Vous êtes sur la page 1sur 1

Outage Manager Training PMI Noida (18.09.13-20.09.

13)
1. Material codification: Sub group for MG49 is changed from SG10 to SG35 by !erp. odes are getting bloc"ed in SG10.Station has re#uested !$%& to ma"e a program to auto shift codes from SG10 to SG35. '. () net*or" print re#uired for display in %+Site , meeting room.

3. ost allocation under plant , machinery head from -adri .hermal to -adri Gas is done throught /0 entries on cost centre.1ffects cost ratios of the station. 4. 0n () /lash %eport in &-/+list of acti2ities not started on the stipulated date not coming in report.%e#uest for incorporation. 5.3uilding+ .o*nship , other assets cost boo"ed 1004 on cost centre. .o*nship , other asset is cost allocated from -adri .hermal through /0 entries. 5. 0mpact of using field "ey %eliability: 0n 61337 (S.7 (M& the cost is boo"ed under o2erhauling head *hereas the same cost is boo"ed under %outine maintenance ..he alters mtc. ost ratios. 8. %e#uest for chec" in cost boo"ing under plant , mtc. )ead . 9.%elease of retention money:liabilities causing 2ariation in cost ratios , repair , mtc. 3udget utili;ation. 9.Store preser2ation scheduled through S1&. oncerned mtc. -ept. is ta"ing permit , closing preser2ation permit. 10. ost boo"ed to (rder mismatch in .codes 61337 (S.7 (M& , /inance cost sheet. 11.;csp issue: apital spares of the tune of %s.4.43 crores tagged as 6Sares.

Vous aimerez peut-être aussi