PREMALA CONSTRUCTION SDN BHD ACTION TRACKING REGISTER LIST

Project: Rev No.: Total Pages:

SABAH AMMONIA UREA

1 Verified By

No.

Date Raised

Action

Responsible Person

Status Originator Target Date OPEN CLOSED EVIDENCE Name

Signature

To do modification for PR 101 by 3/1/2014 tying the pipe rack on steel structure and close all gap To buy new oil tank seal for SD 8809 C

Yahya

Luqman

17/1/2014

3/1/2014

Yahya

Luqman

4/1/2014

3/1/2014 To buy hand glove for workers

Yahya

Luqman

3/1/2014

3/1/2014

To do PUSPAKOM inspection and renewal of road tax for QSN 941

Yahya

Luqman

10/1/2014

3/1/2014

To track all green tag on site for renewal inspection

Scaffold supervisor

Luqman

7/1/2014

3/1/2014 To repair genset breaker box

Yahya

Luqman

4/1/2014

Prepared By

Luqman Osman (HSE Coordinator)

Page 1 of 1