CONTRATO No 3-4-CF-A-734-W-0-3

LUGAR Y FECHA: XALAPA, VER A 30 DE SEPTIEMBRE DE 2013


OBRA: RECONSTRUCCION DE OBRAS DE ALIVIO, MURO DE CONTENCION, CONSTRUCCION DE OBRAS COMPLEMENTARIAS Y RECONSTRUCCION DE BASE HIDRAULICA Y CARPETA
ASFALTICA EN EL CAMINO ACAPULCO-EJIDO DE LA PIA DEL KM. 0+000 AL KM 13+500 CON UNA META DE 13.5KM EN EL MUNICIPIO DE ZENTLA, DEL ESTADO DE VERACRUZ
EMPRESA: CIEG,S.A.DE C.V.
FECHA DE INICIO: 20-oct-13
FECHA DE TERMINO 17-abr-14
No

NORMA DE OBRA
PUBLICA
O ESPECIFICACION

DESCRIPCION

PRESUPUESTO SEGN CONTRATO


VOLUMEN

UNIDAD

P.U.

IMPORTE DEL
CONTRATO

HA

$3,100.86

$12,403.44

M3

$2,131.98

$138,578.70

PRESUPUESTO SEGN VOLUMEN


DE CAMPO
VOLUMEN
IMPORTE

IMPORTE
CONTRATO
VOLUMEN

ADICIONAL

4.00

$12,403.44

0.00

$0.00

$138,578.70

0.00

$0.00

AL

IMPORTE

TERRACERIAS
1

N-CTR-CAR-1-01-001/00

DESMONTE P.U.O.T
4.00

N-CTR-CAR-1-02-001/100

N-CTR-CAR-1-03-003/00

N-CTR-CAR-1-03-007/09

N-CTR-CAR-1-03-006/00

N-CTR-CAR-1-03-002/00

N-CTR-CAR-1-04-002/00
N-CTR-CAR-1-01-013/00

N-CTR-CAR-1-04-004/00

N-CTR-CAR-1-04-006/06
N-CTR-CAR-1-01-013/00

10

11

N-CTR-CAR-1-03-001/00

N-CTR-CAR-1-03-001/00

ESTRUCTURA
MURO DE CONTENCION DE CONCRETO CICLOPEO P.U.O.T
EXCAVACION, RELLENO, MATERIALES PARA DRENES Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION, PARA LA ESTABILIZACION
DE
TALUDES M3
DRENAJES Y SUBDRENES
CUNETAS REVESTIDAS DE CONCRETO HIDRAULICO SIMPLE, DE FC=150
KG/CM2, P.U.O.T.

65.00

65.00

6,000.00

ML

$197.68

$1,186,080.00

6,000.00

$1,186,080.00

0.00

$0.00

6,000.00

ML

$77.62

$465,720.00

6,000.00

$465,720.00

0.00

$0.00

792.00

ML

$572.93

$453,760.56

792.00

$453,760.56

0.00

$0.00

25.00

ML

$7979.30

$199,482.50

0.00

-25.00

-$199,482.50

13,300.00

M3

$148.51

$1,975,183.00

17,247.93

$2,561,490.08

3,947.93

$568,307.08

66,500.00

M2

$15.56

$1,034,740.00

83,612.00

$1,301,002.72

17,112.00

$266,262.72

3,325.00

M3

$2,968.76

$9,871,127.00

4,190.49

$12,440,559.09

865.49

$2,569,432.09

9,500.00

$5.97

$56,715.00

13,500.00

$80,595.00

4,000.00

$23,880.00

19,000.00

$5.97

$113,430.00

27,000.00

$161,190.00

8,000.00

$47,760.00

BORDILLO DE CONCRETO HIDRULICO DE F'C = 150 KG/CM2 P. U. O. T

LAVADERO DE CONCRETO HIDRULICO DE F'C = 150 KG/CM2 P.U.O.T.

ALCANTARILLA TUBULAR DE CONCRETO REFORZADO DE FC = 350


KG/CM2 DE 1.20 MTS. DE DIAMETRO P.U.O.T INCLUYE
TUBERIA,
EXCAVACION, RELLENO, PLANTILLA DE APOYO Y CONCRETO SIMPLE
DE FC= 150 KG/CM2 EN CABEZOTES
PAVIMENTOS
CONSTRUCCION DE BASE DE 20 CMS. DE ESPESOR COMPACTO,
CONSTRUIDO CON MATERIAL DE BANCO, INCLUYE ACARREOS DE
MATERIAL DE PRESTAMO DE BANCO DE ACUERDO A LA NORMA N-CTRCAR-1-01-013/00, BASE COMPACTADA AL 100 %, P.U.O.T.
RIEGO DE IMPREGNACION P.U.O.T.

CARPETA ASFALTICA CON MEZCLA EN CALIENTE; DE 5 CM DE ESPESOR


COMPACTO, CONSTRUIDO CON MATERIAL PETREO DE BANCO, INCLUYE
ACARREOS DE MATERIAL DE PRESTAMO DE BANCO DE ACUERDO A LA
NORMA N-CTR-CAR-1-01-013/00. CARPETA ASFALTICA COMPACTADA AL
95 %, P.U.O.T.
SEALAMIENTO
PINTURA DE RAYA CONTINUA CENTRAL SEPARADORA DE CIRCULACIN
TIPO M-2-A-1 COLOR AMARILLO DE 10 CM DE ANCHO P.U.O.T.
PINTURA DE RAYA CONTINUA EN AMBAS ORILLAS DE CALZADA, TIPO M3.1 COLOR BLANCO DE 10 CMS. DE ANCHO P.U.O.T.

PRESUPUESTO
16% DE IVA

CIEG, SA DE CV
___________________________
ABRAHAM CALDERON AVILA
REPRESENTANTE LEGAL

EL RESIDENTE DE CARRETERAS
ALIMENTADORAS CARDEL
____________________________________________
ING. BERTOLDO AMBROSIO IBAEZ

$15,507,220.20

$18,794,346.48

$3,276,159.39

$2,481,155.23

$3,007,095.44

$524,185.50

IMPORTE TOTAL $17,988,375.43


EL RESIDENTE GENERAL DE CARRETERAS
ALIMENTADORAS DEL CENTRO SCT VERACRUZ
____________________________________________________
ING ELOY HERNANDEZ AGUILAR

$21,801,441.91
$3,800,344.89
EL RESIDENTE GENERAL DE CARRETERAS
ALIMENTADORAS DEL CENTRO SCT VERACRUZ
_______________________________________________
ING ELOY HERNANDEZ AGUILAR