURA
PINTURA LATEX EN MUROS 2 MANOS
PINTURA EN ESTRUCTURAS METALICAS
CARPINTERIA METALICA
ESCALERA GATO, TUB F.GVZDO. C/PARANTES DE 1 1/2" SEGUN DISEO
TAPA METALICA 0.60X0.60X1/8"
INSTALACIONES SANITARIAS
TUBERIA DE REBOSE Y DESAGUE DE 2 1/2" SAL PVC
TUBERIA DE SALIDA DE PVC SAP C-10 DE 1 1/2"
ACCESORIOS DE RESERVORIO
RESERVORIO CIRCULAR (35 M3)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION DE CIMIENTOS EN TERENO COMPACTO
REFINE NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION MATERIAL EXCEDENTE A MANO D<200M
OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
OBRAS DE CONCRETO ARMADO
LOSA
CONCRETO F'C=210 KG/CM2 EN LOSA
ENCOFRADO Y DESENCOFRADO DE LOSA
ACERO FY=4200 KG/CM2
MUROS REFORZADOS
CONCRETO F'C=210 KG/CM2 EN MUROS REFORZADO
ENCOFRADO Y DESENCOFRADO CURVO EN PLACAS
ACERO FY=4200 KG/CM2
CUPULA ESFERICA

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACO
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA
UND

METRADO

AVANCE ANTERIOR
%
METRADO

AVANCE MENSUAL
%
METRADO

AVANCE ACUMULADO
%
METRADO

SALDO
METRADO

m2
m2

7.50
7.50

100.00%
100.00%

7.50
7.50

0.00%
0.00%

0.00 100.00%
0.00 100.00%

7.50
7.50

0.00%
0.00%

0.00
0.00

m2
m2

9.00
22.50

100.00%
100.00%

9.00
22.50

0.00%
0.00%

0.00 100.00%
0.00 100.00%

9.00
22.50

0.00%
0.00%

0.00
0.00

m2
ml

30.00
2.50

0.00%
0.00%

0.00
0.00

100.00%
100.00%

30.00 100.00%
2.50 100.00%

30.00
2.50

0.00%
0.00%

0.00
0.00

ml
und

2.50
2.00

100.00%
100.00%

2.50
2.00

0.00%
0.00%

0.00 100.00%
0.00 100.00%

2.50
2.00

0.00%
0.00%

0.00
0.00

und
und
glb

1.00
2.00
1.00

100.00%
100.00%
100.00%

1.00
2.00
1.00

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

1.00
2.00
1.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

m2
m2

47.90
47.90

100.00%
100.00%

47.90
47.90

0.00%
0.00%

0.00 100.00%
0.00 100.00%

47.90
47.90

0.00%
0.00%

0.00
0.00

m3
m2
m3

57.48
47.90
74.85

100.00%
100.00%
100.00%

57.48
47.90
74.85

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

57.48
47.90
74.85

0.00%
0.00%
0.00%

0.00
0.00
0.00

m2

47.90

100.00%

47.90

0.00%

0.00 100.00%

47.90

0.00%

0.00

m3
m2
kg

16.33
25.00
235.99

100.00%
100.00%
100.00%

16.33
25.00
235.99

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

16.33
25.00
235.99

0.00%
0.00%
0.00%

0.00
0.00
0.00

m3
m2
kg

19.79
120.44
1,258.68

100.00%
100.00%
100.00%

19.79
120.44
1,258.68

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

19.79
120.44
1,258.68

0.00%
0.00%
0.00%

0.00
0.00
0.00

RESUMEN DE PLANILLA DE METRADOS N 07

PARTIDA
08.04.03.01
08.04.03.02
08.04.03.03
08.04.04
08.04.04.01
08.04.04.02
08.04.04.03
08.04.05
08.04.05.01
08.04.05.02
08.04.05.03
8.05
08.05.01
08.05.02
8.06
08.06.01
08.06.02
8.07
08.07.01
08.07.02
8.08
08.08.01
08.08.02
8.09
08.09.01
08.09.02
08.09.03
9
9.01
09.01.01
09.01.02
09.01.03
9.02
09.02.01
09.02.02

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 02

: SISTEMA DE AGUA POTABLE


DESCRIPCION

CONCRETO F'C=210 KG/CM2 EN CUPULAS


ENCOFRADO Y DESENCOFRADO CURVO EN CUPULA
ACERO FY=4200 KG/CM2
COLUMNAS
CONCRETO F'C=210 KG/CM2 EN COLUMNAS
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
ACERO FY=4200 KG/CM2
VIGAS
CONCRETO F'C=210 KG/CM2 EN VIGAS COLLARIN
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
ACERO FY=4200 KG/CM2
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
PISOS Y VEREDAS
CONCRETO F'C=140 KG/CM2 EN VEREDAS
ENCOFRADO Y DESENCOFRADO EN VEREDAS
PINTURA
PINTURA LATEX EN MUROS 2 MANOS
PINTURA EN ESTRUCTURAS METALICAS
CARPINTERIA METALICA
ESCALERA GATO, TUB F.GVZDO. C/PARANTES DE 1 1/2" SEGUN DISEO
TAPA METALICA 0.60X0.60X1/8"
INSTALACIONES SANITARIAS
TUBERIA DE REBOSE Y DESAGUE DE 2 1/2" SAL PVC
TUBERIA DE SALIDA DE PVC SAP C-10 DE 1 1/2"
ACCESORIOS DE RESERVORIO
LINEA DE ADUCCION
TRABAJOS PRELIMINARES
LIMPIEZA DE LINEA DE ADUCCION
TRAZO, NIVELACION Y REPLANTEO
TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA EN TERRENO NORMAL COMPACTO
REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACO
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA
UND

METRADO

AVANCE ANTERIOR
%
METRADO

AVANCE MENSUAL
%
METRADO

AVANCE ACUMULADO
%
METRADO

SALDO
METRADO

m3
m2
kg

6.06
42.32
267.91

100.00%
100.00%
100.00%

6.06
42.32
267.91

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

6.06
42.32
267.91

0.00%
0.00%
0.00%

0.00
0.00
0.00

m3
m2
kg

0.78
12.50
142.68

100.00%
100.00%
100.00%

0.78
12.50
142.68

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

0.78
12.50
142.68

0.00%
0.00%
0.00%

0.00
0.00
0.00

m3
m2
kg

2.10
15.10
224.45

100.00%
100.00%
100.00%

2.10
15.10
224.45

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

2.10
15.10
224.45

0.00%
0.00%
0.00%

0.00
0.00
0.00

m2
m2

131.74
136.84

100.00%
100.00%

131.74
136.84

0.00%
0.00%

0.00 100.00%
0.00 100.00%

131.74
136.84

0.00%
0.00%

0.00
0.00

m3
m2

13.56
2.97

100.00%
100.00%

13.56
2.97

0.00%
0.00%

0.00 100.00%
0.00 100.00%

13.56
2.97

0.00%
0.00%

0.00
0.00

m2
m

136.84
9.60

0.00%
0.00%

0.00
0.00

100.00%
100.00%

136.84 100.00%
9.60 100.00%

136.84
9.60

0.00%
0.00%

0.00
0.00

m
u

9.60
2.00

100.00%
100.00%

9.60
2.00

0.00%
0.00%

0.00 100.00%
0.00 100.00%

9.60
2.00

0.00%
0.00%

0.00
0.00

u
u
glb

1.00
1.00
1.00

100.00%
100.00%
100.00%

1.00
1.00
1.00

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

1.00
1.00
1.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

m
m
m

1,574.63
1,574.63
1,574.63

100.00%
100.00%
100.00%

1,574.63
1,574.63
1,574.63

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

1,574.63
1,574.63
1,574.63

0.00%
0.00%
0.00%

0.00
0.00
0.00

m3
m2

661.34
944.78

100.00%
100.00%

661.34
944.78

0.00%
0.00%

0.00 100.00%
0.00 100.00%

661.34
944.78

0.00%
0.00%

0.00
0.00

RESUMEN DE PLANILLA DE METRADOS N 07

PARTIDA
09.02.03
09.02.04
09.02.05
9.03
09.03.01
09.03.02
09.03.03
9.04

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 02

: SISTEMA DE AGUA POTABLE


DESCRIPCION

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACO
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA
UND

METRADO

AVANCE ANTERIOR
%
METRADO

1,574.63
100.00%
1,574.63
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m
661.34
100.00%
661.34
RELLENO COMPACTADO C/PLNACHA VIBRAT. HASTA H=3.00M CON MATERIALm3
PROPIO ZARANDEADO
EN CAPAS DE 20CM
m3
165.34
100.00%
165.34
ELIMINACION DE MATERIAL EXCEDENTE
TUBERIAS
m
1,574.63
100.00%
1,574.63
TUBERIA DE PVC ISO C-10 DE 1 1/2"
glb
1.00
100.00%
1.00
SUMINISTRO E INSTALACION DE ACCESORIOS PVC RED ADUCCION
m
1,574.63
100.00%
1,574.63
PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8" A ZANJA TAPADA
PASE AEREO

AVANCE MENSUAL
%
METRADO

AVANCE ACUMULADO
%
METRADO

SALDO
METRADO

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

1,574.63
661.34
165.34

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

1,574.63
1.00
1,574.63

0.00%
0.00%
0.00%

0.00
0.00
0.00

RESUMEN DE PLANILLA DE METRADOS N 07

PARTIDA
F 03

1.01.01
1.01.02

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 03

: SISTEMA DE ALCANTARILLADO
DESCRIPCION

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACO
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA
UND

SISTEMA DE ALCANTARILLADO
1 RED DE ALCANTARILLADO
1.01 TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO
TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA
1.02 MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA EN TERRENO NORMAL COMPACTO
CORTE DE PAVIMENTO RIGIDO C/EQUIPO
REPOSICION DE PAVIMENTO DE CONCRETO F'C=210 KG/CM2, LOSA E=10"
REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO
RELLENO COMPACTADO C/PLANCHA VIBRAT. HASTA H=3.00 M CON
ELIMINACION DE MATERIAL EXCEDENTE
1.03 SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 110MM
TUBERIA PVC ALCANT U.F. ISO 4435,S-25 160MM
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM
1.04 VARIOS
PRUEBA HIDRAULICA - ESCORRENTIA DE TUB. A ZANJA ABIERTA
PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MOD. - DENSIDAD DE
2 BUZONES
2.01 TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
2.02 MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
2.03 CONSTRUCCION DE BUZONES
BUZON DE CONCRETO TIPO 1, h= 1.50 m
BUZON DE CONCRETO TIPO 2, h= 1.50 m a 3.00 M.
3 CONEXIONES DOMICILIARIAS DE ALCANTARILLADO
3.01 TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO

METRADO

AVANCE ANTERIOR
%
METRADO

AVANCE MENSUAL
%
METRADO

AVANCE ACUMULADO
%
METRADO

SALDO
METRADO

m
m

4,350.50
4,350.50

100.00%
100.00%

4,350.50
4,350.50

0.00%
0.00%

0.00 100.00%
0.00 100.00%

4,350.50
4,350.50

0.00%
0.00%

0.00
0.00

m3
m
m2
m2
m
m3
m3

3,132.35
246.45
172.50
2,610.30
4,350.50
2,479.79
815.72

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

3,132.35
246.45
172.50
2,610.30
4,350.50
2,479.79
815.72

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

3,132.35
246.45
172.50
2,610.30
4,350.50
2,479.79
815.72

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

m
m
m

659.32
937.32
2,753.86

100.00%
100.00%
100.00%

659.32
937.32
2,753.86

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

659.32
937.32
2,753.86

0.00%
0.00%
0.00%

0.00
0.00
0.00

m
u

4,350.50
10.00

100.00%
100.00%

4,350.50
10.00

0.00%
0.00%

0.00 100.00%
0.00 100.00%

4,350.50
10.00

0.00%
0.00%

0.00
0.00

m2
m2

110.55
110.55

100.00%
100.00%

110.55
110.55

0.00%
0.00%

0.00 100.00%
0.00 100.00%

110.55
110.55

0.00%
0.00%

0.00
0.00

m3
m3

178.89
223.61

100.00%
100.00%

178.89
223.61

0.00%
0.00%

0.00 100.00%
0.00 100.00%

178.89
223.61

0.00%
0.00%

0.00
0.00

u
u

15.00
40.00

100.00%
100.00%

15.00
40.00

0.00%
0.00%

0.00 100.00%
0.00 100.00%

15.00
40.00

0.00%
0.00%

0.00
0.00

m2
m

668.00
668.00

100.00%
100.00%

668.00
668.00

0.00%
0.00%

0.00 100.00%
0.00 100.00%

668.00
668.00

0.00%
0.00%

0.00
0.00

RESUMEN DE PLANILLA DE METRADOS N 07

PARTIDA

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 03

: SISTEMA DE ALCANTARILLADO
DESCRIPCION

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACO
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA
UND

METRADO

AVANCE ANTERIOR
%
METRADO

3.02 MOVIMIENTO DE TIERRAS


m3
480.96
100.00%
480.96
EXCAVACION MANUAL
m2
400.80
100.00%
400.80
REFINE NIVELACION INTERIOR APISONADO MANUAL
668.00
100.00%
668.00
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m
m3 ZARANDEADO
380.76EN CAPAS
100.00%
RELLENO COMPACTADO C/PLANCHA VIBRAT. HASTA H=3.00 M CON MAT/PROPIO
DE 20CM380.76
m3
125.25
100.00%
125.25
ELIMINACION DE MATERIAL EXCEDENTE
3.03 CONEXIONES DOMICILIARIAS
u
167.00
100.00%
167.00
CONEXIONES DOMICILIARIAS 4"X6"

AVANCE MENSUAL
%
METRADO

AVANCE ACUMULADO
%
METRADO

SALDO
METRADO

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%

480.96
400.80
668.00
380.76
125.25

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%

0.00 100.00%

167.00

0.00%

0.00

RESUMEN DE PLANILLA DE METRADOS N 07

PARTIDA
F 04

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 04

: SISTEMA PTAR
DESCRIPCION

SISTEMA DE PTAR
1 CAMARA DE REJAS (01 UND)
1.01 TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
1.02 MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
1.03 OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
1.04 OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
ACERO FY=4200 KG/CM2
1.05 REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
1.06 ACCESORIOS
REJILLA METALICA
PLANCHA METALICA DE FF DE e=3/4"
2 DESARENADOR Y MEDIDOR PARSHALL (01 UND)
2.01 TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
2.02 MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
2.03 OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
2.04 OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
ACERO FY=4200 KG/CM2

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACO
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA
UND

METRADO

AVANCE ANTERIOR
%
METRADO

AVANCE MENSUAL
%
METRADO

AVANCE ACUMULADO
%
METRADO

SALDO
METRADO

m2
m2

3.83
3.83

100.00%
100.00%

3.83
3.83

0.00%
0.00%

0.00 100.00%
0.00 100.00%

3.83
3.83

0.00%
0.00%

0.00
0.00

m3
m2
m3

3.06
3.83
6.56

100.00%
100.00%
100.00%

3.06
3.83
6.56

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

3.06
3.83
6.56

0.00%
0.00%
0.00%

0.00
0.00
0.00

m2

3.83

100.00%

3.83

0.00%

0.00 100.00%

3.83

0.00%

0.00

m3
m2
kg

2.31
17.18
71.83

100.00%
0.00%
100.00%

2.31
0.00
71.83

0.00%
100.00%
0.00%

0.00 100.00%
17.18 100.00%
0.00 100.00%

2.31
17.18
71.83

0.00%
0.00%
0.00%

0.00
0.00
0.00

m2

8.95

100.00%

8.95

0.00%

0.00 100.00%

8.95

0.00%

0.00

u
u

1.00
1.00

100.00%
100.00%

1.00
1.00

0.00%
0.00%

0.00 100.00%
0.00 100.00%

1.00
1.00

0.00%
0.00%

0.00
0.00

m2
m2

17.19
17.19

100.00%
100.00%

17.19
17.19

0.00%
0.00%

0.00 100.00%
0.00 100.00%

17.19
17.19

0.00%
0.00%

0.00
0.00

m3
m2
m3

25.79
17.19
32.23

100.00%
100.00%
100.00%

25.79
17.19
32.23

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

25.79
17.19
32.23

0.00%
0.00%
0.00%

0.00
0.00
0.00

m2

17.19

100.00%

17.19

0.00%

0.00 100.00%

17.19

0.00%

0.00

m3
m2
kg

8.71
53.42
224.95

100.00%
100.00%
100.00%

8.71
53.42
224.95

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

8.71
53.42
224.95

0.00%
0.00%
0.00%

0.00
0.00
0.00

RESUMEN DE PLANILLA DE METRADOS N 07

PARTIDA

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 04

: SISTEMA PTAR
DESCRIPCION

2.05 REVOQUES Y ENLUCIDOS


TARRAJEO CON IMPERMEABILIZANTES
2.06 ACCESORIOS
COMPUERTAS FIERRO DE 0.63*0.44 M
BARANDA DE TUBO FO. GDO. PASAMANO 1 1/2"-PARANTE 1" X 1M.ALT
3 TANQUE IMHOFF (01 UND)
3.01 TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
3.02 MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
RELLENO CON MATERIAL PROPIO SELECCIONADO
ELIMINACION DE MATERIAL EXCEDENTE
3.03 OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
3.04 OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
ACERO FY=4200 KG/CM2
3.05 REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
3.06 CARPINTERIA METALICA
BARANDA DE TUBO FO. GDO. PASAMANO 1 1/2"-PARANTE 1" X 1M.ALT
ESCALERA TUB F.GVZDO. C/PARANTES DE 2" X PELDAOS DE 3/4"
3.07 INSTALACIONES SANITARIAS
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM
TEE UPVC UF S-25 DE 8"
CODO SP PVC UF S-25 DE 8"
VALVULA DE COMPUERTA DE FIERRO FUNDIDO MAZZA DE 8"
PANTALLA DEFLECTORA
4 LECHO DE SECADO (01 UND)
4.01 TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACO
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA
UND

METRADO

AVANCE ANTERIOR
%
METRADO

AVANCE MENSUAL
%
METRADO

AVANCE ACUMULADO
%
METRADO

SALDO
METRADO

m2

28.14

100.00%

28.14

0.00%

0.00 100.00%

28.14

0.00%

0.00

u
m

4.00
2.10

100.00%
100.00%

4.00
2.10

0.00%
0.00%

0.00 100.00%
0.00 100.00%

4.00
2.10

0.00%
0.00%

0.00
0.00

m2
m2

51.41
51.41

100.00%
100.00%

51.41
51.41

0.00%
0.00%

0.00 100.00%
0.00 100.00%

51.41
51.41

0.00%
0.00%

0.00
0.00

m3
m2
m3
m3

308.43
51.41
73.50
293.66

100.00%
100.00%
100.00%
100.00%

308.43
51.41
73.50
293.66

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%

308.43
51.41
73.50
293.66

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

m2

51.41

100.00%

51.41

0.00%

0.00 100.00%

51.41

0.00%

0.00

m3
m2
kg

122.45
487.68
6,029.19

100.00%
100.00%
100.00%

122.45
487.68
6,029.19

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

122.45
487.68
6,029.19

0.00%
0.00%
0.00%

0.00
0.00
0.00

m2
m2

331.67
45.09

100.00%
100.00%

331.67
45.09

0.00%
0.00%

0.00 100.00%
0.00 100.00%

331.67
45.09

0.00%
0.00%

0.00
0.00

m
m

14.20
7.65

100.00%
100.00%

14.20
7.65

0.00%
0.00%

0.00 100.00%
0.00 100.00%

14.20
7.65

0.00%
0.00%

0.00
0.00

m
u
u
u
u

8.50
1.00
1.00
1.00
2.00

100.00%
100.00%
100.00%
100.00%
100.00%

8.50
1.00
1.00
1.00
2.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%

8.50
1.00
1.00
1.00
2.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

m2

35.15

100.00%

35.15

0.00%

0.00 100.00%

35.15

0.00%

0.00

RESUMEN DE PLANILLA DE METRADOS N 07

PARTIDA

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 04

: SISTEMA PTAR
DESCRIPCION

TRAZO Y REPLANTEO
4.02 MOVIMIENTO DE TIERRAS
EXCAVACION C/MAQ. EN TERRENO NORMAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
4.03 OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
4.04 OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY=4200 KG/CM2
4.05 REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
4.06 ESTRUCTURA DE MADERA Y COBERTURA
TIJERAL DE MADERA TIPO 01 L=3.00M
VIGA DE MADERA 3" X 4"
CORREAS Y TIRANTES DE MADERA
COBERTURA DE CALAMINA 11 CANALES E=3MM
4.07 INSTALACIONES SANITARIAS
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 100MM
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 50MM
CODO PVC SAP 6"X90
CODO PVC SAP 4"X90
TEE PVC-SAP 4"* 2"
TEE PVC-SAP 150mmx150mm
TEE PVC-SAP 200mmx150mm
TAPON PVC-SAP 2"
4.08 FILTROS
FILTRO DE GRAVA
FILTRO DE ARENA
FILTRO DE LADRILLO
5 FILTRO BIOLOGICO (01 UND)
5.01 TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACO
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA
UND

METRADO

AVANCE ANTERIOR
%
METRADO

AVANCE MENSUAL
%
METRADO

AVANCE ACUMULADO
%
METRADO

SALDO
METRADO

m2

35.15

100.00%

35.15

0.00%

0.00 100.00%

35.15

0.00%

0.00

m3
m2
m3

50.96
35.15
63.70

100.00%
100.00%
100.00%

50.96
35.15
63.70

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

50.96
35.15
63.70

0.00%
0.00%
0.00%

0.00
0.00
0.00

m2

35.15

100.00%

35.15

0.00%

0.00 100.00%

35.15

0.00%

0.00

m3
m2
kg

25.25
281.33
1,541.20

100.00%
100.00%
100.00%

25.25
281.33
1,541.20

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

25.25
281.33
1,541.20

0.00%
0.00%
0.00%

0.00
0.00
0.00

m2
m2

235.08
57.00

100.00%
100.00%

235.08
57.00

0.00%
0.00%

0.00 100.00%
0.00 100.00%

235.08
57.00

0.00%
0.00%

0.00
0.00

u
m
p2
m2

5.00
8.95
106.76
46.98

100.00%
100.00%
100.00%
100.00%

5.00
8.95
106.76
46.98

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%

5.00
8.95
106.76
46.98

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

m
m
u
u
u
u
u
u

23.65
66.70
3.00
2.00
23.00
2.00
1.00
23.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

23.65
66.70
3.00
2.00
23.00
2.00
1.00
23.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

23.65
66.70
3.00
2.00
23.00
2.00
1.00
23.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

m3
m3
m2

12.48
9.36
31.20

100.00%
100.00%
100.00%

12.48
9.36
31.20

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

12.48
9.36
31.20

0.00%
0.00%
0.00%

0.00
0.00
0.00

m2

14.19

100.00%

14.19

0.00%

0.00 100.00%

14.19

0.00%

0.00

RESUMEN DE PLANILLA DE METRADOS N 07

PARTIDA

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 04

: SISTEMA PTAR
DESCRIPCION

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACO
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA
UND

METRADO

AVANCE ANTERIOR
%
METRADO

m2
14.19
100.00%
14.19
TRAZO Y REPLANTEO
5.02 MOVIMIENTO DE TIERRAS
m3
25.54
100.00%
25.54
EXCAVACION DE ZANJA HASTA 0.80 M, TERRENO NORMAL
m2
14.19
100.00%
14.19
REFINE NIVELACION INTERIOR APISONADO MANUAL
m3
31.93
100.00%
31.93
ELIMINACION DE MATERIAL EXCEDENTE
5.03 OBRAS DE CONCRETO SIMPLE
m2
14.19
100.00%
14.19
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
5.04 OBRAS DE CONCRETO ARMADO
m3
20.62
100.00%
20.62
CONCRETO F'C=210 KG/CM2
m2
117.37
100.00%
117.37
ENCOFRADO Y DESENCOFRADO NORMAL
kg
1,043.53
100.00%
1,043.53
ACERO FY=4200 KG/CM2
5.06 REVOQUES Y ENLUCIDOS
m2
78.04
100.00%
78.04
TARRAJEO CON IMPERMEABILIZANTES
m2
52.60
100.00%
52.60
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
5.07 FILTROS
m3
20.40
100.00%
20.40
FILTRO DE GRAVA
m2
12.00
100.00%
12.00
FILTRO DE LADRILLO
5.08 SISTEMA DE DESINFECCION (HIPOCLORADOR POR GOTEO)
u
1.00
0.00%
0.00
HIPOCLORADOR DIFUSION inc Gancho
u
1.00
0.00%
0.00
TAPA METALICA 0.40X0.45X1/8"
6 RED DE ALCANTARILLADO EN PLANTA DE TRATAMIENTO
6.01 TRABAJOS PRELIMINARES
m
10.75
100.00%
10.75
TRAZO, NIVELACION Y REPLANTEO
m
10.75
100.00%
10.75
TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA
6.02 MOVIMIENTO DE TIERRAS
7.74
100.00%
7.74
EXCAVACION DE ZANJAS EN TERRENO NORMAL PARA-TUB. 6"-8" HASTA 1. m3
m
6.45
100.00%
6.45
REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS
10.75
100.00%
10.75
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m
m ZARANDEADO
5.81EN CAPAS
100.00%
RELLENO COMPACTADO C/PLANCHA VIBRAT. HASTA H=3.00 M CON MAT/PROPIO
DE 20CM 5.81
m3
2.42
100.00%
2.42
ELIMINACION DE MATERIAL EXCEDENTE
6.03 SUMINISTRO E INSTALACION DE TUBERIAS
m
10.75
100.00%
10.75
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM
6.04 BUZONES
u
1.00
100.00%
1.00
BUZON DE CONCRETO TIPO 1, h= 1.50 m
7 CERCO PERIMETRICO

AVANCE MENSUAL
%
METRADO

AVANCE ACUMULADO
%
METRADO

SALDO
METRADO

0.00%

0.00 100.00%

14.19

0.00%

0.00

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

25.54
14.19
31.93

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%

0.00 100.00%

14.19

0.00%

0.00

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

20.62
117.37
1,043.53

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%

0.00 100.00%
0.00 100.00%

78.04
52.60

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00 100.00%
0.00 100.00%

20.40
12.00

0.00%
0.00%

0.00
0.00

100.00%
100.00%

1.00 100.00%
1.00 100.00%

1.00
1.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00 100.00%
0.00 100.00%

10.75
10.75

0.00%
0.00%

0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%

7.74
6.45
10.75
5.81
2.42

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%

0.00 100.00%

10.75

0.00%

0.00

0.00%

0.00 100.00%

1.00

0.00%

0.00

RESUMEN DE PLANILLA DE METRADOS N 07

PARTIDA

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 04

: SISTEMA PTAR
DESCRIPCION

7.01 TRABAJOS PRELIMINARES


LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
7.02 MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
7.03 CERCO PERIMETRICO CON ALAMBRE DE PUAS
ALAMBRE CON PUAS PARA CERCO
7.04 COLUMNETAS PARA CERCO PERMIEMTRICO
CONCRETO F'C=140 KG/CM2
CONCRETO F'c= 175 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY=4200 KG/CM2
7.05 PUERTA DE INGRESO
PUERTA DE MADERA CON ALAMBRE DE PUAS

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACO
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA
UND

METRADO

AVANCE ANTERIOR
%
METRADO

AVANCE MENSUAL
%
METRADO

AVANCE ACUMULADO
%
METRADO

SALDO
METRADO

m2
m2

106.01
106.01

100.00%
100.00%

106.01
106.01

0.00%
0.00%

0.00 100.00%
0.00 100.00%

106.01
106.01

0.00%
0.00%

0.00
0.00

m3
m3

3.78
4.73

100.00%
100.00%

3.78
4.73

0.00%
0.00%

0.00 100.00%
0.00 100.00%

3.78
4.73

0.00%
0.00%

0.00
0.00

840.88

100.00%

840.88

0.00%

0.00 100.00%

840.88

0.00%

0.00

m3
m3
m2
kg

2.94
1.89
61.20
283.20

100.00%
100.00%
100.00%
100.00%

2.94
1.89
61.20
283.20

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%

2.94
1.89
61.20
283.20

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

1.00

0.00%

0.00

100.00%

1.00 100.00%

1.00

0.00%

0.00

RESUMEN DE PLANILLA DE METRADOS N 07

PARTIDA
F 05
1
1.01
01.01.01
01.01.01.01
01.01.02
01.01.02.01
01.01.03
01.01.03.01
01.01.03.02
01.01.03.03
01.01.03.04
01.01.03.05
01.01.04
01.01.04.01
01.01.04.02
1.02
01.02.01
01.02.02
01.02.03
01.02.04
1.03
01.03.01
1.04
01.04.01
1.05
01.05.01
01.05.02
1.06
01.06.01
01.06.02
1.07
01.07.01
01.07.02

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 05

: ESTUDIO DE IMPACTO AMBIENTAL


DESCRIPCION

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACO
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA
UND

METRADO

ESTUDIO DE IMPACTO AMBIENTAL


MITIGACION AMBIENTAL
PROGRAMA DE PREVENCIN Y MITIGACIN
LOGSTICA PARA CUMPLIMIENTO DE NORMATIVIDAD SEALADA EN EL PMA
LOGISTICA PARA CUMPLIMINETO DE NORMATIVIDAD SEALADA EN EL PMA mes
6.00
SUB PROGRAMA DE MANEJO DEL COMPONENTE FSICO
SUB PROGRAMA DE MANEJO DEL COMPONENTE FSICO
mes
6.00
SUB PROGRAMA DE MANEJO DEL COMPONENTE BIOLGICO
mes
6.00
SUB PROGRAMA DE MANEJO DEL COMPONENTE BIOLGICO
glb
1.00
CERCO VIVO DE ARBOLES EN PERIMETRO DE PTAR
m2
35.77
REVEGETACION DE PASTOS EN CAPTACION
m2
100.00
REVEGETACION DE PASTOS EN PTAR
glb
1.00
REVEGETACION DE COMPENSACIN
SUB PROGRAMA DE SALUD Y SEGURIDAD LABORAL
est
1.00
ACCIONES DE SALUD
u
1.00
ACCIONES EN SEGURIDAD LABORAL
PROGRAMA DE MONITOREO Y SEGUIMIENTO AMBIENTAL
mes
6.00
LOGISTICA PARA LAS ACCIONES DE MONITOREO
informe DE LA MEZCLA
6.00
MONITOREO DE LINEA BASE DE CALIDAD DE AGUA DEL CUERPO RECEPTOR-ANTES
informe
3.00
MONITOREO DE LINEA BASE DE CALIDAD DE AGUAS RESIDUALES (DESAGUE)
informeDE MEZCLA3.00
MONITOREO DE PRUEBA A LAS AGUAS RESIDUALES TRATADAS - EMISOR ANTES
PROGRAMA DE SEALIZACIN AMBIENTAL
glb
1.00
INSTALACION DE SEALES
PROGRAMA DE MANEJO AMBIENTAL DE CAMPAMENTOS
m2
200.00
DESARME Y ABANDONO DE CAMPAMENTO
PROGRAMA DE EDUCACION AMBIENTAL
charla
10.00
CAPACITACION
glb
1.00
DIFUSION
PROGRAMA DE MANEJO DE RESIDUOS
est
1.00
RESIDUOS SOLIDOS
est
1.00
AGUAS RESIDUALES DOMESTICAS
PROGRAMA DE CONTINGENCIA
est
1.00
CONTROL ACCIDENTES
u
15.00
CONTINGENCIA TECNICA

AVANCE ANTERIOR
%
METRADO

AVANCE MENSUAL
%
METRADO

AVANCE ACUMULADO
%
METRADO

SALDO
METRADO

100.00%

6.00

0.00%

0.00 100.00%

6.00

0.00%

0.00

100.00%

6.00

0.00%

0.00 100.00%

6.00

0.00%

0.00

100.00%
100.00%
100.00%
100.00%
100.00%

6.00
1.00
35.77
100.00
1.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%

6.00
1.00
35.77
100.00
1.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

100.00%
100.00%

1.00
1.00

0.00%
0.00%

0.00 100.00%
0.00 100.00%

1.00
1.00

0.00%
0.00%

0.00
0.00

100.00%
100.00%
100.00%
100.00%

6.00
6.00
3.00
3.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%

6.00
6.00
3.00
3.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

100.00%

1.00

0.00%

0.00 100.00%

1.00

0.00%

0.00

0.00%

0.00

100.00%

200.00 100.00%

200.00

0.00%

0.00

100.00%
100.00%

10.00
1.00

0.00%
0.00%

0.00 100.00%
0.00 100.00%

10.00
1.00

0.00%
0.00%

0.00
0.00

100.00%
100.00%

1.00
1.00

0.00%
0.00%

0.00 100.00%
0.00 100.00%

1.00
1.00

0.00%
0.00%

0.00
0.00

100.00%
100.00%

1.00
15.00

0.00%
0.00%

0.00 100.00%
0.00 100.00%

1.00
15.00

0.00%
0.00%

0.00
0.00

RESUMEN DE PLANILLA DE METRADOS N 07

PARTIDA
2
2.01
02.01.01
02.01.02
2.02
02.02.01
02.02.02
02.02.03

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 05

: ESTUDIO DE IMPACTO AMBIENTAL


DESCRIPCION

SANEAMIENTO FISICO LEGAL


TRABAJO DE CAMPO
ELABORACION DEL DIAGNOSTICO DE SITUACION ACTUAL
LEVANTAMIENTO TOPOPGRAFICO
TRABAJO DE GABINETE
DIBUJO DE PLANOS
MEMORIA DESCRIPTIVA
PAGO DE TRAMITES

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACO
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA
UND

METRADO

AVANCE ANTERIOR
%
METRADO

AVANCE MENSUAL
%
METRADO

AVANCE ACUMULADO
%
METRADO

SALDO
METRADO

glb
glb

1.00
1.00

100.00%
100.00%

1.00
1.00

0.00%
0.00%

0.00 100.00%
0.00 100.00%

1.00
1.00

0.00%
0.00%

0.00
0.00

glb
glb
glb

1.00
1.00
1.00

100.00%
100.00%
100.00%

1.00
1.00
1.00

0.00%
0.00%
0.00%

0.00 100.00%
0.00 100.00%
0.00 100.00%

1.00
1.00
1.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

RESUMEN DE PLANILLA DE METRADOS N 07

PARTIDA
F 06
1
1.01
01.01.01
01.01.02
01.01.03
1.02
01.02.01
1.03
01.03.01
01.03.02
1.04
01.04.01
01.04.02
01.04.03
01.04.04
2
02.01
02.01.01
02.01.02
2.02
02.02.01
02.02.02
02.02.03

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 06

: FORTALECIMIENTO DE LA UNIDAD DE GESTION


DESCRIPCION

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACO
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA
UND

FORTALECIMIENTO DE LA UNIDAD DE GESTION


IMPLEMENTACION Y CAPACITACION DE LA JASS
EQUIPOS Y MUEBLES
MULTIFUNCIONAL: IMPRESORA, SCANER, FOTOCOPIADORA, FAX
EQUIPO DE COMPUTO
SILLAS DE COMPUTO Y ESCRITORIO
MATERIAL DE OFICINA
UTILES DE ESCRITORIO
CAPACITACION PERSONAL
CAPACITACION PERSONAL TECNICO
CAPACITACION PERSONAL ADMINISTRATIVO
OTROS
CATEGORIZACION DE CONEXIONES
SET BASICO PARA DESATORO DE DESAGUE
LLAVES Y HERRAMIENTAS
MOTOBOMBA PARA AGUA SUCIA TIPO Honda WT 20 X SIMILAR O SUPERIOR
EDUCACION SANITARIA
COSTOS INTANGIBLES
PAGO DE PONENTES
VIATICOS
COSTOS TANGIBLES
ALQUILER DE EQUIPOS
MATERIAL DIDACTICO
PERSONAL LOGISTICO

METRADO

AVANCE ANTERIOR
%
METRADO

AVANCE MENSUAL
%
METRADO

AVANCE ACUMULADO
%
METRADO

SALDO
METRADO

glb
glb
glb

1.00
1.00
1.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

100.00%
100.00%
100.00%

1.00 100.00%
1.00 100.00%
1.00 100.00%

1.00
1.00
1.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

glb

1.00

100.00%

1.00

0.00%

0.00 100.00%

1.00

0.00%

0.00

glb
glb

1.00
1.00

100.00%
100.00%

1.00
1.00

0.00%
0.00%

0.00 100.00%
0.00 100.00%

1.00
1.00

0.00%
0.00%

0.00
0.00

glb
glb
glb
u

1.00
1.00
1.00
1.00

100.00%
100.00%
100.00%
100.00%

1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%

1.00
1.00
1.00
1.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

glb
glb

1.00
1.00

82.78%
0.00%

0.83
0.00

17.22%
100.00%

0.17 100.00%
1.00 100.00%

1.00
1.00

0.00%
0.00%

0.00
0.00

glb
glb
glb

1.00
1.00
1.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

100.00%
100.00%
100.00%

1.00 100.00%
1.00 100.00%
1.00 100.00%

1.00
1.00
1.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

VALORIZACION DE OBRA N 07

PARTIDA

F 01
01
01.01
01.02
01.03
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 01

: OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES


DESCRIPCION

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA

UND

OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES


OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
OBRAS PROVISIONALES PARA TODA LA OBRA
CAMPAMENTO PROVISIONAL DE LA OBRA
glb
CARTEL DE IDENTIFICACION DE OBRA DE 3.60 x 2.40 M.
Und
TRABAJOS PRELIMINARES PARA TODA LA OBRA
FLETE TERRESTRE (SISTEMA DE AGUA POTABLE)
glb
FLETE TERRESTRE (SISTEMA DE DESAGUE)
glb
FLETE TERRESTRE (SISTEMA DE PTAR)
glb
MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA
glb
PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA (PROV. DURANTE Und
CINTA PLASTICA SEALIZADORA PARA LIMITE DE SEGURIDAD DE OBRA
m
COSTO DIRECTO TOTAL
GASTOS GENERALES (12.00%)
UTILIDAD (10.00%)
SUB TOTAL
I.G.V. (18.00%)
PRESUPUESTO REFERENCIAL
FACTOR DE RELACION
PRESUPUESTO CONTRATADO
VALORIZACION CONTRACTUAL
VALORIZACION CONTRACTUAL

METRADO

PRECIO

UNITARIO

PARCIAL

METRADO

AVANCE MENSUAL
MONTO

METRADO

AVANCE ACUMULADO
MONTO

INC. IGV

: 2,812,663.74

INC. IGV

DIAS

180

: 06/02/12
: 03/08/12

AMPLIACION DE PLAZO
AVANCE ANTERIOR

: 2,812,663.74

:.
SALDO

METRADO

MONTO

METRADO

MONTO

1.00
1.00

4,868.26
1,044.11

4,868.26
1,044.11

100.00%
100.00%

1.00
1.00

4,868.26
1,044.11

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

1.00
1.00

4,868.26
1,044.11

0.00%
0.00%

0.00
0.00

0.00
0.00

1.00
1.00
1.00
1.00
24.00
8,701.00

22,929.07
24,696.47
37,873.23
10,500.00
340.11
0.75

22,929.07
24,696.47
37,873.23
10,500.00
8,162.64
6,525.75

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

1.00
1.00
1.00
1.00
24.00
8,701.00

22,929.07
24,696.47
37,873.23
10,500.00
8,162.64
6,525.75

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

1.00
1.00
1.00
1.00
24.00
8,701.00

22,929.07
24,696.47
37,873.23
10,500.00
8,162.64
6,525.75

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

116,599.53
13,991.94
11,659.95
142,251.42
25,605.26
167,856.68

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

116,599.53
13,991.94
11,659.95
142,251.42
25,605.26
167,856.68

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

116,599.53
13,991.94
11,659.95
142,251.42
25,605.26
167,856.68

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

167,856.68

100.00%

167,856.68

0.00%

0.00

100.00%

167,856.68

0.00%

0.00

FR =
INC IGV
SIN IGV

PRECIO

MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO

1.000000
167,856.68
142,251.42

167,856.68
142,251.42

0.00
0.00

167,856.68
142,251.42

0.00
0.00

VALORIZACION DE OBRA N 07

PARTIDA

F 02
01
01.01
01.01.01
01.01.02
01.02
01.02.01
01.03
01.03.01
01.03.02
01.04
01.04.01
01.04.02
01.05
01.05.01
02
02.01
02.01.01
02.01.02
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.03
02.03.01
02.03.02
02.04
02.04.01
02.04.02
02.04.03
02.05
02.05.01
02.05.02
02.06
02.06.01
02.06.02
02.07
02.07.01
03
03.01
03.01.01

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 02

: SISTEMA DE AGUA POTABLE


DESCRIPCION

SISTEMA DE AGUA POTABLE


REHABILITACION DE CAPTACION EXISTENTE - TIPO MANANTIAL (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
FILTROS
FILTRO DE GRAVA
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
VARIOS
TUBERIA DE REBOSE Y DESAGUE DE 2" SAL PVC
TUBERIA DE SALIDA DE CAPTACION PVC SAP C-10 DE 1 1/2"
PINTURA
PINTURA LATEX EN MUROS 2 MANOS
CONSTRUCCION DE CAPTACION - TIPO MANANTIAL DE LADERA (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
RELLENO CON MATERIAL PROPIO SELECCIONADO
ELIMINACION DE MATERIAL EXCEDENTE
FILTROS
CONCRETO F'c= 175 KG/CM2
FILTRO DE GRAVA
OBRAS DE CONCRETO ARMADO
CONCRETO EN MUROS REFORZADOS F'C= 210 KG/CM2
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
ACERO FY=4200 KG/CM2
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
VARIOS
TUBERIA DE REBOSE Y DESAGUE DE 2" SAL PVC
TUBERIA DE SALIDA DE CAPTACION PVC SAP C-10 DE 1 1/2"
PINTURA
PINTURA LATEX EN MUROS 2 MANOS
CAJA DE REUNION (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA

UND

METRADO

MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO

PRECIO

UNITARIO

PARCIAL

AVANCE ANTERIOR
%

METRADO

AVANCE MENSUAL
MONTO

METRADO

AVANCE ACUMULADO
MONTO

INC. IGV

: 2,812,663.74

INC. IGV

DIAS

180

: 06/02/12
: 03/08/12

AMPLIACION DE PLAZO
PRECIO

: 2,812,663.74

:.
SALDO

METRADO

MONTO

METRADO

MONTO

m2
m2

8.55
8.55

2.04
2.06

17.44
17.61

100.00%
100.00%

8.55
8.55

17.44
17.61

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

8.55
8.55

17.44
17.61

0.00%
0.00%

0.00
0.00

0.00
0.00

m3

1.73

160.57

277.79

100.00%

1.73

277.79

0.00%

0.00

0.00

100.00%

1.73

277.79

0.00%

0.00

0.00

m2
m2

10.85
9.40

33.00
27.42

358.05
257.75

100.00%
100.00%

10.85
9.40

358.05
257.75

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

10.85
9.40

358.05
257.75

0.00%
0.00%

0.00
0.00

0.00
0.00

und
und

1.00
1.00

1,095.96
965.59

1,095.96
965.59

100.00%
100.00%

1.00
1.00

1,095.96
965.59

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

1.00
1.00

1,095.96
965.59

0.00%
0.00%

0.00
0.00

0.00
0.00

m2

9.40

12.83

120.60

0.00%

0.00

0.00

100.00%

9.40

120.60

100.00%

9.40

120.60

0.00%

0.00

0.00

m2
m2

8.55
8.55

2.04
2.06

17.44
17.61

100.00%
100.00%

8.55
8.55

17.44
17.61

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

8.55
8.55

17.44
17.61

0.00%
0.00%

0.00
0.00

0.00
0.00

m3
m2
m3
m3

7.76
8.55
2.51
6.56

31.62
2.32
44.52
30.61

245.37
19.84
111.75
200.80

100.00%
100.00%
100.00%
100.00%

7.76
8.55
2.51
6.56

245.37
19.84
111.75
200.80

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%

7.76
8.55
2.51
6.56

245.37
19.84
111.75
200.80

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

m3
m3

0.58
1.73

444.83
160.57

258.00
277.79

100.00%
100.00%

0.58
1.73

258.00
277.79

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

0.58
1.73

258.00
277.79

0.00%
0.00%

0.00
0.00

0.00
0.00

m3
m2
Kg

2.72
23.73
119.80

465.04
40.88
5.24

1,264.91
970.08
627.75

100.00%
100.00%
100.00%

2.72
23.73
119.80

1,264.91
970.08
627.75

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

2.72
23.73
119.80

1,264.91
970.08
627.75

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m2
m2

10.85
9.40

33.00
27.42

358.05
257.75

100.00%
100.00%

10.85
9.40

358.05
257.75

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

10.85
9.40

358.05
257.75

0.00%
0.00%

0.00
0.00

0.00
0.00

und
und

1.00
1.00

1,095.96
965.59

1,095.96
965.59

100.00%
100.00%

1.00
1.00

1,095.96
965.59

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

1.00
1.00

1,095.96
965.59

0.00%
0.00%

0.00
0.00

0.00
0.00

m2

9.40

12.83

120.60

0.00%

0.00

0.00

100.00%

9.40

120.60

100.00%

9.40

120.60

0.00%

0.00

0.00

m2

1.70

2.04

3.47

100.00%

1.70

3.47

-100.00%

-1.70

-3.47

0.00%

0.00

0.00

100.00%

1.70

3.47

VALORIZACION DE OBRA N 07

PARTIDA

03.01.02
03.02
03.02.01
03.02.02
03.02.03
03.03
03.03.01
03.03.02
03.03.03
03.04
03.04.01
03.04.02
03.05
03.05.01
03.05.02
03.05.03
03.06
03.06.01
03.06.02
03.06.03
03.07
03.07.01
04
04.01
04.01.01
04.01.02
04.01.03
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.03
04.03.01
04.03.02
04.03.03
05
05.01
05.01.01
05.01.02
05.02

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 02

: SISTEMA DE AGUA POTABLE


DESCRIPCION

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA

UND

METRADO

MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO

PRECIO

UNITARIO

PARCIAL

TRAZO Y REPLANTEO
m2
1.70
2.06
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
m3
1.36
31.62
REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
1.70
2.32
ELIMINACION DE MATERIAL EXCEDENTE
m3
1.70
30.61
OBRAS DE CONCRETO ARMADO
CONCRETO F'c= 175 KG/CM2
m3
0.48
444.83
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
m2
7.31
40.88
ACERO FY=4200 KG/CM2
Kg
31.41
5.24
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
m2
1.80
33.00
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
4.52
27.42
VARIOS
TUBERIA DE INGRESO A C.R. PVC SAP C-10 DE 1 1/2"
und
1.00
140.59
TUBERIA DE SALIDA DE C.R. PVC SAP C-10 DE 1 1/2"
und
1.00
260.59
TUBERIA DE LIMPIEZA Y DESAGUE DE 2" SAL PVC
und
1.00
193.75
CARPINTERIA METALICA 332.45
TAPA METALICA 0.73X0.73X1/8"
und
1.00
152.42
TAPA METALICA 0.45X0.36X1/8"
und
1.00
84.22
TAPA METALICA 0.46X0.50X1/8"
und
1.00
95.81
PINTURA
PINTURA LATEX EN MUROS 2 MANOS
m2
4.52
12.83
LINEA DE CONDUCCION
TRABAJOS PRELIMINARES
LIMPIEZA DE LINEA DE CONDUCCION
ml
2,085.53
1.04
TRAZO, NIVELACION Y REPLANTEO
ml
2,085.53
1.99
TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA
ml
2,085.53
3.33
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA EN TERRENO NORMAL COMPACTO
m3
875.92
18.45
REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS
m2
1,251.32
2.17
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO
ml
2,085.53
9.49
RELLENO COMPACTADO C/PLANCHA VIBRAT. HASTA H=3.00 M CON MAT/PROPIO
m3ZARANDEADO
875.92
EN CAPAS DE37.80
20CM
ELIMINACION DE MATERIAL EXCEDENTE
m3
218.98
30.61
TUBERIAS
TUBERIA DE PVC ISO C-10 DE 1 1/2"
ml
2,085.53
18.99
SUMINISTRO E INSTALACION DE ACCESORIOS PVC RED CONDUCCION
glb
1.00
817.91
PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8" A ZANJA TAPADA
ml
2,085.53
3.85
TANQUILLA ROMPERCARGA (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
3.70
2.04
TRAZO Y REPLANTEO
m2
3.70
2.06
MOVIMIENTO DE TIERRAS

AVANCE ANTERIOR
%

METRADO

AVANCE MENSUAL
MONTO

METRADO

AVANCE ACUMULADO
MONTO

INC. IGV

: 2,812,663.74

INC. IGV

DIAS

180

: 06/02/12
: 03/08/12

AMPLIACION DE PLAZO
PRECIO

: 2,812,663.74

:.
SALDO

METRADO

MONTO

METRADO

MONTO

3.50

100.00%

1.70

3.50

-100.00%

-1.70

-3.50

0.00%

0.00

0.00

100.00%

1.70

3.50

43.00
3.94
52.04

100.00%
100.00%
100.00%

1.36
1.70
1.70

43.00
3.94
52.04

-100.00%
-100.00%
-100.00%

-1.36
-1.70
-1.70

-43.00
-3.94
-52.04

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

1.36
1.70
1.70

43.00
3.94
52.04

213.52
298.83
164.59

100.00%
100.00%
100.00%

0.48
7.31
31.41

213.52
298.83
164.59

-100.00%
-100.00%
-100.00%

-0.48
-7.31
-31.41

-213.52
-298.83
-164.59

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

0.48
7.31
31.41

213.52
298.83
164.59

59.40
123.94

100.00%
100.00%

1.80
4.52

59.40
123.94

-100.00%
-100.00%

-1.80
-4.52

-59.40
-123.94

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

1.80
4.52

59.40
123.94

140.59
260.59
193.75

100.00%
100.00%
100.00%

1.00
1.00
1.00

140.59
260.59
193.75

-100.00%
-100.00%
-100.00%

-1.00
-1.00
-1.00

-140.59
-260.59
-193.75

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

1.00
1.00
1.00

140.59
260.59
193.75

152.42
84.22
95.81

100.00%
100.00%
100.00%

1.00
1.00
1.00

152.42
84.22
95.81

-100.00%
-100.00%
-100.00%

-1.00
-1.00
-1.00

-152.42
-84.22
-95.81

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

1.00
1.00
1.00

152.42
84.22
95.81

57.99

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

100.00%

4.52

57.99

2,168.95
4,150.20
6,944.81

100.00%
100.00%
100.00%

2,085.53
2,085.53
2,085.53

2,168.95
4,150.20
6,944.81

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

2,085.53
2,085.53
2,085.53

2,168.95
4,150.20
6,944.81

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

16,160.72
2,715.36
19,791.68
33,109.78
6,702.98

100.00%
100.00%
100.00%
100.00%
100.00%

875.92
1,251.32
2,085.53
875.92
218.98

16,160.72
2,715.36
19,791.68
33,109.78
6,702.98

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%

875.92
1,251.32
2,085.53
875.92
218.98

16,160.72
2,715.36
19,791.68
33,109.78
6,702.98

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

39,604.21
817.91
8,029.29

100.00%
100.00%
100.00%

2,085.53
1.00
2,085.53

39,604.21
817.91
8,029.29

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

2,085.53
1.00
2,085.53

39,604.21
817.91
8,029.29

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

7.55
7.62

100.00%
100.00%

3.70
3.70

7.55
7.62

-100.00%
-100.00%

-3.70
-3.70

-7.55
-7.62

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

3.70
3.70

7.55
7.62

VALORIZACION DE OBRA N 07

PARTIDA

05.02.01
05.02.02
05.02.03
05.03
05.03.01
05.03.02
05.03.03
05.04
05.04.01
05.04.02
05.04.03
05.05
05.05.01
05.05.02
05.06
05.06.01
05.06.02
05.06.03
05.07
05.07.01
05.07.02
05.08
05.08.01
06
06.01
06.01.01
06.01.02
06.02
06.02.01
06.02.02
06.02.03
06.03
06.03.01
06.03.02
06.03.03
06.04
06.04.01
06.04.02
06.04.03
06.05
06.05.01
06.05.02

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 02

: SISTEMA DE AGUA POTABLE


DESCRIPCION

EXCAVACION MANUAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
DADOS DE CONCRETO F'c=140 Kg/cm2
ENCOFRADO Y DESENCOFRADO NORMAL
OBRAS DE CONCRETO ARMADO
CONCRETO F'c= 175 KG/CM2
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
ACERO FY=4200 KG/CM2
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
TUBERIAS Y ACCESORIOS
TUBERIA DE INGRESO A C.R. PVC SAP C-10 DE 1 1/2"
TUBERIA DE SALIDA DE C.R. PVC SAP C-10 DE 1 1/2"
TUBERIA DE REBOSE Y LIMPIA DESAGUE DE 2" SAL PVC
CARPINTERIA METALICA
TAPA METALICA 0.65X0.75X3/16"
TAPA METALICA 0.65X0.65X3/16"
PINTURA
PINTURA LATEX EN MUROS 2 MANOS
CAMARA ROMPE PRESION (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
CONCRETO F'C=140 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
OBRAS DE CONCRETO ARMADO
CONCRETO F'c= 175 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY=4200 KG/CM2
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA

UND

METRADO

MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO

PRECIO

UNITARIO

PARCIAL

AVANCE ANTERIOR
%

METRADO

AVANCE MENSUAL
MONTO

METRADO

AVANCE ACUMULADO
MONTO

INC. IGV

: 2,812,663.74

INC. IGV

DIAS

180

: 06/02/12
: 03/08/12

AMPLIACION DE PLAZO
PRECIO

: 2,812,663.74

:.
SALDO

METRADO

MONTO

METRADO

MONTO

m3
m2
m3

4.33
3.70
5.41

31.62
2.32
30.61

136.91
8.58
165.60

100.00%
100.00%
100.00%

4.33
3.70
5.41

136.91
8.58
165.60

-100.00%
-100.00%
-100.00%

-4.33
-3.70
-5.41

-136.91
-8.58
-165.60

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

4.33
3.70
5.41

136.91
8.58
165.60

m2
m3
m2

3.70
0.46
1.22

190.41
354.25
44.07

704.52
162.96
53.77

100.00%
100.00%
100.00%

3.70
0.46
1.22

704.52
162.96
53.77

-100.00%
-100.00%
-100.00%

-3.70
-0.46
-1.22

-704.52
-162.96
-53.77

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

3.70
0.46
1.22

704.52
162.96
53.77

m3
m2
kg

1.92
19.39
104.23

444.83
40.88
5.24

854.07
792.66
546.17

100.00%
100.00%
100.00%

1.92
19.39
104.23

854.07
792.66
546.17

-100.00%
-100.00%
-100.00%

-1.92
-19.39
-104.23

-854.07
-792.66
-546.17

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

1.92
19.39
104.23

854.07
792.66
546.17

m2
m2

10.61
10.91

33.00
27.42

350.13
299.15

100.00%
100.00%

10.61
10.91

350.13
299.15

-100.00%
-100.00%

-10.61
-10.91

-350.13
-299.15

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

10.61
10.91

350.13
299.15

und
und
und

1.00
1.00
1.00

140.59
260.59
301.86

140.59
260.59
301.86

100.00%
100.00%
100.00%

1.00
1.00
1.00

140.59
260.59
301.86

-100.00%
-100.00%
-100.00%

-1.00
-1.00
-1.00

-140.59
-260.59
-301.86

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

1.00
1.00
1.00

140.59
260.59
301.86

und
und

1.00
1.00

144.08
132.13

144.08
132.13

100.00%
100.00%

1.00
1.00

144.08
132.13

-100.00%
-100.00%

-1.00
-1.00

-144.08
-132.13

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

1.00
1.00

144.08
132.13

m2

10.91

12.83

139.98

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

100.00%

10.91

139.98

m2
m2

1.92
1.92

2.04
2.06

3.92
3.96

100.00%
100.00%

1.92
1.92

3.92
3.96

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

1.92
1.92

3.92
3.96

0.00%
0.00%

0.00
0.00

0.00
0.00

m3
m2
m3

0.86
1.92
1.08

31.62
2.32
30.61

27.19
4.45
33.06

100.00%
100.00%
100.00%

0.86
1.92
1.08

27.19
4.45
33.06

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

0.86
1.92
1.08

27.19
4.45
33.06

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m2
m3
m2

1.92
0.11
0.92

190.41
415.25
44.07

365.59
45.68
40.54

100.00%
100.00%
100.00%

1.92
0.11
0.92

365.59
45.68
40.54

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

1.92
0.11
0.92

365.59
45.68
40.54

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m3
m2
kg

0.95
8.87
61.36

444.83
44.07
5.24

422.59
390.90
321.53

100.00%
100.00%
100.00%

0.95
8.87
61.36

422.59
390.90
321.53

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

0.95
8.87
61.36

422.59
390.90
321.53

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m2
m2

6.32
4.18

33.00
27.42

208.56
114.62

100.00%
100.00%

6.32
4.18

208.56
114.62

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

6.32
4.18

208.56
114.62

0.00%
0.00%

0.00
0.00

0.00
0.00

VALORIZACION DE OBRA N 07

PARTIDA

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 02

: SISTEMA DE AGUA POTABLE


DESCRIPCION

06.06
SUMINISTRO E INSTALACION DE TUBERIAS
06.06.01 TUBERIA DE INGRESO A C.R. PVC SAP C-10 DE 1 1/2"
06.06.02 TUBERIA DE SALIDA DE C.R. PVC SAP C-10 DE 1 1/2"
06.06.03 TUBERIA DE REBOSE Y LIMPIA DESAGUE DE 2" SAL PVC
06.07
SUMINISTRO E INSTALACION DE VALVULAS
06.07.01 VALVULA COMPUERTA HD C/ELASTOMERO 2"
06.07.02 VALVULA REDUCTORA DE PRESION 2"
06.08
CARPINTERIA METALICA
06.08.01 TAPA METALICA 0.40X0.45X1/8"
06.08.02 TAPA METALICA 0.60X0.60X1/8"
06.09
PINTURA
06.09.01 PINTURA LATEX EN MUROS 2 MANOS
07
REHABILITACION DE RESERVORIO EXISTENTE
07.01
TRABAJOS PRELIMINARES
07.01.01 LIMPIEZA DE TERRENO MANUAL
07.01.02 TRAZO Y REPLANTEO
07.02
REVOQUES Y ENLUCIDOS
07.02.01 TARRAJEO CON IMPERMEABILIZANTES
07.02.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
07.03
PINTURA
07.03.01 PINTURA LATEX EN MUROS 2 MANOS
07.03.02 PINTURA EN ESTRUCTURAS METALICAS
07.04
CARPINTERIA METALICA
07.04.01 ESCALERA GATO, TUB F.GVZDO. C/PARANTES DE 1 1/2" SEGUN DISEO
07.04.02 TAPA METALICA 0.60X0.60X1/8"
07.05
INSTALACIONES SANITARIAS
07.05.01 TUBERIA DE REBOSE Y DESAGUE DE 2 1/2" SAL PVC
07.05.02 TUBERIA DE SALIDA DE PVC SAP C-10 DE 1 1/2"
07.05.03 ACCESORIOS DE RESERVORIO
08
RESERVORIO CIRCULAR (35 M3)
08.01
TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL
08.01.02 TRAZO Y REPLANTEO
08.02
MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION DE CIMIENTOS EN TERENO COMPACTO
08.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL
08.02.03 ELIMINACION MATERIAL EXCEDENTE A MANO D<200M
08.03
OBRAS DE CONCRETO SIMPLE
08.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON
08.04
OBRAS DE CONCRETO ARMADO
08.04.01 LOSA
08.04.01.01 CONCRETO F'C=210 KG/CM2 EN LOSA

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA

UND

METRADO

MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO

PRECIO

UNITARIO

PARCIAL

AVANCE ANTERIOR
%

METRADO

AVANCE MENSUAL
MONTO

METRADO

AVANCE ACUMULADO
MONTO

INC. IGV

: 2,812,663.74

INC. IGV

DIAS

180

: 06/02/12
: 03/08/12

AMPLIACION DE PLAZO
PRECIO

: 2,812,663.74

:.
SALDO

METRADO

MONTO

METRADO

MONTO

und
und
und

1.00
1.00
1.00

140.59
260.59
301.86

140.59
260.59
301.86

100.00%
100.00%
100.00%

1.00
1.00
1.00

140.59
260.59
301.86

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

1.00
1.00
1.00

140.59
260.59
301.86

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

und
und

1.00
1.00

280.93
145.03

280.93
145.03

100.00%
100.00%

1.00
1.00

280.93
145.03

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

1.00
1.00

280.93
145.03

0.00%
0.00%

0.00
0.00

0.00
0.00

und
und

1.00
1.00

94.43
120.63

94.43
120.63

100.00%
100.00%

1.00
1.00

94.43
120.63

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

1.00
1.00

94.43
120.63

0.00%
0.00%

0.00
0.00

0.00
0.00

m2

4.18

12.83

53.63

0.00%

0.00

0.00

100.00%

4.18

53.63

100.00%

4.18

53.63

0.00%

0.00

0.00

m2
m2

7.50
7.50

2.04
2.06

15.30
15.45

100.00%
100.00%

7.50
7.50

15.30
15.45

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

7.50
7.50

15.30
15.45

0.00%
0.00%

0.00
0.00

0.00
0.00

m2
m2

9.00
22.50

33.00
27.42

297.00
616.95

100.00%
100.00%

9.00
22.50

297.00
616.95

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

9.00
22.50

297.00
616.95

0.00%
0.00%

0.00
0.00

0.00
0.00

m2
ml

30.00
2.50

12.83
25.44

384.90
63.60

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

30.00
2.50

384.90
63.60

100.00%
100.00%

30.00
2.50

384.90
63.60

0.00%
0.00%

0.00
0.00

0.00
0.00

ml
und

2.50
2.00

84.97
120.63

212.43
241.26

100.00%
100.00%

2.50
2.00

212.43
241.26

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

2.50
2.00

212.43
241.26

0.00%
0.00%

0.00
0.00

0.00
0.00

und
und
glb

1.00
2.00
1.00

229.24
394.99
6,646.05

229.24
789.98
6,646.05

100.00%
100.00%
100.00%

1.00
2.00
1.00

229.24
789.98
6,646.05

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

1.00
2.00
1.00

229.24
789.98
6,646.05

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m2
m2

47.90
47.90

2.04
2.06

97.72
98.67

100.00%
100.00%

47.90
47.90

97.72
98.67

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

47.90
47.90

97.72
98.67

0.00%
0.00%

0.00
0.00

0.00
0.00

m3
m2
m3

57.48
47.90
74.85

55.34
2.32
30.61

3,180.94
111.13
2,291.16

100.00%
100.00%
100.00%

57.48
47.90
74.85

3,180.94
111.13
2,291.16

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

57.48
47.90
74.85

3,180.94
111.13
2,291.16

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m2

47.90

190.41

9,120.64

100.00%

47.90

9,120.64

0.00%

0.00

0.00

100.00%

47.90

9,120.64

0.00%

0.00

0.00

m3

16.33

361.78

5,907.87

100.00%

16.33

5,907.87

0.00%

0.00

0.00

100.00%

16.33

5,907.87

0.00%

0.00

0.00

VALORIZACION DE OBRA N 07

PARTIDA

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 02

: SISTEMA DE AGUA POTABLE


DESCRIPCION

08.04.01.02 ENCOFRADO Y DESENCOFRADO DE LOSA


08.04.01.03 ACERO FY=4200 KG/CM2
08.04.02 MUROS REFORZADOS
08.04.02.01 CONCRETO F'C=210 KG/CM2 EN MUROS REFORZADO
08.04.02.02 ENCOFRADO Y DESENCOFRADO CURVO EN PLACAS
08.04.02.03 ACERO FY=4200 KG/CM2
08.04.03 CUPULA ESFERICA
08.04.03.01 CONCRETO F'C=210 KG/CM2 EN CUPULAS
08.04.03.02 ENCOFRADO Y DESENCOFRADO CURVO EN CUPULA
08.04.03.03 ACERO FY=4200 KG/CM2
08.04.04 COLUMNAS
08.04.04.01 CONCRETO F'C=210 KG/CM2 EN COLUMNAS
08.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
08.04.04.03 ACERO FY=4200 KG/CM2
08.04.05 VIGAS
08.04.05.01 CONCRETO F'C=210 KG/CM2 EN VIGAS COLLARIN
08.04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
08.04.05.03 ACERO FY=4200 KG/CM2
8.05
REVOQUES Y ENLUCIDOS
08.05.01 TARRAJEO CON IMPERMEABILIZANTES
08.05.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
8.06
PISOS Y VEREDAS
08.06.01 CONCRETO F'C=140 KG/CM2 EN VEREDAS
08.06.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS
8.07
PINTURA
08.07.01 PINTURA LATEX EN MUROS 2 MANOS
08.07.02 PINTURA EN ESTRUCTURAS METALICAS
8.08
CARPINTERIA METALICA
08.08.01 ESCALERA GATO, TUB F.GVZDO. C/PARANTES DE 1 1/2" SEGUN DISEO
08.08.02 TAPA METALICA 0.60X0.60X1/8"
8.09
INSTALACIONES SANITARIAS
08.09.01 TUBERIA DE REBOSE Y DESAGUE DE 2 1/2" SAL PVC
08.09.02 TUBERIA DE SALIDA DE PVC SAP C-10 DE 1 1/2"
08.09.03 ACCESORIOS DE RESERVORIO
9
LINEA DE ADUCCION
9.01
TRABAJOS PRELIMINARES
09.01.01 LIMPIEZA DE LINEA DE ADUCCION
09.01.02 TRAZO, NIVELACION Y REPLANTEO
09.01.03 TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA
9.02
MOVIMIENTO DE TIERRAS
09.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL COMPACTO
09.02.02 REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA

UND

METRADO

MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO

PRECIO

UNITARIO

PARCIAL

AVANCE ANTERIOR
%

METRADO

AVANCE MENSUAL
MONTO

METRADO

AVANCE ACUMULADO
MONTO

INC. IGV

: 2,812,663.74

INC. IGV

DIAS

180

: 06/02/12
: 03/08/12

AMPLIACION DE PLAZO
PRECIO

: 2,812,663.74

:.
SALDO

METRADO

MONTO

METRADO

MONTO

m2
kg

25.00
235.99

48.43
5.24

1,210.75
1,236.59

100.00%
100.00%

25.00
235.99

1,210.75
1,236.59

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

25.00
235.99

1,210.75
1,236.59

0.00%
0.00%

0.00
0.00

0.00
0.00

m3
m2
kg

19.79
120.44
1,258.68

452.15
47.03
5.24

8,948.05
5,664.29
6,595.48

100.00%
100.00%
100.00%

19.79
120.44
1,258.68

8,948.05
5,664.29
6,595.48

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

19.79
120.44
1,258.68

8,948.05
5,664.29
6,595.48

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m3
m2
kg

6.06
42.32
267.91

480.64
57.30
5.24

2,912.68
2,424.94
1,403.85

100.00%
100.00%
100.00%

6.06
42.32
267.91

2,912.68
2,424.94
1,403.85

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

6.06
42.32
267.91

2,912.68
2,424.94
1,403.85

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m3
m2
kg

0.78
12.50
142.68

461.09
43.90
5.24

359.65
548.75
747.64

100.00%
100.00%
100.00%

0.78
12.50
142.68

359.65
548.75
747.64

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

0.78
12.50
142.68

359.65
548.75
747.64

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m3
m2
kg

2.10
15.10
224.45

361.78
53.50
5.24

759.74
807.85
1,176.12

100.00%
100.00%
100.00%

2.10
15.10
224.45

759.74
807.85
1,176.12

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

2.10
15.10
224.45

759.74
807.85
1,176.12

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m2
m2

131.74
136.84

33.00
27.42

4,347.42
3,752.15

100.00%
100.00%

131.74
136.84

4,347.42
3,752.15

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

131.74
136.84

4,347.42
3,752.15

0.00%
0.00%

0.00
0.00

0.00
0.00

m3
m2

13.56
2.97

320.53
46.42

4,346.39
137.87

100.00%
100.00%

13.56
2.97

4,346.39
137.87

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

13.56
2.97

4,346.39
137.87

0.00%
0.00%

0.00
0.00

0.00
0.00

m2
m

136.84
9.60

12.83
25.44

1,755.66
244.22

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

136.84
9.60

1,755.66
244.22

100.00%
100.00%

136.84
9.60

1,755.66
244.22

0.00%
0.00%

0.00
0.00

0.00
0.00

m
u

9.60
2.00

84.97
120.63

815.71
241.26

100.00%
100.00%

9.60
2.00

815.71
241.26

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

9.60
2.00

815.71
241.26

0.00%
0.00%

0.00
0.00

0.00
0.00

u
u
glb

1.00
1.00
1.00

229.24
394.99
6,646.05

229.24
394.99
6,646.05

100.00%
100.00%
100.00%

1.00
1.00
1.00

229.24
394.99
6,646.05

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

1.00
1.00
1.00

229.24
394.99
6,646.05

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m
m
m

1,574.63
1,574.63
1,574.63

1.04
1.99
3.33

1,637.62
3,133.51
5,243.52

100.00%
100.00%
100.00%

1,574.63
1,574.63
1,574.63

1,637.62
3,133.51
5,243.52

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

1,574.63
1,574.63
1,574.63

1,637.62
3,133.51
5,243.52

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m3
m2

661.34
944.78

18.45
2.17

12,201.72
2,050.17

100.00%
100.00%

661.34
944.78

12,201.72
2,050.17

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

661.34
944.78

12,201.72
2,050.17

0.00%
0.00%

0.00
0.00

0.00
0.00

VALORIZACION DE OBRA N 07

PARTIDA

09.02.03
09.02.04
09.02.05
9.03
09.03.01
09.03.02
09.03.03
9.04
09.04.01
09.04.02
09.04.03
09.04.04
09.04.05
10
10.01
10.01.01
10.01.02
10.01.03
10.02
10.02.01
10.02.02
10.02.03
10.02.04
10.02.05
10.03
10.03.01
10.03.02
10.03.03
10.03.04
11
11.01
11.01.01
11.01.02
11.02
11.02.01
11.02.02
11.03
11.03.01
11.03.02
11.04
11.04.01
11.05

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 02

: SISTEMA DE AGUA POTABLE


DESCRIPCION

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA

UND

METRADO

MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO

PRECIO

UNITARIO

PARCIAL

PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO


m
1,574.63
9.49
RELLENO COMPACTADO C/PLNACHA VIBRAT. HASTA H=3.00M CON MATERIAL PROPIO
m3
ZARANDEADO
661.34 EN CAPAS
37.80
DE 20CM
ELIMINACION DE MATERIAL EXCEDENTE
m3
165.34
30.61
TUBERIAS
TUBERIA DE PVC ISO C-10 DE 1 1/2"
m
1,574.63
18.99
SUMINISTRO E INSTALACION DE ACCESORIOS PVC RED ADUCCION
glb
1.00
642.71
PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8" A ZANJA TAPADA
m
1,574.63
3.85
PASE AEREO
CONCRETO F'c= 175 KG/CM2
m3
0.35
444.83
TUBO GALVANIZADO DE 2"
m
30.00
15.00
CODO GALVANIZADO DE 2"
u
4.00
40.00
CABLE DE ACERO 3/4"
m
30.00
15.00
GANCHOS DE FIERRO DE 1/2"
u
6.00
25.00
RED DE DISTRIBUCION
TRABAJOS PRELIMINARES
LIMPIEZA DE RED DE DISTRIBUCION
m
4,093.06
1.04
TRAZO, NIVELACION Y REPLANTEO
m
4,093.06
1.99
TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA
m
4,093.06
3.33
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA EN TERRENO NORMAL COMPACTO
m3
1,719.09
18.45
REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS
m2
2,455.84
2.17
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO
m
4,093.06
9.49
RELLENO CONPACTADO C/PLANCHA VIBRAT. HASTA H=3.00 M CON MAT/PROPIO
m3ZARANDEADO
1,719.09
EN CAPAS DE37.80
20CM
ELIMINACION DE MATERIAL EXCEDENTE
m3
429.77
30.61
TUBERIAS
TUBERIA DE PVC ISO C-10 DE 1 1/2"
m
1,228.23
18.99
TUBERIA DE PVC ISO C-10 DE 1"
m
2,864.83
13.74
SUMINISTRO E INSTALACION DE ACCESORIOS PVC RED DE DISTRIBUCION
glb
1.00
834.78
PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8" A ZANJA TAPADA
m
4,093.06
3.85
CAJA DE VALVULA DE CONTROL
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
7.20
2.04
TRAZO Y REPLANTEO
m2
7.20
2.06
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
m3
5.76
31.62
ELIMINACION DE MATERIAL EXCEDENTE
m3
7.20
30.61
OBRAS DE CONCRETO SIMPLE
CONCRETO F'c= 175 KG/CM2
m3
2.45
444.83
ENCOFRADO Y DESENCOFRADO NORMAL
m2
39.05
44.07
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
m2
19.85
33.00
CARPINTERIA METALICA

AVANCE ANTERIOR
%

METRADO

AVANCE MENSUAL
MONTO

METRADO

AVANCE ACUMULADO
MONTO

INC. IGV

: 2,812,663.74

INC. IGV

DIAS

180

: 06/02/12
: 03/08/12

AMPLIACION DE PLAZO
PRECIO

: 2,812,663.74

:.
SALDO

METRADO

MONTO

METRADO

MONTO

14,943.24
24,998.65
5,061.06

100.00%
100.00%
100.00%

1,574.63
661.34
165.34

14,943.24
24,998.65
5,061.06

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

1,574.63
661.34
165.34

14,943.24
24,998.65
5,061.06

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

29,902.22
642.71
6,062.33

100.00%
100.00%
100.00%

1,574.63
1.00
1,574.63

29,902.22
642.71
6,062.33

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

1,574.63
1.00
1,574.63

29,902.22
642.71
6,062.33

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

155.69
450.00
160.00
450.00
150.00

100.00%
100.00%
100.00%
100.00%
100.00%

0.35
30.00
4.00
30.00
6.00

155.69
450.00
160.00
450.00
150.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%

0.35
30.00
4.00
30.00
6.00

155.69
450.00
160.00
450.00
150.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

4,256.78
8,145.19
13,629.89

100.00%
100.00%
100.00%

4,093.06
4,093.06
4,093.06

4,256.78
8,145.19
13,629.89

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

4,093.06
4,093.06
4,093.06

4,256.78
8,145.19
13,629.89

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

31,717.21
5,329.17
38,843.14
64,981.60
13,155.26

100.00%
100.00%
100.00%
100.00%
100.00%

1,719.09
2,455.84
4,093.06
1,719.09
429.77

31,717.21
5,329.17
38,843.14
64,981.60
13,155.26

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%

1,719.09
2,455.84
4,093.06
1,719.09
429.77

31,717.21
5,329.17
38,843.14
64,981.60
13,155.26

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

23,324.09
39,362.76
834.78
15,758.28

100.00%
100.00%
100.00%
100.00%

1,228.23
2,864.83
1.00
4,093.06

23,324.09
39,362.76
834.78
15,758.28

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%

1,228.23
2,864.83
1.00
4,093.06

23,324.09
39,362.76
834.78
15,758.28

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

14.69
14.83

100.00%
100.00%

7.20
7.20

14.69
14.83

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

7.20
7.20

14.69
14.83

0.00%
0.00%

0.00
0.00

0.00
0.00

182.13
220.39

100.00%
100.00%

5.76
7.20

182.13
220.39

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

5.76
7.20

182.13
220.39

0.00%
0.00%

0.00
0.00

0.00
0.00

1,089.83
1,720.93

100.00%
100.00%

2.45
39.05

1,089.83
1,720.93

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

2.45
39.05

1,089.83
1,720.93

0.00%
0.00%

0.00
0.00

0.00
0.00

655.05

100.00%

19.85

655.05

0.00%

0.00

0.00

100.00%

19.85

655.05

0.00%

0.00

0.00

VALORIZACION DE OBRA N 07

PARTIDA

11.05.01
11.06
11.06.01
11.07
11.07.01
11.07.02
12
12.01
12.01.01
12.01.02
12.02
12.02.01
12.02.02
12.02.03
12.03
12.03.01
12.03.02
12.03.03
12.04
12.04.01
12.04.02
12.04.03
12.05
12.05.01
12.05.02
12.05.03
13
13.01
13.01.01
13.01.02
13.02
13.02.01
13.02.02
13.02.03
13.02.04
13.03
13.03.01
13.03.02
13.04
13.04.01
13.05
13.05.01

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA

FORMULA N 02

: SISTEMA DE AGUA POTABLE


DESCRIPCION

TAPA METALICA 0.40X0.45X1/8"


PINTURA
PINTURA LATEX EN MUROS 2 MANOS
SUMINISTRO E INSTALACION DE VALVULAS
VALVULA ESFERICA DE BRONCE 1"
VALVULA ESFERICA DE BRONCE 1 1/2"
VALVULA DE PURGA
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
RELLENO CON MATERIAL PROPIO SELECCIONADO
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
CONCRETO F'c= 175 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY=4200 KG/CM2
SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA PVC SAP ISO 4422 DN 12.7 MM C-10
VALVULA DE PURGA 19.10mm (3/4")
ABRAZADERA PVC D=19.1 MM C/SALIDA A 12.70 MM INC. ACCESORIOS
CONEXIONES DOMICILIARIAS DE AGUA POTABLE
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO
TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA HASTA 0.80 M, TERRENO NORMAL
REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO
RELLENO CON MATERIAL PROPIO SELECCIONADO
SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA DE PVC ISO C-10 DE 1/2"
PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8" A ZANJA TAPADA
SUMINISTRO E INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS RED SECUNDARIA 01
CONEXIONES DOMICILIARIAS
CONEXIONES DOMICILIARIAS P TUB MATRIZ DE 1 1/2" A 1/2" INC ACCESORIOS

UND

METRADO

MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO

PRECIO

UNITARIO

PARCIAL

AVANCE ANTERIOR
%

METRADO

AVANCE MENSUAL
MONTO

METRADO

AVANCE ACUMULADO
MONTO

INC. IGV

: 2,812,663.74

INC. IGV

DIAS

180

: 06/02/12
: 03/08/12

AMPLIACION DE PLAZO
PRECIO

: 2,812,663.74

:.
SALDO

METRADO

MONTO

METRADO

MONTO

10.00

94.43

944.30

100.00%

10.00

944.30

0.00%

0.00

0.00

100.00%

10.00

944.30

0.00%

0.00

0.00

m2

19.85

12.83

254.68

100.00%

19.85

254.68

0.00%

0.00

0.00

100.00%

19.85

254.68

0.00%

0.00

0.00

u
u

7.00
3.00

115.53
128.53

808.71
385.59

100.00%
100.00%

7.00
3.00

808.71
385.59

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

7.00
3.00

808.71
385.59

0.00%
0.00%

0.00
0.00

0.00
0.00

m2
m2

3.84
3.84

2.04
2.06

7.83
7.91

100.00%
100.00%

3.84
3.84

7.83
7.91

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

3.84
3.84

7.83
7.91

0.00%
0.00%

0.00
0.00

0.00
0.00

m3
m3
m3

5.76
5.28
0.60

31.62
44.52
30.61

182.13
235.07
18.37

100.00%
100.00%
100.00%

5.76
5.28
0.60

182.13
235.07
18.37

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

5.76
5.28
0.60

182.13
235.07
18.37

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m2
m3
m2

2.56
0.26
3.14

190.41
444.83
44.07

487.45
115.66
138.38

100.00%
100.00%
100.00%

2.56
0.26
3.14

487.45
115.66
138.38

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

2.56
0.26
3.14

487.45
115.66
138.38

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m3
m2
kg

1.48
17.92
83.29

482.32
44.07
5.24

713.83
789.73
436.44

100.00%
100.00%
100.00%

1.48
17.92
83.29

713.83
789.73
436.44

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

1.48
17.92
83.29

713.83
789.73
436.44

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m
u
u

6.00
2.00
2.00

15.95
87.76
902.76

95.70
175.52
1,805.52

100.00%
100.00%
100.00%

6.00
2.00
2.00

95.70
175.52
1,805.52

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

6.00
2.00
2.00

95.70
175.52
1,805.52

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m
m

668.00
668.00

1.99
3.33

1,329.32
2,224.44

100.00%
100.00%

668.00
668.00

1,329.32
2,224.44

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

668.00
668.00

1,329.32
2,224.44

0.00%
0.00%

0.00
0.00

0.00
0.00

m3
m2
m
m3

280.56
400.80
668.00
280.56

18.45
2.17
11.17
44.52

5,176.33
869.74
7,461.56
12,490.53

100.00%
100.00%
100.00%
100.00%

280.56
400.80
668.00
280.56

5,176.33
869.74
7,461.56
12,490.53

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%

280.56
400.80
668.00
280.56

5,176.33
869.74
7,461.56
12,490.53

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

m
m

668.00
668.00

8.49
3.85

5,671.32
2,571.80

100.00%
100.00%

668.00
668.00

5,671.32
2,571.80

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

668.00
668.00

5,671.32
2,571.80

0.00%
0.00%

0.00
0.00

0.00
0.00

glb

1.00

1,453.00

1,453.00

100.00%

1.00

1,453.00

0.00%

0.00

0.00

100.00%

1.00

1,453.00

0.00%

0.00

0.00

105.00

138.70

14,563.50

100.00%

105.00

14,563.50

0.00%

0.00

0.00

100.00%

105.00

14,563.50

0.00%

0.00

0.00

VALORIZACION DE OBRA N 07

PARTIDA

13.05.02

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 02

: SISTEMA DE AGUA POTABLE


DESCRIPCION

CONEXIONES DOMICILIARIAS P TUB MATRIZ DE 1" A 1/2" INC. ACCESORIOS

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA

UND

COSTO DIRECTO TOTAL


GASTOS GENERALES (12.00%)
UTILIDAD (10.00%)
SUB TOTAL
I.G.V. (18.00%)
PRESUPUESTO REFERENCIAL
FACTOR DE RELACION
PRESUPUESTO CONTRATADO
VALORIZACION CONTRACTUAL
VALORIZACION CONTRACTUAL

METRADO

62.00

FR =
INC IGV
SIN IGV

MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO

PRECIO

UNITARIO

PARCIAL

135.10

AVANCE ANTERIOR
%

8,376.20

100.00%

688,953.41
82,674.41
68,895.34
840,523.16
151,294.17
991,817.33
991,817.33

METRADO

62.00

AVANCE MENSUAL
MONTO

8,376.20

0.00%

99.57%
99.57%
99.57%
99.57%
99.57%
99.57%

686,012.22
82,321.47
68,601.22
836,934.91
150,648.28
987,583.19

99.57%

987,583.19

METRADO

0.00

AVANCE ACUMULADO
MONTO

0.00

100.00%

-0.61%
-1.00%
-0.61%
-0.61%
-0.61%
-0.61%

-4,219.34
-506.32
-421.93
-5,147.59
-926.57
-6,074.16

-0.61%

-6,074.16

INC. IGV

: 2,812,663.74

INC. IGV

DIAS

180

: 06/02/12
: 03/08/12

AMPLIACION DE PLAZO
PRECIO

: 2,812,663.74

:.
SALDO

METRADO

62.00

MONTO

METRADO

0.00

MONTO

8,376.20

0.00%

0.00

98.96%
98.96%
98.96%
98.96%
98.96%
98.96%

681,792.88
81,815.15
68,179.29
831,787.32
149,721.72
981,509.04

1.04%
1.04%
1.04%
1.04%
1.04%
1.04%

7,160.53
859.26
716.05
8,735.84
1,572.45
10,308.29

98.96%

981,509.04

1.04%

10,308.30

1.000000
991,817.33
840,523.16

987,583.19
836,934.91

-6,074.16
-5,147.59

981,509.04
831,787.32

10,308.30
8,735.85

VALORIZACION DE OBRA N 07
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA

FORMULA N 03

SISTEMA DE ALCANTARILLADO

PARTIDA

F 03
1
1.01
1.01.01
1.01.02
1.02

1.03

1.04

2
2.01

2.02

2.03

3
3.01

3.02

3.03

DESCRIPCION

UND

METRADO

SISTEMA DE ALCANTARILLADO
RED DE ALCANTARILLADO
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO
m
4,350.50
TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA
m
4,350.50
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA EN TERRENO NORMAL COMPACTO
m3
3,132.35
CORTE DE PAVIMENTO RIGIDO C/EQUIPO
m
246.45
REPOSICION DE PAVIMENTO DE CONCRETO F'C=210 KG/CM2, LOSA E=10"
m2
172.50
REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS
m2
2,610.30
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO
m
4,350.50
RELLENO COMPACTADO C/PLANCHA VIBRAT. HASTA H=3.00 M CON
m3
2,479.79
ELIMINACION DE MATERIAL EXCEDENTE
m3
815.72
SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 110MM
m
659.32
TUBERIA PVC ALCANT U.F. ISO 4435,S-25 160MM
m
937.32
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM
m
2,753.86
VARIOS
PRUEBA HIDRAULICA - ESCORRENTIA DE TUB. A ZANJA ABIERTA
m
4,350.50
PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MOD. - DENSIDAD DE
u
10.00
BUZONES
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
110.55
TRAZO Y REPLANTEO
m2
110.55
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
m3
178.89
ELIMINACION DE MATERIAL EXCEDENTE
m3
223.61
CONSTRUCCION DE BUZONES
BUZON DE CONCRETO TIPO 1, h= 1.50 m
u
15.00
BUZON DE CONCRETO TIPO 2, h= 1.50 m a 3.00 M.
u
40.00
CONEXIONES DOMICILIARIAS DE ALCANTARILLADO
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
668.00
TRAZO, NIVELACION Y REPLANTEO
m
668.00
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
m3
480.96
REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
400.80
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO
m
668.00
RELLENO COMPACTADO C/PLANCHA VIBRAT. HASTA H=3.00 M CON MAT/PROPIO ZARANDEADO
m3EN CAPAS DE
380.76
20CM
ELIMINACION DE MATERIAL EXCEDENTE
m3
125.25
CONEXIONES DOMICILIARIAS
CONEXIONES DOMICILIARIAS 4"X6"
u
167.00
COSTO DIRECTO TOTAL

MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO

PRECIO

UNITARIO

PARCIAL

AVANCE ANTERIOR
%

METRADO

AVANCE MENSUAL
MONTO

METRADO

AVANCE ACUMULADO
MONTO

INC. IGV

: 2,812,663.74

INC. IGV

DIAS

180

: 06/02/12
: 03/08/12

AMPLIACION DE PLAZO

PRECIO

: 2,812,663.74

:.
SALDO

METRADO

MONTO

METRADO

MONTO

1.99
3.33

8,657.50
14,487.17

100.00%
100.00%

4,350.50
4,350.50

8,657.50
14,487.17

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

4,350.50
4,350.50

8,657.50
14,487.17

0.00%
0.00%

0.00
0.00

0.00
0.00

41.68
7.25
148.26
2.17
11.17
37.80
30.61

130,556.35
1,786.76
25,574.85
5,664.35
48,595.09
93,736.06
24,969.19

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

3,132.35
246.45
172.50
2,610.30
4,350.50
2,479.79
815.72

130,556.35
1,786.76
25,574.85
5,664.35
48,595.09
93,736.06
24,969.19

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

3,132.35
246.45
172.50
2,610.30
4,350.50
2,479.79
815.72

130,556.35
1,786.76
25,574.85
5,664.35
48,595.09
93,736.06
24,969.19

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

34.07
41.35
47.43

22,463.03
38,758.18
130,615.58

100.00%
100.00%
100.00%

659.32
937.32
2,753.86

22,463.03
38,758.18
130,615.58

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

659.32
937.32
2,753.86

22,463.03
38,758.18
130,615.58

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.84
285.74

3,654.42
2,857.40

100.00%
100.00%

4,350.50
10.00

3,654.42
2,857.40

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

4,350.50
10.00

3,654.42
2,857.40

0.00%
0.00%

0.00
0.00

0.00
0.00

2.04
2.06

225.52
227.73

100.00%
100.00%

110.55
110.55

225.52
227.73

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

110.55
110.55

225.52
227.73

0.00%
0.00%

0.00
0.00

0.00
0.00

31.62
30.61

5,656.50
6,844.70

100.00%
100.00%

178.89
223.61

5,656.50
6,844.70

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

178.89
223.61

5,656.50
6,844.70

0.00%
0.00%

0.00
0.00

0.00
0.00

1,271.79
1,522.80

19,076.85
60,912.00

100.00%
100.00%

15.00
40.00

19,076.85
60,912.00

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

15.00
40.00

19,076.85
60,912.00

0.00%
0.00%

0.00
0.00

0.00
0.00

2.04
1.99

1,362.72
1,329.32

100.00%
100.00%

668.00
668.00

1,362.72
1,329.32

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

668.00
668.00

1,362.72
1,329.32

0.00%
0.00%

0.00
0.00

0.00
0.00

31.62
2.32
11.17
37.80
30.61

15,207.96
929.86
7,461.56
14,392.73
3,833.90

100.00%
100.00%
100.00%
100.00%
100.00%

480.96
400.80
668.00
380.76
125.25

15,207.96
929.86
7,461.56
14,392.73
3,833.90

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%

480.96
400.80
668.00
380.76
125.25

15,207.96
929.86
7,461.56
14,392.73
3,833.90

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

425.40

71,041.80

100.00%

167.00

71,041.80

0.00%

0.00

0.00

100.00%

167.00

71,041.80

0.00%

0.00

0.00

760,879.07

100.00%

760,879.08

0.00%

0.00

100.00%

760,879.08

0.00%

-0.01

VALORIZACION DE OBRA N 07

PARTIDA

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA

FORMULA N 03

SISTEMA DE ALCANTARILLADO

DESCRIPCION

UND

GASTOS GENERALES (12.00%)


UTILIDAD (10.00%)
SUB TOTAL
I.G.V. (18.00%)
PRESUPUESTO REFERENCIAL
FACTOR DE RELACION
PRESUPUESTO CONTRATADO
VALORIZACION CONTRACTUAL
VALORIZACION CONTRACTUAL

METRADO

FR =
INC IGV
SIN IGV

MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO

PRECIO

UNITARIO

PARCIAL

AVANCE ANTERIOR
%

METRADO

AVANCE MENSUAL
MONTO

METRADO

AVANCE ACUMULADO
MONTO

METRADO

INC. IGV

: 2,812,663.74

INC. IGV

DIAS

180

: 06/02/12
: 03/08/12

AMPLIACION DE PLAZO

PRECIO

: 2,812,663.74

:.
SALDO

MONTO

METRADO

MONTO

91,305.49
76,087.91
928,272.47
167,089.04
1,095,361.51

100.00%
100.00%
100.00%
100.00%
100.00%

91,305.49
76,087.91
928,272.48
167,089.05
1,095,361.53

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%

91,305.49
76,087.91
928,272.48
167,089.05
1,095,361.53

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
-0.01
-0.01
-0.02

1,095,361.51

100.00%

1,095,361.53

0.00%

0.00

100.00%

1,095,361.53

0.00%

-0.03

1.000000
1,095,361.51
928,272.47

1,095,361.53
928,272.48

0.00
0.00

1,095,361.53
928,272.48

-0.03
-0.03

VALORIZACION DE OBRA N 07

PARTIDA

F 04

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 04

: SISTEMA PTAR
DESCRIPCION

SISTEMA DE PTAR
1 CAMARA DE REJAS (01 UND)
1.01 TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
1.02 MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
1.03 OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
1.04 OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
ACERO FY=4200 KG/CM2
1.05 REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
1.06 ACCESORIOS
REJILLA METALICA
PLANCHA METALICA DE FF DE e=3/4"
2 DESARENADOR Y MEDIDOR PARSHALL (01 UND)
2.01 TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
2.02 MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
2.03 OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
2.04 OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
ACERO FY=4200 KG/CM2
2.05 REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
2.06 ACCESORIOS
COMPUERTAS FIERRO DE 0.63*0.44 M
BARANDA DE TUBO FO. GDO. PASAMANO 1 1/2"-PARANTE 1" X 1M.ALT
3 TANQUE IMHOFF (01 UND)
3.01 TRABAJOS PRELIMINARES

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA

UND

MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO

PRECIO

PRECIO

UNITARIO

PARCIAL

AVANCE ANTERIOR
%

METRADO

AVANCE MENSUAL
MONTO

METRADO

AVANCE ACUMULADO
MONTO

INC. IGV

: 2,812,663.74

INC. IGV

DIAS

180

: 06/02/12
: 03/08/12

AMPLIACION DE PLAZO

METRADO

: 2,812,663.74

:.
SALDO

METRADO

MONTO

METRADO

MONTO

m2
m2

3.83
3.83

2.04
2.06

7.81
7.89

100.00%
100.00%

3.83
3.83

7.81
7.89

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

3.83
3.83

7.81
7.89

0.00%
0.00%

0.00
0.00

0.00
0.00

m3
m2
m3

3.06
3.83
6.56

31.62
2.32
30.61

96.76
8.89
200.80

100.00%
100.00%
100.00%

3.06
3.83
6.56

96.76
8.89
200.80

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

3.06
3.83
6.56

96.76
8.89
200.80

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m2

3.83

190.41

729.27

100.00%

3.83

729.27

0.00%

0.00

0.00

100.00%

3.83

729.27

0.00%

0.00

0.00

m3
m2
kg

2.31
17.18
71.83

480.64
40.88
5.24

1,110.28
702.32
376.39

100.00%
0.00%
100.00%

2.31
0.00
71.83

1,110.28
0.00
376.39

0.00%
100.00%
0.00%

0.00
17.18
0.00

0.00
702.32
0.00

100.00%
100.00%
100.00%

2.31
17.18
71.83

1,110.28
702.32
376.39

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m2

8.95

33.00

295.35

100.00%

295.35

0.00%

100.00%

8.95

295.35

0.00%

0.00

0.00

1.00
1.00

37.82
84.55

37.82
84.55

100.00%
100.00%

37.82
84.55

0.00%
0.00%

0.00
0.00
0.00
0.00

0.00

u
u

8.95
0.00
1.00
1.00

0.00
0.00

100.00%
100.00%

1.00
1.00

37.82
84.55

0.00%
0.00%

0.00
0.00

0.00
0.00

m2
m2

17.19
17.19

2.04
2.06

35.07
35.41

100.00%
100.00%

17.19
17.19

35.07
35.41

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

17.19
17.19

35.07
35.41

0.00%
0.00%

0.00
0.00

0.00
0.00

m3
m2
m3

25.79
17.19
32.23

31.62
2.32
30.61

815.48
39.88
986.56

100.00%
100.00%
100.00%

25.79
17.19
32.23

815.48
39.88
986.56

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

25.79
17.19
32.23

815.48
39.88
986.56

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m2

17.19

190.41

3,273.15

100.00%

17.19

3,273.15

0.00%

0.00

0.00

100.00%

17.19

3,273.15

0.00%

0.00

0.00

m3
m2
kg

8.71
53.42
224.95

480.64
40.88
5.24

4,186.37
2,183.81
1,178.74

100.00%
100.00%
100.00%

8.71
53.42
224.95

4,186.37
2,183.81
1,178.74

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

8.71
53.42
224.95

4,186.37
2,183.81
1,178.74

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m2

28.14

33.00

928.62

100.00%

28.14

928.62

0.00%

0.00

0.00

100.00%

28.14

928.62

0.00%

0.00

0.00

u
m

4.00
2.10

650.44
99.33

2,601.76
208.59

100.00%
100.00%

4.00
2.10

2,601.76
208.59

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

4.00
2.10

2,601.76
208.59

0.00%
0.00%

0.00
0.00

0.00
0.00

VALORIZACION DE OBRA N 07

PARTIDA

3.02

3.03
3.04

3.05

3.06

3.07

4
4.01

4.02

4.03
4.04

4.05

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA

FORMULA N 04

: SISTEMA PTAR

MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO

PRECIO

PRECIO

UNITARIO

PARCIAL

AVANCE ANTERIOR

DIAS

180

: 03/08/12
:.

UND

LIMPIEZA DE TERRENO MANUAL


TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
RELLENO CON MATERIAL PROPIO SELECCIONADO
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
ACERO FY=4200 KG/CM2
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
CARPINTERIA METALICA
BARANDA DE TUBO FO. GDO. PASAMANO 1 1/2"-PARANTE 1" X 1M.ALT
ESCALERA TUB F.GVZDO. C/PARANTES DE 2" X PELDAOS DE 3/4"
INSTALACIONES SANITARIAS
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM
TEE UPVC UF S-25 DE 8"
CODO SP PVC UF S-25 DE 8"
VALVULA DE COMPUERTA DE FIERRO FUNDIDO MAZZA DE 8"
PANTALLA DEFLECTORA
LECHO DE SECADO (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION C/MAQ. EN TERRENO NORMAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY=4200 KG/CM2
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA

m2
m2

51.41
51.41

2.04
2.06

104.88
105.90

100.00%
100.00%

51.41
51.41

104.88
105.90

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

51.41
51.41

104.88
105.90

0.00%
0.00%

0.00
0.00

0.00
0.00

m3
m2
m3
m3

308.43
51.41
73.50
293.66

31.62
2.32
16.06
30.61

9,752.56
119.27
1,180.41
8,988.93

100.00%
100.00%
100.00%
100.00%

308.43
51.41
73.50
293.66

9,752.56
119.27
1,180.41
8,988.93

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%

308.43
51.41
73.50
293.66

9,752.56
119.27
1,180.41
8,988.93

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

m2

51.41

190.41

9,788.98

100.00%

51.41

9,788.98

0.00%

0.00

0.00

100.00%

51.41

9,788.98

0.00%

0.00

0.00

m3
m2
kg

122.45
487.68
6,029.19

482.32
48.43
5.24

59,060.08
23,618.34
31,592.96

100.00%
100.00%
100.00%

122.45
487.68
6,029.19

59,060.08
23,618.34
31,592.96

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

122.45
487.68
6,029.19

59,060.08
23,618.34
31,592.96

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m2
m2

331.67
45.09

33.00
27.42

10,945.11
1,236.37

100.00%
100.00%

331.67
45.09

10,945.11
1,236.37

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

331.67
45.09

10,945.11
1,236.37

0.00%
0.00%

0.00
0.00

0.00
0.00

m
m

14.20
7.65

99.33
109.97

1,410.49
841.27

100.00%
100.00%

14.20
7.65

1,410.49
841.27

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

14.20
7.65

1,410.49
841.27

0.00%
0.00%

0.00
0.00

0.00
0.00

m
u
u
u
u

8.50
1.00
1.00
1.00
2.00

47.43
146.59
254.28
1,222.19
126.05

403.16
146.59
254.28
1,222.19
252.10

100.00%
100.00%
100.00%
100.00%
100.00%

8.50
1.00
1.00
1.00
2.00

403.16
146.59
254.28
1,222.19
252.10

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%

8.50
1.00
1.00
1.00
2.00

403.16
146.59
254.28
1,222.19
252.10

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

-0.01
0.00
0.00
0.00
0.00

m2
m2

35.15
35.15

2.04
2.06

71.71
72.41

100.00%
100.00%

35.15
35.15

71.71
72.41

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

35.15
35.15

71.71
72.41

0.00%
0.00%

0.00
0.00

0.00
0.00

m3
m2
m3

50.96
35.15
63.70

6.86
2.32
30.61

349.59
81.55
1,949.86

100.00%
100.00%
100.00%

50.96
35.15
63.70

349.59
81.55
1,949.86

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

50.96
35.15
63.70

349.59
81.55
1,949.86

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m2

35.15

190.41

6,692.91

100.00%

35.15

6,692.91

0.00%

0.00

0.00

100.00%

35.15

6,692.91

0.00%

0.00

0.00

m3
m2
kg

25.25
281.33
1,541.20

482.32
44.07
5.24

12,178.58
12,398.21
8,075.89

100.00%
100.00%
100.00%

25.25
281.33
1,541.20

12,178.58
12,398.21
8,075.89

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

25.25
281.33
1,541.20

12,178.58
12,398.21
8,075.89

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m2
m2

235.08
57.00

33.00
27.42

7,757.64
1,562.94

100.00%
100.00%

235.08
57.00

7,757.64
1,562.94

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

235.08
57.00

7,757.64
1,562.94

0.00%
0.00%

0.00
0.00

0.00
0.00

METRADO

MONTO

METRADO

AVANCE ACUMULADO

INC. IGV

DESCRIPCION

AVANCE MENSUAL

INC. IGV

: 2,812,663.74
: 06/02/12

AMPLIACION DE PLAZO

METRADO

: 2,812,663.74

MONTO

SALDO

METRADO

MONTO

METRADO

MONTO

VALORIZACION DE OBRA N 07

PARTIDA

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 04

: SISTEMA PTAR
DESCRIPCION

4.06 ESTRUCTURA DE MADERA Y COBERTURA


TIJERAL DE MADERA TIPO 01 L=3.00M
VIGA DE MADERA 3" X 4"
CORREAS Y TIRANTES DE MADERA
COBERTURA DE CALAMINA 11 CANALES E=3MM
4.07 INSTALACIONES SANITARIAS
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 100MM
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 50MM
CODO PVC SAP 6"X90
CODO PVC SAP 4"X90
TEE PVC-SAP 4"* 2"
TEE PVC-SAP 150mmx150mm
TEE PVC-SAP 200mmx150mm
TAPON PVC-SAP 2"
4.08 FILTROS
FILTRO DE GRAVA
FILTRO DE ARENA
FILTRO DE LADRILLO
5 FILTRO BIOLOGICO (01 UND)
5.01 TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
5.02 MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA HASTA 0.80 M, TERRENO NORMAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
5.03 OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
5.04 OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY=4200 KG/CM2
5.06 REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
5.07 FILTROS
FILTRO DE GRAVA
FILTRO DE LADRILLO
5.08 SISTEMA DE DESINFECCION (HIPOCLORADOR POR GOTEO)
HIPOCLORADOR DIFUSION inc Gancho
TAPA METALICA 0.40X0.45X1/8"
6 RED DE ALCANTARILLADO EN PLANTA DE TRATAMIENTO

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA

UND

MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO

PRECIO

PRECIO

UNITARIO

PARCIAL

AVANCE ANTERIOR
%

METRADO

AVANCE MENSUAL
MONTO

METRADO

AVANCE ACUMULADO
MONTO

INC. IGV

: 2,812,663.74

INC. IGV

DIAS

180

: 06/02/12
: 03/08/12

AMPLIACION DE PLAZO

METRADO

: 2,812,663.74

:.
SALDO

METRADO

MONTO

METRADO

MONTO

u
m
p2
m2

5.00
8.95
106.76
46.98

758.57
14.91
5.31
51.30

3,792.85
133.44
566.90
2,410.07

100.00%
100.00%
100.00%
100.00%

5.00
8.95
106.76
46.98

3,792.85
133.44
566.90
2,410.07

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%

5.00
8.95
106.76
46.98

3,792.85
133.44
566.90
2,410.07

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

m
m
u
u
u
u
u
u

23.65
66.70
3.00
2.00
23.00
2.00
1.00
23.00

166.77
68.33
146.80
49.45
42.74
54.16
41.66
27.00

3,944.11
4,557.61
440.40
98.90
983.02
108.32
41.66
621.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

23.65
66.70
3.00
2.00
23.00
2.00
1.00
23.00

3,944.11
4,557.61
440.40
98.90
983.02
108.32
41.66
621.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

23.65
66.70
3.00
2.00
23.00
2.00
1.00
23.00

3,944.11
4,557.61
440.40
98.90
983.02
108.32
41.66
621.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

m3
m3
m2

12.48
9.36
31.20

160.57
192.07
91.03

2,003.91
1,797.78
2,840.14

100.00%
100.00%
100.00%

12.48
9.36
31.20

2,003.91
1,797.78
2,840.14

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

12.48
9.36
31.20

2,003.91
1,797.78
2,840.14

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m2
m2

14.19
14.19

2.04
2.06

28.95
29.23

100.00%
100.00%

14.19
14.19

28.95
29.23

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

14.19
14.19

28.95
29.23

0.00%
0.00%

0.00
0.00

0.00
0.00

m3
m2
m3

25.54
14.19
31.93

27.67
2.32
30.61

706.69
32.92
977.38

100.00%
100.00%
100.00%

25.54
14.19
31.93

706.69
32.92
977.38

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

25.54
14.19
31.93

706.69
32.92
977.38

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m2

14.19

190.41

2,701.92

100.00%

14.19

2,701.92

0.00%

0.00

0.00

100.00%

14.19

2,701.92

0.00%

0.00

0.00

m3
m2
kg

20.62
117.37
1,043.53

480.64
44.07
5.24

9,910.80
5,172.50
5,468.10

100.00%
100.00%
100.00%

20.62
117.37
1,043.53

9,910.80
5,172.50
5,468.10

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

20.62
117.37
1,043.53

9,910.80
5,172.50
5,468.10

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m2
m2

78.04
52.60

33.00
27.42

2,575.32
1,442.29

100.00%
100.00%

78.04
52.60

2,575.32
1,442.29

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

78.04
52.60

2,575.32
1,442.29

0.00%
0.00%

0.00
0.00

0.00
0.00

m3
m2

20.40
12.00

160.57
91.03

3,275.63
1,092.36

100.00%
100.00%

20.40
12.00

3,275.63
1,092.36

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

20.40
12.00

3,275.63
1,092.36

0.00%
0.00%

0.00
0.00

0.00
0.00

u
u

1.00
1.00

3,000.00
94.43

3,000.00
94.43

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

1.00
1.00

3,000.00
94.43

100.00%
100.00%

1.00
1.00

3,000.00
94.43

0.00%
0.00%

0.00
0.00

0.00
0.00

VALORIZACION DE OBRA N 07

PARTIDA

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 04

: SISTEMA PTAR
DESCRIPCION

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA

UND

METRADO

PRECIO

PRECIO

UNITARIO

PARCIAL

VALORIZACION CONTRACTUAL
VALORIZACION CONTRACTUAL

FR =
INC IGV
SIN IGV

AVANCE ANTERIOR
%

METRADO

AVANCE MENSUAL
MONTO

METRADO

AVANCE ACUMULADO
MONTO

: 2,812,663.74

INC. IGV

: 2,812,663.74

INC. IGV

DIAS

180

: 06/02/12
: 03/08/12

AMPLIACION DE PLAZO

6.01 TRABAJOS PRELIMINARES


TRAZO, NIVELACION Y REPLANTEO
m
10.75
1.99
TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA
m
10.75
3.33
6.02 MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS EN TERRENO NORMAL PARA-TUB. 6"-8" HASTA 1.
m3
7.74
11.45
REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS
m
6.45
2.17
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO
m
10.75
11.17
RELLENO COMPACTADO C/PLANCHA VIBRAT. HASTA H=3.00 M CON MAT/PROPIO
m ZARANDEADO5.81
EN CAPAS DE37.80
20CM
ELIMINACION DE MATERIAL EXCEDENTE
m3
2.42
30.61
6.03 SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM
m
10.75
47.43
6.04 BUZONES
BUZON DE CONCRETO TIPO 1, h= 1.50 m
u
1.00
1,271.79
7 CERCO PERIMETRICO
7.01 TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
106.01
2.04
TRAZO Y REPLANTEO
m2
106.01
2.06
7.02 MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
m3
3.78
31.62
ELIMINACION DE MATERIAL EXCEDENTE
m3
4.73
30.61
7.03 CERCO PERIMETRICO CON ALAMBRE DE PUAS
ALAMBRE CON PUAS PARA CERCO
m
840.88
5.24
7.04 COLUMNETAS PARA CERCO PERMIEMTRICO
CONCRETO F'C=140 KG/CM2
m3
2.94
415.25
CONCRETO F'c= 175 KG/CM2
m3
1.89
444.83
ENCOFRADO Y DESENCOFRADO NORMAL
m2
61.20
44.07
ACERO FY=4200 KG/CM2
kg
283.20
5.24
7.05 PUERTA DE INGRESO
PUERTA DE MADERA CON ALAMBRE DE PUAS
u
1.00
304.58
COSTO DIRECTO TOTAL
GASTOS GENERALES (12.00%)
UTILIDAD (10.00%)
SUB TOTAL
I.G.V. (18.00%)
PRESUPUESTO REFERENCIAL
FACTOR DE RELACION
PRESUPUESTO CONTRATADO

MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO

:.
SALDO

METRADO

MONTO

METRADO

MONTO

21.39
35.80

100.00%
100.00%

10.75
10.75

21.39
35.80

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

10.75
10.75

21.39
35.80

0.00%
0.00%

0.00
0.00

0.00
0.00

88.62
14.00
120.08
219.62
74.08

100.00%
100.00%
100.00%
100.00%
100.00%

7.74
6.45
10.75
5.81
2.42

88.62
14.00
120.08
219.62
74.08

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%

7.74
6.45
10.75
5.81
2.42

88.62
14.00
120.08
219.62
74.08

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

509.87

100.00%

10.75

509.87

0.00%

0.00

0.00

100.00%

10.75

509.87

0.00%

0.00

0.00

1,271.79

100.00%

1.00

1,271.79

0.00%

0.00

0.00

100.00%

1.00

1,271.79

0.00%

0.00

0.00

216.26
218.38

100.00%
100.00%

106.01
106.01

216.26
218.38

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

106.01
106.01

216.26
218.38

0.00%
0.00%

0.00
0.00

0.00
0.00

119.52
144.79

100.00%
100.00%

3.78
4.73

119.52
144.79

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

3.78
4.73

119.52
144.79

0.00%
0.00%

0.00
0.00

0.00
0.00

4,406.21

100.00%

840.88

4,406.21

0.00%

0.00

0.00

100.00%

840.88

4,406.21

0.00%

0.00

0.00

1,220.84
840.73
2,697.08
1,483.97

100.00%
100.00%
100.00%
100.00%

2.94
1.89
61.20
283.20

1,220.84
840.73
2,697.08
1,483.97

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%

2.94
1.89
61.20
283.20

1,220.84
840.73
2,697.08
1,483.97

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

304.58

0.00%

0.00

0.00

100.00%

1.00

304.58

100.00%

1.00

304.58

0.00%

0.00

0.00

307,202.92
36,864.35
30,720.29
374,787.56
67,461.76
442,249.32

98.66%
98.66%
98.66%
98.66%
98.66%
98.66%

303,101.64
36,372.20
30,310.16
369,784.00
66,561.12
436,345.12

1.34%
1.00%
1.34%
1.34%
1.34%
1.34%

4,101.33
492.16
410.13
5,003.62
900.65
5,904.27

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

307,202.97
36,864.36
30,720.30
374,787.63
67,461.77
442,249.40

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

-0.05
-0.01
-0.01
-0.07
-0.01
-0.08

442,249.32

98.66%

436,345.12

1.34%

5,904.27

100.00%

442,249.40

0.00%

-0.09

1.000000
442,249.32
374,787.56

436,345.12
369,784.00

5,904.27
5,003.62

442,249.40
374,787.63

-0.09
-0.08

VALORIZACION DE OBRA N 07

PARTIDA

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 05

: ESTUDIO DE IMPACTO AMBIENTAL


DESCRIPCION

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA

UND

METRADO

F 05
ESTUDIO DE IMPACTO AMBIENTAL
1
MITIGACION AMBIENTAL
1.01
PROGRAMA DE PREVENCIN Y MITIGACIN
01.01.01 LOGSTICA PARA CUMPLIMIENTO DE NORMATIVIDAD SEALADA EN EL PMA
01.01.01.01 LOGISTICA PARA CUMPLIMINETO DE NORMATIVIDAD SEALADA EN EL PMA mes
6.00
01.01.02 SUB PROGRAMA DE MANEJO DEL COMPONENTE FSICO
01.01.02.01 SUB PROGRAMA DE MANEJO DEL COMPONENTE FSICO
mes
6.00
01.01.03 SUB PROGRAMA DE MANEJO DEL COMPONENTE BIOLGICO
01.01.03.01 SUB PROGRAMA DE MANEJO DEL COMPONENTE BIOLGICO
mes
6.00
01.01.03.02 CERCO VIVO DE ARBOLES EN PERIMETRO DE PTAR
glb
1.00
01.01.03.03 REVEGETACION DE PASTOS EN CAPTACION
m2
35.77
01.01.03.04 REVEGETACION DE PASTOS EN PTAR
m2
100.00
01.01.03.05 REVEGETACION DE COMPENSACIN
glb
1.00
01.01.04 SUB PROGRAMA DE SALUD Y SEGURIDAD LABORAL
01.01.04.01 ACCIONES DE SALUD
est
1.00
01.01.04.02 ACCIONES EN SEGURIDAD LABORAL
u
1.00
1.02
PROGRAMA DE MONITOREO Y SEGUIMIENTO AMBIENTAL
01.02.01 LOGISTICA PARA LAS ACCIONES DE MONITOREO
mes
6.00
01.02.02 MONITOREO DE LINEA BASE DE CALIDAD DE AGUA DEL CUERPO RECEPTOR-ANTES
informe DE LA MEZCLA
6.00
01.02.03 MONITOREO DE LINEA BASE DE CALIDAD DE AGUAS RESIDUALES (DESAGUE)
informe
3.00
01.02.04 MONITOREO DE PRUEBA A LAS AGUAS RESIDUALES TRATADAS - EMISOR ANTES
informe
DE MEZCLA 3.00
1.03
PROGRAMA DE SEALIZACIN AMBIENTAL
01.03.01 INSTALACION DE SEALES
glb
1.00
1.04
PROGRAMA DE MANEJO AMBIENTAL DE CAMPAMENTOS
01.04.01 DESARME Y ABANDONO DE CAMPAMENTO
m2
200.00
1.05
PROGRAMA DE EDUCACION AMBIENTAL
01.05.01 CAPACITACION
charla
10.00
01.05.02 DIFUSION
glb
1.00
1.06
PROGRAMA DE MANEJO DE RESIDUOS
01.06.01 RESIDUOS SOLIDOS
est
1.00
01.06.02 AGUAS RESIDUALES DOMESTICAS
est
1.00
1.07
PROGRAMA DE CONTINGENCIA
01.07.01 CONTROL ACCIDENTES
est
1.00
01.07.02 CONTINGENCIA TECNICA
u
15.00
2
SANEAMIENTO FISICO LEGAL
2.01
TRABAJO DE CAMPO
02.01.01 ELABORACION DEL DIAGNOSTICO DE SITUACION ACTUAL
glb
1.00
02.01.02 LEVANTAMIENTO TOPOPGRAFICO
glb
1.00
2.02
TRABAJO DE GABINETE
02.02.01 DIBUJO DE PLANOS
glb
1.00
02.02.02 MEMORIA DESCRIPTIVA
glb
1.00
02.02.03 PAGO DE TRAMITES
glb
1.00

MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO

PRECIO

UNITARIO

PARCIAL

AVANCE ANTERIOR
%

METRADO

AVANCE MENSUAL
MONTO

METRADO

AVANCE ACUMULADO
MONTO

INC. IGV

: 2,812,663.74

INC. IGV

DIAS

180

: 06/02/12
: 03/08/12

AMPLIACION DE PLAZO

PRECIO

: 2,812,663.74

:.

SALDO

METRADO

MONTO

METRADO

MONTO

530.00

3,180.00

100.00%

6.00

3,180.00

0.00%

0.00

0.00

100.00%

6.00

3,180.00

0.00%

0.00

0.00

899.96

5,399.76

100.00%

6.00

5,399.76

0.00%

0.00

0.00

100.00%

6.00

5,399.76

0.00%

0.00

0.00

800.20
1,310.32
0.48
0.48
1,000.00

4,801.20
1,310.32
17.17
48.00
1,000.00

100.00%
100.00%
100.00%
100.00%
100.00%

6.00
1.00
35.77
100.00
1.00

4,801.20
1,310.32
17.17
48.00
1,000.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%

6.00
1.00
35.77
100.00
1.00

4,801.20
1,310.32
17.17
48.00
1,000.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

3,400.00
1,400.00

3,400.00
1,400.00

100.00%
100.00%

1.00
1.00

3,400.00
1,400.00

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

1.00
1.00

3,400.00
1,400.00

0.00%
0.00%

0.00
0.00

0.00
0.00

200.00
350.00
350.00
350.00

1,200.00
2,100.00
1,050.00
1,050.00

100.00%
100.00%
100.00%
100.00%

6.00
6.00
3.00
3.00

1,200.00
2,100.00
1,050.00
1,050.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%

6.00
6.00
3.00
3.00

1,200.00
2,100.00
1,050.00
1,050.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

1,950.00

1,950.00

100.00%

1.00

1,950.00

0.00%

0.00

0.00

100.00%

1.00

1,950.00

0.00%

0.00

0.00

1.82

364.00

0.00%

0.00

0.00

100.00%

200.00

364.00

100.00%

200.00

364.00

0.00%

0.00

0.00

150.00
650.00

1,500.00
650.00

100.00%
100.00%

10.00
1.00

1,500.00
650.00

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

10.00
1.00

1,500.00
650.00

0.00%
0.00%

0.00
0.00

0.00
0.00

1,600.00
1,220.70

1,600.00
1,220.70

100.00%
100.00%

1.00
1.00

1,600.00
1,220.70

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

1.00
1.00

1,600.00
1,220.70

0.00%
0.00%

0.00
0.00

0.00
0.00

1,750.00
110.00

1,750.00
1,650.00

100.00%
100.00%

1.00
15.00

1,750.00
1,650.00

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

1.00
15.00

1,750.00
1,650.00

0.00%
0.00%

0.00
0.00

0.00
0.00

500.00
1,250.00

500.00
1,250.00

100.00%
100.00%

1.00
1.00

500.00
1,250.00

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

1.00
1.00

500.00
1,250.00

0.00%
0.00%

0.00
0.00

0.00
0.00

1,250.00
800.00
700.00

1,250.00
800.00
700.00

100.00%
100.00%
100.00%

1.00
1.00
1.00

1,250.00
800.00
700.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

1.00
1.00
1.00

1,250.00
800.00
700.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

VALORIZACION DE OBRA N 07

PARTIDA

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 05

: ESTUDIO DE IMPACTO AMBIENTAL


DESCRIPCION

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA

UND

COSTO DIRECTO TOTAL


GASTOS GENERALES (12.00%)
UTILIDAD (10.00%)
SUB TOTAL
I.G.V. (18.00%)
PRESUPUESTO REFERENCIAL
FACTOR DE RELACION
PRESUPUESTO CONTRATADO
VALORIZACION CONTRACTUAL
VALORIZACION CONTRACTUAL

METRADO

FR =
INC IGV
SIN IGV

MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO

PRECIO

UNITARIO

PARCIAL

AVANCE ANTERIOR
%

METRADO

AVANCE MENSUAL
MONTO

METRADO

AVANCE ACUMULADO
MONTO

METRADO

INC. IGV

: 2,812,663.74

INC. IGV

DIAS

180

: 06/02/12
: 03/08/12

AMPLIACION DE PLAZO

PRECIO

: 2,812,663.74

:.

SALDO
MONTO

METRADO

MONTO

41,141.15
4,936.94
4,114.11
50,192.20
9,034.60
59,226.80

99.12%
99.12%
99.12%
99.12%
99.12%
99.12%

40,777.15
4,893.26
4,077.72
49,748.13
8,954.66
58,702.79

0.88%
1.00%
0.88%
0.88%
0.88%
0.88%

364.00
43.68
36.40
444.08
79.93
524.01

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

41,141.15
4,936.94
4,114.12
50,192.21
9,034.60
59,226.81

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
-0.01
-0.01
0.00
-0.01

59,226.80

99.12%

58,702.79

0.88%

524.01

100.00%

59,226.81

0.00%

-0.02

1.000000
59,226.80
50,192.20

58,702.79
49,748.13

524.01
444.08

59,226.81
50,192.21

-0.02
-0.02

VALORIZACION DE OBRA N 07

PARTIDA

F 06
1
1.01
01.01.01
01.01.02
01.01.03
1.02
01.02.01
1.03
01.03.01
01.03.02
1.04
01.04.01
01.04.02
01.04.03
01.04.04
2
02.01
02.01.01
02.01.02
2.02
02.02.01
02.02.02
02.02.03

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA

FORMULA N 07

: FORTALECIMIENTO DE LA UNIDAD DE GESTION


DESCRIPCION

UND

FORTALECIMIENTO DE LA UNIDAD DE GESTION


IMPLEMENTACION Y CAPACITACION DE LA JASS
EQUIPOS Y MUEBLES
MULTIFUNCIONAL: IMPRESORA, SCANER, FOTOCOPIADORA, FAX
EQUIPO DE COMPUTO
SILLAS DE COMPUTO Y ESCRITORIO
MATERIAL DE OFICINA
UTILES DE ESCRITORIO
CAPACITACION PERSONAL
CAPACITACION PERSONAL TECNICO
CAPACITACION PERSONAL ADMINISTRATIVO
OTROS
CATEGORIZACION DE CONEXIONES
SET BASICO PARA DESATORO DE DESAGUE
LLAVES Y HERRAMIENTAS
MOTOBOMBA PARA AGUA SUCIA TIPO Honda WT 20 X SIMILAR O SUPERIOR
EDUCACION SANITARIA
COSTOS INTANGIBLES
PAGO DE PONENTES
VIATICOS
COSTOS TANGIBLES
ALQUILER DE EQUIPOS
MATERIAL DIDACTICO
PERSONAL LOGISTICO

PRECIO

UNITARIO

PARCIAL

AVANCE ANTERIOR
%

METRADO

AVANCE MENSUAL
MONTO

METRADO

AVANCE ACUMULADO
MONTO

INC. IGV

: 2,812,663.74

INC. IGV

DIAS

180

: 06/02/12
: 03/08/12

AMPLIACION DE PLAZO

PRECIO

: 2,812,663.74

:.

SALDO

METRADO

MONTO

METRADO

MONTO

glb
glb
glb

1.00
1.00
1.00

1,500.00
2,399.00
1,200.00

1,500.00
2,399.00
1,200.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

1.00
1.00
1.00

1,500.00
2,399.00
1,200.00

100.00%
100.00%
100.00%

1.00
1.00
1.00

1,500.00
2,399.00
1,200.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

glb

1.00

850.00

850.00

100.00%

1.00

850.00

0.00%

0.00

0.00

100.00%

1.00

850.00

0.00%

0.00

0.00

glb
glb

1.00
1.00

1,500.00
1,500.00

1,500.00
1,500.00

100.00%
100.00%

1.00
1.00

1,500.00
1,500.00

0.00%
0.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

1.00
1.00

1,500.00
1,500.00

0.00%
0.00%

0.00
0.00

0.00
0.00

glb
glb
glb
u

1.00
1.00
1.00
1.00

800.00
11,756.30
3,500.00
6,000.00

800.00
11,756.30
3,500.00
6,000.00

100.00%
100.00%
100.00%
100.00%

1.00
1.00
1.00
1.00

800.00
11,756.30
3,500.00
6,000.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%

1.00
1.00
1.00
1.00

800.00
11,756.30
3,500.00
6,000.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

glb
glb

1.00
1.00

4,000.00
650.00

4,000.00
650.00

82.78%
0.00%

0.83
0.00

3,311.06
0.00

17.22%
100.00%

0.17
1.00

688.94
650.00

100.00%
100.00%

1.00
1.00

4,000.00
650.00

0.00%
0.00%

0.00
0.00

0.00
0.00

glb
glb
glb

1.00
1.00
1.00

350.00
750.00
2,250.00

350.00
750.00
2,250.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

1.00
1.00
1.00

350.00
750.00
2,250.00

100.00%
100.00%
100.00%

1.00
1.00
1.00

350.00
750.00
2,250.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

39,005.30
3,120.42
2,730.37
44,856.09
8,074.10
52,930.19

74.91%
74.91%
74.91%
74.91%
74.91%
74.91%

29,217.36
2,337.39
2,045.22
33,599.97
6,047.99
39,647.96

25.09%
25.00%
25.09%
25.09%
25.09%
25.09%

9,787.94
783.04
685.16
11,256.14
2,026.11
13,282.25

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

39,005.30
3,120.42
2,730.37
44,856.09
8,074.10
52,930.19

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

52,930.19

74.91%

39,647.96

25.09%

13,282.25

100.00%

52,930.19

0.00%

0.00

COSTO DIRECTO TOTAL


GASTOS GENERALES (8.00%)
UTILIDAD (7.00%)
SUB TOTAL
I.G.V. (18.00%)
PRESUPUESTO REFERENCIAL
FACTOR DE RELACION
PRESUPUESTO CONTRATADO
VALORIZACION CONTRACTUAL
VALORIZACION CONTRACTUAL

METRADO

MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO

FR =
INC IGV
SIN IGV

1.000000
52,930.19
44,856.09

39,647.96
33,599.97

13,282.25
11,256.14

52,930.19
44,856.09

0.00
0.00

VALORIZACION DE OBRA N 07

PARTIDA

F 01
F 02
F 03
F 04
F 05
F 06

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

: MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


: "AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
: CONSORCIO NEON ASOCIADOS
: ING. JULIO VICTOR MARTINEZ QUISPE
: SUMA ALZADA

FORMULA N 01-02-03-04-05-06

: VARIOS

DESCRIPCION

UND

PRECIO

PRECIO

UNITARIO

PARCIAL

VALORIZACION CONTRACTUAL
VALORIZACION CONTRACTUAL

FR =
INC IGV
SIN IGV

AVANCE ANTERIOR
%

METRADO

AVANCE MENSUAL
MONTO

116,599.53
688,953.41
760,879.07
307,202.97
41,141.15
39,005.30

100.00%
99.57%
100.00%
98.66%
99.12%
74.91%

116,599.53
686,012.22
760,879.08
303,101.64
40,777.15
29,217.36

0.00%
-0.61%
0.00%
1.34%
0.88%
25.09%

1,953,781.43
234,453.77
195,378.14
2,383,613.34
429,050.40
2,812,663.74

99.12%
99.12%
99.12%
99.12%
99.12%
99.12%

1,936,586.98
232,390.44
193,658.70
2,362,636.12
425,274.50
2,787,910.62

2,812,663.74

99.12%

2,787,910.62

METRADO

METRADO

INC. IGV

: 2,812,663.74

INC. IGV

DIAS

180

: 03/08/12
:.

AVANCE ACUMULADO
MONTO

: 2,812,663.74

: 06/02/12

AMPLIACION DE PLAZO
METRADO

OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES


SISTEMA DE AGUA POTABLE
SISTEMA DE ALCANTARILLADO
SISTEMA DE PTAR
ESTUDIO DE IMPACTO AMBIENTAL
FORTALECIMIENTO DE LA UNIDAD DE GESTION

COSTO DIRECTO TOTAL


GASTOS GENERALES (12.00%)
UTILIDAD (10.00%)
SUB TOTAL
I.G.V. (18.00%)
PRESUPUESTO REFERENCIAL
FACTOR DE RELACION
PRESUPUESTO CONTRATADO

MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO

SALDO
MONTO

METRADO

MONTO

0.00
-4,219.34
0.00
4,101.33
364.00
9,787.94

100.00%
98.96%
100.00%
100.00%
100.00%
100.00%

116,599.53
681,792.89
760,879.07
307,202.97
41,141.15
39,005.30

0.00%
1.04%
0.00%
0.00%
0.00%
0.00%

0.00
7,160.52
0.00
0.00
0.00
0.00

0.51%
0.51%
0.51%
0.51%
0.51%
0.51%

10,033.93
1,204.09
1,003.41
12,241.43
2,203.46
14,444.89

99.63%
99.63%
99.63%
99.63%
99.63%
99.63%

1,946,620.91
233,594.51
194,662.09
2,374,877.51
427,477.95
2,802,355.46

0.37%
0.37%
0.37%
0.37%
0.37%
0.37%

7,160.52
859.26
716.05
8,735.83
1,572.44
10,308.27

0.51%

14,444.89

99.63%

2,802,355.46

0.37%

10,308.27

0.00
-4,362.37
0.00
4,240.36
376.34
10,119.73

1.000000
2,812,663.74
2,383,613.34

2,787,910.62
2,362,636.12

14,444.89
12,241.43

2,802,355.46
2,374,877.51

10,308.27
8,735.82

VALORIZACION DE OBRA N 07
FORMULAS POLINOMICAS
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA

FORMULA N 01

K=

OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES

0.186 x

Mr
Mo

MONOMIO

SIMBOLO

CODIGO
IU

1
2
3
4
5

M
C
A
M
I

47
21
03
43
39

+ 0.084 x

Cr
Co

+ 0.203 x

Ar
Ao

DESCRIPCION

MANO DE OBRA INC LEYES SOCIALES


CEMENTO PORTLAND TIPO I
ACERO DE CONSTRUCCION CORRUGADO
MADERA NACIONAL PARA ENCOFRADO Y CARP.
INDICE GENERAL DE PRECIOS AL CONSUMIDOR

+ 0.081 x

Mr
Mo

+ 0.446 x

COEF. DE
INCIDENCIA

% DE
INCIDENCIA

CI
Material

0.186
0.084
0.203
0.081
0.446

100.000%
100.000%
100.000%
100.000%
100.000%

Ir
Io

0.186000
0.084000
0.203000
0.081000
0.446000
1.000000

FORMULA N 02

K=

SISTEMA DE AGUA POTABLE

0.350 x

Mr
Mo

MONOMIO

SIMBOLO

CODIGO
IU

1
2
3
4
5

M
C
A
M
I

47
21
02
43
39

+ 0.051 x

Cr
Co

+ 0.078 x

Ar
Ao

DESCRIPCION

MANO DE OBRA INC LEYES SOCIALES


CEMENTO PORTLAND TIPO I
ACERO DE CONSTRUCCION LISO
MADERA NACIONAL PARA ENCOFRADO Y CARP.
INDICE GENERAL DE PRECIOS AL CONSUMIDOR

+ 0.118 x

Mr
Mo

+ 0.403 x

COEF. DE
INCIDENCIA

% DE
INCIDENCIA

CI
Material

0.350
0.051
0.078
0.118
0.403

100.000%
100.000%
100.000%
100.000%
100.000%

0.350000
0.051000
0.078000
0.118000
0.403000
1.000000

FORMULA N 03

K=

: VAL. N

0.249 x

Mr
Mo

MONOMIO

SIMBOLO

CODIGO
IU

1
2
3
4

M
A
A
I
T

47
07
12
39
75

+ 0.074 x

SISTEMA DE ALCANTARILLADO

Ar
Ao

+ 0.245 x

Ar
Ao

DESCRIPCION

MANO DE OBRA INC LEYES SOCIALES


ALAMBRE Y CABLE TIPO TW Y THW
ARTEFACTO DE ALUMBRADO INTERIOR
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
NDICE DE PRECIOS DE TUBERA DE PVC

+ 0.432 x

ITr
ITo

COEF. DE
INCIDENCIA

% DE
INCIDENCIA

0.249
0.074
0.245
0.432
0.432

100.000%
100.000%
100.000%
88.889%
11.111%

CI
Material

0.249000
0.074000
0.245000
0.384000
0.048000
1.000000

Ir
Io

FORMULAS POLINOMICAS
FORMULA N 04

K=

SISTEMA PTAR

0.245 x

Mr
Mo

MONOMIO

SIMBOLO

CODIGO
IU

1
2

M
D
T
A
I

47
30
72
10
39

+ 0.146 x

DTr
DTo

+ 0.609 x

AIr
AIo

DESCRIPCION

COEF. DE
INCIDENCIA

FLETE TERRESTRE
PETROLEO DIESEL
MAQUINARIA Y EQUIPO NACIONAL
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
MADERA NACIONAL PARA ENCOFRADO Y CARP.

0.245
0.146
0.146
0.609
0.609

% DE
INCIDENCIA

100.000%
13.699%
86.301%
3.284%
96.716%

CI
Material

0.245000
0.020001
0.125999
0.020000
0.589000
1.000000

FORMULA N 05

K=

ESTUDIO DE IMPACTO AMBIENTAL

0.243 x

Mr
Mo

MONOMIO

SIMBOLO

CODIGO
IU

1
2
3
4

M
C
A
A
I

47
21
03
13
39

+ 0.168 x

Cr
Co

+ 0.062 x

Ar
Ao

DESCRIPCION

MANO DE OBRA INC LEYES SOCIALES


CEMENTO PORTLAND TIPO I
ACERO DE CONSTRUCCION CORRUGADO
ASFALTO
INDICE GENERAL DE PRECIOS AL CONSUMIDOR

+ 0.527 x

AIr
AIo

COEF. DE
INCIDENCIA

% DE
INCIDENCIA

0.243
0.168
0.062
0.527
0.527

100.000%
100.000%
100.000%
15.750%
84.250%

CI
Material

0.243000
0.168000
0.062000
0.083003
0.443998
1.000000

FORMULA N 06

K=

0.00

0.234 x

Mr
Mo

MONOMIO

SIMBOLO

CODIGO
IU

1
2
3
4

M
C
I
A
M

47
21
39
03
45

+ 0.184 x

Cr
Co

+ 0.486 x

Ir
Io

DESCRIPCION

MANO DE OBRA INC LEYES SOCIALES


CEMENTO PORTLAND TIPO I
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
ACERO DE CONSTRUCCION CORRUGADO
MADERA TERCIADA PARA ENCOFRADO

+ 0.096 x

AMr
AMo

COEF. DE
INCIDENCIA

% DE
INCIDENCIA

0.234
0.184
0.486
0.096
0.096

100.000%
100.000%
100.000%
60.417%
39.583%

CI
Material

0.234000
0.184000
0.486000
0.058000
0.038000
1.000000

FORMULAS POLINOMICAS
FORMULA N 07

K=

0.00

0.155 x

Mr
Mo

MONOMIO

SIMBOLO

CODIGO
IU

1
2
3

M
T
I

47
65
39

+ 0.377 x

Tr
To

+ 0.468 x

Ir
Io

DESCRIPCION

COEF. DE
INCIDENCIA

MANO DE OBRA INC LEYES SOCIALES


TUBERIA DE ACERO NEGRO Y/O GALVANIZADO
INDICE GENERAL DE PRECIOS AL CONSUMIDOR

0.155
0.377
0.468

% DE
INCIDENCIA

100.000%
100.000%
100.000%

CI
Material

0.155000
0.377000
0.468000
1.000000

FORMULA N 08

K=

0.00

0.278 x

Mr
Mo

MONOMIO

SIMBOLO

CODIGO
IU

1
2
3

M
I
A
P
C
M

47
39
03
51
21
48

4
5

+ 0.436 x

Ir
Io

+ 0.127 x

APr
APo

DESCRIPCION

MANO DE OBRA INC LEYES SOCIALES


INDICE GENERAL DE PRECIOS AL CONSUMIDOR
ACERO DE CONSTRUCCION CORRUGADO
PERFIL DE ACERO LIVIANO
CEMENTO PORTLAND TIPO I
MAQUINARIA Y EQUIPO NACIONAL

+ 0.107 x

Cr
Co

+ 0.052 x

COEF. DE
INCIDENCIA

% DE
INCIDENCIA

CI
Material

0.278
0.436
0.127
0.127
0.107
0.052

100.000%
100.000%
74.803%
25.197%
100.000%
100.000%

0.278000
0.436000
0.095000
0.032000
0.107000
0.052000
1.000000

FORMULA N 09

K=

0.00

0.669 x

Fr
Fo

MONOMIO

SIMBOLO

CODIGO
IU

1
2

F
T

32
39

+ 0.331 x

Ir
Io

DESCRIPCION

FLETE TERRESTRE
INDICE GENERAL DE PRECIOS AL CONSUMIDOR

COEF. DE
INCIDENCIA

0.669
0.331

% DE
INCIDENCIA

100.000%
100.000%

CI
Material

0.669000
0.331000
1.000000

Mr
Mo

VALORIZACION DE OBRA N 07
CALCULO DEL COEFICIENTE REAJUSTE DE LA VALORIZACION DE OBRA N 07
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLP
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA

FORMULA N 01

K=

OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES

0.186 x

Mr
Mo

+ 0.084 x

Cr
Co

+ 0.203 x

Ar
Ao

+ 0.081 x

Mr
Mo

+ 0.446 x

Ir
Io

COEF. DE
INCIDENCIA

% DE
INCIDENCIA

CI
Material

Io
MAY 09

VAL N 05
MONOMIO

SIMBOLO

CODIGO
IU

1
2
3
4
5

M
C
A
M
I

47
21
03
43
39

DESCRIPCION

MANO DE OBRA INC LEYES SOCIALES


CEMENTO PORTLAND TIPO I
ACERO DE CONSTRUCCION CORRUGADO
MADERA NACIONAL PARA ENCOFRADO Y CARP.
INDICE GENERAL DE PRECIOS AL CONSUMIDOR

FORMULA N 02

K=

0.186
0.084
0.203
0.081
0.446

100.000%
100.000%
100.000%
100.000%
100.000%

0.186000
0.084000
0.203000
0.081000
0.446000

1.000000

397.23
350.43
453.81
670.87
347.88

Ir
MAR 10

MAR 10

415.58
357.75
446.16
687.92
350.59

0.195
0.086
0.200
0.083
0.449

1.013

SISTEMA DE AGUA POTABLE

0.350 x

Mr
Mo

+ 0.051 x

Cr
Co

+ 0.078 x

Ar
Ao

+ 0.118 x

Mr
Mo

+ 0.403 x

Ir
Io

COEF. DE
INCIDENCIA

% DE
INCIDENCIA

CI
Material

Io
MAY 09

VAL N 05
MONOMIO

SIMBOLO

CODIGO
IU

1
2
3
4
5

M
C
A
M
I

47
21
02
43
39

DESCRIPCION

MANO DE OBRA INC LEYES SOCIALES


CEMENTO PORTLAND TIPO I
ACERO DE CONSTRUCCION LISO
MADERA NACIONAL PARA ENCOFRADO Y CARP.
INDICE GENERAL DE PRECIOS AL CONSUMIDOR

FORMULA N 03

K=

0.350
0.051
0.078
0.118
0.403

100.000%
100.000%
100.000%
100.000%
100.000%

0.350000
0.051000
0.078000
0.118000
0.403000

1.000000

397.23
350.43
458.01
670.87
347.88

Ir
MAR 10

0.249 x

Mr
Mo

MAR 10

415.58
357.75
452.81
687.92
350.59

0.366
0.052
0.077
0.121
0.406

1.022

+ 0.074 x

Ar
Ao

+ 0.245 x

Ar
Ao

+ 0.432 x

ITr
ITo

COEF. DE
INCIDENCIA

% DE
INCIDENCIA

VAL N 05
SIMBOLO

CODIGO
IU

1
2
3
4

M
A
A
I
T

47
07
12
39
75

DESCRIPCION

MANO DE OBRA INC LEYES SOCIALES


ALAMBRE Y CABLE TIPO TW Y THW
ARTEFACTO DE ALUMBRADO INTERIOR
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
NDICE DE PRECIOS DE TUBERA DE PVC

FORMULA N 04

0.245 x

Mr
Mo

SIMBOLO

CODIGO
IU

1
2

M
D
T
A
I

47
30
72
10
39

+ 0.146 x

DTr
DTo

+ 0.609 x

100.000%
100.000%
100.000%
88.889%
11.111%

0.249000
0.074000
0.245000
0.384000
0.048000

1.000000

Io
MAY 09

397.23
472.62
281.54
347.88
338.58

Ir
MAR 10

ABR 09
Kr(MAR )=
MAR 10

415.58
567.88
268.21
350.59
328.49

0.261
0.089
0.233
0.387
0.047

1.017

AIr
AIo

DESCRIPCION

COEF. DE
INCIDENCIA

FLETE TERRESTRE
PETROLEO DIESEL
MAQUINARIA Y EQUIPO NACIONAL
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
MADERA NACIONAL PARA ENCOFRADO Y CARP.

FORMULA N 05

K=

0.249
0.074
0.245
0.432
0.432

CI
Material

SISTEMA PTAR

MONOMIO

ABR 09
Kr(MAR )=

SISTEMA DE ALCANTARILLADO

MONOMIO

K=

ABR 09
Kr(MAR )=

0.245
0.146
0.146
0.609
0.609

% DE
INCIDENCIA

CI
Material

100.000%
13.699%
86.301%
3.284%
96.716%

0.245000
0.020001
0.125999
0.020000
0.589000

1.000000

Io
MAY 09

397.23
371.94
338.58
321.79
347.88

VAL N 05
Ir
MAR 10

ABR 09
Kr(MAR )=
MAR 10

415.58
358.60
328.49
321.08
350.59

0.256
0.019
0.122
0.020
0.594

1.011

ESTUDIO DE IMPACTO AMBIENTAL

0.243 x

Mr
Mo

MONOMIO

SIMBOLO

CODIGO
IU

1
2
3
4

M
C
A
A
I

47
21
03
13
39

+ 0.168 x

Cr
Co

+ 0.062 x

Ar
Ao

DESCRIPCION

MANO DE OBRA INC LEYES SOCIALES


CEMENTO PORTLAND TIPO I
ACERO DE CONSTRUCCION CORRUGADO
ASFALTO
INDICE GENERAL DE PRECIOS AL CONSUMIDOR

+ 0.527 x

AIr
AIo

COEF. DE
INCIDENCIA

% DE
INCIDENCIA

0.243
0.168
0.062
0.527
0.527

CI
Material

100.000%
100.000%
100.000%
15.750%
84.250%

0.243000
0.168000
0.062000
0.083003
0.443998

1.000000

Io
MAY 09

397.23
350.43
453.81
966.59
347.88

VAL N 05
Ir
MAR 10

ABR 09
Kr(MAR )=
MAR 10

415.58
357.75
446.16
1,265.36
350.59

0.254
0.172
0.061
0.109
0.447

1.043

CALCULO DEL COEFICIENTE REAJUSTE DE LA VALORIZACION DE OBRA N 07


FORMULA N 06

K=

0.00

0.234 x

Mr
Mo

+ 0.184 x

Cr
Co

Ir
Io

+ 0.486 x

+ 0.096 x

AMr
AMo

COEF. DE
INCIDENCIA

% DE
INCIDENCIA

VAL N 05
MONOMIO

SIMBOLO

CODIGO
IU

1
2
3
4

M
C
I
A
M

47
21
39
03
45

DESCRIPCION

MANO DE OBRA INC LEYES SOCIALES


CEMENTO PORTLAND TIPO I
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
ACERO DE CONSTRUCCION CORRUGADO
MADERA TERCIADA PARA ENCOFRADO

FORMULA N 07

K=

0.155 x

Mr
Mo

SIMBOLO

CODIGO
IU

1
2
3

M
T
I

47
65
39

+ 0.377 x

Tr
To

1.000000

397.23
350.43
347.88
453.81
327.07

ABR 09
Kr(MAR )=
MAR 10

415.58
357.75
350.59
446.16
314.71

0.245
0.188
0.490
0.057
0.037

1.017

COEF. DE
INCIDENCIA

MANO DE OBRA INC LEYES SOCIALES


TUBERIA DE ACERO NEGRO Y/O GALVANIZADO
INDICE GENERAL DE PRECIOS AL CONSUMIDOR

0.155
0.377
0.468

% DE
INCIDENCIA

CI
Material

100.000%
100.000%
100.000%

0.155000
0.377000
0.468000

1.000000

Io
MAY 09

397.23
328.40
347.88

VAL N 05
Ir
MAR 10

ABR 09
Kr(MAR )=
MAR 10

415.58
335.53
350.59

0.162
0.385
0.472

1.019

0.00

0.278 x

Mr
Mo

MONOMIO

SIMBOLO

CODIGO
IU

1
2
3

M
I
A
P
C
M

47
39
03
51
21
48

+ 0.436 x

Ir
Io

+ 0.127 x

APr
APo

DESCRIPCION

MANO DE OBRA INC LEYES SOCIALES


INDICE GENERAL DE PRECIOS AL CONSUMIDOR
ACERO DE CONSTRUCCION CORRUGADO
PERFIL DE ACERO LIVIANO
CEMENTO PORTLAND TIPO I
MAQUINARIA Y EQUIPO NACIONAL

FORMULA N 09

K=

0.234000
0.184000
0.486000
0.058000
0.038000

Ir
MAR 10

Ir
Io

+ 0.468 x

DESCRIPCION

FORMULA N 08

4
5

100.000%
100.000%
100.000%
60.417%
39.583%

Io
MAY 09

0.00

MONOMIO

K=

0.234
0.184
0.486
0.096
0.096

CI
Material

+ 0.107 x

Cr
Co

+ 0.052 x

Mr
Mo

COEF. DE
INCIDENCIA

% DE
INCIDENCIA

CI
Material

Io
MAY 09

0.278
0.436
0.127
0.127
0.107
0.052

100.000%
100.000%
74.803%
25.197%
100.000%
100.000%

0.278000
0.436000
0.095000
0.032000
0.107000
0.052000

1.000000

397.23
347.88
453.81
314.53
350.43
338.98

VAL N 05
Ir
MAR 10

ABR 09
Kr(MAR )=
MAR 10

415.58
350.59
446.16
310.84
357.75
334.22

0.291
0.439
0.093
0.032
0.109
0.051

1.015

0.00

0.669 x

Fr
Fo

MONOMIO

SIMBOLO

CODIGO
IU

1
2

F
I

32
39

+ 0.331 x

Ir
Io

DESCRIPCION

FLETE TERRESTRE
INDICE GENERAL DE PRECIOS AL CONSUMIDOR

COEF. DE
INCIDENCIA

0.669
0.331

% DE
INCIDENCIA

CI
Material

100.000%
100.000%

0.669000
0.331000

1.000000

Io
MAY 09

425.75
347.88

VAL N 05
Ir
MAR 10

ABR 09
Kr(MAR )=
MAR 10

414.72
350.59

0.652
0.334

0.986

VALORIZACION DE OBRA N 07
CALCULO DE LOS COEFICIENTES DE REAJUSTES (K)
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

:
:
:
:
:

FORMULA N 01

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA

: OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES

K=

0.186 x

Mr
Mo

+ 0.084 x

% DE
INCIDENCIA

CI
Material

Cr
Co

+ 0.203 x

Ar
Ao

+ 0.081 x

Mr
Mo

+ 0.446 x

Ir
Io
VAL 01

MONOMIO

SIMBOLO

CODIGO
IU

1
2
3
4
5

M
C
A
M
I

47
21
03
43
39

DESCRIPCION

COEF. DE
INCIDENCIA

MANO DE OBRA INC LEYES SOCIALES


CEMENTO PORTLAND TIPO I
ACERO DE CONSTRUCCION CORRUGADO
MADERA NACIONAL PARA ENCOFRADO Y CARP.
INDICE GENERAL DE PRECIOS AL CONSUMIDOR

0.186
0.084
0.203
0.081
0.446

100.00%
100.00%
100.00%
100.00%
100.00%

0.186000
0.084000
0.203000
0.081000
0.446000

IND. BASE (Io)


MAY 09
COEFIC.

397.23
350.43
453.81
670.87
347.88
Ko(MAY )=

FORMULA N 02

0.186
0.084
0.203
0.081
0.446
1.000

IND. ADEL. EFECT. (Ia)


DIC 09
COEFIC.

413.41
346.98
443.96
665.00
347.45
Ka(NOV )=

0.194
0.083
0.199
0.080
0.445
1.001

IND. ADEL. MAT. (Ia)


ENE 08
COEFIC.

413.41
346.98
452.34
668.44
346.35
Ka(ENE )=

0.194
0.083
0.202
0.081
0.444
1.004

VAL 02

DIC 2009 (Ir)


NOV 09
COEFIC.

413.41
346.98
452.34
668.44
346.35
Kr(NOV )=

0.194
0.083
0.202
0.081
0.444
1.004

0.350 x

Mr
Mo

+ 0.051 x

% DE
INCIDENCIA

CI
Material

Cr
Co

+ 0.078 x

Ar
Ao

+ 0.118 x

Mr
Mo

+ 0.403 x

CODIGO
IU

1
2
3
4
5

M
C
A
M
I

47
21
02
43
39

DESCRIPCION

COEF. DE
INCIDENCIA

MANO DE OBRA INC LEYES SOCIALES


CEMENTO PORTLAND TIPO I
ACERO DE CONSTRUCCION LISO
MADERA NACIONAL PARA ENCOFRADO Y CARP.
INDICE GENERAL DE PRECIOS AL CONSUMIDOR

0.350
0.051
0.078
0.118
0.403

100.00%
100.00%
100.00%
100.00%
100.00%

0.350000
0.051000
0.078000
0.118000
0.403000

IND. BASE (Io)


MAY 09
COEFIC.

397.23
350.43
458.01
670.87
347.88
Ko(MAY )=

FORMULA N 03

SIMBOLO

CODIGO
IU

1
2
3
4

M
A
A
I
T

47
07
12
39
75

DESCRIPCION

0.249 x

COEF. DE
INCIDENCIA

MANO DE OBRA INC LEYES SOCIALES


ALAMBRE Y CABLE TIPO TW Y THW
ARTEFACTO DE ALUMBRADO INTERIOR
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
NDICE DE PRECIOS DE TUBERA DE PVC

0.249
0.074
0.245
0.432
0.432

Mr
Mo

+ 0.074 x

% DE
INCIDENCIA

CI
Material

100.00%
100.00%
100.00%
88.889%
11.111%

0.249000
0.074000
0.245000
0.384000
0.048000

Ar
Ao

CODIGO
IU

1
2

M
D
T
A
I

47
30
72
10
39

DESCRIPCION

0.245 x

COEF. DE
INCIDENCIA

FLETE TERRESTRE
PETROLEO DIESEL
MAQUINARIA Y EQUIPO NACIONAL
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
MADERA NACIONAL PARA ENCOFRADO Y CARP.

0.245
0.146
0.146
0.609
0.609

Mr
Mo

+ 0.146 x

% DE
INCIDENCIA

CI
Material

100.000%
13.699%
86.301%
3.284%
96.716%

0.245000
0.020001
0.125999
0.020000
0.589000

IND. BASE (Io)


MAY 09
COEFIC.

397.23
472.62
281.54
347.88
338.58

DTr
DTo

CODIGO
IU

1
2
3
4

M
C
A
A
I

47
21
03
13
39

397.23
371.94
338.58
321.79
347.88

DESCRIPCION

0.243 x

COEF. DE
INCIDENCIA

MANO DE OBRA INC LEYES SOCIALES


CEMENTO PORTLAND TIPO I
ACERO DE CONSTRUCCION CORRUGADO
ASFALTO
INDICE GENERAL DE PRECIOS AL CONSUMIDOR

0.243
0.168
0.062
0.527
0.527

Mr
Mo

+ 0.168 x

% DE
INCIDENCIA

CI
Material

100.000%
100.000%
100.000%
15.750%
84.250%

0.243000
0.168000
0.062000
0.083003
0.443998

Cr
Co

1
2
3
4

M
C
I
A
M

47
21
39
03
45

397.23
350.43
453.81
966.59
347.88

DESCRIPCION

0.234 x

COEF. DE
INCIDENCIA

MANO DE OBRA INC LEYES SOCIALES


CEMENTO PORTLAND TIPO I
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
ACERO DE CONSTRUCCION CORRUGADO
MADERA TERCIADA PARA ENCOFRADO

0.234
0.184
0.486
0.096
0.096

Mr
Mo

+ 0.184 x

% DE
INCIDENCIA

CI
Material

100.000%
100.000%
100.000%
60.417%
39.583%

0.234000
0.184000
0.486000
0.058000
0.038000

Cr
Co

1
2

M
T

47
65

1.011

413.41
346.98
459.08
668.44
346.35
Ka(ENE )=

0.364
0.050
0.078
0.118
0.401
1.011

413.41
346.98
459.08
668.44
346.35
Kr(NOV )=

0.364
0.050
0.078
0.118
0.401
1.011

ENE 2010 (Ir)


DIC 09
COEFIC.

413.41
346.98
450.58
665.00
347.45
Kr(DIC )=

FEB 2010 (Ir)

0.364
0.050
0.077
0.117
0.403
1.011

Ar
Ao

+ 0.432 x

IND. ADEL.EFECT. (Ia)


DIC 09
COEFIC.

413.41
543.27
270.97
347.45
339.61
Ka(NOV )=

0.259
0.085
0.236
0.384
0.048
1.012

ITr
ITo

IND. ADEL.MAT. (Ia)


ENE 08
COEFIC.

413.41
528.24
271.54
346.35
340.04
Ka(ENE )=

0.259
0.083
0.236
0.382
0.048
1.008

VAL 01
DIC 2009 (Ir)
NOV 09
COEFIC.

413.41
528.24
271.54
346.35
340.04
Kr(NOV )=

0.259
0.083
0.236
0.382
0.048
1.008

VAL 02
ENE 2010 (Ir)
DIC 09
COEFIC.

413.41
543.27
270.97
347.45
339.61
Kr(DIC )=

FEB 2010 (Ir)

0.259
0.085
0.236
0.384
0.048
1.012

AIr
AIo

IND. ADEL.EFECT. (Ia)


DIC 09
COEFIC.

413.41
362.71
339.61
321.44
347.45
Ka(NOV )=

0.255
0.020
0.126
0.020
0.588
1.009

IND. ADEL.MAT. (Ia)


ENE 08
COEFIC.

413.41
363.47
340.04
321.48
346.35
Ka(ENE )=

0.255
0.020
0.127
0.020
0.586
1.008

VAL 01
DIC 2009 (Ir)
NOV 09
COEFIC.

413.41
363.47
340.04
321.48
346.35
Kr(NOV )=

0.255
0.020
0.127
0.020
0.586
1.008

VAL 02
ENE 2010 (Ir)
DIC 09
COEFIC.

413.41
362.71
339.61
321.44
347.45
Kr(DIC )=

FEB 2010 (Ir)

0.255
0.020
0.126
0.020
0.588
1.009

1.000

Ar
Ao

+ 0.527 x

IND. ADEL.EFECT. (Ia)


DIC 09
COEFIC.

413.41
346.98
443.96
1,265.36
347.45
Ka(NOV )=

0.253
0.166
0.061
0.109
0.443
1.032

AIr
AIo

IND. ADEL.MAT. (Ia)


ENE 08
COEFIC.

413.41
346.98
452.34
1,253.01
346.35
Ka(ENE )=

0.253
0.166
0.062
0.108
0.442
1.031

VAL 01
DIC 2009 (Ir)
NOV 09
COEFIC.

413.41
346.98
452.34
1,253.01
346.35
Kr(NOV )=

0.253
0.166
0.062
0.108
0.442
1.031

VAL 02
ENE 2010 (Ir)
DIC 09
COEFIC.

413.41
346.98
443.96
1,265.36
347.45
Kr(DIC )=

FEB 2010 (Ir)

0.253
0.166
0.061
0.109
0.443
1.032

IND. BASE (Io)


MAY 09
COEFIC.

397.23
350.43
347.88
453.81
327.07

0.234
0.184
0.486
0.058
0.038
1.000

Ir
Io

+ 0.096 x

IND. ADEL.EFECT. (Ia)


DIC 09
COEFIC.

413.41
346.98
347.45
443.96
314.70
Ka(NOV )=

0.244
0.182
0.485
0.057
0.037
1.005

AMr
AMo

IND. ADEL.MAT. (Ia)


ENE 08
COEFIC.

413.41
346.98
346.35
452.34
314.88
Ka(ENE )=

0.244
0.182
0.484
0.058
0.037
1.005

VAL 01
DIC 2009 (Ir)
NOV 09
COEFIC.

413.41
346.98
346.35
452.34
314.88
Kr(NOV )=

0.244
0.182
0.484
0.058
0.037
1.005

VAL 02
ENE 2010 (Ir)
DIC 09
COEFIC.

413.41
346.98
347.45
443.96
314.70
Kr(DIC )=

FEB 2010 (Ir)

0.244
0.182
0.485
0.057
0.037
1.005

0.00

K=

CODIGO
IU

0.243
0.168
0.062
0.083
0.444

+ 0.486 x

Ko(MAY )=

SIMBOLO

1.000

IND. BASE (Io)


MAY 09
COEFIC.

FORMULA N 07

MONOMIO

Ka(NOV )=

0.364
0.050
0.077
0.117
0.403

VAL 02

DIC 2009 (Ir)


NOV 09
COEFIC.

0.00

K=

CODIGO
IU

0.245
0.020
0.126
0.020
0.589

+ 0.062 x

Ko(MAY )=

SIMBOLO

1.000

IND. BASE (Io)


MAY 09
COEFIC.

FORMULA N 06

MONOMIO

413.41
346.98
450.58
665.00
347.45

IND. ADEL.MAT. (Ia)


ENE 08
COEFIC.

ESTUDIO DE IMPACTO AMBIENTAL

K=

SIMBOLO

0.249
0.074
0.245
0.384
0.048

+ 0.609 x

Ko(MAY )=
FORMULA N 05

MONOMIO

1.000

IND. ADEL.EFECT. (Ia)


DIC 09
COEFIC.

SISTEMA PTAR

K=

SIMBOLO

0.350
0.051
0.078
0.118
0.403

+ 0.245 x

Ko(MAY )=
FORMULA N 04

MONOMIO

1.001

SISTEMA DE ALCANTARILLADO

K=

MONOMIO

Kr(DIC )=

FEB 2010 (Ir)

0.194
0.083
0.199
0.080
0.445

Ir
Io
VAL 01

SIMBOLO

413.41
346.98
443.96
665.00
347.45

SISTEMA DE AGUA POTABLE

K=
MONOMIO

ENE 2010 (Ir)


DIC 09
COEFIC.

DESCRIPCION

MANO DE OBRA INC LEYES SOCIALES


TUBERIA DE ACERO NEGRO Y/O GALVANIZADO

0.155 x

COEF. DE
INCIDENCIA

0.155
0.377

Mr
Mo

+ 0.377 x

% DE
INCIDENCIA

CI
Material

100.000%
100.000%

0.155000
0.377000

Tr
To

+ 0.468 x

IND. BASE (Io)


MAY 09
COEFIC.

397.23
328.40

0.155
0.377

Ir
Io

IND. ADEL.EFECT. (Ia)


DIC 09
COEFIC.

413.41
338.64

0.161
0.389

IND. ADEL.MAT. (Ia)


ENE 08
COEFIC.

413.41
339.74

0.161
0.390

VAL 01
DIC 2009 (Ir)
NOV 09
COEFIC.

413.41
339.74

0.161
0.390

VAL 02
ENE 2010 (Ir)
DIC 09
COEFIC.

413.41
338.64

0.161
0.389

FEB 2010 (Ir)

CALCULO DE LOS COEFICIENTES DE REAJUSTES (K)


3

39

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

0.468

100.000%

0.468000

347.88
Ko(MAY )=

FORMULA N 08

K=

MONOMIO

SIMBOLO

CODIGO
IU

1
2
3

M
I
A
P
C
M

47
39
03
51
21
48

4
5

DESCRIPCION

0.278 x

COEF. DE
INCIDENCIA

MANO DE OBRA INC LEYES SOCIALES


INDICE GENERAL DE PRECIOS AL CONSUMIDOR
ACERO DE CONSTRUCCION CORRUGADO
PERFIL DE ACERO LIVIANO
CEMENTO PORTLAND TIPO I
MAQUINARIA Y EQUIPO NACIONAL

0.278
0.436
0.127
0.127
0.107
0.052

Mr
Mo

+ 0.436 x

% DE
INCIDENCIA

CI
Material

100.000%
100.000%
74.803%
25.197%
100.000%
100.000%

0.278000
0.436000
0.095000
0.032000
0.107000
0.052000

Ir
Io

+ 0.127 x

397.23
347.88
453.81
314.53
350.43
338.98
Ko(MAY )=

CODIGO
IU

1
2

F
I

32
39

347.45
Ka(NOV )=

0.467
1.017

346.35
Ka(ENE )=

0.466
1.017

346.35
Kr(NOV )=

0.466
1.017

347.45
Kr(DIC )=

0.467
1.017

0.278
0.436
0.095
0.032
0.107
0.052
1.000

APr
APo

+ 0.107 x

IND. ADEL.EFECT. (Ia)


DIC 09
COEFIC.

413.41
347.45
443.96
300.73
346.98
329.98
Ka(NOV )=

0.289
0.435
0.093
0.031
0.106
0.051
1.005

Cr
Co

+ 0.052 x

IND. ADEL.MAT. (Ia)


ENE 08
COEFIC.

413.41
346.35
452.34
301.29
346.98
330.19
Ka(ENE )=

0.289
0.434
0.095
0.031
0.106
0.051
1.006

Mr
Mo
VAL 01
DIC 2009 (Ir)
NOV 09
COEFIC.

413.41
346.35
452.34
301.29
346.98
330.19
Kr(NOV )=

0.289
0.434
0.095
0.031
0.106
0.051
1.006

VAL 02
ENE 2010 (Ir)
DIC 09
COEFIC.

413.41
347.45
443.96
300.73
346.98
329.98
Kr(DIC )=

FEB 2010 (Ir)

0.289
0.435
0.093
0.031
0.106
0.051
1.005

0.00

K=

SIMBOLO

1.000

IND. BASE (Io)


MAY 09
COEFIC.

FORMULA N 09

MONOMIO

0.468

0.00

DESCRIPCION

FLETE TERRESTRE
INDICE GENERAL DE PRECIOS AL CONSUMIDOR

0.669 x

COEF. DE
INCIDENCIA

0.669
0.331

Fr
Fo

+ 0.331 x

% DE
INCIDENCIA

CI
Material

100.000%
100.000%

0.669000
0.331000

Ir
Io

IND. BASE (Io)


MAY 09
COEFIC.

425.75
347.88
Ko(MAY )=

0.669
0.331
1.000

IND. ADEL.EFECT. (Ia)


DIC 09
COEFIC.

418.25
347.45
Ka(NOV )=

0.657
0.331
0.988

IND. ADEL.MAT. (Ia)


ENE 08
COEFIC.

418.41
346.35
Ka(ENE )=

0.657
0.330
0.987

VAL 01
DIC 2009 (Ir)
NOV 09
COEFIC.

418.41
346.35
Kr(NOV )=

0.657
0.330
0.987

VAL 02
ENE 2010 (Ir)
DIC 09
COEFIC.

418.25
347.45
Kr(DIC )=

0.657
0.331
0.988

FEB 2010 (Ir)

VALORIZACION DE OBRA N 07
INDICES UNIFICADOS DE PRECIOS AL CONSUMIDOR
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

IU
2
3
7
10
12
13
21
30
32
39
43
45
47
48
51
65
72
75

:
:
:
:
:

MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTA
CONSORCIO NEON ASOCIADOS
ING. JULIO VICTOR MARTINEZ QUISPE
SUMA ALZADA

INSUMO

ACERO DE CONSTRUCCION LISO


ACERO DE CONSTRUCCION CORRUGADO
ALAMBRE Y CABLE TIPO TW Y THW
APARATO SANITARIO CON GRIFERIA
ARTEFACTO DE ALUMBRADO INTERIOR
ASFALTO
CEMENTO PORTLAND TIPO I
DOLAR (GENERAL PONDERADO)
FLETE TERRESTRE
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
MADERA NACIONAL PARA ENCOFRADO Y CARP.
MADERA TERCIADA PARA ENCOFRADO
MANO DE OBRA INC LEYES SOCIALES
MAQUINARIA Y EQUIPO NACIONAL
PERFIL DE ACERO LIVIANO
TUBERIA DE ACERO NEGRO Y/O GALVANIZADO
NDICE DE PRECIOS DE TUBERA DE PVC
TUBERIA DE PVC PARA ELECTRICIDAD (SEL)(Reag 74)

MAY 09
458.010
453.810
472.620
321.790
281.540
966.590
350.430
371.940
425.750
347.880
670.870
327.070
397.230
338.980
314.530
328.400
338.580
338.580

NOV 09
459.080
452.340
528.240
321.480
271.540
1253.010
346.980
363.470
418.410
346.350
668.440
314.880
413.410
330.190
301.290
339.740
340.040
340.040

DIC 09
450.580
443.960
543.270
321.440
270.970
1265.360
346.980
362.710
418.250
347.450
665.000
314.700
413.410
329.980
300.730
338.640
339.610
339.610

ENE 10 FEBRERO 10 MARZO 10


446.120
445.810
452.810
439.580
439.270
446.160
561.090
561.390
567.880
320.790
321.060
321.080
269.440
269.300
268.210
1265.360
1265.360
1265.360
357.750
357.750
357.750
359.430
360.410
358.600
418.250
418.250
414.720
348.480
349.610
350.590
676.430
684.750
687.920
314.690
314.340
314.710
415.580
415.580
415.580
329.610
334.950
334.220
300.160
302.280
310.840
335.090
334.870
335.530
333.830
331.630
328.490
333.830
331.630
328.490

ABRIL 10

VALORIZACION DE OBRA N 07

: MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


: "AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALID
: CONSORCIO NEON ASOCIADOS
: ING. JULIO VICTOR MARTINEZ QUISPE
: SUMA ALZADA

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
MONTO CONTRATADO (C/ IGV)
MONTO CONTRATADO (S/ IGV)

2,812,663.74
2,363,582.97

CUADRO DE REAJUSTES
CALCULO DEL REAJUSTE DE LA OBRA
VALORES CALCULADOS SIN IGV
FORMULA N 01

OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES

VALORIZACION
No

MES

1
Febrero
2
Marzo
3
Abril
4
Mayo
5
Junio
6
Julio
7
#N/A
TOTALES

FORMULA N 02

MES

1
Febrero
2
Marzo
3
Abril
4
Mayo
5
Junio
6
Julio
7
#N/A
TOTALES

FORMULA N 03

REAL

Kr

1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
REINTEGRO ACUM. ANTERIOR
REINTEGRO DEL MES
REINTEGRO TOTAL

REINTEGRO
RECONOCIDO

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

AVANCE
PROGRAMADO

REAL

Kr

1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00

0.00

REAJUSTE
C= VALx(Kr-1)
CALENDARIO
VALORIZACION

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
REINTEGRO ACUM. ANTERIOR
REINTEGRO DEL MES
REINTEGRO TOTAL

REINTEGRO
RECONOCIDO

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SISTEMA DE ALCANTARILLADO

VALORIZACION
No

PROGRAMADO

REAJUSTE
C= VALx(Kr-1)
CALENDARIO
VALORIZACION

SISTEMA DE AGUA POTABLE

VALORIZACION
No

AVANCE

MES

1
Febrero
2
Marzo
3
Abril
4
Mayo
5
Junio
6
Julio
7
#N/A
TOTALES

AVANCE
PROGRAMADO

REAL

Kr

1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00

0.00

REAJUSTE
C= VALx(Kr-1)
CALENDARIO
VALORIZACION

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
REINTEGRO ACUM. ANTERIOR
REINTEGRO DEL MES
REINTEGRO TOTAL

REINTEGRO
RECONOCIDO

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALORIZACION DE OBRA N 07

: MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


: "AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALID
: CONSORCIO NEON ASOCIADOS
: ING. JULIO VICTOR MARTINEZ QUISPE
: SUMA ALZADA

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
MONTO CONTRATADO (C/ IGV)
MONTO CONTRATADO (S/ IGV)

2,812,663.74
2,363,582.97

CUADRO DE REAJUSTES
CALCULO DEL REAJUSTE DE LA OBRA
VALORES CALCULADOS SIN IGV
FORMULA N 04

SISTEMA PTAR

VALORIZACION
No

AVANCE

MES

PROGRAMADO

1
Febrero
2
Marzo
3
Abril
4
Mayo
5
Junio
6
Julio
7
#N/A
TOTALES

FORMULA N 05

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
REINTEGRO ACUM. ANTERIOR
REINTEGRO DEL MES
REINTEGRO TOTAL

REINTEGRO
RECONOCIDO

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

ESTUDIO DE IMPACTO AMBIENTAL


AVANCE

MES

PROGRAMADO

1
Febrero
2
Marzo
3
Abril
4
Mayo
5
Junio
6
Julio
7
#N/A
TOTALES

FORMULA N 06

REAL

Kr

1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00

0.00

REAJUSTE
C= VALx(Kr-1)
CALENDARIO
VALORIZACION

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
REINTEGRO ACUM. ANTERIOR
REINTEGRO DEL MES
REINTEGRO TOTAL

REINTEGRO
RECONOCIDO

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

FORTALECIMIENTO DE LA UNIDAD DE GESTION

VALORIZACION
No

Kr

1.000
1.000
1.000
1.000
1.000
1.000
1.000

VALORIZACION
No

REAL

REAJUSTE
C= VALx(Kr-1)
CALENDARIO
VALORIZACION

MES

1
Febrero
2
Marzo
3
Abril
4
Mayo
5
Junio
6
Julio
7
#N/A
TOTALES

AVANCE
PROGRAMADO

REAL

Kr

1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00

0.00

RESUMEN DEL REAJUSTE MENSUAL


REINTEGRO ACUM. ANTERIOR
REINTEGRO DEL MES
REINTEGRO TOTAL

0.00
0.00
0.00

REAJUSTE
C= VALx(Kr-1)
CALENDARIO
VALORIZACION

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
REINTEGRO ACUM. ANTERIOR
REINTEGRO DEL MES
REINTEGRO TOTAL

REINTEGRO
RECONOCIDO

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALORIZACION DE OBRA N 07

: MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


: "AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO D
: CONSORCIO NEON ASOCIADOS
: ING. JULIO VICTOR MARTINEZ QUISPE
: SUMA ALZADA

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

AMORTIZACION DEL
ADELANTO EN EFECTIVO
D.S. N 017-79-VC

FORMULA:

AMORT = AxVAL/C
DONDE:
AMORT :
A:
V:
C:
K:
Ka:

Amortizacion por el Adelanto en Efectivo


Monto del Adelanto Otorgado en Efectivo
Monto de la Valorizacin Mensual
Saldo del Contrato por Valorizar a la fecha del Adelanto
Coeficiente de Reajuste obtenido por la Aplicacin de la Frmula Polinomica
Coeficiente de Reajuste correspondiente al mes en que se cancel el Adelanto

SALDO DEL PRESUPUESTO CONTRATADO

2,812,663.74 INC. IGV

SALDO DEL PRESUPUESTO CONTRATADO

2,383,613.34 SIN IGV

PORCENTAJE DEL ADELANTO

0.00%

ADELANTO DIRECTO =

0,000.00 INC IGV

ADELANTO DIRECTO =
No.

FECHA PAGO

-.-

Valorizacion

0,000.00 SIN IGV


ADEL. EFEC.

ADEL. EFEC.

PORCENTAJE

CON IGV

SIN IGV

DEL ADELANTO

0.00

0.00

0.00%

Monto

Adel. Otorg.

Porcentaje

Amortizacion

Monto

(SIN IGV)

del Adelanto

AxVAL/C

por Amortizar

e= a x d

Saldo a Amortizar

Mes

Valorizado
a

VAL N 1

Febrero

23,835.82

0.00

0.00%

0.00

0.00

0.00

VAL N 2

Marzo

190,935.89

0.00

0.00%

0.00

0.00

0.00

VAL N 3

Abril

222,400.53

0.00

0.00%

0.00

0.00

0.00

VAL N 4

mayo

576,807.41

0.00

0.00%

0.00

0.00

0.00

VAL N 5

junio

829,868.53

0.00

0.00%

0.00

0.00

0.00

VAL N 6

Julio

518,787.93

0.00

0.00%

0.00

0.00

0.00

VAL N 7

Agosto

12,241.43

0.00

0.00%

0.00

0.00

0.00

TOTAL

g= f - e

0.00

AMORTIZACION DEL MES

S/.

0.00

VALORIZACION DE OBRA N 07

: MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


: "AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO D
: CONSORCIO NEON ASOCIADOS
: ING. JULIO VICTOR MARTINEZ QUISPE
: SUMA ALZADA

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

AMORTIZACION DEL
ADELANTO PARA MATERIALES
D.S. N 017-79-VC

FORMULA:

AMORT = AxVAL/C
DONDE:
AMORT :
A:
V:
C:
K:
Ka:

Amortizacion por el Adelanto en Efectivo


Monto del Adelanto Otorgado en Efectivo
Monto de la Valorizacin Mensual
Saldo del Contrato por Valorizar a la fecha del Adelanto
Coeficiente de Reajuste obtenido por la Aplicacin de la Frmula Polinomica
Coeficiente de Reajuste correspondiente al mes en que se cancel el Adelanto

SALDO DEL PRESUPUESTO CONTRATADO

2,812,663.74 INC. IGV

SALDO DEL PRESUPUESTO CONTRATADO

2,383,613.34 SIN IGV

PORCENTAJE DEL ADELANTO

20.00%

ADELANTO P/MATERIALES =

562,532.75 INC IGV

ADELANTO P/MATERAILES =
No.

FECHA PAGO

-.-

Valorizacion

476,722.67 SIN IGV


ADEL. EFEC.

ADEL. EFEC.

PORCENTAJE

CON IGV

SIN IGV

DEL ADELANTO

562,532.75

476,722.67

20.00%

Monto

Adel. Otorg.

Porcentaje

Amortizacion

Monto

(SIN IGV)

del Adelanto

AxVAL/C

por Amortizar

e= a x d

Saldo a Amortizar

Mes

Valorizado
a

g= f - e

VAL N 1

Febrero

23,835.82

476,722.67

20.00%

0.00

476,722.67

476,722.67

VAL N 2

Marzo

190,935.89

20.00%

38,187.18

476,722.67

438,535.49

VAL N 3

Abril

222,400.53

20.00%

44,480.11

438,535.49

394,055.38

VAL N 4

Mayo

576,807.41

20.00%

115,361.48

394,055.38

278,693.90

VAL N 5

Junio

829,868.53

20.00%

278,693.90

278,693.90

0.00

VAL N 6

Julio

518,787.93

476,722.67

20.00%

0.00

0.00

0.00

VAL N 7

Agosto

12,241.43

476,722.67

20.00%

0.00

0.00

0.00

TOTAL

476,722.67

AMORTIZACION DEL MES

S/.

0.00

VALORIZACION DE OBRA N 07
: MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI
: "AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
: CONSORCIO NEON ASOCIADOS
: ING. JULIO VICTOR MARTINEZ QUISPE
: SUMA ALZADA

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

DEDUCCION DEL REINTEGRO QUE NO CORRESPONDE


POR EL ADELANTO EN EFECTIVO
D.S. N 017-79-VC

FORMULA:

De = A x VAL / C x ( K / Ka - 1 )
DONDE:
De :
A:
V:
C:
K:
Ka:

Deduccin del Reajuste generado por el Adelanto en Efectivo


Monto del Adelanto Otorgado en Efectivo
Monto de la Valorizacin Mensual
Saldo del Contrato por Valorizar a la fecha del Adelanto
Coeficiente de Reajuste obtenido por la Aplicacin de la Frmula Polinomica
Coeficiente de Reajuste correspondiente al mes en que se cancel el Adelanto

MONTO DEL PRESUPUESTO CONTRATADO

2,812,663.74 INC. IGV

MONTO DEL PRESUPUESTO CONTRATADO

2,363,582.97 SIN IGV

PORCENTAJE DEL ADELANTO

0.00%

ADELANTO DIRECTO =

0,000.00 INC IGV

ADELANTO DIRECTO =

0,000.00 SIN IGV

FORMULA N 01
No.

OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES


FECHA PAGO

-.-

Valorizacion

ADEL. EFEC.

ADEL. EFEC.

PORCENTAJE

CON IGV

SIN IGV

DEL ADELANTO

0.00

0.00

0.00%

Monto

Adel. Otorg.

Porcentaje

Valorizado

(SIN IGV)

del Adelanto

Ka

(K / Ka - 1)

Deduccion

Mes

g= (e / f - 1)

h= a x d x g

VAL N 1

Febrero

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 2

Marzo

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 3

Abril

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 4

Mayo

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 5

Junio

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 6

Julio

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 7

Agosto

0.00

0.00%

1.000

1.000

0.00000

0.00

Ax(VAL/C)x(K/Ka-1)

TOTAL

0.00

S/. 0.00
S/. 0.00
S/. 0.00

DEDUC. ACUM. ANTERIOR


DEDUCTIVO DEL MES
DEDUCTIVO TOTAL
FORMULA N 02
No.

SISTEMA DE AGUA POTABLE


FECHA PAGO

-.-

Valorizacion

ADEL. EFEC.

ADEL. EFEC.

PORCENTAJE

CON IGV

SIN IGV

DEL ADELANTO

0.00

0.00

0.00%

Monto

Adel. Otorg.

Porcentaje

Valorizado

(SIN IGV)

del Adelanto

Ka

(K / Ka - 1)

Deduccion

Mes

g= (e / f - 1)

h= a x d x g

VAL N 1

Febrero

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 2

Marzo

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 3

Abril

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 4

Mayo

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 5

Junio

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 6

Julio

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 7

Agosto

0.00

0.00%

1.000

1.000

0.00000

0.00

Ax(VAL/C)x(K/Ka-1)

TOTAL

0.00

DEDUC. ACUM. ANTERIOR


DEDUCTIVO DEL MES
DEDUCTIVO TOTAL

S/. 0.00
S/. 0.00
S/. 0.00

VALORIZACION DE OBRA N 07
: MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI
: "AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
: CONSORCIO NEON ASOCIADOS
: ING. JULIO VICTOR MARTINEZ QUISPE
: SUMA ALZADA

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

DEDUCCION DEL REINTEGRO QUE NO CORRESPONDE


POR EL ADELANTO EN EFECTIVO
D.S. N 017-79-VC

FORMULA:

De = A x VAL / C x ( K / Ka - 1 )
DONDE:
De :
A:
V:
C:
K:
Ka:

Deduccin del Reajuste generado por el Adelanto en Efectivo


Monto del Adelanto Otorgado en Efectivo
Monto de la Valorizacin Mensual
Saldo del Contrato por Valorizar a la fecha del Adelanto
Coeficiente de Reajuste obtenido por la Aplicacin de la Frmula Polinomica
Coeficiente de Reajuste correspondiente al mes en que se cancel el Adelanto

MONTO DEL PRESUPUESTO CONTRATADO

2,812,663.74 INC. IGV

MONTO DEL PRESUPUESTO CONTRATADO

2,363,582.97 SIN IGV

PORCENTAJE DEL ADELANTO

0.00%

ADELANTO DIRECTO =

0,000.00 INC IGV

ADELANTO DIRECTO =

FORMULA N 03
No.

0,000.00 SIN IGV

SISTEMA DE ALCANTARILLADO
FECHA PAGO

-.-

Valorizacion

ADEL. EFEC.

ADEL. EFEC.

PORCENTAJE

CON IGV

SIN IGV

DEL ADELANTO

0.00

0.00

0.00%

Monto

Adel. Otorg.

Porcentaje

Valorizado

(SIN IGV)

del Adelanto

Ka

(K / Ka - 1)

Deduccion

Mes

g= (e / f - 1)

h= a x d x g

VAL N 1

Febrero

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 2

Marzo

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 3

Abril

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 4

Mayo

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 5

Junio

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 6

Julio

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 7

Agosto

0.00

0.00%

1.000

1.000

0.00000

0.00

Ax(VAL/C)x(K/Ka-1)

TOTAL

0.00

S/. 0.00
S/. 0.00
S/. 0.00

DEDUC. ACUM. ANTERIOR


DEDUCTIVO DEL MES
DEDUCTIVO TOTAL
FORMULA N 04
No.

SISTEMA PTAR
FECHA PAGO

-.-

Valorizacion

ADEL. EFEC.

ADEL. EFEC.

PORCENTAJE

CON IGV

SIN IGV

DEL ADELANTO

0.00

0.00

0.00%

Monto

Adel. Otorg.

Porcentaje

Valorizado

(SIN IGV)

del Adelanto

Ka

(K / Ka - 1)

Deduccion

Mes

g= (e / f - 1)

h= a x d x g

VAL N 1

Febrero

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 2

Marzo

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 3

Abril

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 4

Mayo

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 5

Junio

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 6

Julio

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 7

Agosto

0.00

0.00%

1.000

1.000

0.00000

0.00

Ax(VAL/C)x(K/Ka-1)

TOTAL

0.00

DEDUC. ACUM. ANTERIOR


DEDUCTIVO DEL MES
DEDUCTIVO TOTAL

S/. 0.00
S/. 0.00
S/. 0.00

VALORIZACION DE OBRA N 07
: MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI
: "AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
: CONSORCIO NEON ASOCIADOS
: ING. JULIO VICTOR MARTINEZ QUISPE
: SUMA ALZADA

ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

DEDUCCION DEL REINTEGRO QUE NO CORRESPONDE


POR EL ADELANTO EN EFECTIVO
D.S. N 017-79-VC

FORMULA:

De = A x VAL / C x ( K / Ka - 1 )
DONDE:
De :
A:
V:
C:
K:
Ka:

Deduccin del Reajuste generado por el Adelanto en Efectivo


Monto del Adelanto Otorgado en Efectivo
Monto de la Valorizacin Mensual
Saldo del Contrato por Valorizar a la fecha del Adelanto
Coeficiente de Reajuste obtenido por la Aplicacin de la Frmula Polinomica
Coeficiente de Reajuste correspondiente al mes en que se cancel el Adelanto

MONTO DEL PRESUPUESTO CONTRATADO

2,812,663.74 INC. IGV

MONTO DEL PRESUPUESTO CONTRATADO

2,363,582.97 SIN IGV

PORCENTAJE DEL ADELANTO

0.00%

ADELANTO DIRECTO =

0,000.00 INC IGV

ADELANTO DIRECTO =

FORMULA N 05
No.

FECHA PAGO

0,000.00 SIN IGV

ESTUDIO DE IMPACTO AMBIENTAL

-.-

Valorizacion

ADEL. EFEC.

ADEL. EFEC.

PORCENTAJE

CON IGV

SIN IGV

DEL ADELANTO

0.00

0.00

0.00%

Monto

Adel. Otorg.

Porcentaje

Valorizado

(SIN IGV)

del Adelanto

Ka

(K / Ka - 1)

Deduccion

Mes

g= (e / f - 1)

h= a x d x g

VAL N 1

Febrero

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 2

Marzo

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 3

Abril

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 4

Mayo

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 5

Junio

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 6

Julio

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 7

Agosto

0.00

0.00%

1.000

1.000

0.00000

0.00

Ax(VAL/C)x(K/Ka-1)

TOTAL

0.00

S/. 0.00
S/. 0.00
S/. 0.00

DEDUC. ACUM. ANTERIOR


DEDUCTIVO DEL MES
DEDUCTIVO TOTAL
FORMULA N 06
No.

FORTALECIMIENTO DE LA UNIDAD DE GESTION


FECHA PAGO

-.-

Valorizacion

ADEL. EFEC.

ADEL. EFEC.

PORCENTAJE

CON IGV

SIN IGV

DEL ADELANTO

0.00

0.00

0.00%

Monto

Adel. Otorg.

Porcentaje

Valorizado

(SIN IGV)

del Adelanto

Ka

(K / Ka - 1)

Deduccion

Mes

g= (e / f - 1)

h= a x d x g

VAL N 1

Febrero

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 2

Marzo

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 3

Abril

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 4

Mayo

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 5

Junio

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 6

Julio

0.00

0.00%

1.000

1.000

0.00000

0.00

VAL N 7

Agosto

0.00

0.00%

1.000

1.000

0.00000

0.00

Ax(VAL/C)x(K/Ka-1)

TOTAL

0.00

DEDUC. ACUM. ANTERIOR


DEDUCTIVO DEL MES
DEDUCTIVO TOTAL

RESUMEN DEL DEDUCTIVO MENSUAL

DEDUCTIVO ACUM. ANTERIOR


DEDUCTIVO DEL MES
DEDUCTIVO TOTAL

0.00
0.00
0.00

S/. 0.00
S/. 0.00
S/. 0.00

CONTROL DE PROGRAMACION DE OBRA N

07

Agosto

"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE


ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
CONTRATISTA
CONSORCIO NEON ASOCIADOS
CONTRATO
2,812,663.74
SUPERVISION
ING. JULIO VICTOR MARTINEZ QUISPE
RESIDENTE
ING. JOEL ABIGAEL BEDON VASQUEZ
SIST. CONTRAT.
A SUMA ALZADA
ENTIDAD
MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI
MONTO BASE
S/. 2,812,663.74
MONTO CONTRATO
S/. 2,812,663.74
PLAZO DE EJECUCICON
180
OBRA

AVANCE PROGRAMADO

AVANCE REAL

100%

99.12%
97.00%

100.00%

90%
80%

77.36%
78.40%

70%
60%
50%

48.90%
42.54%

40%
30%
20.60%
18.34%

20%
10%
0%0

10.70%
9.01%

1.00%
0

1.20%

-10%

CUADRO DE VALORIZACIONES DE OBRA


PROGRAMADO
PARCIAL
PARCIAL ACUMUL.
S/.
%
%
0

EJECUTADO
PARCIAL
PARCIAL ACUMUL.
S/.
%
%
0

Feb-12
Mar-12
Apr-12
May-12
Jun-12
Jul-12
Aug-12
(Inc. Adicional de obra)

33,751.96
267,203.06
278,453.71
795,983.84
829,735.80
523,155.46
84,379.91

1.20%
1.20%
9.50%
10.70%
9.90%
20.60%
28.30%
48.90%
29.50%
78.40%
18.60%
97.00%
3.00% 100.00%

28,126.26
225,304.34
262,432.62
680,632.75
979,244.87
612,169.75
24,753.16

TOTAL

2,812,663.74

100.00%

MES
2/2/112

2,812,663.74

1.00%
1.00%
8.01%
9.01%
9.33% 18.34%
24.20% 42.54%
34.82% 77.36%
21.76% 99.12%
0.88% 100.00%

100.00%

ESTADO

-0.20%
-1.69%
-2.26%
-6.36%
-1.04%
2.12%
0.00%

ATRAZADO
ATRAZADO
ATRAZADO
ATRAZADO
ATRAZADO
ADELANTADO
NORMAL

VALORIZACION DE OBRA N 07
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

: MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


: "AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
: CONSORCIO NEON ASOCIADOS
: ING. JULIO VICTOR MARTINEZ QUISPE
: SUMA ALZADA

MONTO REFERENCIAL
MONTO CONTRATADO

: 2,812,663.74
: 2,812,663.74

INC. IGV
INC. IGV
Agosto

ADELANTOS OTORGADOS

FECHA

1.- Adelanto en Efectivo


2.- Adelanto de Materiales
TOTAL DEL ADELANTO OTORGADO

-.-.-

MONTO C/IGV

0.00
562,532.75
562,532.75

MONTO S/IGV

% PRESUPUESTO

0.00
476,722.67
476,722.67

0.00%
20.00%
20.00%
Agosto

VALORIZACION
a) VALORIZACION
1.- Monto Valorizado (sin IGV)
2.- Reintegros (sin IGV)
b) TOTAL VALORIZADO (a.1+b.2)
c) DEDUCCIONES
1.- Amort. Adelanto en Efectivo (sin IGV)
2.- Amort. Adelanto de Materiales (sin IGV)
d) TOTAL DE RETENCIONES (c.1+c.2)
e) TOTAL A PAGAR POR LA VALORIZACION (b-d)
f) I.G.V (18% )
g) TOTAL A RECIBIR POR EL CONTRATISTA (e+f)

N 01

N 02

N 03

N 04

N 05

N 06

N 07

TOTAL

23,835.82
0.00
23,835.82

190,935.89
0.00
190,935.89

222,400.53
0.00
222,400.53

576,807.42
0.00
576,807.42

829,868.53
0.00
829,868.53

518,787.93
0.00
518,787.93

12,241.43
0.00
12,241.43

2,362,636.12
0.00
2,362,636.12

0.00
0.00
0.00
23,835.82
4,290.45
28,126.27

0.00
38,187.18
38,187.18
152,748.71
27,494.77
180,243.48

0.00
44,480.11
44,480.11
177,920.42
32,025.68
209,946.10

0.00
115,361.48
115,361.48
461,445.94
83,060.27
544,506.20

0.00
278,693.90
278,693.90
551,174.62
99,211.43
650,386.05

0.00
0.00
0.00
518,787.92
93,381.83
612,169.75

0.00
0.00
0.00
12,241.43
2,203.46
14,444.89

0.00
476,722.67
476,722.67
1,885,913.43
339,464.42
2,225,377.85

VALORIZACION DE OBRA N 07
RESUMEN DE PAGO A EFECTUAR
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION

: MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI


: "AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEM
: CONSORCIO NEON ASOCIADOS
: ING. JULIO VICTOR MARTINEZ QUISPE
: SUMA ALZADA

MONTO REFERENCIAL
MONTO CONTRATADO

: 2,812,663.74
: 2,812,663.74

INC. IGV
INC. IGV
Agosto

ADELANTOS OTORGADOS

FECHA

1.- Adelanto en Efectivo


2.- Adelanto de Materiales
TOTAL DEL ADELANTO OTORGADO

-.-.-

MONTO C/IGV

0.00
562,532.75
562,532.75

MONTO S/IGV

0.00
562,532.75
562,532.75

% PRESUPUESTO

0.00%
20.00%
20.00%

Agosto

DESCRIPCION

MONTO S/.

RESUMEN DE COSTOS DIRECTOS


F 01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
F 02 SISTEMA DE AGUA POTABLE
F 03 SISTEMA DE ALCANTARILLADO
F 04 SISTEMA PTAR
F 05 ESTUDIO DE IMPACTO AMBIENTAL
F 06 FORTALECIMIENTO DE LA UNIDAD DE GESTION

COSTO DIRECTO TOTAL


GASTOS GENERALES
12.00%
UTILIDADES
10.00%
PRESUPUESTO REFERENCIAL
F.R.= 1.000
VALORIZACION CONTRACTUAL
RESUMEN DE REAJUSTES
F 01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
F 02 SISTEMA DE AGUA POTABLE
F 03 SISTEMA DE ALCANTARILLADO
F 04 SISTEMA PTAR
F 05 ESTUDIO DE IMPACTO AMBIENTAL
F 06 FORTALECIMIENTO DE LA UNIDAD DE GESTION

0.00
-4,219.34
0.00
4,101.33
364.00
9,787.94

10,033.93
1,204.09
1,003.41
12,241.43
12,241.43
S/. 12,241.43
Kr= 1.000
Kr= 1.000
Kr= 1.000
Kr= 1.000
Kr= 1.000
Kr= 1.000

RESUMEN DE DEDUCCION DE REAJUSTES QUE NO CORRESPONDEN


POR ADELANTO DIRECTO
POR ADELANTO PARA MATERIALES
REINTEGRO
VALORIZACION BRUTA (V.B.)
AMORTIZACIONES
Amortizacin Adelantos Directos
Amortizacin de Adelantos de materiales

0.00%
20.00%
TOTAL

VALORIZACION NETA (V.N.)


MONTO A FACTURAR Y PAGAR AL CONTRATISTA
IGV 18%(VN)
TOTAL VN + IGV
TOTAL A RECIBIR POR EL CONTRATISTA

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
S/. 12,241.43
0.00
0.00
0.00
S/. 12,241.43
2,203.46
S/. 14,444.89

S/. 14,444.89