Académique Documents
Professionnel Documents
Culture Documents
PROYECTO:
140
1.77
20
190
80
12.13
12.13
50
0.35
3.3173
VOLUMEN TOTAL V1 + V2
Tendra 02 camaras. la primera los 2/3 del area total y la segunda 1/3.
ALTURA DEL TANQUE SEPTICO (HASTA ESPEJO DE AGUA)
BORDE LIBRE
TOTAL AREA SUPERFICIAL
RELACION ANCHO / LARGO
ENTONCES EL ANCHO SERA
ENTONCES EL LARGO SERA
3.71
1.85
3.71
1.85
0.3
1.5
1.85
15.45
1.5
0.3
10.30
1/3
1.85
5.56
#REF!
2,1*1,5
3.15 M2
2,1*1,5*1,2
3.78 M3
2,1*1,5*1,2*1,2
4.54 M3
1,2*(2*1,8+2*1,2)
7.20
0,50*0,70
0.35
2*0,90*0,60
1.08
1,80*1,20
3.00
6*0,05
0.30
11.93 M2
1,70*2,30*0,20
0.782
Tapa
1,90*1,30*0,05
0.124
Paredes
1,20*(2*2,1+2*1,20)*,15 =
1.183
Muro
0,60*0,15*0,90
0.081
Plataforma
0,70*0,50*0,05
0.018
Fondo
7*1,8+5*2,30
Paredes
22*1,8
29.6
Paredes
6*6,8
40.8
Muro apoy
8*0,70+4*0,90
Muro apoy
5*0,6+3*0,90
2.20 M3
1,6 ACERO
3/8"
24.1
9.2
4.5
118,20m*0,58
1/4"
Tapa
5*2,30*1,7*1,8
24,1*0,25
68.6
6
total
74.6 Kgs
0.38 M3
1,80*1,20
7,20+1,8*1,20=
Ing. Armando D.
2.16 M2
9.36 M2
2.16 M2
0,50*1,1
2*0,5*2,26*1,05
1 Und
2.4 KGS
28.57 M3
15.45 M3
DIMENSIONAMIENTO:
ING. ADD.
4.60
2.30
Ancho Interior
(A)
2.30
Espesor de muros
(E1)
0.15
Espesor de Losa
(E2)
0.15
(E3)
0.15
Espesor de la Division(E4)
0.20
Cantidad de tapas
4.00
(N)
Largo de la tapa
(D)
Ancho de la tapa
(d)
Espesor de la Tapa
(e)
0.60
0.60
0.100
(H)
2.10
1.80
23.40
M2
60.84
M3
67.39
M3
2*H*(L1+L2)+2(H+E3+E2)*(L1+L2+2E1+E4)
64.50
Muro T
4*H*A+2*(A+2E1)*(H+E3+E2)
31.80
Techo
A*(L1+L2)
15.87
Tapas
N*2*E3*(D+d+4*E3)
2.16
N*2*E3*(D+d)
1.44
Ing. Armando D.
Losa
(L1+L2+2*E1+E4)*(A+2*E1)*E2
Techo
(L1+L2+2*E1+E4)*(A+2*E1)*E3
Paredes
2*(L1+L2)*H*E1
2.89
2.89
4.347
115.77
Paredes
2*A*H*E1
Division
A*H*E4
1.449
0.966
N*D*d*E3
Tapas
-0.216
N*(D+4*e)*(d+4*e)*e
0.400
2*N(D+d+4*e)*e*e
0.128
12.85 M3
2,6 ACERO
Fierro
Espacimiento
Longitud
Total(m)
Techo
longitudinal
3/8"
0.20
13
7.70
100.10
0.58
58.06
transversal
3/8"
0.20
37
2.90
107.30
0.58
62.23
vertical
3/8"
0.20
100
2.90
290.00
0.58
168.20
horizontal
3/8"
0.30
20.00
160.00
0.58
92.80
vertical
3/8"
0.20
12
2.90
33.35
0.58
19.34
horizontal
3/8"
0.30
3.00
24.00
0.58
13.92
longitudinal
3/8"
0.20
13
7.70
100.10
0.58
58.06
transversal
3/8"
0.20
37
2.90
107.30
0.58
62.23
9.28
Paredes
Division
Losa
Tapa
longitudinal
3/8"
10
1.60
16.00
0.58
transversal
3/8"
1.60
12.80
0.58
TOTAL
2,7 MORTERO PARA PENDIENTE
(L1+L2)*A
15.87 M2
2*H*(L1+L2)+4*H*A
64.17 M2
(L1+L2+2*E1+E4)*(A+2*E1)
19.24 M2
2,10 ACCESORIOS
TEE 6"*6"
3 Und
CODO 6"*6"
3 Und
NUMERO DE CAJA
4,1 TRAZO Y REPLANTEO
0,90*0,90
2.4 M2
0,81*0,95
2.31 M3
0,81*0,95*1,2
2.77 M3
1.68
0,90*0,90
0.81
7.47 M2
0,90*0,90*0,15
0.12
Tapa
0,90*0,90*0,10
0.081
Paredes
(1,6+1,2)*0,7*0,10
0.196
1.2 M3
Ing. Armando D.
7.42
551.55
4,6 ACERO
3/8"
a 0,20mts
Tapa
10*0,60*0,58
10.5 Kgs
1,68+0,60+0,60
6.12 M2
94 M2
76.62
Clculo
CANTIDAD DE POZOS DE PERCOLACION (N)
DIMENSIONAMIENTO:
Diametro del pozo (D)
2.50
4.00
Espesor de la Tapa
0.15
(E)
0.60
0.40
0.15
0.25
Anillos N
2.00
14.73
M2
76.58
M3
91.89
M3
(D-0,2)*PI*h1
4.34
Cimiento
(D-0,2-2a1)*PI*h1
2.83
sobrecimiento
(D-0,2-a2)*PI*a2*2
1.93
Techo
(D-0,2)^2*PI/4
4.15
Tapa
0,6*PI*E
0.28
2.58
48.33 M2
(D-0,2-a1)*PI*a1*h1
1.433
sobrecimiento
(D-0,2-a2)*PI*a2*h2
0.242
5.02 M3
Ing. Armando D.
0.736
(-)0,6^2*PI/4*E
-0.042
0.64
4.01 M3
5,7 ACERO
3/8"
6*D
(D-0,3)/,2*D/2*2
Anillo de Refuerzo
D*PI*2*n
15
27.50
12.57
55.07
95.82 Kgs
27.69
83.08 M2
5,9 GRAVA
(D-,1)*PI*0,10*(H+,3+h1+h2)
3.81
(D-0,2-2a1)^2*PI/4*h1
1.06
Ing. Armando D.
14.60 M3
3 Und
189.56 Hab
18.96 m2
4.35 mts
Largo
Ancho
Area
m
m
m
m3
m
m
m
1.17 m
1.20 m
L= 7.00
A= 5.00
PLANTA
#REF!
H = 1.20
ELEVACION
METRADO
1.0 EXCAVACION MANUAL
Lecho
L*A*H
Zapatas
1.5*0.5*0.40
Dado
0.40*0.40*0.40
42.00
0.30
0.06
42.36 M3
0.11
1.60
1.35
0.25
1.60
4.91 M2
0.06
0.06 M3
0.30
0.07
0.05
0.42 M3
3.4 Acero
3/8"
1/4"
4.0 MEDIO FILTRANTE
4.1 Material filtrante
5.0 ACCESORIOS
Codo de 6" F.F
Tubera de 6" F.F
Abrazadera
Adaptador de 6"
ADD
0.42
2*4*2.2
4*1.5
10*0.5
20*1
10*0.5
17.60
6.00
5.00
20
5
16.59
6.25
L*A*0.45
22.84 Kgs
15.75 M3
1
1
1
1
Und
Und
Und
Und
7.00 m
5.00 m
35.00 OK
ADD
48.00 M2