FICHA TECNICA
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
SUMA ALZADA
UBICACION
LUGAR
DISTRITO
PROVINCIA
REGION
PRESUPUESTO
ANTACOLPA
CAURI
LAURICOCHA
HUANUCO
BASE
FECHA
CONTRATADO
F.R.
2,812,663.74
2,812,663.74
1.00000
PLAZO
FECHA INICIO
FECHA TERMINO
PLAZO DE EJECUCION
180
06/02/12
03/08/12
AMPLIACION DE PLAZO
DIAS
30
02/09/12
MAX
OTORGADO
0.00
562,532.75
0.00%
20.00%
FECHA
ADELANTO DIRECTO
ADELANTO MATERIALES
562,532.75
1,125,065.50
-.-.-
MES
ACUMULADO
% ACUM.
VALORIZACION
14,444.89
0.51%
2,802,355.46
99.63%
ADICIONAL DE OBRA
10,308.27
24,753.16
Presupuesto
Item
0
1
2
3
4
5
6
7
8
9
10
11
12
F 01
01
01.01
01.02
01.03
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
Descripcin
Und
VAL N
Metrado
C.U.
Parcial
METRADO
116,599.53
4,868.26
1,044.11
22,929.07
24,696.47
37,873.23
10,500.00
8,162.64
6,525.75
01
VAL N
VAL.
0.00
349
F 04
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
2
2.01
2.02
2.03
3
3.01
3.02
3.03
1
1.01
1.02
1.03
1.04
1.05
1.06
2
2.01
2.02
2.03
2.04
2.05
2.06
3
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
5
5.01
5.02
5.03
5.04
5.06
5.07
5.08
6
6.01
6.02
6.03
6.04
7
7.01
7.02
7.03
7.04
7.05
03
VAL N
VAL.
METRADO
182,295.52
04
VAL N
VAL.
METRADO
472,792.96
0.00
0.00
05
VAL N
VAL.
METRADO
650,871.04
06
VAL N
VAL.
METRADO
378,347.95
VAL N
07
VAL.
0.00
0.00
0.00
0.00
0.00
0.00
7,890.51
8,396.80
0.35
8,643.76
0.00
0.00
0.00
0.00
1.00
37,873.23
0.00
0.00
0.00
24.00
8,162.64
1.00
10,500.00
0.00
8,025.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.55
17.44
0.00
0.00
8.55
17.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8,701.00
1.73
0.00
0.00
0.00
0.00
0.00
0.00
6,525.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.73
0.00
358.05
0.00
0.00
0.00
0.00
9.40
257.75
0.00
0.00
0.00
0.00
10.85
9.40
0.00
0.00
0.00
1.00
1,095.96
0.00
0.00
0.00
0.00
1.00
965.59
0.00
0.00
0.00
0.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
120.60
0.00
9.40
8.55
8.55
0.00
0.00
7.76
8.55
2.51
6.56
0.00
0.00
0.00
0.00
0.58
1.73
0.00
0.00
2.72
23.73
119.80
0.00
0.00
0.00
10.85
9.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
245.37
0.00
19.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.51
111.75
0.00
0.00
0.00
0.00
0.00
6.56
200.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.58
258.00
0.00
0.00
0.00
0.00
0.00
1.73
277.79
0.00
0.00
0.00
2.72
1,264.91
0.00
0.00
0.00
0.00
0.00
23.73
970.08
0.00
0.00
0.00
0.00
0.00
119.80
0.00
10.85
358.05
0.00
0.00
0.00
0.00
0.00
9.40
257.75
627.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1,095.96
0.00
0.00
0.00
0.00
1.00
965.59
0.00
0.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
120.60
0.00
9.40
1.70
1.70
-1.70
-1.70
1.36
1.70
1.70
-1.36
-1.70
-1.70
0.48
7.31
31.41
-0.48
-7.31
-31.41
1.80
4.52
-1.80
-4.52
9.40
1.70
3.47
0.00
0.00
0.00
0.00
-1.70
-3.47
3.50
0.00
0.00
0.00
0.00
-1.70
-3.50
43.00
0.00
0.00
0.00
0.00
-1.36
-43.00
1.70
3.94
0.00
0.00
0.00
0.00
-1.70
-3.94
1.70
52.04
0.00
0.00
0.00
0.00
-1.70
-52.04
0.00
0.00
0.00
0.48
213.52
0.00
-0.48
-213.52
0.00
0.00
0.00
7.31
298.83
0.00
-7.31
-298.83
0.00
31.41
0.00
-31.41
0.00
0.00
164.59
-164.59
0.00
0.00
0.00
1.80
59.40
0.00
-1.80
-59.40
0.00
0.00
0.00
4.52
123.94
0.00
-4.52
-123.94
0.00
0.00
1.00
1.00
1.00
-1.00
-1.00
-1.00
0.00
1.00
84.22
0.00
-1.00
-84.22
0.00
0.00
0.00
1.00
95.81
0.00
-1.00
-95.81
1.00
1.00
1.00
-1.00
-1.00
-1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,168.95
0.00
0.00
0.00
0.00
0.00
2,085.53
2,085.53
2,085.53
0.00
0.00
0.00
0.00
0.00
0.00
1.00
140.59
0.00
-1.00
-140.59
0.00
0.00
0.00
1.00
260.59
0.00
-1.00
-260.59
0.00
0.00
0.00
1.00
193.75
0.00
-1.00
-193.75
0.00
0.00
0.00
1.00
152.42
0.00
-1.00
-152.42
0.00
0.00
2,085.53
4,150.20
0.00
0.00
0.00
0.00
0.00
2,085.53
6,944.81
0.00
0.00
0.00
0.00
0.00
0.00
475.00
8,763.75
0.00
650.00
1,410.50
601.32
0.00
2,085.53
19,791.68
0.00
0.00
0.00
0.00
875.92
33,109.78
0.00
0.00
0.00
0.00
0.00
400.92
7,396.97
0.00
1,304.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
218.98
6,702.98
0.00
0.00
0.00
0.00
0.00
2,085.53
39,604.21
0.00
0.00
0.00
0.00
0.00
1.00
817.91
0.00
0.00
0.00
2,085.53
0.00
0.00
8,029.29
0.00
0.00
0.00
3.70
7.55
0.00
0.00
0.00
0.00
-3.70
-7.55
3.70
7.62
0.00
0.00
0.00
0.00
-3.70
-7.62
136.91
0.00
0.00
0.00
0.00
-4.33
-136.91
3.70
8.58
0.00
0.00
0.00
0.00
-3.70
-8.58
5.41
165.60
0.00
0.00
0.00
0.00
-5.41
-165.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.70
704.52
0.00
0.46
162.96
0.00
1.22
53.77
0.00
1.92
854.07
0.00
0.00
19.39
792.66
0.00
0.00
0.00
0.00
-3.70
-704.52
-0.46
-162.96
-1.22
-53.77
-1.92
-854.07
0.00
-19.39
-792.66
0.00
104.23
546.17
0.00
-104.23
-546.17
0.00
10.61
350.13
0.00
-10.61
-350.13
0.00
0.00
0.00
10.91
299.15
0.00
-10.91
-299.15
0.00
0.00
0.00
1.00
140.59
0.00
-1.00
-140.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
260.59
0.00
-1.00
-260.59
875.92
1,251.32
2,085.53
875.92
218.98
0.00
0.00
0.00
0.00
0.00
2,085.53
1.00
2,085.53
0.00
0.00
0.00
3.70
3.70
-3.70
-3.70
4.33
3.70
5.41
-4.33
-3.70
-5.41
3.70
0.46
1.22
-3.70
-0.46
-1.22
1.92
19.39
104.23
-1.92
-19.39
-104.23
10.61
10.91
-10.61
-10.91
1.00
1.00
1.00
-1.00
-1.00
-1.00
0.00
1.00
301.86
0.00
-1.00
-301.86
0.00
1.00
144.08
0.00
-1.00
-144.08
0.00
0.00
0.00
1.00
132.13
0.00
-1.00
-132.13
1.00
1.00
-1.00
-1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.92
0.00
0.00
0.00
0.00
0.00
1.92
1.92
0.00
0.00
0.86
1.92
1.08
0.00
0.00
0.00
1.92
0.11
0.92
0.00
0.00
0.00
0.95
8.87
61.36
0.00
0.00
0.00
6.32
4.18
0.00
0.00
1.00
1.00
1.00
0.00
0.00
0.00
1.00
1.00
0.00
0.00
1.92
3.96
0.86
27.19
0.00
0.00
0.00
0.00
0.00
1.92
4.45
0.00
0.00
0.00
0.00
0.00
1.08
33.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.92
0.00
0.00
0.00
0.00
0.00
365.59
0.00
0.00
0.00
0.00
0.00
0.11
45.68
0.00
0.00
0.00
0.00
0.00
0.92
40.54
0.00
0.00
0.00
0.00
0.00
0.95
422.59
0.00
0.00
0.00
0.00
0.00
8.87
390.90
0.00
0.00
0.00
0.00
0.00
61.36
321.53
0.00
0.00
0.00
0.00
0.00
6.32
208.56
0.00
0.00
0.00
0.00
0.00
4.18
114.62
0.00
0.00
0.00
0.00
0.00
1.00
140.59
0.00
0.00
0.00
0.00
0.00
1.00
260.59
0.00
0.00
0.00
0.00
0.00
1.00
301.86
0.00
0.00
0.00
0.00
0.00
1.00
280.93
0.00
0.00
0.00
0.00
0.00
1.00
145.03
0.00
0.00
0.00
0.00
0.00
0.00
1.00
94.43
0.00
0.00
0.00
0.00
0.00
1.00
120.63
0.00
1.00
1.00
0.00
0.00
0.00
0.00
53.63
0.00
0.00
0.00
0.00
0.00
4.18
7.50
15.30
7.50
15.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.00
297.00
0.00
22.50
616.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.50
2.00
0.00
0.00
0.00
30.00
384.90
0.00
2.50
63.60
212.43
0.00
241.26
0.00
0.00
0.00
0.00
0.00
1.00
229.24
0.00
0.00
0.00
0.00
0.00
2.00
789.98
0.00
0.00
0.00
0.00
0.00
0.00
1.00
6,646.05
47.90
97.72
0.00
0.00
0.00
0.00
0.00
47.90
98.67
0.00
0.00
0.00
0.00
0.00
57.48
10.85
9.40
0.00
1.70
1.92
0.00
0.00
0.00
0.00
17.44
4.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17.61
2,085.53
0.00
0.00
277.79
8.55
1.36
ACTUAL
1.00
1.00
1.00
1.00
24.00
8,701.00
8.55
8.55
8.55
7.76
7.00
1.00
1.00
0.00
0.00
0.00
0.00
8.55
ANTERIOR
-422.59
0.00
0.34
0.34
0.00
0.35
0.00
0.00
0.00
0.00
F 03
1.04
METRADO
1,044.11
0.00
307
1.03
VAL N
VAL.
0.00
1.00
7,013.38
7,655.91
F 02
SISTEMA DE AGUA POTABLE
688,953.41
01
REHABILITACION DE CAPTACION EXISTENTE - TIPO MANANTIAL (01 UND)
01.01
TRABAJOS PRELIMINARES
01.01.01 LIMPIEZA DE TERRENO MANUAL
m2
8.55
2.04
17.44
0.00
01.01.02 TRAZO Y REPLANTEO
m2
8.55
2.06
17.61
0.00
01.02
FILTROS
01.02.01 FILTRO DE GRAVA
m3
1.73
160.57
277.79
0.00
01.03
REVOQUES Y ENLUCIDOS
01.03.01 TARRAJEO CON IMPERMEABILIZANTES
m2
10.85
33.00
358.05
0.00
01.03.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
9.40
27.42
257.75
0.00
01.04
VARIOS
01.04.01 TUBERIA DE REBOSE Y DESAGUE DE 2" SAL PVC und
1.00 1,095.96
1,095.96
0.00
01.04.02 TUBERIA DE SALIDA DE CAPTACION PVC SAP C-10
undDE 1 1/2" 1.00
965.59
965.59
0.00
01.05
PINTURA
01.05.01 PINTURA LATEX EN MUROS 2 MANOS
m2
9.40
12.83
120.60
0.00
02
CONSTRUCCION DE CAPTACION - TIPO MANANTIAL DE LADERA (01 UND)
02.01
TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO MANUAL
m2
8.55
2.04
17.44
0.00
02.01.02 TRAZO Y REPLANTEO
m2
8.55
2.06
17.61
0.00
02.02
MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION MANUAL
m3
7.76
31.62
245.37
0.00
02.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
8.55
2.32
19.84
0.00
02.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO
m3
2.51
44.52
111.75
0.00
02.02.04 ELIMINACION DE MATERIAL EXCEDENTE
m3
6.56
30.61
200.80
0.00
02.03
FILTROS
02.03.01 CONCRETO F'c= 175 KG/CM2
m3
0.58
444.83
258.00
0.00
02.03.02 FILTRO DE GRAVA
m3
1.73
160.57
277.79
0.00
02.04
OBRAS DE CONCRETO ARMADO
02.04.01 CONCRETO EN MUROS REFORZADOS F'C= 210 m3
KG/CM2
2.72
465.04
1,264.91
0.00
02.04.02 ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
m2
23.73
40.88
970.08
0.00
02.04.03 ACERO FY=4200 KG/CM2
Kg
119.80
5.24
627.75
0.00
02.05
REVOQUES Y ENLUCIDOS
02.05.01 TARRAJEO CON IMPERMEABILIZANTES
m2
10.85
33.00
358.05
0.00
02.05.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
9.40
27.42
257.75
0.00
02.06
VARIOS
02.06.01 TUBERIA DE REBOSE Y DESAGUE DE 2" SAL PVC und
1.00 1,095.96
1,095.96
0.00
02.06.02 TUBERIA DE SALIDA DE CAPTACION PVC SAP C-10
undDE 1 1/2" 1.00
965.59
965.59
0.00
02.07
PINTURA
02.07.01 PINTURA LATEX EN MUROS 2 MANOS
m2
9.40
12.83
120.60
0.00
03
CAJA DE REUNION (01 UND)
03.01
TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL
m2
1.70
2.04
3.47
0.00
03.01.02 TRAZO Y REPLANTEO
m2
1.70
2.06
3.50
0.00
03.02
MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION MANUAL
m3
1.36
31.62
43.00
0.00
03.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
1.70
2.32
3.94
0.00
03.02.03 ELIMINACION DE MATERIAL EXCEDENTE
m3
1.70
30.61
52.04
0.00
03.03
OBRAS DE CONCRETO ARMADO
03.03.01 CONCRETO F'c= 175 KG/CM2
m3
0.48
444.83
213.52
0.00
03.03.02 ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
m2
7.31
40.88
298.83
0.00
03.03.03 ACERO FY=4200 KG/CM2
Kg
31.41
5.24
164.59
0.00
03.04
REVOQUES Y ENLUCIDOS
03.04.01 TARRAJEO CON IMPERMEABILIZANTES
m2
1.80
33.00
59.40
0.00
03.04.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
4.52
27.42
123.94
0.00
03.05
VARIOS
03.05.01 TUBERIA DE INGRESO A C.R. PVC SAP C-10 DE 1und
1/2"
1.00
140.59
140.59
0.00
03.05.02 TUBERIA DE SALIDA DE C.R. PVC SAP C-10 DE 1und
1/2"
1.00
260.59
260.59
0.00
03.05.03 TUBERIA DE LIMPIEZA Y DESAGUE DE 2" SAL PVCund
1.00
193.75
193.75
0.00
03.06
CARPINTERIA METALICA 332.45
03.06.01 TAPA METALICA 0.73X0.73X1/8"
und
1.00
152.42
152.42
0.00
03.06.02 TAPA METALICA 0.45X0.36X1/8"
und
1.00
84.22
84.22
0.00
03.06.03 TAPA METALICA 0.46X0.50X1/8"
und
1.00
95.81
95.81
0.00
03.07
PINTURA
03.07.01 PINTURA LATEX EN MUROS 2 MANOS
m2
4.52
12.83
57.99
0.00
04
LINEA DE CONDUCCION
04.01
TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DE LINEA DE CONDUCCION
ml
2,085.53
1.04
2,168.95
0.00
04.01.02 TRAZO, NIVELACION Y REPLANTEO
ml
2,085.53
1.99
4,150.20
0.00
04.01.03 TRAZO, NIVELACION Y REPLANTEO DURANTE LA
mlEJECUCION
2,085.53
DE LA OBRA 3.33
6,944.81
0.00
04.02
MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION DE ZANJA EN TERRENO NORMALm3
COMPACTO
875.92
18.45
16,160.72
0.00
04.02.02 REFINE, NIVELACION DE ZANJA Y CONFORMACION
m2 DE FONDOS
1,251.32
2.17
2,715.36
0.00
04.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL
ml PROPIO
2,085.53
ZARANDEADO
9.49
19,791.68
0.00
04.02.04 RELLENO COMPACTADO C/PLANCHA VIBRAT. HASTA
m3 H=3.00
875.92
M CON MAT/PROPIO
37.80
ZARANDEADO
33,109.78 EN CAPAS DE 20CM 0.00
04.02.05 ELIMINACION DE MATERIAL EXCEDENTE
m3
218.98
30.61
6,702.98
0.00
04.03
TUBERIAS
04.03.01 TUBERIA DE PVC ISO C-10 DE 1 1/2"
ml
2,085.53
18.99
39,604.21
0.00
04.03.02 SUMINISTRO E INSTALACION DE ACCESORIOS PVC
glb RED CONDUCCION
1.00
817.91
817.91
0.00
04.03.03 PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8"ml
A ZANJA2,085.53
TAPADA
3.85
8,029.29
0.00
05
TANQUILLA ROMPERCARGA (01 UND)
05.01
TRABAJOS PRELIMINARES
05.01.01 LIMPIEZA DE TERRENO MANUAL
m2
3.70
2.04
7.55
0.00
05.01.02 TRAZO Y REPLANTEO
m2
3.70
2.06
7.62
0.00
05.02
MOVIMIENTO DE TIERRAS
05.02.01 EXCAVACION MANUAL
m3
4.33
31.62
136.91
0.00
05.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
3.70
2.32
8.58
0.00
05.02.03 ELIMINACION DE MATERIAL EXCEDENTE
m3
5.41
30.61
165.60
0.00
05.03
OBRAS DE CONCRETO SIMPLE
05.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2
3.70
190.41
704.52
0.00
05.03.02 DADOS DE CONCRETO F'c=140 Kg/cm2
m3
0.46
354.25
162.96
0.00
05.03.03 ENCOFRADO Y DESENCOFRADO NORMAL
m2
1.22
44.07
53.77
0.00
05.04
OBRAS DE CONCRETO ARMADO
05.04.01 CONCRETO F'c= 175 KG/CM2
m3
1.92
444.83
854.07
0.00
05.04.02 ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
m2
19.39
40.88
792.66
0.00
05.04.03 ACERO FY=4200 KG/CM2
kg
104.23
5.24
546.17
0.00
05.05
REVOQUES Y ENLUCIDOS
05.05.01 TARRAJEO CON IMPERMEABILIZANTES
m2
10.61
33.00
350.13
0.00
05.05.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
10.91
27.42
299.15
0.00
05.06
TUBERIAS Y ACCESORIOS
05.06.01 TUBERIA DE INGRESO A C.R. PVC SAP C-10 DE 1und
1/2"
1.00
140.59
140.59
0.00
05.06.02 TUBERIA DE SALIDA DE C.R. PVC SAP C-10 DE 1und
1/2"
1.00
260.59
260.59
0.00
05.06.03 TUBERIA DE REBOSE Y LIMPIA DESAGUE DE 2" SAL
undPVC
1.00
301.86
301.86
0.00
05.07
CARPINTERIA METALICA
05.07.01 TAPA METALICA 0.65X0.75X3/16"
und
1.00
144.08
144.08
0.00
05.07.02 TAPA METALICA 0.65X0.65X3/16"
und
1.00
132.13
132.13
0.00
05.08
PINTURA
05.08.01 PINTURA LATEX EN MUROS 2 MANOS
m2
10.91
12.83
139.98
0.00
06
CAMARA ROMPE PRESION (01 UND)
06.01
TRABAJOS PRELIMINARES
06.01.01 LIMPIEZA DE TERRENO MANUAL
m2
1.92
2.04
3.92
0.00
06.01.02 TRAZO Y REPLANTEO
m2
1.92
2.06
3.96
0.00
06.02
MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION MANUAL
m3
0.86
31.62
27.19
0.00
06.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
1.92
2.32
4.45
0.00
06.02.03 ELIMINACION DE MATERIAL EXCEDENTE
m3
1.08
30.61
33.06
0.00
06.03
OBRAS DE CONCRETO SIMPLE
06.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2
1.92
190.41
365.59
0.00
06.03.02 CONCRETO F'C=140 KG/CM2
m3
0.11
415.25
45.68
0.00
06.03.03 ENCOFRADO Y DESENCOFRADO NORMAL
m2
0.92
44.07
40.54
0.00
06.04
OBRAS DE CONCRETO ARMADO
06.04.01 CONCRETO F'c= 175 KG/CM2
m3
0.95
444.83
422.59
0.00
06.04.02 ENCOFRADO Y DESENCOFRADO NORMAL
m2
8.87
44.07
390.90
0.00
06.04.03 ACERO FY=4200 KG/CM2
kg
61.36
5.24
321.53
0.00
06.05
REVOQUES Y ENLUCIDOS
06.05.01 TARRAJEO CON IMPERMEABILIZANTES
m2
6.32
33.00
208.56
0.00
06.05.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
4.18
27.42
114.62
0.00
06.06
SUMINISTRO E INSTALACION DE TUBERIAS
06.06.01 TUBERIA DE INGRESO A C.R. PVC SAP C-10 DE 1und
1/2"
1.00
140.59
140.59
0.00
06.06.02 TUBERIA DE SALIDA DE C.R. PVC SAP C-10 DE 1und
1/2"
1.00
260.59
260.59
0.00
06.06.03 TUBERIA DE REBOSE Y LIMPIA DESAGUE DE 2" SAL
undPVC
1.00
301.86
301.86
0.00
06.07
SUMINISTRO E INSTALACION DE VALVULAS
06.07.01 VALVULA COMPUERTA HD C/ELASTOMERO 2"
und
1.00
280.93
280.93
0.00
06.07.02 VALVULA REDUCTORA DE PRESION 2"
und
1.00
145.03
145.03
0.00
06.08
CARPINTERIA METALICA
06.08.01 TAPA METALICA 0.40X0.45X1/8"
und
1.00
94.43
94.43
0.00
06.08.02 TAPA METALICA 0.60X0.60X1/8"
und
1.00
120.63
120.63
0.00
06.09
PINTURA
06.09.01 PINTURA LATEX EN MUROS 2 MANOS
m2
4.18
12.83
53.63
0.00
07
REHABILITACION DE RESERVORIO EXISTENTE
07.01
TRABAJOS PRELIMINARES
07.01.01 LIMPIEZA DE TERRENO MANUAL
m2
7.50
2.04
15.30
0.00
07.01.02 TRAZO Y REPLANTEO
m2
7.50
2.06
15.45
0.00
07.02
REVOQUES Y ENLUCIDOS
07.02.01 TARRAJEO CON IMPERMEABILIZANTES
m2
9.00
33.00
297.00
0.00
07.02.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
22.50
27.42
616.95
0.00
07.03
PINTURA
07.03.01 PINTURA LATEX EN MUROS 2 MANOS
m2
30.00
12.83
384.90
0.00
07.03.02 PINTURA EN ESTRUCTURAS METALICAS
ml
2.50
25.44
63.60
0.00
07.04
CARPINTERIA METALICA
07.04.01 ESCALERA GATO, TUB F.GVZDO. C/PARANTES DEml1 1/2" SEGUN
2.50
DISEO 84.97
212.43
0.00
07.04.02 TAPA METALICA 0.60X0.60X1/8"
und
2.00
120.63
241.26
0.00
07.05
INSTALACIONES SANITARIAS
07.05.01 TUBERIA DE REBOSE Y DESAGUE DE 2 1/2" SAL PVC
und
1.00
229.24
229.24
0.00
07.05.02 TUBERIA DE SALIDA DE PVC SAP C-10 DE 1 1/2"u nd
2.00
394.99
789.98
0.00
07.05.03 ACCESORIOS DE RESERVORIO
glb
1.00 6,646.05
6,646.05
0.00
08
RESERVORIO CIRCULAR (35 M3)
08.01
TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL
m2
47.90
2.04
97.72
0.00
08.01.02 TRAZO Y REPLANTEO
m2
47.90
2.06
98.67
0.00
08.02
MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION DE CIMIENTOS EN TERENO COMPACTO
m3
57.48
55.34
3,180.94
0.00
08.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
47.90
2.32
111.13
0.00
08.02.03 ELIMINACION MATERIAL EXCEDENTE A MANO m3
D<200M 74.85
30.61
2,291.16
0.00
08.03
OBRAS DE CONCRETO SIMPLE
08.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2
47.90
190.41
9,120.64
0.00
08.04
OBRAS DE CONCRETO ARMADO
08.04.01 LOSA
08.04.01.01CONCRETO F'C=210 KG/CM2 EN LOSA
m3
16.33
361.78
5,907.87
0.00
08.04.01.02ENCOFRADO Y DESENCOFRADO DE LOSA
m2
25.00
48.43
1,210.75
0.00
08.04.01.03ACERO FY=4200 KG/CM2
kg
235.99
5.24
1,236.59
0.00
08.04.02 MUROS REFORZADOS
08.04.02.01CONCRETO F'C=210 KG/CM2 EN MUROS REFORZADO
m3
19.79
452.15
8,948.05
0.00
08.04.02.02ENCOFRADO Y DESENCOFRADO CURVO EN PLACAS
m2
120.44
47.03
5,664.29
0.00
08.04.02.03ACERO FY=4200 KG/CM2
kg
1,258.68
5.24
6,595.48
0.00
08.04.03 CUPULA ESFERICA
08.04.03.01CONCRETO F'C=210 KG/CM2 EN CUPULAS
m3
6.06
480.64
2,912.68
0.00
08.04.03.02ENCOFRADO Y DESENCOFRADO CURVO EN CUPULA
m2
42.32
57.30
2,424.94
0.00
08.04.03.03ACERO FY=4200 KG/CM2
kg
267.91
5.24
1,403.85
0.00
08.04.04 COLUMNAS
08.04.04.01CONCRETO F'C=210 KG/CM2 EN COLUMNAS m3
0.78
461.09
359.65
0.00
08.04.04.02ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
m2
12.50
43.90
548.75
0.00
08.04.04.03ACERO FY=4200 KG/CM2
kg
142.68
5.24
747.64
0.00
08.04.05 VIGAS
08.04.05.01CONCRETO F'C=210 KG/CM2 EN VIGAS COLLARIN
m3
2.10
361.78
759.74
0.00
08.04.05.02ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
m2
15.10
53.50
807.85
0.00
08.04.05.03ACERO FY=4200 KG/CM2
kg
224.45
5.24
1,176.12
0.00
8.05
REVOQUES Y ENLUCIDOS
08.05.01 TARRAJEO CON IMPERMEABILIZANTES
m2
131.74
33.00
4,347.42
0.00
08.05.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
136.84
27.42
3,752.15
0.00
8.06
PISOS Y VEREDAS
08.06.01 CONCRETO F'C=140 KG/CM2 EN VEREDAS
m3
13.56
320.53
4,346.39
0.00
08.06.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2
2.97
46.42
137.87
0.00
8.07
PINTURA
08.07.01 PINTURA LATEX EN MUROS 2 MANOS
m2
136.84
12.83
1,755.66
0.00
08.07.02 PINTURA EN ESTRUCTURAS METALICAS
m
9.60
25.44
244.22
0.00
8.08
CARPINTERIA METALICA
08.08.01 ESCALERA GATO, TUB F.GVZDO. C/PARANTES DEm1 1/2" SEGUN
9.60
DISEO 84.97
815.71
0.00
08.08.02 TAPA METALICA 0.60X0.60X1/8"
u
2.00
120.63
241.26
0.00
8.09
INSTALACIONES SANITARIAS
08.09.01 TUBERIA DE REBOSE Y DESAGUE DE 2 1/2" SAL PVC
u
1.00
229.24
229.24
0.00
08.09.02 TUBERIA DE SALIDA DE PVC SAP C-10 DE 1 1/2"u
1.00
394.99
394.99
0.00
08.09.03 ACCESORIOS DE RESERVORIO
glb
1.00 6,646.05
6,646.05
0.00
9 LINEA DE ADUCCION
9.01 TRABAJOS PRELIMINARES
09.01.01 LIMPIEZA DE LINEA DE ADUCCION
m
1,574.63
1.04
1,637.62
0.00
09.01.02 TRAZO, NIVELACION Y REPLANTEO
m
1,574.63
1.99
3,133.51
0.00
09.01.03 TRAZO, NIVELACION Y REPLANTEO DURANTE LA
m EJECUCION
1,574.63
DE LA OBRA 3.33
5,243.52
0.00
9.02 MOVIMIENTO DE TIERRAS
09.02.01 EXCAVACION DE ZANJA EN TERRENO NORMALm3
COMPACTO
661.34
18.45
12,201.72
0.00
09.02.02 REFINE, NIVELACION DE ZANJA Y CONFORMACION
m2 DE FONDOS
944.78
2.17
2,050.17
0.00
09.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL
m
PROPIO
1,574.63
ZARANDEADO
9.49
14,943.24
0.00
09.02.04 RELLENO COMPACTADO C/PLNACHA VIBRAT. HASTA
m3 H=3.00M
661.34
CON MATERIAL
37.80 PROPIO
24,998.65
ZARANDEADO EN CAPAS DE 20CM
0.00
09.02.05 ELIMINACION DE MATERIAL EXCEDENTE
m3
165.34
30.61
5,061.06
0.00
9.03 TUBERIAS
09.03.01 TUBERIA DE PVC ISO C-10 DE 1 1/2"
m
1,574.63
18.99
29,902.22
0.00
09.03.02 SUMINISTRO E INSTALACION DE ACCESORIOS PVC
glb RED ADUCCION
1.00
642.71
642.71
0.00
09.03.03 PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8"mA ZANJA1,574.63
TAPADA
3.85
6,062.33
0.00
9.04 PASE AEREO
09.04.01 CONCRETO F'c= 175 KG/CM2
m3
0.35
444.83
155.69
0.00
09.04.02 TUBO GALVANIZADO DE 2"
m
30.00
15.00
450.00
0.00
09.04.03 CODO GALVANIZADO DE 2"
u
4.00
40.00
160.00
0.00
09.04.04 CABLE DE ACERO 3/4"
m
30.00
15.00
450.00
0.00
09.04.05 GANCHOS DE FIERRO DE 1/2"
u
6.00
25.00
150.00
0.00
10 RED DE DISTRIBUCION
10.01 TRABAJOS PRELIMINARES
10.01.01 LIMPIEZA DE RED DE DISTRIBUCION
m
4,093.06
1.04
4,256.78
0.00
10.01.02 TRAZO, NIVELACION Y REPLANTEO
m
4,093.06
1.99
8,145.19
0.00
10.01.03 TRAZO, NIVELACION Y REPLANTEO DURANTE LA
m EJECUCION
4,093.06
DE LA OBRA 3.33
13,629.89
0.00
10.02 MOVIMIENTO DE TIERRAS
10.02.01 EXCAVACION DE ZANJA EN TERRENO NORMALm3
COMPACTO
1,719.09
18.45
31,717.21
0.00
10.02.02 REFINE, NIVELACION DE ZANJA Y CONFORMACION
m2 DE FONDOS
2,455.84
2.17
5,329.17
0.00
10.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL
m
PROPIO
4,093.06
ZARANDEADO
9.49
38,843.14
0.00
10.02.04 RELLENO CONPACTADO C/PLANCHA VIBRAT. HASTA
m3 H=3.00
1,719.09
M CON MAT/PROPIO
37.80
ZARANDEADO
64,981.60 EN CAPAS DE 20CM 0.00
10.02.05 ELIMINACION DE MATERIAL EXCEDENTE
m3
429.77
30.61
13,155.26
0.00
10.03 TUBERIAS
10.03.01 TUBERIA DE PVC ISO C-10 DE 1 1/2"
m
1,228.23
18.99
23,324.09
0.00
10.03.02 TUBERIA DE PVC ISO C-10 DE 1"
m
2,864.83
13.74
39,362.76
0.00
10.03.03 SUMINISTRO E INSTALACION DE ACCESORIOS PVC
glb RED DE DISTRIBUCION
1.00
834.78
834.78
0.00
10.03.04 PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8"mA ZANJA4,093.06
TAPADA
3.85
15,758.28
0.00
11 CAJA DE VALVULA DE CONTROL
11.01 TRABAJOS PRELIMINARES
11.01.01 LIMPIEZA DE TERRENO MANUAL
m2
7.20
2.04
14.69
0.00
11.01.02 TRAZO Y REPLANTEO
m2
7.20
2.06
14.83
0.00
11.02 MOVIMIENTO DE TIERRAS
11.02.01 EXCAVACION MANUAL
m3
5.76
31.62
182.13
0.00
11.02.02 ELIMINACION DE MATERIAL EXCEDENTE
m3
7.20
30.61
220.39
0.00
11.03 OBRAS DE CONCRETO SIMPLE
11.03.01 CONCRETO F'c= 175 KG/CM2
m3
2.45
444.83
1,089.83
0.00
11.03.02 ENCOFRADO Y DESENCOFRADO NORMAL
m2
39.05
44.07
1,720.93
0.00
11.04 REVOQUES Y ENLUCIDOS
11.04.01 TARRAJEO CON IMPERMEABILIZANTES
m2
19.85
33.00
655.05
0.00
11.05 CARPINTERIA METALICA
11.05.01 TAPA METALICA 0.40X0.45X1/8"
u
10.00
94.43
944.30
0.00
11.06 PINTURA
11.06.01 PINTURA LATEX EN MUROS 2 MANOS
m2
19.85
12.83
254.68
0.00
11.07 SUMINISTRO E INSTALACION DE VALVULAS
11.07.01 VALVULA ESFERICA DE BRONCE 1"
u
7.00
115.53
808.71
0.00
11.07.02 VALVULA ESFERICA DE BRONCE 1 1/2"
u
3.00
128.53
385.59
0.00
12 VALVULA DE PURGA
12.01 TRABAJOS PRELIMINARES
12.01.01 LIMPIEZA DE TERRENO MANUAL
m2
3.84
2.04
7.83
0.00
12.01.02 TRAZO Y REPLANTEO
m2
3.84
2.06
7.91
0.00
12.02 MOVIMIENTO DE TIERRAS
12.02.01 EXCAVACION MANUAL
m3
5.76
31.62
182.13
0.00
12.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO
m3
5.28
44.52
235.07
0.00
12.02.03 ELIMINACION DE MATERIAL EXCEDENTE
m3
0.60
30.61
18.37
0.00
12.03 OBRAS DE CONCRETO SIMPLE
12.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2
2.56
190.41
487.45
0.00
12.03.02 CONCRETO F'c= 175 KG/CM2
m3
0.26
444.83
115.66
0.00
12.03.03 ENCOFRADO Y DESENCOFRADO NORMAL
m2
3.14
44.07
138.38
0.00
12.04 OBRAS DE CONCRETO ARMADO
12.04.01 CONCRETO F'C=210 KG/CM2
m3
1.48
482.32
713.83
0.00
12.04.02 ENCOFRADO Y DESENCOFRADO NORMAL
m2
17.92
44.07
789.73
0.00
12.04.03 ACERO FY=4200 KG/CM2
kg
83.29
5.24
436.44
0.00
12.05 SUMINISTRO E INSTALACION DE TUBERIAS
12.05.01 TUBERIA PVC SAP ISO 4422 DN 12.7 MM C-10m
6.00
15.95
95.70
0.00
12.05.02 VALVULA DE PURGA 19.10mm (3/4")
u
2.00
87.76
175.52
0.00
12.05.03 ABRAZADERA PVC D=19.1 MM C/SALIDA A 12.70
u MM INC. ACCESORIOS
2.00
902.76
1,805.52
0.00
13 CONEXIONES DOMICILIARIAS DE AGUA POTABLE
13.01 TRABAJOS PRELIMINARES
13.01.01 TRAZO, NIVELACION Y REPLANTEO
m
668.00
1.99
1,329.32
0.00
13.01.02 TRAZO, NIVELACION Y REPLANTEO DURANTE LA
m EJECUCION
668.00
DE LA OBRA 3.33
2,224.44
0.00
13.02 MOVIMIENTO DE TIERRAS
13.02.01 EXCAVACION DE ZANJA HASTA 0.80 M, TERRENO
m3 NORMAL
280.56
18.45
5,176.33
0.00
13.02.02 REFINE, NIVELACION DE ZANJA Y CONFORMACION
m2 DE FONDOS
400.80
2.17
869.74
0.00
13.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL
m
PROPIO
668.00
ZARANDEADO
11.17
7,461.56
0.00
13.02.04 RELLENO CON MATERIAL PROPIO SELECCIONADO
m3
280.56
44.52
12,490.53
0.00
13.03 SUMINISTRO E INSTALACION DE TUBERIAS
13.03.01 TUBERIA DE PVC ISO C-10 DE 1/2"
m
668.00
8.49
5,671.32
0.00
13.03.02 PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8"mA ZANJA TAPADA
668.00
3.85
2,571.80
0.00
13.04 SUMINISTRO E INSTALACION DE ACCESORIOS
13.04.01 SUMINISTRO E INSTALACION DE ACCESORIOS RED
glb SECUNDARIA
1.0001 1,453.00
1,453.00
0.00
13.05 CONEXIONES DOMICILIARIAS
13.05.01 CONEXIONES DOMICILIARIAS P TUB MATRIZ DEu 1 1/2" A 105.00
1/2" INC ACCESORIOS
138.70
14,563.50
0.00
13.05.02 CONEXIONES DOMICILIARIAS P TUB MATRIZ DEu 1" A 1/2" INC.
62.00ACCESORIOS
135.10
8,376.20
0.00
1
1.01
1.01.01
1.01.02
1.02
02
156,504.83
4,868.26
0.31
0.31
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
METRADO
19,537.55
1.00
3,180.94
0.00
0.00
0.00
0.00
0.00
7.50
7.50
0.00
0.00
4.18
0.00
0.00
9.00
22.50
0.00
0.00
0.00
0.00
30.00
2.50
2.50
2.00
0.00
0.00
1.00
2.00
1.00
0.00
0.00
0.00
47.90
47.90
0.00
0.00
57.48
47.90
74.85
0.00
0.00
0.00
47.90
111.13
0.00
0.00
0.00
0.00
0.00
74.85
2,291.16
0.00
0.00
0.00
0.00
0.00
9,120.64
0.00
0.00
0.00
0.00
47.90
0.00
0.00
16.33
25.00
235.99
0.00
0.00
0.00
19.79
120.44
1,258.68
0.00
0.00
0.00
6.06
42.32
267.91
0.00
0.00
0.00
0.78
12.50
142.68
0.00
0.00
0.00
0.00
0.00
47.90
16.33
0.00
0.00
0.00
25.00
1,210.75
0.00
0.00
0.00
0.00
235.99
1,236.59
0.00
0.00
0.00
0.00
0.00
0.00
19.79
8,948.05
0.00
0.00
0.00
0.00
0.00
120.44
5,664.29
0.00
0.00
0.00
0.00
0.00
1,258.68
6,595.48
0.00
0.00
0.00
0.00
0.00
0.00
6.06
2,912.68
0.00
0.00
0.00
0.00
0.00
42.32
2,424.94
0.00
0.00
0.00
267.91
1,403.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.78
359.65
0.00
12.50
0.00
0.00
142.68
747.64
0.00
0.00
0.00
0.00
0.00
2.10
759.74
0.00
0.00
0.00
548.75
0.00
0.00
0.00
0.00
0.00
15.10
807.85
0.00
0.00
0.00
0.00
0.00
224.45
1,176.12
0.00
0.00
0.00
0.00
0.00
0.00
131.74
4,347.42
0.00
0.00
0.00
0.00
0.00
136.84
3,752.15
0.00
0.00
0.00
1,574.63
5,907.87
0.00
0.00
0.00
13.56
4,346.39
0.00
0.00
0.00
2.97
137.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
136.84
1,755.66
0.00
0.00
9.60
244.22
815.71
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
241.26
0.00
0.00
0.00
0.00
0.00
1.00
229.24
0.00
0.00
0.00
0.00
0.00
1.00
394.99
0.00
0.00
0.00
0.00
0.00
1.00
6,646.05
0.00
0.00
1,637.62
0.00
0.00
0.00
0.00
0.00
1,574.63
3,133.51
0.00
0.00
0.00
0.00
0.00
1,574.63
5,243.52
0.00
0.00
0.00
0.00
0.00
0.00
320.50
5,913.23
340.84
6,288.50
0.00
0.00
0.00
0.00
450.60
977.80
494.18
1,072.37
0.00
0.00
0.00
0.00
1,574.63
14,943.24
661.34
24,998.65
0.00
0.00
0.00
0.00
0.00
165.34
5,061.06
0.00
1,574.63
29,902.22
0.00
0.00
1.00
642.71
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,574.63
0.00
0.00
0.00
0.00
0.00
6,062.33
0.00
0.00
0.00
0.00
0.00
0.35
155.69
0.00
0.00
0.00
0.00
0.00
30.00
450.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
0.00
0.00
30.00
450.00
0.00
0.00
0.00
0.00
6.00
150.00
160.00
0.00
0.00
0.00
0.00
0.00
4,093.06
4,256.78
0.00
0.00
0.00
0.00
0.00
4,093.06
8,145.19
0.00
0.00
0.00
0.00
0.00
4,093.06
13,629.89
0.00
0.00
0.00
0.00
0.00
820.00
15,129.00
899.09
0.00
0.00
0.00
16,588.21
0.00
0.00
0.00
1,040.00
2,256.80
1,415.84
0.00
2,140.00
20,308.60
1,953.06
18,534.54
820.00
30,996.00
899.09
33,985.60
0.00
251.97
0.00
0.00
0.00
0.00
3,072.37
7,712.80
0.00
0.00
0.00
177.80
0.00
0.00
0.00
5,442.46
0.00
0.00
0.00
620.00
11,773.80
325.00
6,171.75
283.23
5,378.54
0.00
0.00
0.00
1,140.00
15,663.60
880.00
12,091.20
844.83
11,607.96
0.00
1.00
834.78
0.00
0.00
4,093.06
15,758.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.20
0.00
0.00
0.00
0.00
7.20
14.69
0.00
14.83
0.00
0.00
0.00
0.00
0.00
5.76
182.13
0.00
0.00
0.00
0.00
0.00
7.20
220.39
0.00
0.00
0.00
0.00
0.00
2.45
1,089.83
0.00
0.00
0.00
0.00
0.00
39.05
1,720.93
0.00
2.10
15.10
224.45
131.74
136.84
0.00
0.00
0.00
0.00
0.00
13.56
2.97
0.00
0.00
0.00
0.00
136.84
9.60
9.60
2.00
0.00
0.00
1.00
1.00
1.00
0.00
0.00
0.00
1,574.63
1,574.63
1,574.63
0.00
0.00
0.00
661.34
944.78
1,574.63
661.34
165.34
0.00
0.00
0.00
0.00
0.00
1,574.63
1.00
1,574.63
0.00
0.00
0.00
0.35
30.00
4.00
30.00
6.00
0.00
0.00
0.00
0.00
0.00
4,093.06
4,093.06
4,093.06
0.00
0.00
0.00
1,719.09
2,455.84
4,093.06
1,719.09
429.77
0.00
0.00
0.00
0.00
0.00
1,228.23
2,864.83
1.00
4,093.06
0.00
0.00
0.00
0.00
7.20
7.20
0.00
0.00
5.76
7.20
0.00
0.00
2.45
39.05
0.00
0.00
0.00
0.00
0.00
0.00
19.85
655.05
0.00
19.85
0.00
0.00
0.00
0.00
0.00
10.00
944.30
0.00
10.00
0.00
0.00
0.00
0.00
0.00
19.85
254.68
0.00
19.85
0.00
0.00
0.00
0.00
0.00
7.00
808.71
0.00
0.00
0.00
0.00
0.00
3.00
385.59
0.00
7.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
3.84
7.83
0.00
0.00
0.00
0.00
0.00
3.84
7.91
0.00
0.00
0.00
0.00
0.00
5.76
182.13
0.00
0.00
0.00
0.00
0.00
5.28
235.07
0.00
0.00
0.00
0.00
0.00
0.60
18.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.56
487.45
0.00
0.26
115.66
0.00
3.14
138.38
0.00
1.48
713.83
0.00
0.00
0.00
0.00
0.00
17.92
789.73
0.00
0.00
0.00
0.00
0.00
83.29
436.44
0.00
0.00
0.00
0.00
0.00
6.00
95.70
0.00
0.00
0.00
0.00
0.00
2.00
175.52
0.00
0.00
0.00
0.00
0.00
2.00
1,805.52
0.00
0.00
0.00
0.00
668.00
1,329.32
0.00
0.00
0.00
0.00
0.00
668.00
2,224.44
0.00
0.00
0.00
0.00
0.00
280.56
5,176.33
0.00
0.00
0.00
0.00
0.00
400.80
869.74
0.00
0.00
0.00
0.00
0.00
668.00
7,461.56
0.00
0.00
0.00
0.00
0.00
280.56
12,490.53
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.84
3.84
0.00
0.00
5.76
5.28
0.60
0.00
0.00
0.00
2.56
0.26
3.14
0.00
0.00
0.00
1.48
17.92
83.29
0.00
0.00
0.00
6.00
2.00
2.00
0.00
0.00
0.00
668.00
668.00
0.00
0.00
280.56
400.80
668.00
280.56
0.00
0.00
0.00
0.00
668.00
668.00
0.00
0.00
0.00
668.00
5,671.32
0.00
668.00
2,571.80
0.00
0.00
0.00
1.00
1,453.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
105.00
14,563.50
0.00
0.00
0.00
0.00
0.00
62.00
8,376.20
0.00
105.00
62.00
0.00
0.00
4,350.50
4,350.50
0.00
0.00
3,132.35
246.45
172.50
2,610.30
4,350.50
2,479.79
815.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
659.32
937.32
2,753.86
0.00
0.00
0.00
4,350.50
10.00
0.00
0.00
110.55
110.55
0.00
0.00
178.89
223.61
0.00
0.00
15.00
40.00
0.00
0.00
668.00
668.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
760,879.07
SISTEMA DE ALCANTARILLADO
RED DE ALCANTARILLADO
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO
m
4,350.50
1.99
8,657.50
TRAZO, NIVELACION Y REPLANTEO DURANTE LA
m EJECUCION
4,350.50
DE LA OBRA 3.33
14,487.17
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA EN TERRENO NORMALm3
COMPACTO
3,132.35
41.68
130,556.35
CORTE DE PAVIMENTO RIGIDO C/EQUIPO
m
246.45
7.25
1,786.76
REPOSICION DE PAVIMENTO DE CONCRETO F'C=210
m2
KG/CM2,
172.50
LOSA E=10"
148.26
25,574.85
REFINE, NIVELACION DE ZANJA Y CONFORMACION
m2 DE FONDOS
2,610.30
2.17
5,664.35
PREPARACION DE CAMA DE APOYO CON MATERIAL
m
PROPIO
4,350.50
ZARANDEADO
11.17
48,595.09
RELLENO COMPACTADO C/PLANCHA VIBRAT. HASTA
m3 H=3.00
2,479.79
M CON 37.80
93,736.06
ELIMINACION DE MATERIAL EXCEDENTE
m3
815.72
30.61
24,969.19
SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 110MM
m
659.32
34.07
22,463.03
TUBERIA PVC ALCANT U.F. ISO 4435,S-25 160MM
m
937.32
41.35
38,758.18
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM
m
2,753.86
47.43
130,615.58
VARIOS
PRUEBA HIDRAULICA - ESCORRENTIA DE TUB. AmZANJA ABIERTA
4,350.50
0.84
3,654.42
PRUEBA DE COMPACTACION DE SUELOS (PROCTOR
u
MOD. -10.00
DENSIDAD DE
285.74
2,857.40
BUZONES
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
110.55
2.04
225.52
TRAZO Y REPLANTEO
m2
110.55
2.06
227.73
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
m3
178.89
31.62
5,656.50
ELIMINACION DE MATERIAL EXCEDENTE
m3
223.61
30.61
6,844.70
CONSTRUCCION DE BUZONES
BUZON DE CONCRETO TIPO 1, h= 1.50 m
u
15.00 1,271.79
19,076.85
BUZON DE CONCRETO TIPO 2, h= 1.50 m a 3.00
u M.
40.00 1,522.80
60,912.00
CONEXIONES DOMICILIARIAS DE ALCANTARILLADO
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
668.00
2.04
1,362.72
TRAZO, NIVELACION Y REPLANTEO
m
668.00
1.99
1,329.32
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
m3
480.96
31.62
15,207.96
REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
400.80
2.32
929.86
PREPARACION DE CAMA DE APOYO CON MATERIAL
m
PROPIO
668.00
ZARANDEADO
11.17
7,461.56
RELLENO COMPACTADO C/PLANCHA VIBRAT. HASTA
m3 H=3.00
380.76
M CON MAT/PROPIO
37.80
ZARANDEADO
14,392.73 EN CAPAS DE 20CM
ELIMINACION DE MATERIAL EXCEDENTE
m3
125.25
30.61
3,833.90
CONEXIONES DOMICILIARIAS
CONEXIONES DOMICILIARIAS 4"X6"
u
167.00
425.40
71,041.80
0.00
4,350.50
8,657.50
0.00
0.00
0.00
0.00
0.00
0.00
4,350.50
14,487.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
542.50
1,045.00
0.00
0.00
0.00
22,611.40
0.00
0.00
43,555.60
745.00
31,051.60
0.00
246.45
1,786.76
0.00
0.00
0.00
0.00
1,350.00
799.85
172.50
33,337.75
0.00
0.00
0.00
25,574.85
0.00
2,929.50
1,260.30
0.00
0.00
0.00
1,120.00
12,510.40
1,980.00
22,116.60
1,250.50
13,968.09
0.00
0.00
0.00
0.00
520.00
19,656.00
1,450.00
54,810.00
509.79
19,270.06
2,734.85
0.00
0.00
0.00
0.00
0.00
0.00
815.72
24,969.19
0.00
0.00
0.00
0.00
0.00
0.00
659.32
22,463.03
0.00
0.00
0.00
0.00
0.00
0.00
937.32
38,758.18
0.00
0.00
0.00
0.00
2,156.00
102,259.08
597.86
0.00
0.00
0.00
0.00
28,356.50
0.00
0.00
0.00
0.00
0.00
4,350.50
3,654.42
0.00
0.00
0.00
0.00
0.00
10.00
2,857.40
0.00
0.00
110.55
225.52
0.00
0.00
0.00
0.00
0.00
0.00
110.55
227.73
0.00
0.00
0.00
0.00
0.00
0.00
178.89
0.00
178.89
5,656.50
0.00
5,475.82
0.00
44.72
0.00
0.00
0.00
0.00
1,368.88
0.00
0.00
0.00
0.00
15.00
19,076.85
0.00
0.00
0.00
0.00
0.00
0.00
40.00
60,912.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
668.00
1,362.72
0.00
0.00
0.00
0.00
0.00
0.00
668.00
1,329.32
0.00
0.00
480.96
15,207.96
0.00
0.00
0.00
0.00
0.00
0.00
480.96
400.80
668.00
380.76
125.25
71,041.80
0.00
167.00
3.83
3.83
0.00
0.00
0.00
0.00
0.00
0.00
400.80
929.86
0.00
0.00
0.00
0.00
0.00
0.00
668.00
7,461.56
0.00
0.00
0.00
380.76
14,392.73
0.00
0.00
0.00
0.00
125.25
3,833.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
167.00
0.00
307,202.9731
SISTEMA DE PTAR
CAMARA DE REJAS (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
3.83
2.04
TRAZO Y REPLANTEO
m2
3.83
2.06
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
m3
3.06
31.62
REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
3.83
2.32
ELIMINACION DE MATERIAL EXCEDENTE
m3
6.56
30.61
OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2
3.83
190.41
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
m3
2.31
480.64
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
m2
17.18
40.88
ACERO FY=4200 KG/CM2
kg
71.83
5.24
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
m2
8.95
33.00
ACCESORIOS
REJILLA METALICA
u
1.00
37.82
PLANCHA METALICA DE FF DE e=3/4"
u
1.00
84.55
DESARENADOR Y MEDIDOR PARSHALL (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
17.19
2.04
TRAZO Y REPLANTEO
m2
17.19
2.06
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
m3
25.79
31.62
REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
17.19
2.32
ELIMINACION DE MATERIAL EXCEDENTE
m3
32.23
30.61
OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2
17.19
190.41
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
m3
8.71
480.64
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
m2
53.42
40.88
ACERO FY=4200 KG/CM2
kg
224.95
5.24
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
m2
28.14
33.00
ACCESORIOS
COMPUERTAS FIERRO DE 0.63*0.44 M
u
4.00
650.44
BARANDA DE TUBO FO. GDO. PASAMANO 1 1/2"-PARANTE
m
1"
2.10
X 1M.ALT99.33
TANQUE IMHOFF (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
51.41
2.04
TRAZO Y REPLANTEO
m2
51.41
2.06
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
m3
308.43
31.62
REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
51.41
2.32
RELLENO CON MATERIAL PROPIO SELECCIONADO
m3
73.50
16.06
ELIMINACION DE MATERIAL EXCEDENTE
m3
293.66
30.61
OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2
51.41
190.41
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
m3
122.45
482.32
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
m2
487.68
48.43
ACERO FY=4200 KG/CM2
kg
6,029.19
5.24
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
m2
331.67
33.00
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
45.09
27.42
CARPINTERIA METALICA
BARANDA DE TUBO FO. GDO. PASAMANO 1 1/2"-PARANTE
m
14.20
1" X 1M.ALT99.33
ESCALERA TUB F.GVZDO. C/PARANTES DE 2" X PELDAOS
m
DE7.65
3/4"
109.97
INSTALACIONES SANITARIAS
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM
m
8.50
47.43
TEE UPVC UF S-25 DE 8"
u
1.00
146.59
CODO SP PVC UF S-25 DE 8"
u
1.00
254.28
VALVULA DE COMPUERTA DE FIERRO FUNDIDO uMAZZA DE 8" 1.00 1,222.19
PANTALLA DEFLECTORA
u
2.00
126.05
LECHO DE SECADO (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
35.15
2.04
TRAZO Y REPLANTEO
m2
35.15
2.06
MOVIMIENTO DE TIERRAS
EXCAVACION C/MAQ. EN TERRENO NORMAL m3
50.96
6.86
REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
35.15
2.32
ELIMINACION DE MATERIAL EXCEDENTE
m3
63.70
30.61
OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2
35.15
190.41
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
m3
25.25
482.32
ENCOFRADO Y DESENCOFRADO NORMAL
m2
281.33
44.07
ACERO FY=4200 KG/CM2
kg
1,541.20
5.24
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
m2
235.08
33.00
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
57.00
27.42
ESTRUCTURA DE MADERA Y COBERTURA
TIJERAL DE MADERA TIPO 01 L=3.00M
u
5.00
758.57
VIGA DE MADERA 3" X 4"
m
8.95
14.91
CORREAS Y TIRANTES DE MADERA
p2
106.76
5.31
COBERTURA DE CALAMINA 11 CANALES E=3MM
m2
46.98
51.30
INSTALACIONES SANITARIAS
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 100MM
m
23.65
166.77
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 50MM
m
66.70
68.33
CODO PVC SAP 6"X90
u
3.00
146.80
CODO PVC SAP 4"X90
u
2.00
49.45
TEE PVC-SAP 4"* 2"
u
23.00
42.74
TEE PVC-SAP 150mmx150mm
u
2.00
54.16
TEE PVC-SAP 200mmx150mm
u
1.00
41.66
TAPON PVC-SAP 2"
u
23.00
27.00
FILTROS
FILTRO DE GRAVA
m3
12.48
160.57
FILTRO DE ARENA
m3
9.36
192.07
FILTRO DE LADRILLO
m2
31.20
91.03
FILTRO BIOLOGICO (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
14.19
2.04
TRAZO Y REPLANTEO
m2
14.19
2.06
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA HASTA 0.80 M, TERRENO
m3 NORMAL25.54
27.67
REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
14.19
2.32
ELIMINACION DE MATERIAL EXCEDENTE
m3
31.93
30.61
OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2
14.19
190.41
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
m3
20.62
480.64
ENCOFRADO Y DESENCOFRADO NORMAL
m2
117.37
44.07
ACERO FY=4200 KG/CM2
kg
1,043.53
5.24
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
m2
78.04
33.00
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
52.60
27.42
FILTROS
FILTRO DE GRAVA
m3
20.40
160.57
FILTRO DE LADRILLO
m2
12.00
91.03
SISTEMA DE DESINFECCION (HIPOCLORADOR POR GOTEO)
HIPOCLORADOR DIFUSION inc Gancho
u
1.00 3,000.00
TAPA METALICA 0.40X0.45X1/8"
u
1.00
94.43
RED DE ALCANTARILLADO EN PLANTA DE TRATAMIENTO
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO
m
10.75
1.99
TRAZO, NIVELACION Y REPLANTEO DURANTE LA
m EJECUCION10.75
DE LA OBRA 3.33
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS EN TERRENO NORMAL
m3
PARA-TUB. 6"-8"
7.74 HASTA11.45
1.
REFINE, NIVELACION DE ZANJA Y CONFORMACION
m DE FONDOS
6.45
2.17
PREPARACION DE CAMA DE APOYO CON MATERIAL
m
PROPIO
10.75
ZARANDEADO
11.17
RELLENO COMPACTADO C/PLANCHA VIBRAT. HASTA
m
H=3.005.81
M CON MAT/PROPIO
37.80
ELIMINACION DE MATERIAL EXCEDENTE
m3
2.42
30.61
SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM
m
10.75
47.43
BUZONES
BUZON DE CONCRETO TIPO 1, h= 1.50 m
u
1.00 1,271.79
CERCO PERIMETRICO
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
106.01
2.04
TRAZO Y REPLANTEO
m2
106.01
2.06
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
m3
3.78
31.62
ELIMINACION DE MATERIAL EXCEDENTE
m3
4.73
30.61
CERCO PERIMETRICO CON ALAMBRE DE PUAS
ALAMBRE CON PUAS PARA CERCO
m
840.88
5.24
7.81
7.89
0.00
0.00
3.83
7.81
0.00
0.00
0.00
0.00
0.00
0.00
3.83
7.89
0.00
0.00
0.00
0.00
96.76
8.89
200.80
0.00
0.00
3.83
8.89
0.00
0.00
0.00
0.00
0.00
0.00
6.56
200.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
71.83
376.39
0.00
0.00
0.00
0.00
0.00
729.27
0.00
0.00
1,110.28
702.32
376.39
0.00
0.00
0.00
0.00
0.00
0.00
3.06
96.76
0.00
0.00
0.00
0.00
3.83
729.27
0.00
0.00
0.00
2.31
1,110.28
0.00
0.00
0.00
17.18
3.06
3.83
6.56
0.00
0.00
0.00
0.00
0.00
0.00
3.83
0.00
0.00
2.31
0.00
71.83
0.00
17.18
0.00
702.32
0.00
295.35
0.00
0.00
8.95
0.00
37.82
84.55
0.00
0.00
0.00
0.00
0.00
1.00
37.82
0.00
0.00
0.00
0.00
0.00
0.00
1.00
84.55
0.00
1.00
1.00
0.00
0.00
35.07
35.41
0.00
0.00
35.07
0.00
0.00
0.00
0.00
17.19
17.19
0.00
0.00
0.00
0.00
17.19
0.00
0.00
0.00
17.19
0.00
0.00
25.79
0.00
14.87
34.50
0.00
0.00
30.61
936.97
0.00
1.62
49.59
0.00
0.00
25.79
17.19
32.23
0.00
0.00
0.00
0.00
0.00
17.19
3,273.15
0.00
0.00
0.00
0.00
17.19
0.00
4,186.37
2,183.81
1,178.74
0.00
0.00
0.00
0.00
8.71
4,186.37
0.00
0.00
0.00
0.00
0.00
0.00
53.42
2,183.81
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.71
53.42
224.95
0.00
0.00
0.00
928.62
0.00
0.00
28.14
928.62
0.00
0.00
28.14
0.00
2,601.76
208.59
0.00
0.00
0.00
0.00
0.00
4.00
2,601.76
0.00
0.00
0.00
0.00
0.00
0.00
2.10
208.59
0.00
4.00
2.10
0.00
0.00
104.88
105.90
0.00
0.00
51.41
104.88
0.00
0.00
0.00
0.00
0.00
0.00
51.41
105.90
0.00
0.00
0.00
0.00
51.41
51.41
0.00
0.00
0.00
0.00
308.43
9,752.56
0.00
0.00
0.00
0.00
0.00
0.00
51.41
119.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9,752.56
119.27
1,180.41
8,988.93
224.95
0.00
5.38
1,178.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
308.43
51.41
73.50
293.66
9,788.98
0.00
0.00
51.41
0.00
59,060.08
0.00
23,618.34
0.00
122.45
487.68
6,029.19
0.00
0.00
0.00
331.67
45.09
0.00
0.00
14.20
7.65
0.00
0.00
8.50
1.00
1.00
1.00
2.00
0.00
0.00
0.00
0.00
0.00
35.15
35.15
0.00
0.00
50.96
35.15
63.70
0.00
0.00
0.00
0.00
73.50
1,180.41
0.00
0.00
293.66
8,988.93
0.00
0.00
0.00
0.00
0.00
59,060.08
23,618.34
31,592.96
0.00
0.00
0.00
0.00
0.00
122.45
0.00
0.00
0.00
0.00
0.00
487.68
0.00
0.00
331.67
10,945.11
0.00
1,410.49
841.27
403.16
146.59
254.28
1,222.19
252.10
71.71
72.41
0.00
0.00
0.00
0.00
0.00
6,029.19
0.00
0.00
0.00
0.00
9,788.98
10,945.11
1,236.37
0.00
2.32
0.00
0.00
815.48
39.88
986.56
0.00
35.41
295.35
3,273.15
0.00
815.48
8.95
0.00
51.41
31,592.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
45.09
1,236.37
0.00
0.00
0.00
0.00
0.00
14.20
1,410.49
0.00
0.00
0.00
0.00
0.00
0.00
7.65
841.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.50
403.16
0.00
0.00
0.00
0.00
0.00
0.00
1.00
146.59
0.00
1.00
254.28
0.00
0.00
0.00
0.00
0.00
1.00
1,222.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
252.10
0.00
0.00
0.00
0.00
35.15
71.71
0.00
0.00
0.00
0.00
0.00
0.00
35.15
72.41
0.00
0.00
0.00
0.00
349.59
81.55
1,949.86
0.00
0.00
50.96
349.59
0.00
0.00
0.00
0.00
0.00
0.00
35.15
81.55
0.00
0.00
0.00
0.00
63.70
1,949.86
0.00
0.00
0.00
0.00
25.25
12,178.58
0.00
0.00
281.33
12,398.21
0.00
0.00
1,541.20
8,075.89
0.00
0.00
0.00
0.00
0.00
0.00
6,692.91
0.00
0.00
12,178.58
12,398.21
8,075.89
0.00
0.00
0.00
0.00
7,757.64
1,562.94
0.00
0.00
0.00
0.00
235.08
7,757.64
0.00
0.00
0.00
0.00
0.00
0.00
57.00
1,562.94
0.00
0.00
3,792.85
133.44
566.90
2,410.07
3,944.11
4,557.61
440.40
98.90
983.02
108.32
41.66
621.00
2,003.91
1,797.78
2,840.14
0.00
0.00
0.00
35.15
0.00
0.00
0.00
6,692.91
0.00
0.00
35.15
0.00
0.00
25.25
281.33
1,541.20
0.00
0.00
0.00
235.08
57.00
0.00
0.00
5.00
8.95
106.76
46.98
0.00
0.00
0.00
0.00
23.65
66.70
3.00
2.00
23.00
2.00
1.00
23.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.48
9.36
31.20
0.00
0.00
0.00
14.19
14.19
0.00
0.00
25.54
14.19
31.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.00
3,792.85
0.00
0.00
0.00
0.00
0.00
0.00
8.95
133.44
0.00
0.00
0.00
106.76
0.00
0.00
0.00
566.90
0.00
0.00
0.00
0.00
0.00
0.00
46.98
2,410.07
0.00
0.00
0.00
0.00
0.00
0.00
23.65
3,944.11
0.00
0.00
0.00
66.70
4,557.61
0.00
0.00
0.00
0.00
3.00
440.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
98.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
23.00
983.02
0.00
0.00
0.00
0.00
2.00
108.32
0.00
0.00
0.00
0.00
0.00
0.00
1.00
41.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
621.00
0.00
0.00
23.00
0.00
0.00
0.00
0.00
12.48
2,003.91
0.00
0.00
0.00
0.00
0.00
0.00
9.36
1,797.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31.20
2,840.14
0.00
0.00
28.95
29.23
0.00
0.00
14.19
0.00
0.00
14.19
706.69
32.92
977.38
0.00
0.00
14.19
32.92
0.00
0.00
0.00
0.00
0.00
0.00
31.93
977.38
0.00
0.00
0.00
0.00
1,043.53
5,468.10
0.00
0.00
2,701.92
0.00
0.00
9,910.80
5,172.50
5,468.10
0.00
0.00
2,575.32
1,442.29
0.00
0.00
0.00
0.00
0.00
0.00
25.54
28.95
0.00
0.00
0.00
0.00
29.23
0.00
0.00
0.00
0.00
706.69
0.00
0.00
0.00
0.00
14.19
2,701.92
0.00
0.00
0.00
14.19
0.00
0.00
20.62
9,910.80
0.00
0.00
0.00
0.00
117.37
5,172.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.62
117.37
1,043.53
0.00
0.00
0.00
0.00
0.00
0.00
78.04
2,575.32
0.00
0.00
0.00
0.00
0.00
0.00
52.60
1,442.29
0.00
0.00
3,275.63
1,092.36
0.00
0.00
0.00
0.00
20.40
3,275.63
0.00
0.00
0.00
0.00
0.00
0.00
12.00
1,092.36
0.00
3,000.00
94.43
0.00
0.00
0.00
0.00
0.00
0.00
1.00
3,000.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
94.43
21.39
35.80
0.00
0.00
0.00
21.39
0.00
0.00
10.75
0.00
0.00
0.00
0.00
10.75
35.80
0.00
0.00
0.00
0.00
0.00
0.00
7.74
88.62
0.00
0.00
0.00
0.00
78.04
52.60
0.00
0.00
20.40
12.00
0.00
0.00
0.00
0.00
1.00
1.00
10.75
10.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.42
74.08
0.00
0.00
7.74
6.45
10.75
5.81
2.42
509.87
0.00
0.00
0.00
0.00
10.75
509.87
0.00
0.00
10.75
0.00
1,271.79
0.00
0.00
0.00
0.00
1.00
1,271.79
0.00
0.00
1.00
0.00
216.26
218.38
0.00
0.00
0.00
0.00
106.01
216.26
0.00
0.00
0.00
0.00
0.00
0.00
106.01
218.38
0.00
0.00
106.01
106.01
0.00
0.00
119.52
144.79
0.00
0.00
0.00
0.00
3.78
119.52
0.00
0.00
0.00
0.00
0.00
0.00
4.73
144.79
0.00
0.00
3.78
4.73
0.00
0.00
88.62
14.00
120.08
ZARANDEADO
219.62 EN CAPAS DE 20CM
74.08
0.00
6.45
0.00
0.00
0.00
0.00
10.75
120.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.81
219.62
14.00
0.00
0.00
0.00
0.00
4,406.21
0.00
0.00
0.00
0.00
840.88
4,406.21
0.00
0.00
840.88
0.00
2.94
1.89
61.20
283.20
415.25
444.83
44.07
5.24
1,220.84
840.73
2,697.08
1,483.97
0.00
0.00
0.00
0.00
2.94
1,220.84
0.00
0.00
0.00
0.00
0.00
0.00
61.20
2,697.08
0.00
0.00
0.00
0.00
0.00
0.00
283.20
1,483.97
0.00
0.00
2.94
1.89
61.20
283.20
0.00
0.00
0.00
0.00
1.00
304.58
304.58
0.00
0.00
0.00
0.00
0.00
0.00
304.58
0.00
1.00
0.00
0.00
0.00
0.00
6.00
3,180.00
0.00
0.00
6.00
0.00
0.00
0.00
0.00
0.00
6.00
5,399.76
0.00
0.00
6.00
0.00
0.00
6.00
1.00
35.77
100.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.89
840.73
0.00
0.00
1.00
F 05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
4,801.20
1.00
1,310.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
35.77
17.17
0.00
0.00
0.00
0.00
0.00
0.00
100.00
48.00
0.00
0.00
1.00
1,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
6.00
0.00
0.00
0.00
1.00
3,400.00
0.00
0.00
1.00
1,400.00
0.00
0.00
0.00
1,200.00
2,100.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
1,050.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
1,050.00
0.00
0.00
1.00
1,950.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
200.00
0.00
200.00
10.00
1.00
0.00
0.00
1.00
1.00
0.00
0.00
1.00
15.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
1,500.00
0.00
0.00
0.00
0.00
1.00
650.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
6.00
3.00
3.00
364.00
0.00
0.00
1.00
1.00
1.00
1,600.00
0.00
1.00
1,220.70
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1,750.00
0.00
0.00
0.00
0.00
0.00
0.00
15.00
1,650.00
0.00
537
538
539
540
541
542
543
544
545
F 06
1
1.01
01.01.01
01.01.02
01.01.03
1.02
01.02.01
1.03
01.03.01
01.03.02
1.04
01.04.01
01.04.02
01.04.03
01.04.04
2
02.01
02.01.01
02.01.02
2.02
02.02.01
02.02.02
02.02.03
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
1.00
1.00
500.00
1,250.00
500.00
1,250.00
0.00
0.00
0.00
0.00
0.00
1.00
500.00
0.00
0.00
0.00
0.00
0.00
1.00
1,250.00
1.00
1.00
1.00
1,250.00
800.00
700.00
1,250.00
800.00
700.00
1.00
1,250.00
0.00
0.00
0.00
0.00
0.00
1.00
800.00
0.00
0.00
0.00
0.00
0.00
1.00
700.00
1,500.00
2,399.00
1,200.00
1,500.00
2,399.00
1,200.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
0.00
0.00
1.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
39,005.30
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1,500.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
2,399.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1,200.00
850.00
850.00
0.00
0.00
0.00
0.00
0.00
1.00
850.00
0.00
1.00
0.00
1,500.00
1,500.00
1,500.00
1,500.00
0.00
0.00
0.00
0.00
0.00
1.00
1,500.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1,500.00
0.00
1.00
1.00
0.00
0.00
800.00
##########
3,500.00
SUPERIOR
6,000.00
800.00
11,756.30
3,500.00
6,000.00
0.00
0.00
0.00
0.00
0.00
1.00
800.00
0.00
1.00
11,756.30
1.00
1.00
1.00
1.00
0.00
0.00
0.00
0.00
4,000.00
650.00
4,000.00
650.00
0.83
0.00
0.17
1.00
350.00
750.00
2,250.00
350.00
750.00
2,250.00
0.00
0.00
0.00
1.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
3,500.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
6,000.00
0.00
0.83
3,311.06
0.17
688.94
0.00
1.00
650.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
350.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
750.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
2,250.00
PARTIDA
F 01
01
01.01
01.02
01.03
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 01
METRADO
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
%
METRADO
AVANCE ACUMULADO
%
METRADO
1.00
1.00
100.00%
100.00%
1.00
1.00
0.00%
0.00%
0.00 100.00%
0.00 100.00%
1.00
1.00
1.00
1.00
24.00
8,701.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
1.00
1.00
1.00
24.00
8,701.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
SALDO
METRADO
1.00
1.00
0.00%
0.00%
0.00
0.00
1.00
1.00
1.00
1.00
24.00
8,701.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
PARTIDA
F 02
01
01.01
01.01.01
01.01.02
01.02
01.02.01
01.03
01.03.01
01.03.02
01.04
01.04.01
01.04.02
01.05
01.05.01
02
02.01
02.01.01
02.01.02
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.03
02.03.01
02.03.02
02.04
02.04.01
02.04.02
02.04.03
02.05
02.05.01
02.05.02
02.06
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 02
METRADO
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
%
METRADO
AVANCE ACUMULADO
%
METRADO
SALDO
METRADO
m2
m2
8.55
8.55
100.00%
100.00%
8.55
8.55
0.00%
0.00%
0.00 100.00%
0.00 100.00%
8.55
8.55
0.00%
0.00%
0.00
0.00
m3
1.73
100.00%
1.73
0.00%
0.00 100.00%
1.73
0.00%
0.00
m2
m2
10.85
9.40
100.00%
100.00%
10.85
9.40
0.00%
0.00%
0.00 100.00%
0.00 100.00%
10.85
9.40
0.00%
0.00%
0.00
0.00
und
und
1.00
1.00
100.00%
100.00%
1.00
1.00
0.00%
0.00%
0.00 100.00%
0.00 100.00%
1.00
1.00
0.00%
0.00%
0.00
0.00
m2
9.40
0.00%
0.00
100.00%
9.40 100.00%
9.40
0.00%
0.00
m2
m2
8.55
8.55
100.00%
100.00%
8.55
8.55
0.00%
0.00%
0.00 100.00%
0.00 100.00%
8.55
8.55
0.00%
0.00%
0.00
0.00
m3
m2
m3
m3
7.76
8.55
2.51
6.56
100.00%
100.00%
100.00%
100.00%
7.76
8.55
2.51
6.56
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
7.76
8.55
2.51
6.56
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
m3
m3
0.58
1.73
100.00%
100.00%
0.58
1.73
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.58
1.73
0.00%
0.00%
0.00
0.00
m3
m2
Kg
2.72
23.73
119.80
100.00%
100.00%
100.00%
2.72
23.73
119.80
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
2.72
23.73
119.80
0.00%
0.00%
0.00%
0.00
0.00
0.00
m2
m2
10.85
9.40
100.00%
100.00%
10.85
9.40
0.00%
0.00%
0.00 100.00%
0.00 100.00%
10.85
9.40
0.00%
0.00%
0.00
0.00
PARTIDA
02.06.01
02.06.02
02.07
02.07.01
03
03.01
03.01.01
03.01.02
03.02
03.02.01
03.02.02
03.02.03
03.03
03.03.01
03.03.02
03.03.03
03.04
03.04.01
03.04.02
03.05
03.05.01
03.05.02
03.05.03
03.06
03.06.01
03.06.02
03.06.03
03.07
03.07.01
04
04.01
04.01.01
04.01.02
04.01.03
04.02
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 02
METRADO
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
%
METRADO
AVANCE ACUMULADO
%
METRADO
SALDO
METRADO
und
und
1.00
1.00
100.00%
100.00%
1.00
1.00
0.00%
0.00%
0.00 100.00%
0.00 100.00%
1.00
1.00
0.00%
0.00%
0.00
0.00
m2
9.40
0.00%
0.00
100.00%
9.40 100.00%
9.40
0.00%
0.00
m2
m2
1.70
1.70
100.00%
100.00%
1.70
1.70
-100.00%
-100.00%
-1.70
-1.70
0.00%
0.00%
0.00
0.00
100.00%
100.00%
1.70
1.70
m3
m2
m3
1.36
1.70
1.70
100.00%
100.00%
100.00%
1.36
1.70
1.70
-100.00%
-100.00%
-100.00%
-1.36
-1.70
-1.70
0.00%
0.00%
0.00%
0.00
0.00
0.00
100.00%
100.00%
100.00%
1.36
1.70
1.70
m3
m2
Kg
0.48
7.31
31.41
100.00%
100.00%
100.00%
0.48
7.31
31.41
-100.00%
-100.00%
-100.00%
-0.48
-7.31
-31.41
0.00%
0.00%
0.00%
0.00
0.00
0.00
100.00%
100.00%
100.00%
0.48
7.31
31.41
m2
m2
1.80
4.52
100.00%
100.00%
1.80
4.52
-100.00%
-100.00%
-1.80
-4.52
0.00%
0.00%
0.00
0.00
100.00%
100.00%
1.80
4.52
und
und
und
1.00
1.00
1.00
100.00%
100.00%
100.00%
1.00
1.00
1.00
-100.00%
-100.00%
-100.00%
-1.00
-1.00
-1.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
100.00%
100.00%
100.00%
1.00
1.00
1.00
und
und
und
1.00
1.00
1.00
100.00%
100.00%
100.00%
1.00
1.00
1.00
-100.00%
-100.00%
-100.00%
-1.00
-1.00
-1.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
100.00%
100.00%
100.00%
1.00
1.00
1.00
m2
4.52
0.00%
0.00
0.00%
0.00
0.00%
0.00
100.00%
4.52
ml
ml
ml
2,085.53
2,085.53
2,085.53
100.00%
100.00%
100.00%
2,085.53
2,085.53
2,085.53
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
2,085.53
2,085.53
2,085.53
0.00%
0.00%
0.00%
0.00
0.00
0.00
PARTIDA
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.03
04.03.01
04.03.02
04.03.03
05
05.01
05.01.01
05.01.02
05.02
05.02.01
05.02.02
05.02.03
05.03
05.03.01
05.03.02
05.03.03
05.04
05.04.01
05.04.02
05.04.03
05.05
05.05.01
05.05.02
05.06
05.06.01
05.06.02
05.06.03
05.07
05.07.01
05.07.02
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 02
METRADO
AVANCE ANTERIOR
%
METRADO
m3
875.92
100.00%
875.92
EXCAVACION DE ZANJA EN TERRENO NORMAL COMPACTO
m2
1,251.32
100.00%
1,251.32
REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS
2,085.53
100.00%
2,085.53
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO ml
m3 ZARANDEADO
875.92EN CAPAS
100.00%
RELLENO COMPACTADO C/PLANCHA VIBRAT. HASTA H=3.00 M CON MAT/PROPIO
DE 20CM875.92
m3
218.98
100.00%
218.98
ELIMINACION DE MATERIAL EXCEDENTE
TUBERIAS
ml
2,085.53
100.00%
2,085.53
TUBERIA DE PVC ISO C-10 DE 1 1/2"
glb
1.00
100.00%
1.00
SUMINISTRO E INSTALACION DE ACCESORIOS PVC RED CONDUCCION
ml
2,085.53
100.00%
2,085.53
PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8" A ZANJA TAPADA
TANQUILLA ROMPERCARGA (01 UND)
TRABAJOS PRELIMINARES
m2
3.70
100.00%
3.70
LIMPIEZA DE TERRENO MANUAL
m2
3.70
100.00%
3.70
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
m3
4.33
100.00%
4.33
EXCAVACION MANUAL
m2
3.70
100.00%
3.70
REFINE NIVELACION INTERIOR APISONADO MANUAL
m3
5.41
100.00%
5.41
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
m2
3.70
100.00%
3.70
DADOS DE CONCRETO F'c=140 Kg/cm2
m3
0.46
100.00%
0.46
ENCOFRADO Y DESENCOFRADO NORMAL
m2
1.22
100.00%
1.22
OBRAS DE CONCRETO ARMADO
m3
1.92
100.00%
1.92
CONCRETO F'c= 175 KG/CM2
m2
19.39
100.00%
19.39
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
kg
104.23
100.00%
104.23
ACERO FY=4200 KG/CM2
REVOQUES Y ENLUCIDOS
m2
10.61
100.00%
10.61
TARRAJEO CON IMPERMEABILIZANTES
m2
10.91
100.00%
10.91
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
TUBERIAS Y ACCESORIOS
und
1.00
100.00%
1.00
TUBERIA DE INGRESO A C.R. PVC SAP C-10 DE 1 1/2"
und
1.00
100.00%
1.00
TUBERIA DE SALIDA DE C.R. PVC SAP C-10 DE 1 1/2"
und
1.00
100.00%
1.00
TUBERIA DE REBOSE Y LIMPIA DESAGUE DE 2" SAL PVC
CARPINTERIA METALICA
und
1.00
100.00%
1.00
TAPA METALICA 0.65X0.75X3/16"
und
1.00
100.00%
1.00
TAPA METALICA 0.65X0.65X3/16"
AVANCE MENSUAL
%
METRADO
AVANCE ACUMULADO
%
METRADO
SALDO
METRADO
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
875.92
1,251.32
2,085.53
875.92
218.98
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
2,085.53
1.00
2,085.53
0.00%
0.00%
0.00%
0.00
0.00
0.00
-100.00%
-100.00%
-3.70
-3.70
0.00%
0.00%
0.00
0.00
100.00%
100.00%
3.70
3.70
-100.00%
-100.00%
-100.00%
-4.33
-3.70
-5.41
0.00%
0.00%
0.00%
0.00
0.00
0.00
100.00%
100.00%
100.00%
4.33
3.70
5.41
-100.00%
-100.00%
-100.00%
-3.70
-0.46
-1.22
0.00%
0.00%
0.00%
0.00
0.00
0.00
100.00%
100.00%
100.00%
3.70
0.46
1.22
-100.00%
-100.00%
-100.00%
-1.92
-19.39
-104.23
0.00%
0.00%
0.00%
0.00
0.00
0.00
100.00%
100.00%
100.00%
1.92
19.39
104.23
-100.00%
-100.00%
-10.61
-10.91
0.00%
0.00%
0.00
0.00
100.00%
100.00%
10.61
10.91
-100.00%
-100.00%
-100.00%
-1.00
-1.00
-1.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
100.00%
100.00%
100.00%
1.00
1.00
1.00
-100.00%
-100.00%
-1.00
-1.00
0.00%
0.00%
0.00
0.00
100.00%
100.00%
1.00
1.00
PARTIDA
05.08
05.08.01
06
06.01
06.01.01
06.01.02
06.02
06.02.01
06.02.02
06.02.03
06.03
06.03.01
06.03.02
06.03.03
06.04
06.04.01
06.04.02
06.04.03
06.05
06.05.01
06.05.02
06.06
06.06.01
06.06.02
06.06.03
06.07
06.07.01
06.07.02
06.08
06.08.01
06.08.02
06.09
06.09.01
07
07.01
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 02
PINTURA
PINTURA LATEX EN MUROS 2 MANOS
CAMARA ROMPE PRESION (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
CONCRETO F'C=140 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
OBRAS DE CONCRETO ARMADO
CONCRETO F'c= 175 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY=4200 KG/CM2
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA DE INGRESO A C.R. PVC SAP C-10 DE 1 1/2"
TUBERIA DE SALIDA DE C.R. PVC SAP C-10 DE 1 1/2"
TUBERIA DE REBOSE Y LIMPIA DESAGUE DE 2" SAL PVC
SUMINISTRO E INSTALACION DE VALVULAS
VALVULA COMPUERTA HD C/ELASTOMERO 2"
VALVULA REDUCTORA DE PRESION 2"
CARPINTERIA METALICA
TAPA METALICA 0.40X0.45X1/8"
TAPA METALICA 0.60X0.60X1/8"
PINTURA
PINTURA LATEX EN MUROS 2 MANOS
REHABILITACION DE RESERVORIO EXISTENTE
TRABAJOS PRELIMINARES
METRADO
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
%
METRADO
AVANCE ACUMULADO
%
METRADO
SALDO
METRADO
m2
10.91
0.00%
0.00
0.00%
0.00
0.00%
0.00
100.00%
10.91
m2
m2
1.92
1.92
100.00%
100.00%
1.92
1.92
0.00%
0.00%
0.00 100.00%
0.00 100.00%
1.92
1.92
0.00%
0.00%
0.00
0.00
m3
m2
m3
0.86
1.92
1.08
100.00%
100.00%
100.00%
0.86
1.92
1.08
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
0.86
1.92
1.08
0.00%
0.00%
0.00%
0.00
0.00
0.00
m2
m3
m2
1.92
0.11
0.92
100.00%
100.00%
100.00%
1.92
0.11
0.92
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
1.92
0.11
0.92
0.00%
0.00%
0.00%
0.00
0.00
0.00
m3
m2
kg
0.95
8.87
61.36
100.00%
100.00%
100.00%
0.95
8.87
61.36
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
0.95
8.87
61.36
0.00%
0.00%
0.00%
0.00
0.00
0.00
m2
m2
6.32
4.18
100.00%
100.00%
6.32
4.18
0.00%
0.00%
0.00 100.00%
0.00 100.00%
6.32
4.18
0.00%
0.00%
0.00
0.00
und
und
und
1.00
1.00
1.00
100.00%
100.00%
100.00%
1.00
1.00
1.00
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
1.00
1.00
1.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
und
und
1.00
1.00
100.00%
100.00%
1.00
1.00
0.00%
0.00%
0.00 100.00%
0.00 100.00%
1.00
1.00
0.00%
0.00%
0.00
0.00
und
und
1.00
1.00
100.00%
100.00%
1.00
1.00
0.00%
0.00%
0.00 100.00%
0.00 100.00%
1.00
1.00
0.00%
0.00%
0.00
0.00
m2
4.18
0.00%
0.00
100.00%
4.18 100.00%
4.18
0.00%
0.00
PARTIDA
07.01.01
07.01.02
07.02
07.02.01
07.02.02
07.03
07.03.01
07.03.02
07.04
07.04.01
07.04.02
07.05
07.05.01
07.05.02
07.05.03
08
08.01
08.01.01
08.01.02
08.02
08.02.01
08.02.02
08.02.03
08.03
08.03.01
08.04
08.04.01
08.04.01.01
08.04.01.02
08.04.01.03
08.04.02
08.04.02.01
08.04.02.02
08.04.02.03
08.04.03
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 02
METRADO
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
%
METRADO
AVANCE ACUMULADO
%
METRADO
SALDO
METRADO
m2
m2
7.50
7.50
100.00%
100.00%
7.50
7.50
0.00%
0.00%
0.00 100.00%
0.00 100.00%
7.50
7.50
0.00%
0.00%
0.00
0.00
m2
m2
9.00
22.50
100.00%
100.00%
9.00
22.50
0.00%
0.00%
0.00 100.00%
0.00 100.00%
9.00
22.50
0.00%
0.00%
0.00
0.00
m2
ml
30.00
2.50
0.00%
0.00%
0.00
0.00
100.00%
100.00%
30.00 100.00%
2.50 100.00%
30.00
2.50
0.00%
0.00%
0.00
0.00
ml
und
2.50
2.00
100.00%
100.00%
2.50
2.00
0.00%
0.00%
0.00 100.00%
0.00 100.00%
2.50
2.00
0.00%
0.00%
0.00
0.00
und
und
glb
1.00
2.00
1.00
100.00%
100.00%
100.00%
1.00
2.00
1.00
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
1.00
2.00
1.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
m2
m2
47.90
47.90
100.00%
100.00%
47.90
47.90
0.00%
0.00%
0.00 100.00%
0.00 100.00%
47.90
47.90
0.00%
0.00%
0.00
0.00
m3
m2
m3
57.48
47.90
74.85
100.00%
100.00%
100.00%
57.48
47.90
74.85
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
57.48
47.90
74.85
0.00%
0.00%
0.00%
0.00
0.00
0.00
m2
47.90
100.00%
47.90
0.00%
0.00 100.00%
47.90
0.00%
0.00
m3
m2
kg
16.33
25.00
235.99
100.00%
100.00%
100.00%
16.33
25.00
235.99
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
16.33
25.00
235.99
0.00%
0.00%
0.00%
0.00
0.00
0.00
m3
m2
kg
19.79
120.44
1,258.68
100.00%
100.00%
100.00%
19.79
120.44
1,258.68
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
19.79
120.44
1,258.68
0.00%
0.00%
0.00%
0.00
0.00
0.00
PARTIDA
08.04.03.01
08.04.03.02
08.04.03.03
08.04.04
08.04.04.01
08.04.04.02
08.04.04.03
08.04.05
08.04.05.01
08.04.05.02
08.04.05.03
8.05
08.05.01
08.05.02
8.06
08.06.01
08.06.02
8.07
08.07.01
08.07.02
8.08
08.08.01
08.08.02
8.09
08.09.01
08.09.02
08.09.03
9
9.01
09.01.01
09.01.02
09.01.03
9.02
09.02.01
09.02.02
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 02
METRADO
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
%
METRADO
AVANCE ACUMULADO
%
METRADO
SALDO
METRADO
m3
m2
kg
6.06
42.32
267.91
100.00%
100.00%
100.00%
6.06
42.32
267.91
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
6.06
42.32
267.91
0.00%
0.00%
0.00%
0.00
0.00
0.00
m3
m2
kg
0.78
12.50
142.68
100.00%
100.00%
100.00%
0.78
12.50
142.68
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
0.78
12.50
142.68
0.00%
0.00%
0.00%
0.00
0.00
0.00
m3
m2
kg
2.10
15.10
224.45
100.00%
100.00%
100.00%
2.10
15.10
224.45
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
2.10
15.10
224.45
0.00%
0.00%
0.00%
0.00
0.00
0.00
m2
m2
131.74
136.84
100.00%
100.00%
131.74
136.84
0.00%
0.00%
0.00 100.00%
0.00 100.00%
131.74
136.84
0.00%
0.00%
0.00
0.00
m3
m2
13.56
2.97
100.00%
100.00%
13.56
2.97
0.00%
0.00%
0.00 100.00%
0.00 100.00%
13.56
2.97
0.00%
0.00%
0.00
0.00
m2
m
136.84
9.60
0.00%
0.00%
0.00
0.00
100.00%
100.00%
136.84 100.00%
9.60 100.00%
136.84
9.60
0.00%
0.00%
0.00
0.00
m
u
9.60
2.00
100.00%
100.00%
9.60
2.00
0.00%
0.00%
0.00 100.00%
0.00 100.00%
9.60
2.00
0.00%
0.00%
0.00
0.00
u
u
glb
1.00
1.00
1.00
100.00%
100.00%
100.00%
1.00
1.00
1.00
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
1.00
1.00
1.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
m
m
m
1,574.63
1,574.63
1,574.63
100.00%
100.00%
100.00%
1,574.63
1,574.63
1,574.63
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
1,574.63
1,574.63
1,574.63
0.00%
0.00%
0.00%
0.00
0.00
0.00
m3
m2
661.34
944.78
100.00%
100.00%
661.34
944.78
0.00%
0.00%
0.00 100.00%
0.00 100.00%
661.34
944.78
0.00%
0.00%
0.00
0.00
PARTIDA
09.02.03
09.02.04
09.02.05
9.03
09.03.01
09.03.02
09.03.03
9.04
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 02
METRADO
AVANCE ANTERIOR
%
METRADO
1,574.63
100.00%
1,574.63
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m
661.34
100.00%
661.34
RELLENO COMPACTADO C/PLNACHA VIBRAT. HASTA H=3.00M CON MATERIALm3
PROPIO ZARANDEADO
EN CAPAS DE 20CM
m3
165.34
100.00%
165.34
ELIMINACION DE MATERIAL EXCEDENTE
TUBERIAS
m
1,574.63
100.00%
1,574.63
TUBERIA DE PVC ISO C-10 DE 1 1/2"
glb
1.00
100.00%
1.00
SUMINISTRO E INSTALACION DE ACCESORIOS PVC RED ADUCCION
m
1,574.63
100.00%
1,574.63
PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8" A ZANJA TAPADA
PASE AEREO
AVANCE MENSUAL
%
METRADO
AVANCE ACUMULADO
%
METRADO
SALDO
METRADO
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
1,574.63
661.34
165.34
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
1,574.63
1.00
1,574.63
0.00%
0.00%
0.00%
0.00
0.00
0.00
PARTIDA
F 03
1.01.01
1.01.02
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 03
: SISTEMA DE ALCANTARILLADO
DESCRIPCION
SISTEMA DE ALCANTARILLADO
1 RED DE ALCANTARILLADO
1.01 TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO
TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA
1.02 MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA EN TERRENO NORMAL COMPACTO
CORTE DE PAVIMENTO RIGIDO C/EQUIPO
REPOSICION DE PAVIMENTO DE CONCRETO F'C=210 KG/CM2, LOSA E=10"
REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO
RELLENO COMPACTADO C/PLANCHA VIBRAT. HASTA H=3.00 M CON
ELIMINACION DE MATERIAL EXCEDENTE
1.03 SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 110MM
TUBERIA PVC ALCANT U.F. ISO 4435,S-25 160MM
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM
1.04 VARIOS
PRUEBA HIDRAULICA - ESCORRENTIA DE TUB. A ZANJA ABIERTA
PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MOD. - DENSIDAD DE
2 BUZONES
2.01 TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
2.02 MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
2.03 CONSTRUCCION DE BUZONES
BUZON DE CONCRETO TIPO 1, h= 1.50 m
BUZON DE CONCRETO TIPO 2, h= 1.50 m a 3.00 M.
3 CONEXIONES DOMICILIARIAS DE ALCANTARILLADO
3.01 TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
METRADO
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
%
METRADO
AVANCE ACUMULADO
%
METRADO
SALDO
METRADO
m
m
4,350.50
4,350.50
100.00%
100.00%
4,350.50
4,350.50
0.00%
0.00%
0.00 100.00%
0.00 100.00%
4,350.50
4,350.50
0.00%
0.00%
0.00
0.00
m3
m
m2
m2
m
m3
m3
3,132.35
246.45
172.50
2,610.30
4,350.50
2,479.79
815.72
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
3,132.35
246.45
172.50
2,610.30
4,350.50
2,479.79
815.72
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
3,132.35
246.45
172.50
2,610.30
4,350.50
2,479.79
815.72
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m
m
m
659.32
937.32
2,753.86
100.00%
100.00%
100.00%
659.32
937.32
2,753.86
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
659.32
937.32
2,753.86
0.00%
0.00%
0.00%
0.00
0.00
0.00
m
u
4,350.50
10.00
100.00%
100.00%
4,350.50
10.00
0.00%
0.00%
0.00 100.00%
0.00 100.00%
4,350.50
10.00
0.00%
0.00%
0.00
0.00
m2
m2
110.55
110.55
100.00%
100.00%
110.55
110.55
0.00%
0.00%
0.00 100.00%
0.00 100.00%
110.55
110.55
0.00%
0.00%
0.00
0.00
m3
m3
178.89
223.61
100.00%
100.00%
178.89
223.61
0.00%
0.00%
0.00 100.00%
0.00 100.00%
178.89
223.61
0.00%
0.00%
0.00
0.00
u
u
15.00
40.00
100.00%
100.00%
15.00
40.00
0.00%
0.00%
0.00 100.00%
0.00 100.00%
15.00
40.00
0.00%
0.00%
0.00
0.00
m2
m
668.00
668.00
100.00%
100.00%
668.00
668.00
0.00%
0.00%
0.00 100.00%
0.00 100.00%
668.00
668.00
0.00%
0.00%
0.00
0.00
PARTIDA
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 03
: SISTEMA DE ALCANTARILLADO
DESCRIPCION
METRADO
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
%
METRADO
AVANCE ACUMULADO
%
METRADO
SALDO
METRADO
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
480.96
400.80
668.00
380.76
125.25
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00 100.00%
167.00
0.00%
0.00
PARTIDA
F 04
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 04
: SISTEMA PTAR
DESCRIPCION
SISTEMA DE PTAR
1 CAMARA DE REJAS (01 UND)
1.01 TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
1.02 MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
1.03 OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
1.04 OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
ACERO FY=4200 KG/CM2
1.05 REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
1.06 ACCESORIOS
REJILLA METALICA
PLANCHA METALICA DE FF DE e=3/4"
2 DESARENADOR Y MEDIDOR PARSHALL (01 UND)
2.01 TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
2.02 MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
2.03 OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
2.04 OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
ACERO FY=4200 KG/CM2
METRADO
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
%
METRADO
AVANCE ACUMULADO
%
METRADO
SALDO
METRADO
m2
m2
3.83
3.83
100.00%
100.00%
3.83
3.83
0.00%
0.00%
0.00 100.00%
0.00 100.00%
3.83
3.83
0.00%
0.00%
0.00
0.00
m3
m2
m3
3.06
3.83
6.56
100.00%
100.00%
100.00%
3.06
3.83
6.56
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
3.06
3.83
6.56
0.00%
0.00%
0.00%
0.00
0.00
0.00
m2
3.83
100.00%
3.83
0.00%
0.00 100.00%
3.83
0.00%
0.00
m3
m2
kg
2.31
17.18
71.83
100.00%
0.00%
100.00%
2.31
0.00
71.83
0.00%
100.00%
0.00%
0.00 100.00%
17.18 100.00%
0.00 100.00%
2.31
17.18
71.83
0.00%
0.00%
0.00%
0.00
0.00
0.00
m2
8.95
100.00%
8.95
0.00%
0.00 100.00%
8.95
0.00%
0.00
u
u
1.00
1.00
100.00%
100.00%
1.00
1.00
0.00%
0.00%
0.00 100.00%
0.00 100.00%
1.00
1.00
0.00%
0.00%
0.00
0.00
m2
m2
17.19
17.19
100.00%
100.00%
17.19
17.19
0.00%
0.00%
0.00 100.00%
0.00 100.00%
17.19
17.19
0.00%
0.00%
0.00
0.00
m3
m2
m3
25.79
17.19
32.23
100.00%
100.00%
100.00%
25.79
17.19
32.23
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
25.79
17.19
32.23
0.00%
0.00%
0.00%
0.00
0.00
0.00
m2
17.19
100.00%
17.19
0.00%
0.00 100.00%
17.19
0.00%
0.00
m3
m2
kg
8.71
53.42
224.95
100.00%
100.00%
100.00%
8.71
53.42
224.95
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
8.71
53.42
224.95
0.00%
0.00%
0.00%
0.00
0.00
0.00
PARTIDA
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 04
: SISTEMA PTAR
DESCRIPCION
METRADO
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
%
METRADO
AVANCE ACUMULADO
%
METRADO
SALDO
METRADO
m2
28.14
100.00%
28.14
0.00%
0.00 100.00%
28.14
0.00%
0.00
u
m
4.00
2.10
100.00%
100.00%
4.00
2.10
0.00%
0.00%
0.00 100.00%
0.00 100.00%
4.00
2.10
0.00%
0.00%
0.00
0.00
m2
m2
51.41
51.41
100.00%
100.00%
51.41
51.41
0.00%
0.00%
0.00 100.00%
0.00 100.00%
51.41
51.41
0.00%
0.00%
0.00
0.00
m3
m2
m3
m3
308.43
51.41
73.50
293.66
100.00%
100.00%
100.00%
100.00%
308.43
51.41
73.50
293.66
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
308.43
51.41
73.50
293.66
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
m2
51.41
100.00%
51.41
0.00%
0.00 100.00%
51.41
0.00%
0.00
m3
m2
kg
122.45
487.68
6,029.19
100.00%
100.00%
100.00%
122.45
487.68
6,029.19
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
122.45
487.68
6,029.19
0.00%
0.00%
0.00%
0.00
0.00
0.00
m2
m2
331.67
45.09
100.00%
100.00%
331.67
45.09
0.00%
0.00%
0.00 100.00%
0.00 100.00%
331.67
45.09
0.00%
0.00%
0.00
0.00
m
m
14.20
7.65
100.00%
100.00%
14.20
7.65
0.00%
0.00%
0.00 100.00%
0.00 100.00%
14.20
7.65
0.00%
0.00%
0.00
0.00
m
u
u
u
u
8.50
1.00
1.00
1.00
2.00
100.00%
100.00%
100.00%
100.00%
100.00%
8.50
1.00
1.00
1.00
2.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
8.50
1.00
1.00
1.00
2.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
m2
35.15
100.00%
35.15
0.00%
0.00 100.00%
35.15
0.00%
0.00
PARTIDA
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 04
: SISTEMA PTAR
DESCRIPCION
TRAZO Y REPLANTEO
4.02 MOVIMIENTO DE TIERRAS
EXCAVACION C/MAQ. EN TERRENO NORMAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
4.03 OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
4.04 OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY=4200 KG/CM2
4.05 REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
4.06 ESTRUCTURA DE MADERA Y COBERTURA
TIJERAL DE MADERA TIPO 01 L=3.00M
VIGA DE MADERA 3" X 4"
CORREAS Y TIRANTES DE MADERA
COBERTURA DE CALAMINA 11 CANALES E=3MM
4.07 INSTALACIONES SANITARIAS
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 100MM
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 50MM
CODO PVC SAP 6"X90
CODO PVC SAP 4"X90
TEE PVC-SAP 4"* 2"
TEE PVC-SAP 150mmx150mm
TEE PVC-SAP 200mmx150mm
TAPON PVC-SAP 2"
4.08 FILTROS
FILTRO DE GRAVA
FILTRO DE ARENA
FILTRO DE LADRILLO
5 FILTRO BIOLOGICO (01 UND)
5.01 TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
METRADO
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
%
METRADO
AVANCE ACUMULADO
%
METRADO
SALDO
METRADO
m2
35.15
100.00%
35.15
0.00%
0.00 100.00%
35.15
0.00%
0.00
m3
m2
m3
50.96
35.15
63.70
100.00%
100.00%
100.00%
50.96
35.15
63.70
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
50.96
35.15
63.70
0.00%
0.00%
0.00%
0.00
0.00
0.00
m2
35.15
100.00%
35.15
0.00%
0.00 100.00%
35.15
0.00%
0.00
m3
m2
kg
25.25
281.33
1,541.20
100.00%
100.00%
100.00%
25.25
281.33
1,541.20
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
25.25
281.33
1,541.20
0.00%
0.00%
0.00%
0.00
0.00
0.00
m2
m2
235.08
57.00
100.00%
100.00%
235.08
57.00
0.00%
0.00%
0.00 100.00%
0.00 100.00%
235.08
57.00
0.00%
0.00%
0.00
0.00
u
m
p2
m2
5.00
8.95
106.76
46.98
100.00%
100.00%
100.00%
100.00%
5.00
8.95
106.76
46.98
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
5.00
8.95
106.76
46.98
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
m
m
u
u
u
u
u
u
23.65
66.70
3.00
2.00
23.00
2.00
1.00
23.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
23.65
66.70
3.00
2.00
23.00
2.00
1.00
23.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
23.65
66.70
3.00
2.00
23.00
2.00
1.00
23.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m3
m3
m2
12.48
9.36
31.20
100.00%
100.00%
100.00%
12.48
9.36
31.20
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
12.48
9.36
31.20
0.00%
0.00%
0.00%
0.00
0.00
0.00
m2
14.19
100.00%
14.19
0.00%
0.00 100.00%
14.19
0.00%
0.00
PARTIDA
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 04
: SISTEMA PTAR
DESCRIPCION
METRADO
AVANCE ANTERIOR
%
METRADO
m2
14.19
100.00%
14.19
TRAZO Y REPLANTEO
5.02 MOVIMIENTO DE TIERRAS
m3
25.54
100.00%
25.54
EXCAVACION DE ZANJA HASTA 0.80 M, TERRENO NORMAL
m2
14.19
100.00%
14.19
REFINE NIVELACION INTERIOR APISONADO MANUAL
m3
31.93
100.00%
31.93
ELIMINACION DE MATERIAL EXCEDENTE
5.03 OBRAS DE CONCRETO SIMPLE
m2
14.19
100.00%
14.19
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
5.04 OBRAS DE CONCRETO ARMADO
m3
20.62
100.00%
20.62
CONCRETO F'C=210 KG/CM2
m2
117.37
100.00%
117.37
ENCOFRADO Y DESENCOFRADO NORMAL
kg
1,043.53
100.00%
1,043.53
ACERO FY=4200 KG/CM2
5.06 REVOQUES Y ENLUCIDOS
m2
78.04
100.00%
78.04
TARRAJEO CON IMPERMEABILIZANTES
m2
52.60
100.00%
52.60
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
5.07 FILTROS
m3
20.40
100.00%
20.40
FILTRO DE GRAVA
m2
12.00
100.00%
12.00
FILTRO DE LADRILLO
5.08 SISTEMA DE DESINFECCION (HIPOCLORADOR POR GOTEO)
u
1.00
0.00%
0.00
HIPOCLORADOR DIFUSION inc Gancho
u
1.00
0.00%
0.00
TAPA METALICA 0.40X0.45X1/8"
6 RED DE ALCANTARILLADO EN PLANTA DE TRATAMIENTO
6.01 TRABAJOS PRELIMINARES
m
10.75
100.00%
10.75
TRAZO, NIVELACION Y REPLANTEO
m
10.75
100.00%
10.75
TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA
6.02 MOVIMIENTO DE TIERRAS
7.74
100.00%
7.74
EXCAVACION DE ZANJAS EN TERRENO NORMAL PARA-TUB. 6"-8" HASTA 1. m3
m
6.45
100.00%
6.45
REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS
10.75
100.00%
10.75
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m
m ZARANDEADO
5.81EN CAPAS
100.00%
RELLENO COMPACTADO C/PLANCHA VIBRAT. HASTA H=3.00 M CON MAT/PROPIO
DE 20CM 5.81
m3
2.42
100.00%
2.42
ELIMINACION DE MATERIAL EXCEDENTE
6.03 SUMINISTRO E INSTALACION DE TUBERIAS
m
10.75
100.00%
10.75
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM
6.04 BUZONES
u
1.00
100.00%
1.00
BUZON DE CONCRETO TIPO 1, h= 1.50 m
7 CERCO PERIMETRICO
AVANCE MENSUAL
%
METRADO
AVANCE ACUMULADO
%
METRADO
SALDO
METRADO
0.00%
0.00 100.00%
14.19
0.00%
0.00
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
25.54
14.19
31.93
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00 100.00%
14.19
0.00%
0.00
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
20.62
117.37
1,043.53
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00 100.00%
0.00 100.00%
78.04
52.60
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00 100.00%
0.00 100.00%
20.40
12.00
0.00%
0.00%
0.00
0.00
100.00%
100.00%
1.00 100.00%
1.00 100.00%
1.00
1.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00 100.00%
0.00 100.00%
10.75
10.75
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
7.74
6.45
10.75
5.81
2.42
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00 100.00%
10.75
0.00%
0.00
0.00%
0.00 100.00%
1.00
0.00%
0.00
PARTIDA
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 04
: SISTEMA PTAR
DESCRIPCION
METRADO
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
%
METRADO
AVANCE ACUMULADO
%
METRADO
SALDO
METRADO
m2
m2
106.01
106.01
100.00%
100.00%
106.01
106.01
0.00%
0.00%
0.00 100.00%
0.00 100.00%
106.01
106.01
0.00%
0.00%
0.00
0.00
m3
m3
3.78
4.73
100.00%
100.00%
3.78
4.73
0.00%
0.00%
0.00 100.00%
0.00 100.00%
3.78
4.73
0.00%
0.00%
0.00
0.00
840.88
100.00%
840.88
0.00%
0.00 100.00%
840.88
0.00%
0.00
m3
m3
m2
kg
2.94
1.89
61.20
283.20
100.00%
100.00%
100.00%
100.00%
2.94
1.89
61.20
283.20
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
2.94
1.89
61.20
283.20
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
1.00
0.00%
0.00
100.00%
1.00 100.00%
1.00
0.00%
0.00
PARTIDA
F 05
1
1.01
01.01.01
01.01.01.01
01.01.02
01.01.02.01
01.01.03
01.01.03.01
01.01.03.02
01.01.03.03
01.01.03.04
01.01.03.05
01.01.04
01.01.04.01
01.01.04.02
1.02
01.02.01
01.02.02
01.02.03
01.02.04
1.03
01.03.01
1.04
01.04.01
1.05
01.05.01
01.05.02
1.06
01.06.01
01.06.02
1.07
01.07.01
01.07.02
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 05
METRADO
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
%
METRADO
AVANCE ACUMULADO
%
METRADO
SALDO
METRADO
100.00%
6.00
0.00%
0.00 100.00%
6.00
0.00%
0.00
100.00%
6.00
0.00%
0.00 100.00%
6.00
0.00%
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
6.00
1.00
35.77
100.00
1.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
6.00
1.00
35.77
100.00
1.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
1.00
1.00
0.00%
0.00%
0.00 100.00%
0.00 100.00%
1.00
1.00
0.00%
0.00%
0.00
0.00
100.00%
100.00%
100.00%
100.00%
6.00
6.00
3.00
3.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
6.00
6.00
3.00
3.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
1.00
0.00%
0.00 100.00%
1.00
0.00%
0.00
0.00%
0.00
100.00%
200.00 100.00%
200.00
0.00%
0.00
100.00%
100.00%
10.00
1.00
0.00%
0.00%
0.00 100.00%
0.00 100.00%
10.00
1.00
0.00%
0.00%
0.00
0.00
100.00%
100.00%
1.00
1.00
0.00%
0.00%
0.00 100.00%
0.00 100.00%
1.00
1.00
0.00%
0.00%
0.00
0.00
100.00%
100.00%
1.00
15.00
0.00%
0.00%
0.00 100.00%
0.00 100.00%
1.00
15.00
0.00%
0.00%
0.00
0.00
PARTIDA
2
2.01
02.01.01
02.01.02
2.02
02.02.01
02.02.02
02.02.03
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 05
METRADO
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
%
METRADO
AVANCE ACUMULADO
%
METRADO
SALDO
METRADO
glb
glb
1.00
1.00
100.00%
100.00%
1.00
1.00
0.00%
0.00%
0.00 100.00%
0.00 100.00%
1.00
1.00
0.00%
0.00%
0.00
0.00
glb
glb
glb
1.00
1.00
1.00
100.00%
100.00%
100.00%
1.00
1.00
1.00
0.00%
0.00%
0.00%
0.00 100.00%
0.00 100.00%
0.00 100.00%
1.00
1.00
1.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
PARTIDA
F 06
1
1.01
01.01.01
01.01.02
01.01.03
1.02
01.02.01
1.03
01.03.01
01.03.02
1.04
01.04.01
01.04.02
01.04.03
01.04.04
2
02.01
02.01.01
02.01.02
2.02
02.02.01
02.02.02
02.02.03
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 06
METRADO
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
%
METRADO
AVANCE ACUMULADO
%
METRADO
SALDO
METRADO
glb
glb
glb
1.00
1.00
1.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
100.00%
100.00%
100.00%
1.00 100.00%
1.00 100.00%
1.00 100.00%
1.00
1.00
1.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
glb
1.00
100.00%
1.00
0.00%
0.00 100.00%
1.00
0.00%
0.00
glb
glb
1.00
1.00
100.00%
100.00%
1.00
1.00
0.00%
0.00%
0.00 100.00%
0.00 100.00%
1.00
1.00
0.00%
0.00%
0.00
0.00
glb
glb
glb
u
1.00
1.00
1.00
1.00
100.00%
100.00%
100.00%
100.00%
1.00
1.00
1.00
1.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
1.00
1.00
1.00
1.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
glb
glb
1.00
1.00
82.78%
0.00%
0.83
0.00
17.22%
100.00%
0.17 100.00%
1.00 100.00%
1.00
1.00
0.00%
0.00%
0.00
0.00
glb
glb
glb
1.00
1.00
1.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
100.00%
100.00%
100.00%
1.00 100.00%
1.00 100.00%
1.00 100.00%
1.00
1.00
1.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
VALORIZACION DE OBRA N 07
PARTIDA
F 01
01
01.01
01.02
01.03
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 01
UND
METRADO
PRECIO
UNITARIO
PARCIAL
METRADO
AVANCE MENSUAL
MONTO
METRADO
AVANCE ACUMULADO
MONTO
INC. IGV
: 2,812,663.74
INC. IGV
DIAS
180
: 06/02/12
: 03/08/12
AMPLIACION DE PLAZO
AVANCE ANTERIOR
: 2,812,663.74
:.
SALDO
METRADO
MONTO
METRADO
MONTO
1.00
1.00
4,868.26
1,044.11
4,868.26
1,044.11
100.00%
100.00%
1.00
1.00
4,868.26
1,044.11
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
1.00
1.00
4,868.26
1,044.11
0.00%
0.00%
0.00
0.00
0.00
0.00
1.00
1.00
1.00
1.00
24.00
8,701.00
22,929.07
24,696.47
37,873.23
10,500.00
340.11
0.75
22,929.07
24,696.47
37,873.23
10,500.00
8,162.64
6,525.75
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
1.00
1.00
1.00
24.00
8,701.00
22,929.07
24,696.47
37,873.23
10,500.00
8,162.64
6,525.75
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
1.00
1.00
1.00
24.00
8,701.00
22,929.07
24,696.47
37,873.23
10,500.00
8,162.64
6,525.75
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
116,599.53
13,991.94
11,659.95
142,251.42
25,605.26
167,856.68
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
116,599.53
13,991.94
11,659.95
142,251.42
25,605.26
167,856.68
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
116,599.53
13,991.94
11,659.95
142,251.42
25,605.26
167,856.68
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
167,856.68
100.00%
167,856.68
0.00%
0.00
100.00%
167,856.68
0.00%
0.00
FR =
INC IGV
SIN IGV
PRECIO
MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO
1.000000
167,856.68
142,251.42
167,856.68
142,251.42
0.00
0.00
167,856.68
142,251.42
0.00
0.00
VALORIZACION DE OBRA N 07
PARTIDA
F 02
01
01.01
01.01.01
01.01.02
01.02
01.02.01
01.03
01.03.01
01.03.02
01.04
01.04.01
01.04.02
01.05
01.05.01
02
02.01
02.01.01
02.01.02
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.03
02.03.01
02.03.02
02.04
02.04.01
02.04.02
02.04.03
02.05
02.05.01
02.05.02
02.06
02.06.01
02.06.02
02.07
02.07.01
03
03.01
03.01.01
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 02
UND
METRADO
MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO
PRECIO
UNITARIO
PARCIAL
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
MONTO
METRADO
AVANCE ACUMULADO
MONTO
INC. IGV
: 2,812,663.74
INC. IGV
DIAS
180
: 06/02/12
: 03/08/12
AMPLIACION DE PLAZO
PRECIO
: 2,812,663.74
:.
SALDO
METRADO
MONTO
METRADO
MONTO
m2
m2
8.55
8.55
2.04
2.06
17.44
17.61
100.00%
100.00%
8.55
8.55
17.44
17.61
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
8.55
8.55
17.44
17.61
0.00%
0.00%
0.00
0.00
0.00
0.00
m3
1.73
160.57
277.79
100.00%
1.73
277.79
0.00%
0.00
0.00
100.00%
1.73
277.79
0.00%
0.00
0.00
m2
m2
10.85
9.40
33.00
27.42
358.05
257.75
100.00%
100.00%
10.85
9.40
358.05
257.75
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
10.85
9.40
358.05
257.75
0.00%
0.00%
0.00
0.00
0.00
0.00
und
und
1.00
1.00
1,095.96
965.59
1,095.96
965.59
100.00%
100.00%
1.00
1.00
1,095.96
965.59
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
1.00
1.00
1,095.96
965.59
0.00%
0.00%
0.00
0.00
0.00
0.00
m2
9.40
12.83
120.60
0.00%
0.00
0.00
100.00%
9.40
120.60
100.00%
9.40
120.60
0.00%
0.00
0.00
m2
m2
8.55
8.55
2.04
2.06
17.44
17.61
100.00%
100.00%
8.55
8.55
17.44
17.61
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
8.55
8.55
17.44
17.61
0.00%
0.00%
0.00
0.00
0.00
0.00
m3
m2
m3
m3
7.76
8.55
2.51
6.56
31.62
2.32
44.52
30.61
245.37
19.84
111.75
200.80
100.00%
100.00%
100.00%
100.00%
7.76
8.55
2.51
6.56
245.37
19.84
111.75
200.80
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
7.76
8.55
2.51
6.56
245.37
19.84
111.75
200.80
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m3
m3
0.58
1.73
444.83
160.57
258.00
277.79
100.00%
100.00%
0.58
1.73
258.00
277.79
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
0.58
1.73
258.00
277.79
0.00%
0.00%
0.00
0.00
0.00
0.00
m3
m2
Kg
2.72
23.73
119.80
465.04
40.88
5.24
1,264.91
970.08
627.75
100.00%
100.00%
100.00%
2.72
23.73
119.80
1,264.91
970.08
627.75
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
2.72
23.73
119.80
1,264.91
970.08
627.75
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m2
m2
10.85
9.40
33.00
27.42
358.05
257.75
100.00%
100.00%
10.85
9.40
358.05
257.75
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
10.85
9.40
358.05
257.75
0.00%
0.00%
0.00
0.00
0.00
0.00
und
und
1.00
1.00
1,095.96
965.59
1,095.96
965.59
100.00%
100.00%
1.00
1.00
1,095.96
965.59
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
1.00
1.00
1,095.96
965.59
0.00%
0.00%
0.00
0.00
0.00
0.00
m2
9.40
12.83
120.60
0.00%
0.00
0.00
100.00%
9.40
120.60
100.00%
9.40
120.60
0.00%
0.00
0.00
m2
1.70
2.04
3.47
100.00%
1.70
3.47
-100.00%
-1.70
-3.47
0.00%
0.00
0.00
100.00%
1.70
3.47
VALORIZACION DE OBRA N 07
PARTIDA
03.01.02
03.02
03.02.01
03.02.02
03.02.03
03.03
03.03.01
03.03.02
03.03.03
03.04
03.04.01
03.04.02
03.05
03.05.01
03.05.02
03.05.03
03.06
03.06.01
03.06.02
03.06.03
03.07
03.07.01
04
04.01
04.01.01
04.01.02
04.01.03
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.03
04.03.01
04.03.02
04.03.03
05
05.01
05.01.01
05.01.02
05.02
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 02
UND
METRADO
MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO
PRECIO
UNITARIO
PARCIAL
TRAZO Y REPLANTEO
m2
1.70
2.06
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
m3
1.36
31.62
REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
1.70
2.32
ELIMINACION DE MATERIAL EXCEDENTE
m3
1.70
30.61
OBRAS DE CONCRETO ARMADO
CONCRETO F'c= 175 KG/CM2
m3
0.48
444.83
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
m2
7.31
40.88
ACERO FY=4200 KG/CM2
Kg
31.41
5.24
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
m2
1.80
33.00
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
4.52
27.42
VARIOS
TUBERIA DE INGRESO A C.R. PVC SAP C-10 DE 1 1/2"
und
1.00
140.59
TUBERIA DE SALIDA DE C.R. PVC SAP C-10 DE 1 1/2"
und
1.00
260.59
TUBERIA DE LIMPIEZA Y DESAGUE DE 2" SAL PVC
und
1.00
193.75
CARPINTERIA METALICA 332.45
TAPA METALICA 0.73X0.73X1/8"
und
1.00
152.42
TAPA METALICA 0.45X0.36X1/8"
und
1.00
84.22
TAPA METALICA 0.46X0.50X1/8"
und
1.00
95.81
PINTURA
PINTURA LATEX EN MUROS 2 MANOS
m2
4.52
12.83
LINEA DE CONDUCCION
TRABAJOS PRELIMINARES
LIMPIEZA DE LINEA DE CONDUCCION
ml
2,085.53
1.04
TRAZO, NIVELACION Y REPLANTEO
ml
2,085.53
1.99
TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA
ml
2,085.53
3.33
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA EN TERRENO NORMAL COMPACTO
m3
875.92
18.45
REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS
m2
1,251.32
2.17
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO
ml
2,085.53
9.49
RELLENO COMPACTADO C/PLANCHA VIBRAT. HASTA H=3.00 M CON MAT/PROPIO
m3ZARANDEADO
875.92
EN CAPAS DE37.80
20CM
ELIMINACION DE MATERIAL EXCEDENTE
m3
218.98
30.61
TUBERIAS
TUBERIA DE PVC ISO C-10 DE 1 1/2"
ml
2,085.53
18.99
SUMINISTRO E INSTALACION DE ACCESORIOS PVC RED CONDUCCION
glb
1.00
817.91
PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8" A ZANJA TAPADA
ml
2,085.53
3.85
TANQUILLA ROMPERCARGA (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
3.70
2.04
TRAZO Y REPLANTEO
m2
3.70
2.06
MOVIMIENTO DE TIERRAS
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
MONTO
METRADO
AVANCE ACUMULADO
MONTO
INC. IGV
: 2,812,663.74
INC. IGV
DIAS
180
: 06/02/12
: 03/08/12
AMPLIACION DE PLAZO
PRECIO
: 2,812,663.74
:.
SALDO
METRADO
MONTO
METRADO
MONTO
3.50
100.00%
1.70
3.50
-100.00%
-1.70
-3.50
0.00%
0.00
0.00
100.00%
1.70
3.50
43.00
3.94
52.04
100.00%
100.00%
100.00%
1.36
1.70
1.70
43.00
3.94
52.04
-100.00%
-100.00%
-100.00%
-1.36
-1.70
-1.70
-43.00
-3.94
-52.04
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
1.36
1.70
1.70
43.00
3.94
52.04
213.52
298.83
164.59
100.00%
100.00%
100.00%
0.48
7.31
31.41
213.52
298.83
164.59
-100.00%
-100.00%
-100.00%
-0.48
-7.31
-31.41
-213.52
-298.83
-164.59
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
0.48
7.31
31.41
213.52
298.83
164.59
59.40
123.94
100.00%
100.00%
1.80
4.52
59.40
123.94
-100.00%
-100.00%
-1.80
-4.52
-59.40
-123.94
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
1.80
4.52
59.40
123.94
140.59
260.59
193.75
100.00%
100.00%
100.00%
1.00
1.00
1.00
140.59
260.59
193.75
-100.00%
-100.00%
-100.00%
-1.00
-1.00
-1.00
-140.59
-260.59
-193.75
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
1.00
1.00
1.00
140.59
260.59
193.75
152.42
84.22
95.81
100.00%
100.00%
100.00%
1.00
1.00
1.00
152.42
84.22
95.81
-100.00%
-100.00%
-100.00%
-1.00
-1.00
-1.00
-152.42
-84.22
-95.81
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
1.00
1.00
1.00
152.42
84.22
95.81
57.99
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
4.52
57.99
2,168.95
4,150.20
6,944.81
100.00%
100.00%
100.00%
2,085.53
2,085.53
2,085.53
2,168.95
4,150.20
6,944.81
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
2,085.53
2,085.53
2,085.53
2,168.95
4,150.20
6,944.81
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
16,160.72
2,715.36
19,791.68
33,109.78
6,702.98
100.00%
100.00%
100.00%
100.00%
100.00%
875.92
1,251.32
2,085.53
875.92
218.98
16,160.72
2,715.36
19,791.68
33,109.78
6,702.98
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
875.92
1,251.32
2,085.53
875.92
218.98
16,160.72
2,715.36
19,791.68
33,109.78
6,702.98
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39,604.21
817.91
8,029.29
100.00%
100.00%
100.00%
2,085.53
1.00
2,085.53
39,604.21
817.91
8,029.29
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
2,085.53
1.00
2,085.53
39,604.21
817.91
8,029.29
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
7.55
7.62
100.00%
100.00%
3.70
3.70
7.55
7.62
-100.00%
-100.00%
-3.70
-3.70
-7.55
-7.62
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
3.70
3.70
7.55
7.62
VALORIZACION DE OBRA N 07
PARTIDA
05.02.01
05.02.02
05.02.03
05.03
05.03.01
05.03.02
05.03.03
05.04
05.04.01
05.04.02
05.04.03
05.05
05.05.01
05.05.02
05.06
05.06.01
05.06.02
05.06.03
05.07
05.07.01
05.07.02
05.08
05.08.01
06
06.01
06.01.01
06.01.02
06.02
06.02.01
06.02.02
06.02.03
06.03
06.03.01
06.03.02
06.03.03
06.04
06.04.01
06.04.02
06.04.03
06.05
06.05.01
06.05.02
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 02
EXCAVACION MANUAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
DADOS DE CONCRETO F'c=140 Kg/cm2
ENCOFRADO Y DESENCOFRADO NORMAL
OBRAS DE CONCRETO ARMADO
CONCRETO F'c= 175 KG/CM2
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
ACERO FY=4200 KG/CM2
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
TUBERIAS Y ACCESORIOS
TUBERIA DE INGRESO A C.R. PVC SAP C-10 DE 1 1/2"
TUBERIA DE SALIDA DE C.R. PVC SAP C-10 DE 1 1/2"
TUBERIA DE REBOSE Y LIMPIA DESAGUE DE 2" SAL PVC
CARPINTERIA METALICA
TAPA METALICA 0.65X0.75X3/16"
TAPA METALICA 0.65X0.65X3/16"
PINTURA
PINTURA LATEX EN MUROS 2 MANOS
CAMARA ROMPE PRESION (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
CONCRETO F'C=140 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
OBRAS DE CONCRETO ARMADO
CONCRETO F'c= 175 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO FY=4200 KG/CM2
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
UND
METRADO
MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO
PRECIO
UNITARIO
PARCIAL
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
MONTO
METRADO
AVANCE ACUMULADO
MONTO
INC. IGV
: 2,812,663.74
INC. IGV
DIAS
180
: 06/02/12
: 03/08/12
AMPLIACION DE PLAZO
PRECIO
: 2,812,663.74
:.
SALDO
METRADO
MONTO
METRADO
MONTO
m3
m2
m3
4.33
3.70
5.41
31.62
2.32
30.61
136.91
8.58
165.60
100.00%
100.00%
100.00%
4.33
3.70
5.41
136.91
8.58
165.60
-100.00%
-100.00%
-100.00%
-4.33
-3.70
-5.41
-136.91
-8.58
-165.60
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
4.33
3.70
5.41
136.91
8.58
165.60
m2
m3
m2
3.70
0.46
1.22
190.41
354.25
44.07
704.52
162.96
53.77
100.00%
100.00%
100.00%
3.70
0.46
1.22
704.52
162.96
53.77
-100.00%
-100.00%
-100.00%
-3.70
-0.46
-1.22
-704.52
-162.96
-53.77
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
3.70
0.46
1.22
704.52
162.96
53.77
m3
m2
kg
1.92
19.39
104.23
444.83
40.88
5.24
854.07
792.66
546.17
100.00%
100.00%
100.00%
1.92
19.39
104.23
854.07
792.66
546.17
-100.00%
-100.00%
-100.00%
-1.92
-19.39
-104.23
-854.07
-792.66
-546.17
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
1.92
19.39
104.23
854.07
792.66
546.17
m2
m2
10.61
10.91
33.00
27.42
350.13
299.15
100.00%
100.00%
10.61
10.91
350.13
299.15
-100.00%
-100.00%
-10.61
-10.91
-350.13
-299.15
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
10.61
10.91
350.13
299.15
und
und
und
1.00
1.00
1.00
140.59
260.59
301.86
140.59
260.59
301.86
100.00%
100.00%
100.00%
1.00
1.00
1.00
140.59
260.59
301.86
-100.00%
-100.00%
-100.00%
-1.00
-1.00
-1.00
-140.59
-260.59
-301.86
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
1.00
1.00
1.00
140.59
260.59
301.86
und
und
1.00
1.00
144.08
132.13
144.08
132.13
100.00%
100.00%
1.00
1.00
144.08
132.13
-100.00%
-100.00%
-1.00
-1.00
-144.08
-132.13
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
1.00
1.00
144.08
132.13
m2
10.91
12.83
139.98
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
10.91
139.98
m2
m2
1.92
1.92
2.04
2.06
3.92
3.96
100.00%
100.00%
1.92
1.92
3.92
3.96
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
1.92
1.92
3.92
3.96
0.00%
0.00%
0.00
0.00
0.00
0.00
m3
m2
m3
0.86
1.92
1.08
31.62
2.32
30.61
27.19
4.45
33.06
100.00%
100.00%
100.00%
0.86
1.92
1.08
27.19
4.45
33.06
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
0.86
1.92
1.08
27.19
4.45
33.06
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m2
m3
m2
1.92
0.11
0.92
190.41
415.25
44.07
365.59
45.68
40.54
100.00%
100.00%
100.00%
1.92
0.11
0.92
365.59
45.68
40.54
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
1.92
0.11
0.92
365.59
45.68
40.54
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m3
m2
kg
0.95
8.87
61.36
444.83
44.07
5.24
422.59
390.90
321.53
100.00%
100.00%
100.00%
0.95
8.87
61.36
422.59
390.90
321.53
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
0.95
8.87
61.36
422.59
390.90
321.53
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m2
m2
6.32
4.18
33.00
27.42
208.56
114.62
100.00%
100.00%
6.32
4.18
208.56
114.62
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
6.32
4.18
208.56
114.62
0.00%
0.00%
0.00
0.00
0.00
0.00
VALORIZACION DE OBRA N 07
PARTIDA
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 02
06.06
SUMINISTRO E INSTALACION DE TUBERIAS
06.06.01 TUBERIA DE INGRESO A C.R. PVC SAP C-10 DE 1 1/2"
06.06.02 TUBERIA DE SALIDA DE C.R. PVC SAP C-10 DE 1 1/2"
06.06.03 TUBERIA DE REBOSE Y LIMPIA DESAGUE DE 2" SAL PVC
06.07
SUMINISTRO E INSTALACION DE VALVULAS
06.07.01 VALVULA COMPUERTA HD C/ELASTOMERO 2"
06.07.02 VALVULA REDUCTORA DE PRESION 2"
06.08
CARPINTERIA METALICA
06.08.01 TAPA METALICA 0.40X0.45X1/8"
06.08.02 TAPA METALICA 0.60X0.60X1/8"
06.09
PINTURA
06.09.01 PINTURA LATEX EN MUROS 2 MANOS
07
REHABILITACION DE RESERVORIO EXISTENTE
07.01
TRABAJOS PRELIMINARES
07.01.01 LIMPIEZA DE TERRENO MANUAL
07.01.02 TRAZO Y REPLANTEO
07.02
REVOQUES Y ENLUCIDOS
07.02.01 TARRAJEO CON IMPERMEABILIZANTES
07.02.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
07.03
PINTURA
07.03.01 PINTURA LATEX EN MUROS 2 MANOS
07.03.02 PINTURA EN ESTRUCTURAS METALICAS
07.04
CARPINTERIA METALICA
07.04.01 ESCALERA GATO, TUB F.GVZDO. C/PARANTES DE 1 1/2" SEGUN DISEO
07.04.02 TAPA METALICA 0.60X0.60X1/8"
07.05
INSTALACIONES SANITARIAS
07.05.01 TUBERIA DE REBOSE Y DESAGUE DE 2 1/2" SAL PVC
07.05.02 TUBERIA DE SALIDA DE PVC SAP C-10 DE 1 1/2"
07.05.03 ACCESORIOS DE RESERVORIO
08
RESERVORIO CIRCULAR (35 M3)
08.01
TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL
08.01.02 TRAZO Y REPLANTEO
08.02
MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION DE CIMIENTOS EN TERENO COMPACTO
08.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL
08.02.03 ELIMINACION MATERIAL EXCEDENTE A MANO D<200M
08.03
OBRAS DE CONCRETO SIMPLE
08.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON
08.04
OBRAS DE CONCRETO ARMADO
08.04.01 LOSA
08.04.01.01 CONCRETO F'C=210 KG/CM2 EN LOSA
UND
METRADO
MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO
PRECIO
UNITARIO
PARCIAL
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
MONTO
METRADO
AVANCE ACUMULADO
MONTO
INC. IGV
: 2,812,663.74
INC. IGV
DIAS
180
: 06/02/12
: 03/08/12
AMPLIACION DE PLAZO
PRECIO
: 2,812,663.74
:.
SALDO
METRADO
MONTO
METRADO
MONTO
und
und
und
1.00
1.00
1.00
140.59
260.59
301.86
140.59
260.59
301.86
100.00%
100.00%
100.00%
1.00
1.00
1.00
140.59
260.59
301.86
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
1.00
1.00
1.00
140.59
260.59
301.86
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
und
und
1.00
1.00
280.93
145.03
280.93
145.03
100.00%
100.00%
1.00
1.00
280.93
145.03
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
1.00
1.00
280.93
145.03
0.00%
0.00%
0.00
0.00
0.00
0.00
und
und
1.00
1.00
94.43
120.63
94.43
120.63
100.00%
100.00%
1.00
1.00
94.43
120.63
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
1.00
1.00
94.43
120.63
0.00%
0.00%
0.00
0.00
0.00
0.00
m2
4.18
12.83
53.63
0.00%
0.00
0.00
100.00%
4.18
53.63
100.00%
4.18
53.63
0.00%
0.00
0.00
m2
m2
7.50
7.50
2.04
2.06
15.30
15.45
100.00%
100.00%
7.50
7.50
15.30
15.45
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
7.50
7.50
15.30
15.45
0.00%
0.00%
0.00
0.00
0.00
0.00
m2
m2
9.00
22.50
33.00
27.42
297.00
616.95
100.00%
100.00%
9.00
22.50
297.00
616.95
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
9.00
22.50
297.00
616.95
0.00%
0.00%
0.00
0.00
0.00
0.00
m2
ml
30.00
2.50
12.83
25.44
384.90
63.60
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
30.00
2.50
384.90
63.60
100.00%
100.00%
30.00
2.50
384.90
63.60
0.00%
0.00%
0.00
0.00
0.00
0.00
ml
und
2.50
2.00
84.97
120.63
212.43
241.26
100.00%
100.00%
2.50
2.00
212.43
241.26
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
2.50
2.00
212.43
241.26
0.00%
0.00%
0.00
0.00
0.00
0.00
und
und
glb
1.00
2.00
1.00
229.24
394.99
6,646.05
229.24
789.98
6,646.05
100.00%
100.00%
100.00%
1.00
2.00
1.00
229.24
789.98
6,646.05
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
1.00
2.00
1.00
229.24
789.98
6,646.05
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m2
m2
47.90
47.90
2.04
2.06
97.72
98.67
100.00%
100.00%
47.90
47.90
97.72
98.67
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
47.90
47.90
97.72
98.67
0.00%
0.00%
0.00
0.00
0.00
0.00
m3
m2
m3
57.48
47.90
74.85
55.34
2.32
30.61
3,180.94
111.13
2,291.16
100.00%
100.00%
100.00%
57.48
47.90
74.85
3,180.94
111.13
2,291.16
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
57.48
47.90
74.85
3,180.94
111.13
2,291.16
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m2
47.90
190.41
9,120.64
100.00%
47.90
9,120.64
0.00%
0.00
0.00
100.00%
47.90
9,120.64
0.00%
0.00
0.00
m3
16.33
361.78
5,907.87
100.00%
16.33
5,907.87
0.00%
0.00
0.00
100.00%
16.33
5,907.87
0.00%
0.00
0.00
VALORIZACION DE OBRA N 07
PARTIDA
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 02
UND
METRADO
MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO
PRECIO
UNITARIO
PARCIAL
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
MONTO
METRADO
AVANCE ACUMULADO
MONTO
INC. IGV
: 2,812,663.74
INC. IGV
DIAS
180
: 06/02/12
: 03/08/12
AMPLIACION DE PLAZO
PRECIO
: 2,812,663.74
:.
SALDO
METRADO
MONTO
METRADO
MONTO
m2
kg
25.00
235.99
48.43
5.24
1,210.75
1,236.59
100.00%
100.00%
25.00
235.99
1,210.75
1,236.59
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
25.00
235.99
1,210.75
1,236.59
0.00%
0.00%
0.00
0.00
0.00
0.00
m3
m2
kg
19.79
120.44
1,258.68
452.15
47.03
5.24
8,948.05
5,664.29
6,595.48
100.00%
100.00%
100.00%
19.79
120.44
1,258.68
8,948.05
5,664.29
6,595.48
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
19.79
120.44
1,258.68
8,948.05
5,664.29
6,595.48
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m3
m2
kg
6.06
42.32
267.91
480.64
57.30
5.24
2,912.68
2,424.94
1,403.85
100.00%
100.00%
100.00%
6.06
42.32
267.91
2,912.68
2,424.94
1,403.85
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
6.06
42.32
267.91
2,912.68
2,424.94
1,403.85
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m3
m2
kg
0.78
12.50
142.68
461.09
43.90
5.24
359.65
548.75
747.64
100.00%
100.00%
100.00%
0.78
12.50
142.68
359.65
548.75
747.64
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
0.78
12.50
142.68
359.65
548.75
747.64
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m3
m2
kg
2.10
15.10
224.45
361.78
53.50
5.24
759.74
807.85
1,176.12
100.00%
100.00%
100.00%
2.10
15.10
224.45
759.74
807.85
1,176.12
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
2.10
15.10
224.45
759.74
807.85
1,176.12
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m2
m2
131.74
136.84
33.00
27.42
4,347.42
3,752.15
100.00%
100.00%
131.74
136.84
4,347.42
3,752.15
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
131.74
136.84
4,347.42
3,752.15
0.00%
0.00%
0.00
0.00
0.00
0.00
m3
m2
13.56
2.97
320.53
46.42
4,346.39
137.87
100.00%
100.00%
13.56
2.97
4,346.39
137.87
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
13.56
2.97
4,346.39
137.87
0.00%
0.00%
0.00
0.00
0.00
0.00
m2
m
136.84
9.60
12.83
25.44
1,755.66
244.22
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
136.84
9.60
1,755.66
244.22
100.00%
100.00%
136.84
9.60
1,755.66
244.22
0.00%
0.00%
0.00
0.00
0.00
0.00
m
u
9.60
2.00
84.97
120.63
815.71
241.26
100.00%
100.00%
9.60
2.00
815.71
241.26
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
9.60
2.00
815.71
241.26
0.00%
0.00%
0.00
0.00
0.00
0.00
u
u
glb
1.00
1.00
1.00
229.24
394.99
6,646.05
229.24
394.99
6,646.05
100.00%
100.00%
100.00%
1.00
1.00
1.00
229.24
394.99
6,646.05
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
1.00
1.00
1.00
229.24
394.99
6,646.05
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m
m
m
1,574.63
1,574.63
1,574.63
1.04
1.99
3.33
1,637.62
3,133.51
5,243.52
100.00%
100.00%
100.00%
1,574.63
1,574.63
1,574.63
1,637.62
3,133.51
5,243.52
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
1,574.63
1,574.63
1,574.63
1,637.62
3,133.51
5,243.52
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m3
m2
661.34
944.78
18.45
2.17
12,201.72
2,050.17
100.00%
100.00%
661.34
944.78
12,201.72
2,050.17
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
661.34
944.78
12,201.72
2,050.17
0.00%
0.00%
0.00
0.00
0.00
0.00
VALORIZACION DE OBRA N 07
PARTIDA
09.02.03
09.02.04
09.02.05
9.03
09.03.01
09.03.02
09.03.03
9.04
09.04.01
09.04.02
09.04.03
09.04.04
09.04.05
10
10.01
10.01.01
10.01.02
10.01.03
10.02
10.02.01
10.02.02
10.02.03
10.02.04
10.02.05
10.03
10.03.01
10.03.02
10.03.03
10.03.04
11
11.01
11.01.01
11.01.02
11.02
11.02.01
11.02.02
11.03
11.03.01
11.03.02
11.04
11.04.01
11.05
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 02
UND
METRADO
MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO
PRECIO
UNITARIO
PARCIAL
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
MONTO
METRADO
AVANCE ACUMULADO
MONTO
INC. IGV
: 2,812,663.74
INC. IGV
DIAS
180
: 06/02/12
: 03/08/12
AMPLIACION DE PLAZO
PRECIO
: 2,812,663.74
:.
SALDO
METRADO
MONTO
METRADO
MONTO
14,943.24
24,998.65
5,061.06
100.00%
100.00%
100.00%
1,574.63
661.34
165.34
14,943.24
24,998.65
5,061.06
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
1,574.63
661.34
165.34
14,943.24
24,998.65
5,061.06
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
29,902.22
642.71
6,062.33
100.00%
100.00%
100.00%
1,574.63
1.00
1,574.63
29,902.22
642.71
6,062.33
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
1,574.63
1.00
1,574.63
29,902.22
642.71
6,062.33
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
155.69
450.00
160.00
450.00
150.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.35
30.00
4.00
30.00
6.00
155.69
450.00
160.00
450.00
150.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.35
30.00
4.00
30.00
6.00
155.69
450.00
160.00
450.00
150.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,256.78
8,145.19
13,629.89
100.00%
100.00%
100.00%
4,093.06
4,093.06
4,093.06
4,256.78
8,145.19
13,629.89
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
4,093.06
4,093.06
4,093.06
4,256.78
8,145.19
13,629.89
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
31,717.21
5,329.17
38,843.14
64,981.60
13,155.26
100.00%
100.00%
100.00%
100.00%
100.00%
1,719.09
2,455.84
4,093.06
1,719.09
429.77
31,717.21
5,329.17
38,843.14
64,981.60
13,155.26
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
1,719.09
2,455.84
4,093.06
1,719.09
429.77
31,717.21
5,329.17
38,843.14
64,981.60
13,155.26
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
23,324.09
39,362.76
834.78
15,758.28
100.00%
100.00%
100.00%
100.00%
1,228.23
2,864.83
1.00
4,093.06
23,324.09
39,362.76
834.78
15,758.28
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
1,228.23
2,864.83
1.00
4,093.06
23,324.09
39,362.76
834.78
15,758.28
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14.69
14.83
100.00%
100.00%
7.20
7.20
14.69
14.83
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
7.20
7.20
14.69
14.83
0.00%
0.00%
0.00
0.00
0.00
0.00
182.13
220.39
100.00%
100.00%
5.76
7.20
182.13
220.39
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
5.76
7.20
182.13
220.39
0.00%
0.00%
0.00
0.00
0.00
0.00
1,089.83
1,720.93
100.00%
100.00%
2.45
39.05
1,089.83
1,720.93
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
2.45
39.05
1,089.83
1,720.93
0.00%
0.00%
0.00
0.00
0.00
0.00
655.05
100.00%
19.85
655.05
0.00%
0.00
0.00
100.00%
19.85
655.05
0.00%
0.00
0.00
VALORIZACION DE OBRA N 07
PARTIDA
11.05.01
11.06
11.06.01
11.07
11.07.01
11.07.02
12
12.01
12.01.01
12.01.02
12.02
12.02.01
12.02.02
12.02.03
12.03
12.03.01
12.03.02
12.03.03
12.04
12.04.01
12.04.02
12.04.03
12.05
12.05.01
12.05.02
12.05.03
13
13.01
13.01.01
13.01.02
13.02
13.02.01
13.02.02
13.02.03
13.02.04
13.03
13.03.01
13.03.02
13.04
13.04.01
13.05
13.05.01
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 02
UND
METRADO
MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO
PRECIO
UNITARIO
PARCIAL
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
MONTO
METRADO
AVANCE ACUMULADO
MONTO
INC. IGV
: 2,812,663.74
INC. IGV
DIAS
180
: 06/02/12
: 03/08/12
AMPLIACION DE PLAZO
PRECIO
: 2,812,663.74
:.
SALDO
METRADO
MONTO
METRADO
MONTO
10.00
94.43
944.30
100.00%
10.00
944.30
0.00%
0.00
0.00
100.00%
10.00
944.30
0.00%
0.00
0.00
m2
19.85
12.83
254.68
100.00%
19.85
254.68
0.00%
0.00
0.00
100.00%
19.85
254.68
0.00%
0.00
0.00
u
u
7.00
3.00
115.53
128.53
808.71
385.59
100.00%
100.00%
7.00
3.00
808.71
385.59
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
7.00
3.00
808.71
385.59
0.00%
0.00%
0.00
0.00
0.00
0.00
m2
m2
3.84
3.84
2.04
2.06
7.83
7.91
100.00%
100.00%
3.84
3.84
7.83
7.91
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
3.84
3.84
7.83
7.91
0.00%
0.00%
0.00
0.00
0.00
0.00
m3
m3
m3
5.76
5.28
0.60
31.62
44.52
30.61
182.13
235.07
18.37
100.00%
100.00%
100.00%
5.76
5.28
0.60
182.13
235.07
18.37
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
5.76
5.28
0.60
182.13
235.07
18.37
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m2
m3
m2
2.56
0.26
3.14
190.41
444.83
44.07
487.45
115.66
138.38
100.00%
100.00%
100.00%
2.56
0.26
3.14
487.45
115.66
138.38
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
2.56
0.26
3.14
487.45
115.66
138.38
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m3
m2
kg
1.48
17.92
83.29
482.32
44.07
5.24
713.83
789.73
436.44
100.00%
100.00%
100.00%
1.48
17.92
83.29
713.83
789.73
436.44
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
1.48
17.92
83.29
713.83
789.73
436.44
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m
u
u
6.00
2.00
2.00
15.95
87.76
902.76
95.70
175.52
1,805.52
100.00%
100.00%
100.00%
6.00
2.00
2.00
95.70
175.52
1,805.52
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
6.00
2.00
2.00
95.70
175.52
1,805.52
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m
m
668.00
668.00
1.99
3.33
1,329.32
2,224.44
100.00%
100.00%
668.00
668.00
1,329.32
2,224.44
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
668.00
668.00
1,329.32
2,224.44
0.00%
0.00%
0.00
0.00
0.00
0.00
m3
m2
m
m3
280.56
400.80
668.00
280.56
18.45
2.17
11.17
44.52
5,176.33
869.74
7,461.56
12,490.53
100.00%
100.00%
100.00%
100.00%
280.56
400.80
668.00
280.56
5,176.33
869.74
7,461.56
12,490.53
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
280.56
400.80
668.00
280.56
5,176.33
869.74
7,461.56
12,490.53
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m
m
668.00
668.00
8.49
3.85
5,671.32
2,571.80
100.00%
100.00%
668.00
668.00
5,671.32
2,571.80
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
668.00
668.00
5,671.32
2,571.80
0.00%
0.00%
0.00
0.00
0.00
0.00
glb
1.00
1,453.00
1,453.00
100.00%
1.00
1,453.00
0.00%
0.00
0.00
100.00%
1.00
1,453.00
0.00%
0.00
0.00
105.00
138.70
14,563.50
100.00%
105.00
14,563.50
0.00%
0.00
0.00
100.00%
105.00
14,563.50
0.00%
0.00
0.00
VALORIZACION DE OBRA N 07
PARTIDA
13.05.02
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 02
UND
METRADO
62.00
FR =
INC IGV
SIN IGV
MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO
PRECIO
UNITARIO
PARCIAL
135.10
AVANCE ANTERIOR
%
8,376.20
100.00%
688,953.41
82,674.41
68,895.34
840,523.16
151,294.17
991,817.33
991,817.33
METRADO
62.00
AVANCE MENSUAL
MONTO
8,376.20
0.00%
99.57%
99.57%
99.57%
99.57%
99.57%
99.57%
686,012.22
82,321.47
68,601.22
836,934.91
150,648.28
987,583.19
99.57%
987,583.19
METRADO
0.00
AVANCE ACUMULADO
MONTO
0.00
100.00%
-0.61%
-1.00%
-0.61%
-0.61%
-0.61%
-0.61%
-4,219.34
-506.32
-421.93
-5,147.59
-926.57
-6,074.16
-0.61%
-6,074.16
INC. IGV
: 2,812,663.74
INC. IGV
DIAS
180
: 06/02/12
: 03/08/12
AMPLIACION DE PLAZO
PRECIO
: 2,812,663.74
:.
SALDO
METRADO
62.00
MONTO
METRADO
0.00
MONTO
8,376.20
0.00%
0.00
98.96%
98.96%
98.96%
98.96%
98.96%
98.96%
681,792.88
81,815.15
68,179.29
831,787.32
149,721.72
981,509.04
1.04%
1.04%
1.04%
1.04%
1.04%
1.04%
7,160.53
859.26
716.05
8,735.84
1,572.45
10,308.29
98.96%
981,509.04
1.04%
10,308.30
1.000000
991,817.33
840,523.16
987,583.19
836,934.91
-6,074.16
-5,147.59
981,509.04
831,787.32
10,308.30
8,735.85
VALORIZACION DE OBRA N 07
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 03
SISTEMA DE ALCANTARILLADO
PARTIDA
F 03
1
1.01
1.01.01
1.01.02
1.02
1.03
1.04
2
2.01
2.02
2.03
3
3.01
3.02
3.03
DESCRIPCION
UND
METRADO
SISTEMA DE ALCANTARILLADO
RED DE ALCANTARILLADO
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO
m
4,350.50
TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA
m
4,350.50
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA EN TERRENO NORMAL COMPACTO
m3
3,132.35
CORTE DE PAVIMENTO RIGIDO C/EQUIPO
m
246.45
REPOSICION DE PAVIMENTO DE CONCRETO F'C=210 KG/CM2, LOSA E=10"
m2
172.50
REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS
m2
2,610.30
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO
m
4,350.50
RELLENO COMPACTADO C/PLANCHA VIBRAT. HASTA H=3.00 M CON
m3
2,479.79
ELIMINACION DE MATERIAL EXCEDENTE
m3
815.72
SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 110MM
m
659.32
TUBERIA PVC ALCANT U.F. ISO 4435,S-25 160MM
m
937.32
TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM
m
2,753.86
VARIOS
PRUEBA HIDRAULICA - ESCORRENTIA DE TUB. A ZANJA ABIERTA
m
4,350.50
PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MOD. - DENSIDAD DE
u
10.00
BUZONES
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
110.55
TRAZO Y REPLANTEO
m2
110.55
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
m3
178.89
ELIMINACION DE MATERIAL EXCEDENTE
m3
223.61
CONSTRUCCION DE BUZONES
BUZON DE CONCRETO TIPO 1, h= 1.50 m
u
15.00
BUZON DE CONCRETO TIPO 2, h= 1.50 m a 3.00 M.
u
40.00
CONEXIONES DOMICILIARIAS DE ALCANTARILLADO
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
668.00
TRAZO, NIVELACION Y REPLANTEO
m
668.00
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
m3
480.96
REFINE NIVELACION INTERIOR APISONADO MANUAL
m2
400.80
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO
m
668.00
RELLENO COMPACTADO C/PLANCHA VIBRAT. HASTA H=3.00 M CON MAT/PROPIO ZARANDEADO
m3EN CAPAS DE
380.76
20CM
ELIMINACION DE MATERIAL EXCEDENTE
m3
125.25
CONEXIONES DOMICILIARIAS
CONEXIONES DOMICILIARIAS 4"X6"
u
167.00
COSTO DIRECTO TOTAL
MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO
PRECIO
UNITARIO
PARCIAL
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
MONTO
METRADO
AVANCE ACUMULADO
MONTO
INC. IGV
: 2,812,663.74
INC. IGV
DIAS
180
: 06/02/12
: 03/08/12
AMPLIACION DE PLAZO
PRECIO
: 2,812,663.74
:.
SALDO
METRADO
MONTO
METRADO
MONTO
1.99
3.33
8,657.50
14,487.17
100.00%
100.00%
4,350.50
4,350.50
8,657.50
14,487.17
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
4,350.50
4,350.50
8,657.50
14,487.17
0.00%
0.00%
0.00
0.00
0.00
0.00
41.68
7.25
148.26
2.17
11.17
37.80
30.61
130,556.35
1,786.76
25,574.85
5,664.35
48,595.09
93,736.06
24,969.19
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
3,132.35
246.45
172.50
2,610.30
4,350.50
2,479.79
815.72
130,556.35
1,786.76
25,574.85
5,664.35
48,595.09
93,736.06
24,969.19
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
3,132.35
246.45
172.50
2,610.30
4,350.50
2,479.79
815.72
130,556.35
1,786.76
25,574.85
5,664.35
48,595.09
93,736.06
24,969.19
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
34.07
41.35
47.43
22,463.03
38,758.18
130,615.58
100.00%
100.00%
100.00%
659.32
937.32
2,753.86
22,463.03
38,758.18
130,615.58
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
659.32
937.32
2,753.86
22,463.03
38,758.18
130,615.58
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.84
285.74
3,654.42
2,857.40
100.00%
100.00%
4,350.50
10.00
3,654.42
2,857.40
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
4,350.50
10.00
3,654.42
2,857.40
0.00%
0.00%
0.00
0.00
0.00
0.00
2.04
2.06
225.52
227.73
100.00%
100.00%
110.55
110.55
225.52
227.73
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
110.55
110.55
225.52
227.73
0.00%
0.00%
0.00
0.00
0.00
0.00
31.62
30.61
5,656.50
6,844.70
100.00%
100.00%
178.89
223.61
5,656.50
6,844.70
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
178.89
223.61
5,656.50
6,844.70
0.00%
0.00%
0.00
0.00
0.00
0.00
1,271.79
1,522.80
19,076.85
60,912.00
100.00%
100.00%
15.00
40.00
19,076.85
60,912.00
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
15.00
40.00
19,076.85
60,912.00
0.00%
0.00%
0.00
0.00
0.00
0.00
2.04
1.99
1,362.72
1,329.32
100.00%
100.00%
668.00
668.00
1,362.72
1,329.32
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
668.00
668.00
1,362.72
1,329.32
0.00%
0.00%
0.00
0.00
0.00
0.00
31.62
2.32
11.17
37.80
30.61
15,207.96
929.86
7,461.56
14,392.73
3,833.90
100.00%
100.00%
100.00%
100.00%
100.00%
480.96
400.80
668.00
380.76
125.25
15,207.96
929.86
7,461.56
14,392.73
3,833.90
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
480.96
400.80
668.00
380.76
125.25
15,207.96
929.86
7,461.56
14,392.73
3,833.90
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
425.40
71,041.80
100.00%
167.00
71,041.80
0.00%
0.00
0.00
100.00%
167.00
71,041.80
0.00%
0.00
0.00
760,879.07
100.00%
760,879.08
0.00%
0.00
100.00%
760,879.08
0.00%
-0.01
VALORIZACION DE OBRA N 07
PARTIDA
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 03
SISTEMA DE ALCANTARILLADO
DESCRIPCION
UND
METRADO
FR =
INC IGV
SIN IGV
MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO
PRECIO
UNITARIO
PARCIAL
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
MONTO
METRADO
AVANCE ACUMULADO
MONTO
METRADO
INC. IGV
: 2,812,663.74
INC. IGV
DIAS
180
: 06/02/12
: 03/08/12
AMPLIACION DE PLAZO
PRECIO
: 2,812,663.74
:.
SALDO
MONTO
METRADO
MONTO
91,305.49
76,087.91
928,272.47
167,089.04
1,095,361.51
100.00%
100.00%
100.00%
100.00%
100.00%
91,305.49
76,087.91
928,272.48
167,089.05
1,095,361.53
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
91,305.49
76,087.91
928,272.48
167,089.05
1,095,361.53
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
-0.01
-0.01
-0.02
1,095,361.51
100.00%
1,095,361.53
0.00%
0.00
100.00%
1,095,361.53
0.00%
-0.03
1.000000
1,095,361.51
928,272.47
1,095,361.53
928,272.48
0.00
0.00
1,095,361.53
928,272.48
-0.03
-0.03
VALORIZACION DE OBRA N 07
PARTIDA
F 04
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 04
: SISTEMA PTAR
DESCRIPCION
SISTEMA DE PTAR
1 CAMARA DE REJAS (01 UND)
1.01 TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
1.02 MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
1.03 OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
1.04 OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
ACERO FY=4200 KG/CM2
1.05 REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
1.06 ACCESORIOS
REJILLA METALICA
PLANCHA METALICA DE FF DE e=3/4"
2 DESARENADOR Y MEDIDOR PARSHALL (01 UND)
2.01 TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
2.02 MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
REFINE NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
2.03 OBRAS DE CONCRETO SIMPLE
SOLADO DE 4" 1:12 CEMENTO-HORMIGON
2.04 OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
ACERO FY=4200 KG/CM2
2.05 REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES
2.06 ACCESORIOS
COMPUERTAS FIERRO DE 0.63*0.44 M
BARANDA DE TUBO FO. GDO. PASAMANO 1 1/2"-PARANTE 1" X 1M.ALT
3 TANQUE IMHOFF (01 UND)
3.01 TRABAJOS PRELIMINARES
UND
MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO
PRECIO
PRECIO
UNITARIO
PARCIAL
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
MONTO
METRADO
AVANCE ACUMULADO
MONTO
INC. IGV
: 2,812,663.74
INC. IGV
DIAS
180
: 06/02/12
: 03/08/12
AMPLIACION DE PLAZO
METRADO
: 2,812,663.74
:.
SALDO
METRADO
MONTO
METRADO
MONTO
m2
m2
3.83
3.83
2.04
2.06
7.81
7.89
100.00%
100.00%
3.83
3.83
7.81
7.89
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
3.83
3.83
7.81
7.89
0.00%
0.00%
0.00
0.00
0.00
0.00
m3
m2
m3
3.06
3.83
6.56
31.62
2.32
30.61
96.76
8.89
200.80
100.00%
100.00%
100.00%
3.06
3.83
6.56
96.76
8.89
200.80
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
3.06
3.83
6.56
96.76
8.89
200.80
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m2
3.83
190.41
729.27
100.00%
3.83
729.27
0.00%
0.00
0.00
100.00%
3.83
729.27
0.00%
0.00
0.00
m3
m2
kg
2.31
17.18
71.83
480.64
40.88
5.24
1,110.28
702.32
376.39
100.00%
0.00%
100.00%
2.31
0.00
71.83
1,110.28
0.00
376.39
0.00%
100.00%
0.00%
0.00
17.18
0.00
0.00
702.32
0.00
100.00%
100.00%
100.00%
2.31
17.18
71.83
1,110.28
702.32
376.39
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m2
8.95
33.00
295.35
100.00%
295.35
0.00%
100.00%
8.95
295.35
0.00%
0.00
0.00
1.00
1.00
37.82
84.55
37.82
84.55
100.00%
100.00%
37.82
84.55
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
u
u
8.95
0.00
1.00
1.00
0.00
0.00
100.00%
100.00%
1.00
1.00
37.82
84.55
0.00%
0.00%
0.00
0.00
0.00
0.00
m2
m2
17.19
17.19
2.04
2.06
35.07
35.41
100.00%
100.00%
17.19
17.19
35.07
35.41
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
17.19
17.19
35.07
35.41
0.00%
0.00%
0.00
0.00
0.00
0.00
m3
m2
m3
25.79
17.19
32.23
31.62
2.32
30.61
815.48
39.88
986.56
100.00%
100.00%
100.00%
25.79
17.19
32.23
815.48
39.88
986.56
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
25.79
17.19
32.23
815.48
39.88
986.56
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m2
17.19
190.41
3,273.15
100.00%
17.19
3,273.15
0.00%
0.00
0.00
100.00%
17.19
3,273.15
0.00%
0.00
0.00
m3
m2
kg
8.71
53.42
224.95
480.64
40.88
5.24
4,186.37
2,183.81
1,178.74
100.00%
100.00%
100.00%
8.71
53.42
224.95
4,186.37
2,183.81
1,178.74
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
8.71
53.42
224.95
4,186.37
2,183.81
1,178.74
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m2
28.14
33.00
928.62
100.00%
28.14
928.62
0.00%
0.00
0.00
100.00%
28.14
928.62
0.00%
0.00
0.00
u
m
4.00
2.10
650.44
99.33
2,601.76
208.59
100.00%
100.00%
4.00
2.10
2,601.76
208.59
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
4.00
2.10
2,601.76
208.59
0.00%
0.00%
0.00
0.00
0.00
0.00
VALORIZACION DE OBRA N 07
PARTIDA
3.02
3.03
3.04
3.05
3.06
3.07
4
4.01
4.02
4.03
4.04
4.05
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 04
: SISTEMA PTAR
MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO
PRECIO
PRECIO
UNITARIO
PARCIAL
AVANCE ANTERIOR
DIAS
180
: 03/08/12
:.
UND
m2
m2
51.41
51.41
2.04
2.06
104.88
105.90
100.00%
100.00%
51.41
51.41
104.88
105.90
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
51.41
51.41
104.88
105.90
0.00%
0.00%
0.00
0.00
0.00
0.00
m3
m2
m3
m3
308.43
51.41
73.50
293.66
31.62
2.32
16.06
30.61
9,752.56
119.27
1,180.41
8,988.93
100.00%
100.00%
100.00%
100.00%
308.43
51.41
73.50
293.66
9,752.56
119.27
1,180.41
8,988.93
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
308.43
51.41
73.50
293.66
9,752.56
119.27
1,180.41
8,988.93
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m2
51.41
190.41
9,788.98
100.00%
51.41
9,788.98
0.00%
0.00
0.00
100.00%
51.41
9,788.98
0.00%
0.00
0.00
m3
m2
kg
122.45
487.68
6,029.19
482.32
48.43
5.24
59,060.08
23,618.34
31,592.96
100.00%
100.00%
100.00%
122.45
487.68
6,029.19
59,060.08
23,618.34
31,592.96
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
122.45
487.68
6,029.19
59,060.08
23,618.34
31,592.96
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m2
m2
331.67
45.09
33.00
27.42
10,945.11
1,236.37
100.00%
100.00%
331.67
45.09
10,945.11
1,236.37
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
331.67
45.09
10,945.11
1,236.37
0.00%
0.00%
0.00
0.00
0.00
0.00
m
m
14.20
7.65
99.33
109.97
1,410.49
841.27
100.00%
100.00%
14.20
7.65
1,410.49
841.27
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
14.20
7.65
1,410.49
841.27
0.00%
0.00%
0.00
0.00
0.00
0.00
m
u
u
u
u
8.50
1.00
1.00
1.00
2.00
47.43
146.59
254.28
1,222.19
126.05
403.16
146.59
254.28
1,222.19
252.10
100.00%
100.00%
100.00%
100.00%
100.00%
8.50
1.00
1.00
1.00
2.00
403.16
146.59
254.28
1,222.19
252.10
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
8.50
1.00
1.00
1.00
2.00
403.16
146.59
254.28
1,222.19
252.10
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
-0.01
0.00
0.00
0.00
0.00
m2
m2
35.15
35.15
2.04
2.06
71.71
72.41
100.00%
100.00%
35.15
35.15
71.71
72.41
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
35.15
35.15
71.71
72.41
0.00%
0.00%
0.00
0.00
0.00
0.00
m3
m2
m3
50.96
35.15
63.70
6.86
2.32
30.61
349.59
81.55
1,949.86
100.00%
100.00%
100.00%
50.96
35.15
63.70
349.59
81.55
1,949.86
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
50.96
35.15
63.70
349.59
81.55
1,949.86
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m2
35.15
190.41
6,692.91
100.00%
35.15
6,692.91
0.00%
0.00
0.00
100.00%
35.15
6,692.91
0.00%
0.00
0.00
m3
m2
kg
25.25
281.33
1,541.20
482.32
44.07
5.24
12,178.58
12,398.21
8,075.89
100.00%
100.00%
100.00%
25.25
281.33
1,541.20
12,178.58
12,398.21
8,075.89
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
25.25
281.33
1,541.20
12,178.58
12,398.21
8,075.89
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m2
m2
235.08
57.00
33.00
27.42
7,757.64
1,562.94
100.00%
100.00%
235.08
57.00
7,757.64
1,562.94
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
235.08
57.00
7,757.64
1,562.94
0.00%
0.00%
0.00
0.00
0.00
0.00
METRADO
MONTO
METRADO
AVANCE ACUMULADO
INC. IGV
DESCRIPCION
AVANCE MENSUAL
INC. IGV
: 2,812,663.74
: 06/02/12
AMPLIACION DE PLAZO
METRADO
: 2,812,663.74
MONTO
SALDO
METRADO
MONTO
METRADO
MONTO
VALORIZACION DE OBRA N 07
PARTIDA
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 04
: SISTEMA PTAR
DESCRIPCION
UND
MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO
PRECIO
PRECIO
UNITARIO
PARCIAL
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
MONTO
METRADO
AVANCE ACUMULADO
MONTO
INC. IGV
: 2,812,663.74
INC. IGV
DIAS
180
: 06/02/12
: 03/08/12
AMPLIACION DE PLAZO
METRADO
: 2,812,663.74
:.
SALDO
METRADO
MONTO
METRADO
MONTO
u
m
p2
m2
5.00
8.95
106.76
46.98
758.57
14.91
5.31
51.30
3,792.85
133.44
566.90
2,410.07
100.00%
100.00%
100.00%
100.00%
5.00
8.95
106.76
46.98
3,792.85
133.44
566.90
2,410.07
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
5.00
8.95
106.76
46.98
3,792.85
133.44
566.90
2,410.07
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m
m
u
u
u
u
u
u
23.65
66.70
3.00
2.00
23.00
2.00
1.00
23.00
166.77
68.33
146.80
49.45
42.74
54.16
41.66
27.00
3,944.11
4,557.61
440.40
98.90
983.02
108.32
41.66
621.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
23.65
66.70
3.00
2.00
23.00
2.00
1.00
23.00
3,944.11
4,557.61
440.40
98.90
983.02
108.32
41.66
621.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
23.65
66.70
3.00
2.00
23.00
2.00
1.00
23.00
3,944.11
4,557.61
440.40
98.90
983.02
108.32
41.66
621.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m3
m3
m2
12.48
9.36
31.20
160.57
192.07
91.03
2,003.91
1,797.78
2,840.14
100.00%
100.00%
100.00%
12.48
9.36
31.20
2,003.91
1,797.78
2,840.14
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
12.48
9.36
31.20
2,003.91
1,797.78
2,840.14
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m2
m2
14.19
14.19
2.04
2.06
28.95
29.23
100.00%
100.00%
14.19
14.19
28.95
29.23
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
14.19
14.19
28.95
29.23
0.00%
0.00%
0.00
0.00
0.00
0.00
m3
m2
m3
25.54
14.19
31.93
27.67
2.32
30.61
706.69
32.92
977.38
100.00%
100.00%
100.00%
25.54
14.19
31.93
706.69
32.92
977.38
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
25.54
14.19
31.93
706.69
32.92
977.38
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m2
14.19
190.41
2,701.92
100.00%
14.19
2,701.92
0.00%
0.00
0.00
100.00%
14.19
2,701.92
0.00%
0.00
0.00
m3
m2
kg
20.62
117.37
1,043.53
480.64
44.07
5.24
9,910.80
5,172.50
5,468.10
100.00%
100.00%
100.00%
20.62
117.37
1,043.53
9,910.80
5,172.50
5,468.10
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
20.62
117.37
1,043.53
9,910.80
5,172.50
5,468.10
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
m2
m2
78.04
52.60
33.00
27.42
2,575.32
1,442.29
100.00%
100.00%
78.04
52.60
2,575.32
1,442.29
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
78.04
52.60
2,575.32
1,442.29
0.00%
0.00%
0.00
0.00
0.00
0.00
m3
m2
20.40
12.00
160.57
91.03
3,275.63
1,092.36
100.00%
100.00%
20.40
12.00
3,275.63
1,092.36
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
20.40
12.00
3,275.63
1,092.36
0.00%
0.00%
0.00
0.00
0.00
0.00
u
u
1.00
1.00
3,000.00
94.43
3,000.00
94.43
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
1.00
1.00
3,000.00
94.43
100.00%
100.00%
1.00
1.00
3,000.00
94.43
0.00%
0.00%
0.00
0.00
0.00
0.00
VALORIZACION DE OBRA N 07
PARTIDA
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 04
: SISTEMA PTAR
DESCRIPCION
UND
METRADO
PRECIO
PRECIO
UNITARIO
PARCIAL
VALORIZACION CONTRACTUAL
VALORIZACION CONTRACTUAL
FR =
INC IGV
SIN IGV
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
MONTO
METRADO
AVANCE ACUMULADO
MONTO
: 2,812,663.74
INC. IGV
: 2,812,663.74
INC. IGV
DIAS
180
: 06/02/12
: 03/08/12
AMPLIACION DE PLAZO
MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO
:.
SALDO
METRADO
MONTO
METRADO
MONTO
21.39
35.80
100.00%
100.00%
10.75
10.75
21.39
35.80
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
10.75
10.75
21.39
35.80
0.00%
0.00%
0.00
0.00
0.00
0.00
88.62
14.00
120.08
219.62
74.08
100.00%
100.00%
100.00%
100.00%
100.00%
7.74
6.45
10.75
5.81
2.42
88.62
14.00
120.08
219.62
74.08
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
7.74
6.45
10.75
5.81
2.42
88.62
14.00
120.08
219.62
74.08
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
509.87
100.00%
10.75
509.87
0.00%
0.00
0.00
100.00%
10.75
509.87
0.00%
0.00
0.00
1,271.79
100.00%
1.00
1,271.79
0.00%
0.00
0.00
100.00%
1.00
1,271.79
0.00%
0.00
0.00
216.26
218.38
100.00%
100.00%
106.01
106.01
216.26
218.38
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
106.01
106.01
216.26
218.38
0.00%
0.00%
0.00
0.00
0.00
0.00
119.52
144.79
100.00%
100.00%
3.78
4.73
119.52
144.79
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
3.78
4.73
119.52
144.79
0.00%
0.00%
0.00
0.00
0.00
0.00
4,406.21
100.00%
840.88
4,406.21
0.00%
0.00
0.00
100.00%
840.88
4,406.21
0.00%
0.00
0.00
1,220.84
840.73
2,697.08
1,483.97
100.00%
100.00%
100.00%
100.00%
2.94
1.89
61.20
283.20
1,220.84
840.73
2,697.08
1,483.97
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
2.94
1.89
61.20
283.20
1,220.84
840.73
2,697.08
1,483.97
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
304.58
0.00%
0.00
0.00
100.00%
1.00
304.58
100.00%
1.00
304.58
0.00%
0.00
0.00
307,202.92
36,864.35
30,720.29
374,787.56
67,461.76
442,249.32
98.66%
98.66%
98.66%
98.66%
98.66%
98.66%
303,101.64
36,372.20
30,310.16
369,784.00
66,561.12
436,345.12
1.34%
1.00%
1.34%
1.34%
1.34%
1.34%
4,101.33
492.16
410.13
5,003.62
900.65
5,904.27
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
307,202.97
36,864.36
30,720.30
374,787.63
67,461.77
442,249.40
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
-0.05
-0.01
-0.01
-0.07
-0.01
-0.08
442,249.32
98.66%
436,345.12
1.34%
5,904.27
100.00%
442,249.40
0.00%
-0.09
1.000000
442,249.32
374,787.56
436,345.12
369,784.00
5,904.27
5,003.62
442,249.40
374,787.63
-0.09
-0.08
VALORIZACION DE OBRA N 07
PARTIDA
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 05
UND
METRADO
F 05
ESTUDIO DE IMPACTO AMBIENTAL
1
MITIGACION AMBIENTAL
1.01
PROGRAMA DE PREVENCIN Y MITIGACIN
01.01.01 LOGSTICA PARA CUMPLIMIENTO DE NORMATIVIDAD SEALADA EN EL PMA
01.01.01.01 LOGISTICA PARA CUMPLIMINETO DE NORMATIVIDAD SEALADA EN EL PMA mes
6.00
01.01.02 SUB PROGRAMA DE MANEJO DEL COMPONENTE FSICO
01.01.02.01 SUB PROGRAMA DE MANEJO DEL COMPONENTE FSICO
mes
6.00
01.01.03 SUB PROGRAMA DE MANEJO DEL COMPONENTE BIOLGICO
01.01.03.01 SUB PROGRAMA DE MANEJO DEL COMPONENTE BIOLGICO
mes
6.00
01.01.03.02 CERCO VIVO DE ARBOLES EN PERIMETRO DE PTAR
glb
1.00
01.01.03.03 REVEGETACION DE PASTOS EN CAPTACION
m2
35.77
01.01.03.04 REVEGETACION DE PASTOS EN PTAR
m2
100.00
01.01.03.05 REVEGETACION DE COMPENSACIN
glb
1.00
01.01.04 SUB PROGRAMA DE SALUD Y SEGURIDAD LABORAL
01.01.04.01 ACCIONES DE SALUD
est
1.00
01.01.04.02 ACCIONES EN SEGURIDAD LABORAL
u
1.00
1.02
PROGRAMA DE MONITOREO Y SEGUIMIENTO AMBIENTAL
01.02.01 LOGISTICA PARA LAS ACCIONES DE MONITOREO
mes
6.00
01.02.02 MONITOREO DE LINEA BASE DE CALIDAD DE AGUA DEL CUERPO RECEPTOR-ANTES
informe DE LA MEZCLA
6.00
01.02.03 MONITOREO DE LINEA BASE DE CALIDAD DE AGUAS RESIDUALES (DESAGUE)
informe
3.00
01.02.04 MONITOREO DE PRUEBA A LAS AGUAS RESIDUALES TRATADAS - EMISOR ANTES
informe
DE MEZCLA 3.00
1.03
PROGRAMA DE SEALIZACIN AMBIENTAL
01.03.01 INSTALACION DE SEALES
glb
1.00
1.04
PROGRAMA DE MANEJO AMBIENTAL DE CAMPAMENTOS
01.04.01 DESARME Y ABANDONO DE CAMPAMENTO
m2
200.00
1.05
PROGRAMA DE EDUCACION AMBIENTAL
01.05.01 CAPACITACION
charla
10.00
01.05.02 DIFUSION
glb
1.00
1.06
PROGRAMA DE MANEJO DE RESIDUOS
01.06.01 RESIDUOS SOLIDOS
est
1.00
01.06.02 AGUAS RESIDUALES DOMESTICAS
est
1.00
1.07
PROGRAMA DE CONTINGENCIA
01.07.01 CONTROL ACCIDENTES
est
1.00
01.07.02 CONTINGENCIA TECNICA
u
15.00
2
SANEAMIENTO FISICO LEGAL
2.01
TRABAJO DE CAMPO
02.01.01 ELABORACION DEL DIAGNOSTICO DE SITUACION ACTUAL
glb
1.00
02.01.02 LEVANTAMIENTO TOPOPGRAFICO
glb
1.00
2.02
TRABAJO DE GABINETE
02.02.01 DIBUJO DE PLANOS
glb
1.00
02.02.02 MEMORIA DESCRIPTIVA
glb
1.00
02.02.03 PAGO DE TRAMITES
glb
1.00
MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO
PRECIO
UNITARIO
PARCIAL
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
MONTO
METRADO
AVANCE ACUMULADO
MONTO
INC. IGV
: 2,812,663.74
INC. IGV
DIAS
180
: 06/02/12
: 03/08/12
AMPLIACION DE PLAZO
PRECIO
: 2,812,663.74
:.
SALDO
METRADO
MONTO
METRADO
MONTO
530.00
3,180.00
100.00%
6.00
3,180.00
0.00%
0.00
0.00
100.00%
6.00
3,180.00
0.00%
0.00
0.00
899.96
5,399.76
100.00%
6.00
5,399.76
0.00%
0.00
0.00
100.00%
6.00
5,399.76
0.00%
0.00
0.00
800.20
1,310.32
0.48
0.48
1,000.00
4,801.20
1,310.32
17.17
48.00
1,000.00
100.00%
100.00%
100.00%
100.00%
100.00%
6.00
1.00
35.77
100.00
1.00
4,801.20
1,310.32
17.17
48.00
1,000.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
6.00
1.00
35.77
100.00
1.00
4,801.20
1,310.32
17.17
48.00
1,000.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,400.00
1,400.00
3,400.00
1,400.00
100.00%
100.00%
1.00
1.00
3,400.00
1,400.00
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
1.00
1.00
3,400.00
1,400.00
0.00%
0.00%
0.00
0.00
0.00
0.00
200.00
350.00
350.00
350.00
1,200.00
2,100.00
1,050.00
1,050.00
100.00%
100.00%
100.00%
100.00%
6.00
6.00
3.00
3.00
1,200.00
2,100.00
1,050.00
1,050.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
6.00
6.00
3.00
3.00
1,200.00
2,100.00
1,050.00
1,050.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,950.00
1,950.00
100.00%
1.00
1,950.00
0.00%
0.00
0.00
100.00%
1.00
1,950.00
0.00%
0.00
0.00
1.82
364.00
0.00%
0.00
0.00
100.00%
200.00
364.00
100.00%
200.00
364.00
0.00%
0.00
0.00
150.00
650.00
1,500.00
650.00
100.00%
100.00%
10.00
1.00
1,500.00
650.00
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
10.00
1.00
1,500.00
650.00
0.00%
0.00%
0.00
0.00
0.00
0.00
1,600.00
1,220.70
1,600.00
1,220.70
100.00%
100.00%
1.00
1.00
1,600.00
1,220.70
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
1.00
1.00
1,600.00
1,220.70
0.00%
0.00%
0.00
0.00
0.00
0.00
1,750.00
110.00
1,750.00
1,650.00
100.00%
100.00%
1.00
15.00
1,750.00
1,650.00
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
1.00
15.00
1,750.00
1,650.00
0.00%
0.00%
0.00
0.00
0.00
0.00
500.00
1,250.00
500.00
1,250.00
100.00%
100.00%
1.00
1.00
500.00
1,250.00
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
1.00
1.00
500.00
1,250.00
0.00%
0.00%
0.00
0.00
0.00
0.00
1,250.00
800.00
700.00
1,250.00
800.00
700.00
100.00%
100.00%
100.00%
1.00
1.00
1.00
1,250.00
800.00
700.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
1.00
1.00
1.00
1,250.00
800.00
700.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
VALORIZACION DE OBRA N 07
PARTIDA
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 05
UND
METRADO
FR =
INC IGV
SIN IGV
MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO
PRECIO
UNITARIO
PARCIAL
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
MONTO
METRADO
AVANCE ACUMULADO
MONTO
METRADO
INC. IGV
: 2,812,663.74
INC. IGV
DIAS
180
: 06/02/12
: 03/08/12
AMPLIACION DE PLAZO
PRECIO
: 2,812,663.74
:.
SALDO
MONTO
METRADO
MONTO
41,141.15
4,936.94
4,114.11
50,192.20
9,034.60
59,226.80
99.12%
99.12%
99.12%
99.12%
99.12%
99.12%
40,777.15
4,893.26
4,077.72
49,748.13
8,954.66
58,702.79
0.88%
1.00%
0.88%
0.88%
0.88%
0.88%
364.00
43.68
36.40
444.08
79.93
524.01
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
41,141.15
4,936.94
4,114.12
50,192.21
9,034.60
59,226.81
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
-0.01
-0.01
0.00
-0.01
59,226.80
99.12%
58,702.79
0.88%
524.01
100.00%
59,226.81
0.00%
-0.02
1.000000
59,226.80
50,192.20
58,702.79
49,748.13
524.01
444.08
59,226.81
50,192.21
-0.02
-0.02
VALORIZACION DE OBRA N 07
PARTIDA
F 06
1
1.01
01.01.01
01.01.02
01.01.03
1.02
01.02.01
1.03
01.03.01
01.03.02
1.04
01.04.01
01.04.02
01.04.03
01.04.04
2
02.01
02.01.01
02.01.02
2.02
02.02.01
02.02.02
02.02.03
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 07
UND
PRECIO
UNITARIO
PARCIAL
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
MONTO
METRADO
AVANCE ACUMULADO
MONTO
INC. IGV
: 2,812,663.74
INC. IGV
DIAS
180
: 06/02/12
: 03/08/12
AMPLIACION DE PLAZO
PRECIO
: 2,812,663.74
:.
SALDO
METRADO
MONTO
METRADO
MONTO
glb
glb
glb
1.00
1.00
1.00
1,500.00
2,399.00
1,200.00
1,500.00
2,399.00
1,200.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
1.00
1.00
1.00
1,500.00
2,399.00
1,200.00
100.00%
100.00%
100.00%
1.00
1.00
1.00
1,500.00
2,399.00
1,200.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
glb
1.00
850.00
850.00
100.00%
1.00
850.00
0.00%
0.00
0.00
100.00%
1.00
850.00
0.00%
0.00
0.00
glb
glb
1.00
1.00
1,500.00
1,500.00
1,500.00
1,500.00
100.00%
100.00%
1.00
1.00
1,500.00
1,500.00
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
1.00
1.00
1,500.00
1,500.00
0.00%
0.00%
0.00
0.00
0.00
0.00
glb
glb
glb
u
1.00
1.00
1.00
1.00
800.00
11,756.30
3,500.00
6,000.00
800.00
11,756.30
3,500.00
6,000.00
100.00%
100.00%
100.00%
100.00%
1.00
1.00
1.00
1.00
800.00
11,756.30
3,500.00
6,000.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
1.00
1.00
1.00
1.00
800.00
11,756.30
3,500.00
6,000.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
glb
glb
1.00
1.00
4,000.00
650.00
4,000.00
650.00
82.78%
0.00%
0.83
0.00
3,311.06
0.00
17.22%
100.00%
0.17
1.00
688.94
650.00
100.00%
100.00%
1.00
1.00
4,000.00
650.00
0.00%
0.00%
0.00
0.00
0.00
0.00
glb
glb
glb
1.00
1.00
1.00
350.00
750.00
2,250.00
350.00
750.00
2,250.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
1.00
1.00
1.00
350.00
750.00
2,250.00
100.00%
100.00%
100.00%
1.00
1.00
1.00
350.00
750.00
2,250.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
39,005.30
3,120.42
2,730.37
44,856.09
8,074.10
52,930.19
74.91%
74.91%
74.91%
74.91%
74.91%
74.91%
29,217.36
2,337.39
2,045.22
33,599.97
6,047.99
39,647.96
25.09%
25.00%
25.09%
25.09%
25.09%
25.09%
9,787.94
783.04
685.16
11,256.14
2,026.11
13,282.25
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
39,005.30
3,120.42
2,730.37
44,856.09
8,074.10
52,930.19
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
52,930.19
74.91%
39,647.96
25.09%
13,282.25
100.00%
52,930.19
0.00%
0.00
METRADO
MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO
FR =
INC IGV
SIN IGV
1.000000
52,930.19
44,856.09
39,647.96
33,599.97
13,282.25
11,256.14
52,930.19
44,856.09
0.00
0.00
VALORIZACION DE OBRA N 07
PARTIDA
F 01
F 02
F 03
F 04
F 05
F 06
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
FORMULA N 01-02-03-04-05-06
: VARIOS
DESCRIPCION
UND
PRECIO
PRECIO
UNITARIO
PARCIAL
VALORIZACION CONTRACTUAL
VALORIZACION CONTRACTUAL
FR =
INC IGV
SIN IGV
AVANCE ANTERIOR
%
METRADO
AVANCE MENSUAL
MONTO
116,599.53
688,953.41
760,879.07
307,202.97
41,141.15
39,005.30
100.00%
99.57%
100.00%
98.66%
99.12%
74.91%
116,599.53
686,012.22
760,879.08
303,101.64
40,777.15
29,217.36
0.00%
-0.61%
0.00%
1.34%
0.88%
25.09%
1,953,781.43
234,453.77
195,378.14
2,383,613.34
429,050.40
2,812,663.74
99.12%
99.12%
99.12%
99.12%
99.12%
99.12%
1,936,586.98
232,390.44
193,658.70
2,362,636.12
425,274.50
2,787,910.62
2,812,663.74
99.12%
2,787,910.62
METRADO
METRADO
INC. IGV
: 2,812,663.74
INC. IGV
DIAS
180
: 03/08/12
:.
AVANCE ACUMULADO
MONTO
: 2,812,663.74
: 06/02/12
AMPLIACION DE PLAZO
METRADO
MONTO REFERENCIAL
MONTO CONTRATADO
PLAZO DE EJECUCION
FECHA DE INICIO
FECHA DE TERMINO
SALDO
MONTO
METRADO
MONTO
0.00
-4,219.34
0.00
4,101.33
364.00
9,787.94
100.00%
98.96%
100.00%
100.00%
100.00%
100.00%
116,599.53
681,792.89
760,879.07
307,202.97
41,141.15
39,005.30
0.00%
1.04%
0.00%
0.00%
0.00%
0.00%
0.00
7,160.52
0.00
0.00
0.00
0.00
0.51%
0.51%
0.51%
0.51%
0.51%
0.51%
10,033.93
1,204.09
1,003.41
12,241.43
2,203.46
14,444.89
99.63%
99.63%
99.63%
99.63%
99.63%
99.63%
1,946,620.91
233,594.51
194,662.09
2,374,877.51
427,477.95
2,802,355.46
0.37%
0.37%
0.37%
0.37%
0.37%
0.37%
7,160.52
859.26
716.05
8,735.83
1,572.44
10,308.27
0.51%
14,444.89
99.63%
2,802,355.46
0.37%
10,308.27
0.00
-4,362.37
0.00
4,240.36
376.34
10,119.73
1.000000
2,812,663.74
2,383,613.34
2,787,910.62
2,362,636.12
14,444.89
12,241.43
2,802,355.46
2,374,877.51
10,308.27
8,735.82
VALORIZACION DE OBRA N 07
FORMULAS POLINOMICAS
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 01
K=
0.186 x
Mr
Mo
MONOMIO
SIMBOLO
CODIGO
IU
1
2
3
4
5
M
C
A
M
I
47
21
03
43
39
+ 0.084 x
Cr
Co
+ 0.203 x
Ar
Ao
DESCRIPCION
+ 0.081 x
Mr
Mo
+ 0.446 x
COEF. DE
INCIDENCIA
% DE
INCIDENCIA
CI
Material
0.186
0.084
0.203
0.081
0.446
100.000%
100.000%
100.000%
100.000%
100.000%
Ir
Io
0.186000
0.084000
0.203000
0.081000
0.446000
1.000000
FORMULA N 02
K=
0.350 x
Mr
Mo
MONOMIO
SIMBOLO
CODIGO
IU
1
2
3
4
5
M
C
A
M
I
47
21
02
43
39
+ 0.051 x
Cr
Co
+ 0.078 x
Ar
Ao
DESCRIPCION
+ 0.118 x
Mr
Mo
+ 0.403 x
COEF. DE
INCIDENCIA
% DE
INCIDENCIA
CI
Material
0.350
0.051
0.078
0.118
0.403
100.000%
100.000%
100.000%
100.000%
100.000%
0.350000
0.051000
0.078000
0.118000
0.403000
1.000000
FORMULA N 03
K=
: VAL. N
0.249 x
Mr
Mo
MONOMIO
SIMBOLO
CODIGO
IU
1
2
3
4
M
A
A
I
T
47
07
12
39
75
+ 0.074 x
SISTEMA DE ALCANTARILLADO
Ar
Ao
+ 0.245 x
Ar
Ao
DESCRIPCION
+ 0.432 x
ITr
ITo
COEF. DE
INCIDENCIA
% DE
INCIDENCIA
0.249
0.074
0.245
0.432
0.432
100.000%
100.000%
100.000%
88.889%
11.111%
CI
Material
0.249000
0.074000
0.245000
0.384000
0.048000
1.000000
Ir
Io
FORMULAS POLINOMICAS
FORMULA N 04
K=
SISTEMA PTAR
0.245 x
Mr
Mo
MONOMIO
SIMBOLO
CODIGO
IU
1
2
M
D
T
A
I
47
30
72
10
39
+ 0.146 x
DTr
DTo
+ 0.609 x
AIr
AIo
DESCRIPCION
COEF. DE
INCIDENCIA
FLETE TERRESTRE
PETROLEO DIESEL
MAQUINARIA Y EQUIPO NACIONAL
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
MADERA NACIONAL PARA ENCOFRADO Y CARP.
0.245
0.146
0.146
0.609
0.609
% DE
INCIDENCIA
100.000%
13.699%
86.301%
3.284%
96.716%
CI
Material
0.245000
0.020001
0.125999
0.020000
0.589000
1.000000
FORMULA N 05
K=
0.243 x
Mr
Mo
MONOMIO
SIMBOLO
CODIGO
IU
1
2
3
4
M
C
A
A
I
47
21
03
13
39
+ 0.168 x
Cr
Co
+ 0.062 x
Ar
Ao
DESCRIPCION
+ 0.527 x
AIr
AIo
COEF. DE
INCIDENCIA
% DE
INCIDENCIA
0.243
0.168
0.062
0.527
0.527
100.000%
100.000%
100.000%
15.750%
84.250%
CI
Material
0.243000
0.168000
0.062000
0.083003
0.443998
1.000000
FORMULA N 06
K=
0.00
0.234 x
Mr
Mo
MONOMIO
SIMBOLO
CODIGO
IU
1
2
3
4
M
C
I
A
M
47
21
39
03
45
+ 0.184 x
Cr
Co
+ 0.486 x
Ir
Io
DESCRIPCION
+ 0.096 x
AMr
AMo
COEF. DE
INCIDENCIA
% DE
INCIDENCIA
0.234
0.184
0.486
0.096
0.096
100.000%
100.000%
100.000%
60.417%
39.583%
CI
Material
0.234000
0.184000
0.486000
0.058000
0.038000
1.000000
FORMULAS POLINOMICAS
FORMULA N 07
K=
0.00
0.155 x
Mr
Mo
MONOMIO
SIMBOLO
CODIGO
IU
1
2
3
M
T
I
47
65
39
+ 0.377 x
Tr
To
+ 0.468 x
Ir
Io
DESCRIPCION
COEF. DE
INCIDENCIA
0.155
0.377
0.468
% DE
INCIDENCIA
100.000%
100.000%
100.000%
CI
Material
0.155000
0.377000
0.468000
1.000000
FORMULA N 08
K=
0.00
0.278 x
Mr
Mo
MONOMIO
SIMBOLO
CODIGO
IU
1
2
3
M
I
A
P
C
M
47
39
03
51
21
48
4
5
+ 0.436 x
Ir
Io
+ 0.127 x
APr
APo
DESCRIPCION
+ 0.107 x
Cr
Co
+ 0.052 x
COEF. DE
INCIDENCIA
% DE
INCIDENCIA
CI
Material
0.278
0.436
0.127
0.127
0.107
0.052
100.000%
100.000%
74.803%
25.197%
100.000%
100.000%
0.278000
0.436000
0.095000
0.032000
0.107000
0.052000
1.000000
FORMULA N 09
K=
0.00
0.669 x
Fr
Fo
MONOMIO
SIMBOLO
CODIGO
IU
1
2
F
T
32
39
+ 0.331 x
Ir
Io
DESCRIPCION
FLETE TERRESTRE
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
COEF. DE
INCIDENCIA
0.669
0.331
% DE
INCIDENCIA
100.000%
100.000%
CI
Material
0.669000
0.331000
1.000000
Mr
Mo
VALORIZACION DE OBRA N 07
CALCULO DEL COEFICIENTE REAJUSTE DE LA VALORIZACION DE OBRA N 07
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 01
K=
0.186 x
Mr
Mo
+ 0.084 x
Cr
Co
+ 0.203 x
Ar
Ao
+ 0.081 x
Mr
Mo
+ 0.446 x
Ir
Io
COEF. DE
INCIDENCIA
% DE
INCIDENCIA
CI
Material
Io
MAY 09
VAL N 05
MONOMIO
SIMBOLO
CODIGO
IU
1
2
3
4
5
M
C
A
M
I
47
21
03
43
39
DESCRIPCION
FORMULA N 02
K=
0.186
0.084
0.203
0.081
0.446
100.000%
100.000%
100.000%
100.000%
100.000%
0.186000
0.084000
0.203000
0.081000
0.446000
1.000000
397.23
350.43
453.81
670.87
347.88
Ir
MAR 10
MAR 10
415.58
357.75
446.16
687.92
350.59
0.195
0.086
0.200
0.083
0.449
1.013
0.350 x
Mr
Mo
+ 0.051 x
Cr
Co
+ 0.078 x
Ar
Ao
+ 0.118 x
Mr
Mo
+ 0.403 x
Ir
Io
COEF. DE
INCIDENCIA
% DE
INCIDENCIA
CI
Material
Io
MAY 09
VAL N 05
MONOMIO
SIMBOLO
CODIGO
IU
1
2
3
4
5
M
C
A
M
I
47
21
02
43
39
DESCRIPCION
FORMULA N 03
K=
0.350
0.051
0.078
0.118
0.403
100.000%
100.000%
100.000%
100.000%
100.000%
0.350000
0.051000
0.078000
0.118000
0.403000
1.000000
397.23
350.43
458.01
670.87
347.88
Ir
MAR 10
0.249 x
Mr
Mo
MAR 10
415.58
357.75
452.81
687.92
350.59
0.366
0.052
0.077
0.121
0.406
1.022
+ 0.074 x
Ar
Ao
+ 0.245 x
Ar
Ao
+ 0.432 x
ITr
ITo
COEF. DE
INCIDENCIA
% DE
INCIDENCIA
VAL N 05
SIMBOLO
CODIGO
IU
1
2
3
4
M
A
A
I
T
47
07
12
39
75
DESCRIPCION
FORMULA N 04
0.245 x
Mr
Mo
SIMBOLO
CODIGO
IU
1
2
M
D
T
A
I
47
30
72
10
39
+ 0.146 x
DTr
DTo
+ 0.609 x
100.000%
100.000%
100.000%
88.889%
11.111%
0.249000
0.074000
0.245000
0.384000
0.048000
1.000000
Io
MAY 09
397.23
472.62
281.54
347.88
338.58
Ir
MAR 10
ABR 09
Kr(MAR )=
MAR 10
415.58
567.88
268.21
350.59
328.49
0.261
0.089
0.233
0.387
0.047
1.017
AIr
AIo
DESCRIPCION
COEF. DE
INCIDENCIA
FLETE TERRESTRE
PETROLEO DIESEL
MAQUINARIA Y EQUIPO NACIONAL
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
MADERA NACIONAL PARA ENCOFRADO Y CARP.
FORMULA N 05
K=
0.249
0.074
0.245
0.432
0.432
CI
Material
SISTEMA PTAR
MONOMIO
ABR 09
Kr(MAR )=
SISTEMA DE ALCANTARILLADO
MONOMIO
K=
ABR 09
Kr(MAR )=
0.245
0.146
0.146
0.609
0.609
% DE
INCIDENCIA
CI
Material
100.000%
13.699%
86.301%
3.284%
96.716%
0.245000
0.020001
0.125999
0.020000
0.589000
1.000000
Io
MAY 09
397.23
371.94
338.58
321.79
347.88
VAL N 05
Ir
MAR 10
ABR 09
Kr(MAR )=
MAR 10
415.58
358.60
328.49
321.08
350.59
0.256
0.019
0.122
0.020
0.594
1.011
0.243 x
Mr
Mo
MONOMIO
SIMBOLO
CODIGO
IU
1
2
3
4
M
C
A
A
I
47
21
03
13
39
+ 0.168 x
Cr
Co
+ 0.062 x
Ar
Ao
DESCRIPCION
+ 0.527 x
AIr
AIo
COEF. DE
INCIDENCIA
% DE
INCIDENCIA
0.243
0.168
0.062
0.527
0.527
CI
Material
100.000%
100.000%
100.000%
15.750%
84.250%
0.243000
0.168000
0.062000
0.083003
0.443998
1.000000
Io
MAY 09
397.23
350.43
453.81
966.59
347.88
VAL N 05
Ir
MAR 10
ABR 09
Kr(MAR )=
MAR 10
415.58
357.75
446.16
1,265.36
350.59
0.254
0.172
0.061
0.109
0.447
1.043
K=
0.00
0.234 x
Mr
Mo
+ 0.184 x
Cr
Co
Ir
Io
+ 0.486 x
+ 0.096 x
AMr
AMo
COEF. DE
INCIDENCIA
% DE
INCIDENCIA
VAL N 05
MONOMIO
SIMBOLO
CODIGO
IU
1
2
3
4
M
C
I
A
M
47
21
39
03
45
DESCRIPCION
FORMULA N 07
K=
0.155 x
Mr
Mo
SIMBOLO
CODIGO
IU
1
2
3
M
T
I
47
65
39
+ 0.377 x
Tr
To
1.000000
397.23
350.43
347.88
453.81
327.07
ABR 09
Kr(MAR )=
MAR 10
415.58
357.75
350.59
446.16
314.71
0.245
0.188
0.490
0.057
0.037
1.017
COEF. DE
INCIDENCIA
0.155
0.377
0.468
% DE
INCIDENCIA
CI
Material
100.000%
100.000%
100.000%
0.155000
0.377000
0.468000
1.000000
Io
MAY 09
397.23
328.40
347.88
VAL N 05
Ir
MAR 10
ABR 09
Kr(MAR )=
MAR 10
415.58
335.53
350.59
0.162
0.385
0.472
1.019
0.00
0.278 x
Mr
Mo
MONOMIO
SIMBOLO
CODIGO
IU
1
2
3
M
I
A
P
C
M
47
39
03
51
21
48
+ 0.436 x
Ir
Io
+ 0.127 x
APr
APo
DESCRIPCION
FORMULA N 09
K=
0.234000
0.184000
0.486000
0.058000
0.038000
Ir
MAR 10
Ir
Io
+ 0.468 x
DESCRIPCION
FORMULA N 08
4
5
100.000%
100.000%
100.000%
60.417%
39.583%
Io
MAY 09
0.00
MONOMIO
K=
0.234
0.184
0.486
0.096
0.096
CI
Material
+ 0.107 x
Cr
Co
+ 0.052 x
Mr
Mo
COEF. DE
INCIDENCIA
% DE
INCIDENCIA
CI
Material
Io
MAY 09
0.278
0.436
0.127
0.127
0.107
0.052
100.000%
100.000%
74.803%
25.197%
100.000%
100.000%
0.278000
0.436000
0.095000
0.032000
0.107000
0.052000
1.000000
397.23
347.88
453.81
314.53
350.43
338.98
VAL N 05
Ir
MAR 10
ABR 09
Kr(MAR )=
MAR 10
415.58
350.59
446.16
310.84
357.75
334.22
0.291
0.439
0.093
0.032
0.109
0.051
1.015
0.00
0.669 x
Fr
Fo
MONOMIO
SIMBOLO
CODIGO
IU
1
2
F
I
32
39
+ 0.331 x
Ir
Io
DESCRIPCION
FLETE TERRESTRE
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
COEF. DE
INCIDENCIA
0.669
0.331
% DE
INCIDENCIA
CI
Material
100.000%
100.000%
0.669000
0.331000
1.000000
Io
MAY 09
425.75
347.88
VAL N 05
Ir
MAR 10
ABR 09
Kr(MAR )=
MAR 10
414.72
350.59
0.652
0.334
0.986
VALORIZACION DE OBRA N 07
CALCULO DE LOS COEFICIENTES DE REAJUSTES (K)
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
:
:
:
:
:
FORMULA N 01
K=
0.186 x
Mr
Mo
+ 0.084 x
% DE
INCIDENCIA
CI
Material
Cr
Co
+ 0.203 x
Ar
Ao
+ 0.081 x
Mr
Mo
+ 0.446 x
Ir
Io
VAL 01
MONOMIO
SIMBOLO
CODIGO
IU
1
2
3
4
5
M
C
A
M
I
47
21
03
43
39
DESCRIPCION
COEF. DE
INCIDENCIA
0.186
0.084
0.203
0.081
0.446
100.00%
100.00%
100.00%
100.00%
100.00%
0.186000
0.084000
0.203000
0.081000
0.446000
397.23
350.43
453.81
670.87
347.88
Ko(MAY )=
FORMULA N 02
0.186
0.084
0.203
0.081
0.446
1.000
413.41
346.98
443.96
665.00
347.45
Ka(NOV )=
0.194
0.083
0.199
0.080
0.445
1.001
413.41
346.98
452.34
668.44
346.35
Ka(ENE )=
0.194
0.083
0.202
0.081
0.444
1.004
VAL 02
413.41
346.98
452.34
668.44
346.35
Kr(NOV )=
0.194
0.083
0.202
0.081
0.444
1.004
0.350 x
Mr
Mo
+ 0.051 x
% DE
INCIDENCIA
CI
Material
Cr
Co
+ 0.078 x
Ar
Ao
+ 0.118 x
Mr
Mo
+ 0.403 x
CODIGO
IU
1
2
3
4
5
M
C
A
M
I
47
21
02
43
39
DESCRIPCION
COEF. DE
INCIDENCIA
0.350
0.051
0.078
0.118
0.403
100.00%
100.00%
100.00%
100.00%
100.00%
0.350000
0.051000
0.078000
0.118000
0.403000
397.23
350.43
458.01
670.87
347.88
Ko(MAY )=
FORMULA N 03
SIMBOLO
CODIGO
IU
1
2
3
4
M
A
A
I
T
47
07
12
39
75
DESCRIPCION
0.249 x
COEF. DE
INCIDENCIA
0.249
0.074
0.245
0.432
0.432
Mr
Mo
+ 0.074 x
% DE
INCIDENCIA
CI
Material
100.00%
100.00%
100.00%
88.889%
11.111%
0.249000
0.074000
0.245000
0.384000
0.048000
Ar
Ao
CODIGO
IU
1
2
M
D
T
A
I
47
30
72
10
39
DESCRIPCION
0.245 x
COEF. DE
INCIDENCIA
FLETE TERRESTRE
PETROLEO DIESEL
MAQUINARIA Y EQUIPO NACIONAL
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
MADERA NACIONAL PARA ENCOFRADO Y CARP.
0.245
0.146
0.146
0.609
0.609
Mr
Mo
+ 0.146 x
% DE
INCIDENCIA
CI
Material
100.000%
13.699%
86.301%
3.284%
96.716%
0.245000
0.020001
0.125999
0.020000
0.589000
397.23
472.62
281.54
347.88
338.58
DTr
DTo
CODIGO
IU
1
2
3
4
M
C
A
A
I
47
21
03
13
39
397.23
371.94
338.58
321.79
347.88
DESCRIPCION
0.243 x
COEF. DE
INCIDENCIA
0.243
0.168
0.062
0.527
0.527
Mr
Mo
+ 0.168 x
% DE
INCIDENCIA
CI
Material
100.000%
100.000%
100.000%
15.750%
84.250%
0.243000
0.168000
0.062000
0.083003
0.443998
Cr
Co
1
2
3
4
M
C
I
A
M
47
21
39
03
45
397.23
350.43
453.81
966.59
347.88
DESCRIPCION
0.234 x
COEF. DE
INCIDENCIA
0.234
0.184
0.486
0.096
0.096
Mr
Mo
+ 0.184 x
% DE
INCIDENCIA
CI
Material
100.000%
100.000%
100.000%
60.417%
39.583%
0.234000
0.184000
0.486000
0.058000
0.038000
Cr
Co
1
2
M
T
47
65
1.011
413.41
346.98
459.08
668.44
346.35
Ka(ENE )=
0.364
0.050
0.078
0.118
0.401
1.011
413.41
346.98
459.08
668.44
346.35
Kr(NOV )=
0.364
0.050
0.078
0.118
0.401
1.011
413.41
346.98
450.58
665.00
347.45
Kr(DIC )=
0.364
0.050
0.077
0.117
0.403
1.011
Ar
Ao
+ 0.432 x
413.41
543.27
270.97
347.45
339.61
Ka(NOV )=
0.259
0.085
0.236
0.384
0.048
1.012
ITr
ITo
413.41
528.24
271.54
346.35
340.04
Ka(ENE )=
0.259
0.083
0.236
0.382
0.048
1.008
VAL 01
DIC 2009 (Ir)
NOV 09
COEFIC.
413.41
528.24
271.54
346.35
340.04
Kr(NOV )=
0.259
0.083
0.236
0.382
0.048
1.008
VAL 02
ENE 2010 (Ir)
DIC 09
COEFIC.
413.41
543.27
270.97
347.45
339.61
Kr(DIC )=
0.259
0.085
0.236
0.384
0.048
1.012
AIr
AIo
413.41
362.71
339.61
321.44
347.45
Ka(NOV )=
0.255
0.020
0.126
0.020
0.588
1.009
413.41
363.47
340.04
321.48
346.35
Ka(ENE )=
0.255
0.020
0.127
0.020
0.586
1.008
VAL 01
DIC 2009 (Ir)
NOV 09
COEFIC.
413.41
363.47
340.04
321.48
346.35
Kr(NOV )=
0.255
0.020
0.127
0.020
0.586
1.008
VAL 02
ENE 2010 (Ir)
DIC 09
COEFIC.
413.41
362.71
339.61
321.44
347.45
Kr(DIC )=
0.255
0.020
0.126
0.020
0.588
1.009
1.000
Ar
Ao
+ 0.527 x
413.41
346.98
443.96
1,265.36
347.45
Ka(NOV )=
0.253
0.166
0.061
0.109
0.443
1.032
AIr
AIo
413.41
346.98
452.34
1,253.01
346.35
Ka(ENE )=
0.253
0.166
0.062
0.108
0.442
1.031
VAL 01
DIC 2009 (Ir)
NOV 09
COEFIC.
413.41
346.98
452.34
1,253.01
346.35
Kr(NOV )=
0.253
0.166
0.062
0.108
0.442
1.031
VAL 02
ENE 2010 (Ir)
DIC 09
COEFIC.
413.41
346.98
443.96
1,265.36
347.45
Kr(DIC )=
0.253
0.166
0.061
0.109
0.443
1.032
397.23
350.43
347.88
453.81
327.07
0.234
0.184
0.486
0.058
0.038
1.000
Ir
Io
+ 0.096 x
413.41
346.98
347.45
443.96
314.70
Ka(NOV )=
0.244
0.182
0.485
0.057
0.037
1.005
AMr
AMo
413.41
346.98
346.35
452.34
314.88
Ka(ENE )=
0.244
0.182
0.484
0.058
0.037
1.005
VAL 01
DIC 2009 (Ir)
NOV 09
COEFIC.
413.41
346.98
346.35
452.34
314.88
Kr(NOV )=
0.244
0.182
0.484
0.058
0.037
1.005
VAL 02
ENE 2010 (Ir)
DIC 09
COEFIC.
413.41
346.98
347.45
443.96
314.70
Kr(DIC )=
0.244
0.182
0.485
0.057
0.037
1.005
0.00
K=
CODIGO
IU
0.243
0.168
0.062
0.083
0.444
+ 0.486 x
Ko(MAY )=
SIMBOLO
1.000
FORMULA N 07
MONOMIO
Ka(NOV )=
0.364
0.050
0.077
0.117
0.403
VAL 02
0.00
K=
CODIGO
IU
0.245
0.020
0.126
0.020
0.589
+ 0.062 x
Ko(MAY )=
SIMBOLO
1.000
FORMULA N 06
MONOMIO
413.41
346.98
450.58
665.00
347.45
K=
SIMBOLO
0.249
0.074
0.245
0.384
0.048
+ 0.609 x
Ko(MAY )=
FORMULA N 05
MONOMIO
1.000
SISTEMA PTAR
K=
SIMBOLO
0.350
0.051
0.078
0.118
0.403
+ 0.245 x
Ko(MAY )=
FORMULA N 04
MONOMIO
1.001
SISTEMA DE ALCANTARILLADO
K=
MONOMIO
Kr(DIC )=
0.194
0.083
0.199
0.080
0.445
Ir
Io
VAL 01
SIMBOLO
413.41
346.98
443.96
665.00
347.45
K=
MONOMIO
DESCRIPCION
0.155 x
COEF. DE
INCIDENCIA
0.155
0.377
Mr
Mo
+ 0.377 x
% DE
INCIDENCIA
CI
Material
100.000%
100.000%
0.155000
0.377000
Tr
To
+ 0.468 x
397.23
328.40
0.155
0.377
Ir
Io
413.41
338.64
0.161
0.389
413.41
339.74
0.161
0.390
VAL 01
DIC 2009 (Ir)
NOV 09
COEFIC.
413.41
339.74
0.161
0.390
VAL 02
ENE 2010 (Ir)
DIC 09
COEFIC.
413.41
338.64
0.161
0.389
39
0.468
100.000%
0.468000
347.88
Ko(MAY )=
FORMULA N 08
K=
MONOMIO
SIMBOLO
CODIGO
IU
1
2
3
M
I
A
P
C
M
47
39
03
51
21
48
4
5
DESCRIPCION
0.278 x
COEF. DE
INCIDENCIA
0.278
0.436
0.127
0.127
0.107
0.052
Mr
Mo
+ 0.436 x
% DE
INCIDENCIA
CI
Material
100.000%
100.000%
74.803%
25.197%
100.000%
100.000%
0.278000
0.436000
0.095000
0.032000
0.107000
0.052000
Ir
Io
+ 0.127 x
397.23
347.88
453.81
314.53
350.43
338.98
Ko(MAY )=
CODIGO
IU
1
2
F
I
32
39
347.45
Ka(NOV )=
0.467
1.017
346.35
Ka(ENE )=
0.466
1.017
346.35
Kr(NOV )=
0.466
1.017
347.45
Kr(DIC )=
0.467
1.017
0.278
0.436
0.095
0.032
0.107
0.052
1.000
APr
APo
+ 0.107 x
413.41
347.45
443.96
300.73
346.98
329.98
Ka(NOV )=
0.289
0.435
0.093
0.031
0.106
0.051
1.005
Cr
Co
+ 0.052 x
413.41
346.35
452.34
301.29
346.98
330.19
Ka(ENE )=
0.289
0.434
0.095
0.031
0.106
0.051
1.006
Mr
Mo
VAL 01
DIC 2009 (Ir)
NOV 09
COEFIC.
413.41
346.35
452.34
301.29
346.98
330.19
Kr(NOV )=
0.289
0.434
0.095
0.031
0.106
0.051
1.006
VAL 02
ENE 2010 (Ir)
DIC 09
COEFIC.
413.41
347.45
443.96
300.73
346.98
329.98
Kr(DIC )=
0.289
0.435
0.093
0.031
0.106
0.051
1.005
0.00
K=
SIMBOLO
1.000
FORMULA N 09
MONOMIO
0.468
0.00
DESCRIPCION
FLETE TERRESTRE
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
0.669 x
COEF. DE
INCIDENCIA
0.669
0.331
Fr
Fo
+ 0.331 x
% DE
INCIDENCIA
CI
Material
100.000%
100.000%
0.669000
0.331000
Ir
Io
425.75
347.88
Ko(MAY )=
0.669
0.331
1.000
418.25
347.45
Ka(NOV )=
0.657
0.331
0.988
418.41
346.35
Ka(ENE )=
0.657
0.330
0.987
VAL 01
DIC 2009 (Ir)
NOV 09
COEFIC.
418.41
346.35
Kr(NOV )=
0.657
0.330
0.987
VAL 02
ENE 2010 (Ir)
DIC 09
COEFIC.
418.25
347.45
Kr(DIC )=
0.657
0.331
0.988
VALORIZACION DE OBRA N 07
INDICES UNIFICADOS DE PRECIOS AL CONSUMIDOR
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
IU
2
3
7
10
12
13
21
30
32
39
43
45
47
48
51
65
72
75
:
:
:
:
:
INSUMO
MAY 09
458.010
453.810
472.620
321.790
281.540
966.590
350.430
371.940
425.750
347.880
670.870
327.070
397.230
338.980
314.530
328.400
338.580
338.580
NOV 09
459.080
452.340
528.240
321.480
271.540
1253.010
346.980
363.470
418.410
346.350
668.440
314.880
413.410
330.190
301.290
339.740
340.040
340.040
DIC 09
450.580
443.960
543.270
321.440
270.970
1265.360
346.980
362.710
418.250
347.450
665.000
314.700
413.410
329.980
300.730
338.640
339.610
339.610
ABRIL 10
VALORIZACION DE OBRA N 07
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
MONTO CONTRATADO (C/ IGV)
MONTO CONTRATADO (S/ IGV)
2,812,663.74
2,363,582.97
CUADRO DE REAJUSTES
CALCULO DEL REAJUSTE DE LA OBRA
VALORES CALCULADOS SIN IGV
FORMULA N 01
VALORIZACION
No
MES
1
Febrero
2
Marzo
3
Abril
4
Mayo
5
Junio
6
Julio
7
#N/A
TOTALES
FORMULA N 02
MES
1
Febrero
2
Marzo
3
Abril
4
Mayo
5
Junio
6
Julio
7
#N/A
TOTALES
FORMULA N 03
REAL
Kr
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
REINTEGRO ACUM. ANTERIOR
REINTEGRO DEL MES
REINTEGRO TOTAL
REINTEGRO
RECONOCIDO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AVANCE
PROGRAMADO
REAL
Kr
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
REAJUSTE
C= VALx(Kr-1)
CALENDARIO
VALORIZACION
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
REINTEGRO ACUM. ANTERIOR
REINTEGRO DEL MES
REINTEGRO TOTAL
REINTEGRO
RECONOCIDO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SISTEMA DE ALCANTARILLADO
VALORIZACION
No
PROGRAMADO
REAJUSTE
C= VALx(Kr-1)
CALENDARIO
VALORIZACION
VALORIZACION
No
AVANCE
MES
1
Febrero
2
Marzo
3
Abril
4
Mayo
5
Junio
6
Julio
7
#N/A
TOTALES
AVANCE
PROGRAMADO
REAL
Kr
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
REAJUSTE
C= VALx(Kr-1)
CALENDARIO
VALORIZACION
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
REINTEGRO ACUM. ANTERIOR
REINTEGRO DEL MES
REINTEGRO TOTAL
REINTEGRO
RECONOCIDO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
VALORIZACION DE OBRA N 07
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
MONTO CONTRATADO (C/ IGV)
MONTO CONTRATADO (S/ IGV)
2,812,663.74
2,363,582.97
CUADRO DE REAJUSTES
CALCULO DEL REAJUSTE DE LA OBRA
VALORES CALCULADOS SIN IGV
FORMULA N 04
SISTEMA PTAR
VALORIZACION
No
AVANCE
MES
PROGRAMADO
1
Febrero
2
Marzo
3
Abril
4
Mayo
5
Junio
6
Julio
7
#N/A
TOTALES
FORMULA N 05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
REINTEGRO ACUM. ANTERIOR
REINTEGRO DEL MES
REINTEGRO TOTAL
REINTEGRO
RECONOCIDO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MES
PROGRAMADO
1
Febrero
2
Marzo
3
Abril
4
Mayo
5
Junio
6
Julio
7
#N/A
TOTALES
FORMULA N 06
REAL
Kr
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
REAJUSTE
C= VALx(Kr-1)
CALENDARIO
VALORIZACION
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
REINTEGRO ACUM. ANTERIOR
REINTEGRO DEL MES
REINTEGRO TOTAL
REINTEGRO
RECONOCIDO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
VALORIZACION
No
Kr
1.000
1.000
1.000
1.000
1.000
1.000
1.000
VALORIZACION
No
REAL
REAJUSTE
C= VALx(Kr-1)
CALENDARIO
VALORIZACION
MES
1
Febrero
2
Marzo
3
Abril
4
Mayo
5
Junio
6
Julio
7
#N/A
TOTALES
AVANCE
PROGRAMADO
REAL
Kr
1.000
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
0.00
0.00
0.00
REAJUSTE
C= VALx(Kr-1)
CALENDARIO
VALORIZACION
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
REINTEGRO ACUM. ANTERIOR
REINTEGRO DEL MES
REINTEGRO TOTAL
REINTEGRO
RECONOCIDO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
VALORIZACION DE OBRA N 07
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
AMORTIZACION DEL
ADELANTO EN EFECTIVO
D.S. N 017-79-VC
FORMULA:
AMORT = AxVAL/C
DONDE:
AMORT :
A:
V:
C:
K:
Ka:
0.00%
ADELANTO DIRECTO =
ADELANTO DIRECTO =
No.
FECHA PAGO
-.-
Valorizacion
ADEL. EFEC.
PORCENTAJE
CON IGV
SIN IGV
DEL ADELANTO
0.00
0.00
0.00%
Monto
Adel. Otorg.
Porcentaje
Amortizacion
Monto
(SIN IGV)
del Adelanto
AxVAL/C
por Amortizar
e= a x d
Saldo a Amortizar
Mes
Valorizado
a
VAL N 1
Febrero
23,835.82
0.00
0.00%
0.00
0.00
0.00
VAL N 2
Marzo
190,935.89
0.00
0.00%
0.00
0.00
0.00
VAL N 3
Abril
222,400.53
0.00
0.00%
0.00
0.00
0.00
VAL N 4
mayo
576,807.41
0.00
0.00%
0.00
0.00
0.00
VAL N 5
junio
829,868.53
0.00
0.00%
0.00
0.00
0.00
VAL N 6
Julio
518,787.93
0.00
0.00%
0.00
0.00
0.00
VAL N 7
Agosto
12,241.43
0.00
0.00%
0.00
0.00
0.00
TOTAL
g= f - e
0.00
S/.
0.00
VALORIZACION DE OBRA N 07
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
AMORTIZACION DEL
ADELANTO PARA MATERIALES
D.S. N 017-79-VC
FORMULA:
AMORT = AxVAL/C
DONDE:
AMORT :
A:
V:
C:
K:
Ka:
20.00%
ADELANTO P/MATERIALES =
ADELANTO P/MATERAILES =
No.
FECHA PAGO
-.-
Valorizacion
ADEL. EFEC.
PORCENTAJE
CON IGV
SIN IGV
DEL ADELANTO
562,532.75
476,722.67
20.00%
Monto
Adel. Otorg.
Porcentaje
Amortizacion
Monto
(SIN IGV)
del Adelanto
AxVAL/C
por Amortizar
e= a x d
Saldo a Amortizar
Mes
Valorizado
a
g= f - e
VAL N 1
Febrero
23,835.82
476,722.67
20.00%
0.00
476,722.67
476,722.67
VAL N 2
Marzo
190,935.89
20.00%
38,187.18
476,722.67
438,535.49
VAL N 3
Abril
222,400.53
20.00%
44,480.11
438,535.49
394,055.38
VAL N 4
Mayo
576,807.41
20.00%
115,361.48
394,055.38
278,693.90
VAL N 5
Junio
829,868.53
20.00%
278,693.90
278,693.90
0.00
VAL N 6
Julio
518,787.93
476,722.67
20.00%
0.00
0.00
0.00
VAL N 7
Agosto
12,241.43
476,722.67
20.00%
0.00
0.00
0.00
TOTAL
476,722.67
S/.
0.00
VALORIZACION DE OBRA N 07
: MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI
: "AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
: CONSORCIO NEON ASOCIADOS
: ING. JULIO VICTOR MARTINEZ QUISPE
: SUMA ALZADA
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
FORMULA:
De = A x VAL / C x ( K / Ka - 1 )
DONDE:
De :
A:
V:
C:
K:
Ka:
0.00%
ADELANTO DIRECTO =
ADELANTO DIRECTO =
FORMULA N 01
No.
-.-
Valorizacion
ADEL. EFEC.
ADEL. EFEC.
PORCENTAJE
CON IGV
SIN IGV
DEL ADELANTO
0.00
0.00
0.00%
Monto
Adel. Otorg.
Porcentaje
Valorizado
(SIN IGV)
del Adelanto
Ka
(K / Ka - 1)
Deduccion
Mes
g= (e / f - 1)
h= a x d x g
VAL N 1
Febrero
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 2
Marzo
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 3
Abril
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 4
Mayo
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 5
Junio
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 6
Julio
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 7
Agosto
0.00
0.00%
1.000
1.000
0.00000
0.00
Ax(VAL/C)x(K/Ka-1)
TOTAL
0.00
S/. 0.00
S/. 0.00
S/. 0.00
-.-
Valorizacion
ADEL. EFEC.
ADEL. EFEC.
PORCENTAJE
CON IGV
SIN IGV
DEL ADELANTO
0.00
0.00
0.00%
Monto
Adel. Otorg.
Porcentaje
Valorizado
(SIN IGV)
del Adelanto
Ka
(K / Ka - 1)
Deduccion
Mes
g= (e / f - 1)
h= a x d x g
VAL N 1
Febrero
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 2
Marzo
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 3
Abril
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 4
Mayo
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 5
Junio
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 6
Julio
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 7
Agosto
0.00
0.00%
1.000
1.000
0.00000
0.00
Ax(VAL/C)x(K/Ka-1)
TOTAL
0.00
S/. 0.00
S/. 0.00
S/. 0.00
VALORIZACION DE OBRA N 07
: MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI
: "AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
: CONSORCIO NEON ASOCIADOS
: ING. JULIO VICTOR MARTINEZ QUISPE
: SUMA ALZADA
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
FORMULA:
De = A x VAL / C x ( K / Ka - 1 )
DONDE:
De :
A:
V:
C:
K:
Ka:
0.00%
ADELANTO DIRECTO =
ADELANTO DIRECTO =
FORMULA N 03
No.
SISTEMA DE ALCANTARILLADO
FECHA PAGO
-.-
Valorizacion
ADEL. EFEC.
ADEL. EFEC.
PORCENTAJE
CON IGV
SIN IGV
DEL ADELANTO
0.00
0.00
0.00%
Monto
Adel. Otorg.
Porcentaje
Valorizado
(SIN IGV)
del Adelanto
Ka
(K / Ka - 1)
Deduccion
Mes
g= (e / f - 1)
h= a x d x g
VAL N 1
Febrero
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 2
Marzo
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 3
Abril
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 4
Mayo
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 5
Junio
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 6
Julio
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 7
Agosto
0.00
0.00%
1.000
1.000
0.00000
0.00
Ax(VAL/C)x(K/Ka-1)
TOTAL
0.00
S/. 0.00
S/. 0.00
S/. 0.00
SISTEMA PTAR
FECHA PAGO
-.-
Valorizacion
ADEL. EFEC.
ADEL. EFEC.
PORCENTAJE
CON IGV
SIN IGV
DEL ADELANTO
0.00
0.00
0.00%
Monto
Adel. Otorg.
Porcentaje
Valorizado
(SIN IGV)
del Adelanto
Ka
(K / Ka - 1)
Deduccion
Mes
g= (e / f - 1)
h= a x d x g
VAL N 1
Febrero
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 2
Marzo
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 3
Abril
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 4
Mayo
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 5
Junio
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 6
Julio
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 7
Agosto
0.00
0.00%
1.000
1.000
0.00000
0.00
Ax(VAL/C)x(K/Ka-1)
TOTAL
0.00
S/. 0.00
S/. 0.00
S/. 0.00
VALORIZACION DE OBRA N 07
: MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE CAURI
: "AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE ANTACOLPA"
: CONSORCIO NEON ASOCIADOS
: ING. JULIO VICTOR MARTINEZ QUISPE
: SUMA ALZADA
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
FORMULA:
De = A x VAL / C x ( K / Ka - 1 )
DONDE:
De :
A:
V:
C:
K:
Ka:
0.00%
ADELANTO DIRECTO =
ADELANTO DIRECTO =
FORMULA N 05
No.
FECHA PAGO
-.-
Valorizacion
ADEL. EFEC.
ADEL. EFEC.
PORCENTAJE
CON IGV
SIN IGV
DEL ADELANTO
0.00
0.00
0.00%
Monto
Adel. Otorg.
Porcentaje
Valorizado
(SIN IGV)
del Adelanto
Ka
(K / Ka - 1)
Deduccion
Mes
g= (e / f - 1)
h= a x d x g
VAL N 1
Febrero
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 2
Marzo
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 3
Abril
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 4
Mayo
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 5
Junio
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 6
Julio
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 7
Agosto
0.00
0.00%
1.000
1.000
0.00000
0.00
Ax(VAL/C)x(K/Ka-1)
TOTAL
0.00
S/. 0.00
S/. 0.00
S/. 0.00
-.-
Valorizacion
ADEL. EFEC.
ADEL. EFEC.
PORCENTAJE
CON IGV
SIN IGV
DEL ADELANTO
0.00
0.00
0.00%
Monto
Adel. Otorg.
Porcentaje
Valorizado
(SIN IGV)
del Adelanto
Ka
(K / Ka - 1)
Deduccion
Mes
g= (e / f - 1)
h= a x d x g
VAL N 1
Febrero
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 2
Marzo
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 3
Abril
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 4
Mayo
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 5
Junio
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 6
Julio
0.00
0.00%
1.000
1.000
0.00000
0.00
VAL N 7
Agosto
0.00
0.00%
1.000
1.000
0.00000
0.00
Ax(VAL/C)x(K/Ka-1)
TOTAL
0.00
0.00
0.00
0.00
S/. 0.00
S/. 0.00
S/. 0.00
07
Agosto
AVANCE PROGRAMADO
AVANCE REAL
100%
99.12%
97.00%
100.00%
90%
80%
77.36%
78.40%
70%
60%
50%
48.90%
42.54%
40%
30%
20.60%
18.34%
20%
10%
0%0
10.70%
9.01%
1.00%
0
1.20%
-10%
EJECUTADO
PARCIAL
PARCIAL ACUMUL.
S/.
%
%
0
Feb-12
Mar-12
Apr-12
May-12
Jun-12
Jul-12
Aug-12
(Inc. Adicional de obra)
33,751.96
267,203.06
278,453.71
795,983.84
829,735.80
523,155.46
84,379.91
1.20%
1.20%
9.50%
10.70%
9.90%
20.60%
28.30%
48.90%
29.50%
78.40%
18.60%
97.00%
3.00% 100.00%
28,126.26
225,304.34
262,432.62
680,632.75
979,244.87
612,169.75
24,753.16
TOTAL
2,812,663.74
100.00%
MES
2/2/112
2,812,663.74
1.00%
1.00%
8.01%
9.01%
9.33% 18.34%
24.20% 42.54%
34.82% 77.36%
21.76% 99.12%
0.88% 100.00%
100.00%
ESTADO
-0.20%
-1.69%
-2.26%
-6.36%
-1.04%
2.12%
0.00%
ATRAZADO
ATRAZADO
ATRAZADO
ATRAZADO
ATRAZADO
ADELANTADO
NORMAL
VALORIZACION DE OBRA N 07
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
MONTO REFERENCIAL
MONTO CONTRATADO
: 2,812,663.74
: 2,812,663.74
INC. IGV
INC. IGV
Agosto
ADELANTOS OTORGADOS
FECHA
-.-.-
MONTO C/IGV
0.00
562,532.75
562,532.75
MONTO S/IGV
% PRESUPUESTO
0.00
476,722.67
476,722.67
0.00%
20.00%
20.00%
Agosto
VALORIZACION
a) VALORIZACION
1.- Monto Valorizado (sin IGV)
2.- Reintegros (sin IGV)
b) TOTAL VALORIZADO (a.1+b.2)
c) DEDUCCIONES
1.- Amort. Adelanto en Efectivo (sin IGV)
2.- Amort. Adelanto de Materiales (sin IGV)
d) TOTAL DE RETENCIONES (c.1+c.2)
e) TOTAL A PAGAR POR LA VALORIZACION (b-d)
f) I.G.V (18% )
g) TOTAL A RECIBIR POR EL CONTRATISTA (e+f)
N 01
N 02
N 03
N 04
N 05
N 06
N 07
TOTAL
23,835.82
0.00
23,835.82
190,935.89
0.00
190,935.89
222,400.53
0.00
222,400.53
576,807.42
0.00
576,807.42
829,868.53
0.00
829,868.53
518,787.93
0.00
518,787.93
12,241.43
0.00
12,241.43
2,362,636.12
0.00
2,362,636.12
0.00
0.00
0.00
23,835.82
4,290.45
28,126.27
0.00
38,187.18
38,187.18
152,748.71
27,494.77
180,243.48
0.00
44,480.11
44,480.11
177,920.42
32,025.68
209,946.10
0.00
115,361.48
115,361.48
461,445.94
83,060.27
544,506.20
0.00
278,693.90
278,693.90
551,174.62
99,211.43
650,386.05
0.00
0.00
0.00
518,787.92
93,381.83
612,169.75
0.00
0.00
0.00
12,241.43
2,203.46
14,444.89
0.00
476,722.67
476,722.67
1,885,913.43
339,464.42
2,225,377.85
VALORIZACION DE OBRA N 07
RESUMEN DE PAGO A EFECTUAR
ENTIDAD EJECUTORA
OBRA
CONTRATISTA
SUPERVISOR
MODALIDA DE EJECUCION
MONTO REFERENCIAL
MONTO CONTRATADO
: 2,812,663.74
: 2,812,663.74
INC. IGV
INC. IGV
Agosto
ADELANTOS OTORGADOS
FECHA
-.-.-
MONTO C/IGV
0.00
562,532.75
562,532.75
MONTO S/IGV
0.00
562,532.75
562,532.75
% PRESUPUESTO
0.00%
20.00%
20.00%
Agosto
DESCRIPCION
MONTO S/.
0.00
-4,219.34
0.00
4,101.33
364.00
9,787.94
10,033.93
1,204.09
1,003.41
12,241.43
12,241.43
S/. 12,241.43
Kr= 1.000
Kr= 1.000
Kr= 1.000
Kr= 1.000
Kr= 1.000
Kr= 1.000
0.00%
20.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
S/. 12,241.43
0.00
0.00
0.00
S/. 12,241.43
2,203.46
S/. 14,444.89
S/. 14,444.89