150

1. INSTALL 32A CIRCUIT BREAKER IN ACTIVE PHASE OF LV SUPPLY FROM EITHER VT OR LV-ABC. CONNECT DIN MOUNTED SURGE ARRESTER TO EARTH ON LOAD SIDE OF CIRCUIT BREAKER.

CT PIN

32 33
SEE DETAIL A

25

75

INSULATOR 2. CONNECT BOTOM OF HV LINK TO CAPACITOR STAR POINT. CONNECT TOP OF SOURCE SIDE 14 2-1 OR 2-11 CONSTRUCTION 4. REFER TO NS 116 FOR SPACING OF ELECTRODES AND TARGET MINIMUM VALUE OF RESISTANCE. TO 100 550 TO HV EARTH HV MAINS FROM BOTTOM OF EDOS ON ADJACENT POLE 1100 550 18
6

A
HV LINK TO HV EARTH.

(LINE)

3. THIS DRAWING TO BE READ IN CONJUNCTION WITH A1 162475 SHEET 2.

25
950

WIRE INTO CAPACITOR UNIT JUNCTION BOX (SEE A3-166887)

DETAIL A 19 17 29 EARTHING REQUIREMENTS 23


HV CT PIN INSULATOR 5. REFER TO NS 116 TO DETERMINE IF HV AND LV EARTHING SHOULD BE COMBINED SCALE : 1:5 MATERIAL : 40x6mm COPPER ( TINNED) OR SEGREGATED.

29 14 22
HV MAINS FROM BOTTOM OF EDOS ON ADJACENT POLE

EARTH

B
1000

22 30 31 23
SEE NOTE 3
L L L

18
P P

21
U

MOUNTING BOLT SURGE ARRESTERS

28 16 13
L

20 26 27 14

LV SUPPLY

CAPACITOR BANK STAR POINT EARTH LINK VACUUM SWITCH

13
TO CAPACITOR BANK STAR POINT

THIS DRAWING MUST BE READ IN CONJUNCTION WITH DRAWING A1 162475/2 WHICH DETAILS THE
2700

SURGE ARRESTER CONTROL BOX

15

LOCATION OF THE CURRENT TRANSFORMER (CT) TO ENSURE THE LOAD CURRENT ONLY IS METERED.
(NOT THE COMBINED LOAD AND CAPACITOR CURRENT)

LV NEUTRAL IN CAPACITOR UNIT JUNCTION BOX

POWER CAPACITORS

34 12
1700

REACTOR CAPACITORS

CAPACITOR RACK

12 C

PORTABLE EARTH CONNECTION

307

11kV SUPPLY FROM D.O. FUSES

BOND REFER TO NOTE 5

EARTH TEST LINK

VERMIN CAPS OR HEATSHRINK TO BE INSTALLED ON ALL


390

EXPOSED HV TERMINALS
GROUND LEVEL

24

SURGE ARRESTERS

EXCESS CONTROL CABLE TO BE COILED BELOW


100

6500 MAX.

CAPACITOR FRAME

11

SEE NOTE 2 VACCUM SWITCH TRINETICS TYPE VS 15/95

LV EARTH

HV EARTH SIGNIFIES THREE UNITS TO BE EARTHED

FROM

24 D

CAPACITOR, RIPPLE BLOCKING 72.4KVAr, 3.2KV

IMPORTANT
REACTOR, RIPPLE BLOCKING

10

1mH, 64A

* HV EARTH LINK TO BE NORMALLY OPEN WHEN EQUIPMENT IS IN SERVICE.


3 x DOUBLE POLE STEPS
FROM GROUND LEVEL

CAPACITOR, POWER 333KVAr, 6.93KV

4500

TYPICAL

9
N/O LINK ISOLATION

* HV EARTH LINK TO BE CLOSED BY OPERATOR ONLY DURING EQUIPMENT ISOLATION AND EARTHING OF CAPACITORS

450

8
HV EARTH LV EARTH

12kV, 630A

E 1 CAPACITOR BANK SCHEMATIC


34 33 32 INSULATOR - PIN, 11kV BAR - 40x6mm, TINNED COPPER - SEE DETAIL A INSULATOR - CT SADDLE - 25mm, GALVANISED CONDUIT - 25mm, FLEXIBLE PVC, GREY BOLT AND NUT - M16 x 130mm, HEX, GALVANISED BOLT - M12 x 90mm, COACH, GALVANISED NUT - M16, NYLOC, STAINLESS STEEL BOLT - M16 x 40mm, HEX, STAINLESS STEEL CABLE - 6mm 1/8 Cu, 2C, PVC INSULATED AND SCREENED BOLT AND NUT - M20, TO SUIT POLE, GALVANISED LINK - 12/24kV, 630A SCREW - SELF DRILL, 12#x45mm LUG - HEAVY DUTY, TO SUIT 35mm 1/8 Cu LDPE CABLE CLAMP - LV ABC BRACKET - TWISTED INSULATOR - LONGROD, 22kV CROSSARM - 2400 x 150 x 100mm ARRESTERS - SURGE, 9kV, 10kA, POLYMERIC BRACE - 720 x 38 x 38 x 5mm ANGLE, GALVANISED CROSSARM - 2400 x 100 x 100mm CABLE - 11kV, 35mm 1/8 Cu LDPE, INSULATED CAPACITOR BANK - COMPLETE UNIT 58750 175567 H125260 H113472 176901 150375 156083 111948 99119 71589 H14578 SUPPLIED 75705 MANUFACTURE SUPPLIED 66043 176567 46805 50443 177122 H38413 H14243

TO FIRST POLE STEP

31

3600

7
TO CURRENT SENSOR (CT)

30 29 28 27 26

TO 240VAC
A

25 24 23 22 21 20

8
GROUND LINE
300

LV SUPPLY TO SWITCH
BK GN W

GROUND LINE

MECHANISM

F
500

6
TO ADDITIONAL ELECTRODES IF REQUIRED

TERMINAL STRIP IN JUNCTION BOX

19 18 17 16 15

WHICH IS MOUNTED ON FRAMEWORK OF CAPACITOR BANK

5
2BK HV EARTH LV EARTH 1BK 3W 2W 1W

4
LV EARTH HV EARTH 2500

MINIMUM 6000 SEPARATION REFER TO NOTE 4

14 13

LV EARTH

12 11 10 9 8

FUSE BOX - FOR AC SUPPLY TO CONTROL BOX DIRECT PURCHASE CONTROL BOX - FOR CAPACITORS POLE STEPS TROUGHING - TO SUIT EARTHING CABLES, PVC TEST LINK - FOR EARTHING COVER - CABLE, PVC, 150 x 1200mm CABLE - COPPER, 70mm 1/8 , PVC INSULATED CONNECTOR - TO SUIT 15mm EARTH ROD COUPLER - TO SUIT 15mm EARTH ROD EARTH ROD - 15 x 1800mm COPPER CLAD POLE - WOOD, 12.5m x 12kN SUPPLIED H17720 157552 177069 151100 60111 H31699 H31649 H31631 176966

3 x EARTHRODS (MIN)

3 G

3 x EARTHRODS (MIN)

CONTROL WIRING

7 6 5 4 3 2

ALL DIMENSIONS IN MILLIMETRES


PARALLEL POLE SPIKES SHOWN. TELESCOPIC OPERATING STICKS. NOTE 1 ALTERED FROM 16A TO 32A CIRCUIT BREAKER. TO NEW POLE. MATERIAL LIST

DO NOT SCALE
CAPACITOR BANK SCHEMATIC ADDED. EARTHING NOTES 4 & 5 ADDED.

CONSTRUCTION ISSUE
11kV POLE TOP CAPACITORS, MODIFICATIONS TO EDO POLE CONSTRUCTION DETAIL A1-162475/2 A3-166887 A3-166888

ITEM
1:25 W.GRAHAM PATRICIA RIOS W.GRAHAM R HUGHES 12/08/04

DESCRIPTION

STOCK CODE

DO NOT MANUALLY AMEND

DROP-OUT FUSE ARM MOVED

W.G

W.G

W.G

W.G

A M E N D M E N T S

ITEM 14 CROSSARM CHANGED

MODIFIED. SHEET 2 CREATED.

SCALE DESIGNED DRAWN

AUTHD by: WILLIAM GRAHAM

NOTE 1 DELETED REGARDING

CAD DRAWING

CAPACITOR RACK LOWERED

BARBARA BARSKI

BARBARA BARSKI

CHKED: WILLIAM GRAHAM

200mm EARTHING DETAIL

W.GRAHAM

W.GRAHAM

W.GRAHAM

W.GRAHAM

ABB - 12kV POLE MOUNT CAPACITOR BANK CONTROL WIRING DIAGRAM ABB - 1MVAR, 12kV CAPACITOR BANK INSTALLATION INSTRUCTIONS ABB - DRY TYPE AIR CORE CURRENT LIMITING REACTOR ABB - RACK - 6 UNITS POLE MOUNT - ENERGY AUSTRALIA

AUTHD by: GLENN FORD

INITIAL ISSUE

CHKED: W. GRAHAM

11/10/2005

04/05/2006

27/04/05

31/08/04

15/09/04

23/11/04

CHECKED
1-25413 X7016194 DESIGN 145 NEWCASTLE RD WALLSEND, NSW 2287 TEL: 4951 9388 FAX: 4951 9389

STANDARD CONSTRUCTION 11KV POLE TOP CAPACITORS CONSTRUCTION DETAIL


H

CHKED:

CHKED:

CHKED:

CHKED:

TO 100 x 100.

DWN: B.B.

AUTHD by:

AUTHD by:

AUTHD by:

DWN: B.B.

DWN: P.R

DWN: P.R

APPROVED DATE PRJTRK No.

1 DATE:

2 DATE:

3 DATE:

AUTHD by:

CHANGED.

DATE:

7 DATE:

DATE:

DWN:

DWN:

ABB - PROPOSED ENERGY AUSTRALIA 1MVar 12kV POLE MOUNT BANK WITH RIPPLE BLOCKING

A3-166885

ASSOCIATED DRAWINGS

Enerserve 7 8

A Business of EnergyAustralia

PROJECT NUMBER

NET STD
10

DRAWING No

162475
11

SHEET

01

AMD

7
12

SIZE

A1