Académique Documents
Professionnel Documents
Culture Documents
Pipe
Layed
Layed
under B- under B2/16
2/17
Pipe
Dia
Total
Bought
Pipe
90
34219
15447
110
23449
125
Pipe
Pipe
Issued Pipe Issued
Tota
Remaini
Pipe Issued
Received at from
from
Pipe
ng Pipe
from Palej
Pakhajan Pakhaja
Sudiora
Issued
n
Availa Availa
Available ble at ble at
at Palej Sudior Pakhaj
a
an
Total
Layed
Billed
Line
16725
32172
32777
2047
23545
23545
875
9700
34120
13752
8890
22642
22997
807
642
642
12084
11256
23982
54
27591
16498
5552
22050
20602
5541
7266
15426
22692
48
140
12418
6096
5570
11666
7717
752
2592
2592
9590
12182
160
32645
10920
7808
18728
18728
13917
2148
2148
11886
25590
1488
180
23069
10664
7416
18080
18219
4989
13512
13476
8202
21678
200
10608
4536
4890
9426
8920
1182
3228
6876
225
17753
6738
6708
13446
13503
4307
732
732
6354
250
16933
9204
3546
12750
12156
4183
5556
5556
280
6644
2700
2700
2750
3944
432
315
6726
6580
6580
6580
146
312
355
408
408
212463
105999
63821
170240 164949
42223
49471
312
49003
99
100
1997
2196
54
42
711
807
318
516
1440
2274
60
294
354
3054
3281
174
6509
1080
36
1116
1170
10104
504
504
456
9900
16986
312
360
672
624
1296
3528
3540
12624
4878
312
5190
330
5520
1800
1914
3714
1974
210
432
2616
48
2664
5742
526
6580
84
84
84
408
408
89224
190660
10338
2901
468
13707
11556
52433
99
Total
270
1566
6627
2286
570
3189
1530
23523
Total
Pipe
Available
Cross
Check
Error
34219
24036
-587
23010
4581
12182
236
28644
4001
22794
275
10608
17658
95
17814
-881
6330
314
6664
62
408
204367
8096
Dia in
mm
90
110
125
140
160
180
200
225
250
280
315
355
B-2/16
3rd RA
4th RA
9775.0
6277
7880.0
6227
2778.0
7586
846.0
3021
10920
6830.0
3973
2000.0
2030
5766.0
1029
8190.0
420
2490.0
260
6000.0
580
52555.0
42323.0
Total B2/16
16052.0
14107.0
10364.0
3867.0
10920.0
10803.0
4030.0
6795.0
8610.0
2750.0
6580.0
0.0
94878.0
Bill Details
B-2/17
3rd RA
4th RA
13120
3605
5190
3700
10238
3850
0
180
4322
7416
4890
3486
3222
486
3060
26312.0
40453.0
Total B2/17
16725
8890
10238
3850
4502
7416
4890
6708
3546
0
0
0
66765.0
Total Layed
in Bill
32777.0
22997.0
20602.0
7717.0
15422.0
18219.0
8920.0
13503.0
12156.0
2750.0
6580.0
0.0
161643.0
31477
7175.0
Actual
Layed
32172
22642
22050
11666
17436
18080
9426
13446
12750
2700
6450
168818
Pipe Dia
Total
Bought Pipe
Available in B2/16
90
34319
100
110
23449
42
125
27591
516
140
12418
60
160
32645
2304
180
23069
1170
200
10608
456
225
17753
624
250
16933
330
280
6644
48
315
6726
355
408
212563
5650
Pipe Dia
90
34319
1997
110
23449
711
125
27591
1440
140
12418
294
160
32645
174
180
23069
200
10608
225
17753
250
16933
280
6644
315
6726
355
408
212563
570
3189
Pipe Dia
90
110
125
140
160
180
200
225
250
280
315
355
Upto 17.2.14
Pipe Issued
from Palej
Upto 17.2.14
Available at
H.W.
9700
11256
54
15426
48
9590
11886
1488
8202
1080
6876
504
9900
312
3540
4878
1914
1974
526
408
89224
10338
upto 31.1.14
Pipe
Issued Available
Pipe Dia
from at H.W.
Sudiora
90
875
99
110
12084
125
7266
270
140
160
11556
1566
180
200
3228
225
6354
360
250
3528
312
280
1800
210
315
5742
84
355
0
2901
52433
Issued
Sudi
Palej
52433
81942
Available at H.W.
2976
17160
Available at Agency
Pakhajan
37617
2502
Bought
171992
22638
8839
31477
212563
40571
Upto 31.1.14
Pipe Issued
Available
Pipe Dia
from
at H.W.
Pakhajan
90
23545
110
642
125
140
2592
160
2148
546
180
2246
36
200
225
732
1002
250
5556
330
280
432
315
156
156
355
37617
2502
Dia in mm
Bought
90
110
125
140
160
180
200
225
250
280
315
355
Available
for CZBT
33387.1
23446.7
28385.22
11814.55
32636.93
23060.93
10605.69
17748.38
16929.53
6641.69
6726
408
211790.7
504
1260
486
204
12000
13400
14368
46218
486
504
900
4200
2550
726
180
540
5280
684
5400
9000
e Pass Issued
Dec-13
Jan-14
1200
79253
15200
9534
13693
19868
3642
1200
38148
Jan-14
1/3/2014
4800
3600
1200
4800
1200
800
1200
1200
1/5/2014 1/6/2014
250
2304
330
3654
2004
822
4842
1/11/2014
10425
200
606
7062
7356
4368
300
276
18800
38148
12202
2304
Total Gate
Pass Issued
34120
25172
22518
12182
23496
21678
10104
21312
12624
3720
6710
276
193912
0
-1190
-66
0
438
0
0
-5202
0
-486
-130
132
Shri R.Z.Patel
Diameter
90
110
125
140
160
180
200
225
250
280
315
355
B-2/16 Laying
6815
5188
702
B-2/17 Laying
16725
7290
6298
3850
2502
10026
6048
6708
3546
12705
62993
Total
23540
12478
7000
3850
2502
10026
6048
6708
3546
0
0
0
75698
Pipe Issued
23540
12720
8442
4140
2850
10050
6048
6708
3546
Pipe Balance
0
242
1442
290
348
24
78044
2346