Vous êtes sur la page 1sur 1

RENDIMIENTO DE CONCRETO POR 1 M3 PARA:

PROPORCION
CEMENTO
BULTOS BOTES BOTES BOTES

RESISTENCIA

CANTIDAD DE MATERIAL PARA 1 M3

100 Kg/m2

CEMENTO ARENA GRAVA CEMENTO ARENA GRAVA CEMENTO ARENA GRAVA CEMENTO ARENA GRAVA

8 BULTOS 6 1/2 X 8 X 19 LT. = 988 LT. = 0.988 M 3 7 3/4 X 8 X 19 LT. = 1064 LT. = 1.064 M 3 8 BULTOS 5 X 8 X 19 LT. = 760 LT. = 0.760 M 3 5 3/4 X 8 X 19 LT. = 874 LT. = 0.874 M 3 8 BULTOS 4 X 8 X 19 LT. = 608 LT. = 0.608 M 3 5 X 8 X 19 LT. = 780 LT. = 0.780 M 3 8 BULTOS 3 X 8 X 19 LT. = 456 LT. = 0.456 M 3 4 X 8 X 19 LT. = 608 LT. = 0.608 M 3

2 1/4

6 1/2

150 Kg/m

5 3/4

200 Kg/m

1 1/2

250 Kg/m2

1 1/3

RENDIMIENTO DE MORTERO POR 1 M3 PARA:


PROPORCION
MORTERO
BULTOS BOTES

RESISTENCIA

CANTIDAD DE MATERIAL PARA 1 M3

PLANTILLAS MUROS DE TABIQUE

MORTERO ARENA MORTERO ARENA

8.77 BULTOS 1 M3 13.16 BULTOS 1 M3

RENDIMIENTO DE FIERRO POR 1 ML.


No. 2 No. 3 No. 4 ALAMBRE ALAMBRN VARILLA VARILLA 0.030 KG. / ML. 0.388 KG. / ML. 0.56 KG. / ML. 0.994 KG. / ML.