Leading processes to lead companies: Lean Six Sigma

Gabriele Arcidiacono Claudio Calabrese Kai Yang

Leading ead g processes p ocesses to lead ead companies: co pa es:

Lean Six Sigma g

Kaizen Leader & Green Belt Handbook

Gabriele Arcidiacono Marconi University of Rome (Italy)

Claudio Calabrese Lean Six Sigma Expert

Kai Yang Wayne State University, Detroit (USA)


ISBN 978-88-470-2492-2 (eBook)

ISBN 978-88-470-2347-5 DOI 10.1007/ 978-88-470-2492-2

Library of Congress Control Number: 2011931733

Springer Milan Dordrecht Heidelberg London NewYork

Springer-Verlag Italia 2012

This work is subject to copyright. All rights are reserved, whether the whole or part of the material is concerned, specifically the rights of translation, reprinting, reuse of illustrations, recitation, broadcasting, reproduction on microfilms or in other ways, and storage in data banks. Duplication of this publication or parts thereof is permitted only under the provisions of the Italian Copyright Law in its current version, and permission for use must always be obtained from Springer. Violations are liable to prosecution under the Italian Copyright Law.

The use of general descriptive names, registered names, trademarks, etc. in this publication does not imply, even in the absence of a specific statement, that such names are exempt from the relevant protective laws and regulations and therefore free for general use.

Cover-Design: Simona Colombo, Milan Typesetting: PTP-Berlin, Protago TE X-Production GmbH, Germany (www.ptp-berlin.eu) Printing and Binding: Grafiche Porpora, Segrate (MI)

Printed in Italy

Springer-Verlag Italia s.r.l., Via Decembrio 28, I-20137 Milano Springer is a part of Springer Science+Business Media (springer.com)

Foreword

H How and d why h should h ld you b become G Green B Belt? lt?

It is not easy to explain how with just a foreword, but this book which hi h is i very lean l and d well ll done d - certainly i l represents the h ideal id l tool l to find the right answer to this question.

I my opinion, In i i h however, the h book b k is i even more effective ff i for f those h people who are asking themselves why should I become Green Belt? I may try to give my personal contribution to this second Belt? question.

One possible answer may be: because my Company has decided that I

LEAN SIX X SIGMA MI INIBOOK

have to, in order to embark on process of in-house business improvements. p


V

Foreword

Apparently this is the least appropriate answer, answer but it is not true. true As a matter of fact, the value you acquire by entering into the training mechanism, by managing an improvement project following the proposed methodology, completing it and, finally, getting the Green Belt Certificate, makes appropriate even this answer.

However, we may provide several answers to the fatidic question and we may consider valid each of them, but most probably, the most appropriate one shall be because I believe in the Lean Six Sigma meth-

odology and in my professional growth!

LEAN SIX X SIGMA MI INIBOOK

When you work with three inseparable elements like Products, Processes, People, we may surely consider the Process as the one which hi h may positively i i l influence i fl the h other h two.
VI

Foreword

Better and suitable processes help people professional growth, growth complete their skills profile and support them in providing better products and services.

Nearby, however, I have my own and personal answer which I believe may complete the one I have already considered as the most appropriate: Ive become Green Belt because I have so strongly

LEAN SIX X SIGMA MI INIBOOK

believed in this methodology to persuade my company to join it. Ive found out both efficiency and effectiveness of the method, but above all, Ive deeply needed it. I was needing to wholly lead the processes and d to t speak k the th same language l of f a team t of f people l and, d therefore, th f of f a whole company which began to run at higher speed: the results were right there.
VII

Foreword

And so, thanks to the authors because, coming at the end of this handbook, I am sure that the reader, the manager and the professional will find an obvious and easy answer to a simple question: Why have I become a Green Belt?

R Rome, October O b 2011

LEAN SIX SIGMA MINIBOOK

(Certified Green Belt, Chairman of Farmindustria, CEO of Janssen Pharmaceutical Company of Johnson & Johnson)

Lean6

Massimo Scaccabarozzi

VIII

Preface

This Minibook is a brief guide for Green Belt during a Lean Six Sigma project p j management g or for Kaizen Leader during gap process improvep ment activity. Having theoretical concepts and practical examples, it is a handbook for a quick consultancy. The authors idea comes from companies needs to analyze useful information and get to know different kinds of processes in depth.

The set of Six Sigma tools are explained through Minitab 16, the latest release of the most widely y used statistical software.

LEAN SIX X SIGMA MI INIBOOK

The Authors
IX

Table of contents
page 1 page 1 page 3 page 7 page 10

Introduction Six Sigma Lean Methodology Kaizen Events approach The power of Lean Six Sigma

DEFINE SIPOC Diagram Process Mapping

Basic Flow Diagram Functional Flow Diagram Value Added and Not Value Added Activity Flow Diagram Waste Walk Spaghetti Diagram Product Family Matrix Value Stream Mapping

LEAN SIX X SIGMA MI INIBOOK

CTQ-Tree Diagram Kano Diagram Project Charter COPQ: Cost Of Poor Quality

page page page page page page page page page page page page page page page

11 13 16 17 18 19 20 21 25 28 30 44 45 46 48
XI

Table of contents
page 51 page 53 page 58 page 66 page 69 page 76 page 81 page 83 page 95 page 103 page 107 page 111 page 118 page 119 page p g 120 page 122 page 128 page 132

LEAN SIX X SIGMA MI INIBOOK

MEASURE Sampling Basic Statistics Confidence Interval Graphical Summary Boxplot Gage R&R Gage R&R (Continuous Data) Gage G R&R (A (Attribute ib Discrete Di Data) D ) Pareto Diagram Normality Test Capability Analysis Calculation of DPMO Calculation of Process Sigma Takt Time Overall Equipment Effectiveness (OEE) Time Series Plot Run Chart

XII

Table of contents

ANALYZE Cause-Effect Diagram Statistical Hypothesis Testing

1-Sample t 2S 2-Sample l t Paired t-Test ANOVA Chi-Square Chi Square Test for Equal Variances

LEAN SIX X SIGMA MI INIBOOK

Scatter Diagram Regression: Fitted Line Plot Regression: Analytical Approach Regression: Assumptions

page 137 page 138 page 145 page 147 page 151 page 155 page 160 page 164 page 168 page 174 page 178 page 183 page 186

XIII

Table of contents
page 187 page 189 page 195 page 208 page 213 page 221 page 228 page 233 page 237 page 242 page 247 page 258 page 259 page 261 page 262 page 267 page 273 page 278 page 287 page 293
XIV

IMPROVE 5S Program Standard Work Cell Design SMED - Single Minute Exchange of Die Kanban Heijunka TPM - Total Productive Maintenance Priority Pi i M Matrix i FMEA DOE DOE: Assumptions

LEAN SIX X SIGMA MI INIBOOK

CONTROL Control Chart Control C t l Ch Chart tf for continuous ti variables: i bl I Individual di id l Control Chart for continuous variables : Xbar-R Control Chart for attributes: P Chart Poka Yoke Visual Management OPL One point Lesson

Table of contents
page 299 page 300 page 301 page 302 page 303 page 304 page 305 page 307 page 308 page 321 page 325 page 333

Lean Six Sigma Checklist Define Checklist Measure Checklist Analyze Checklist Improve I Checklist Ch kli Control Checklist

APPENDIX A: Process Sigma table

APPENDIX B: Kind of variables

APPENDIX C: Kaizen Leader Standard Form

Index

Glossary

LEAN SIX X SIGMA MI INIBOOK

References

XV

Introduction: Six Sigma

is a proven business strategy (structured according to the DMAIC phases) to measure, analyze and improve the performance in terms of operational excellence. Th methodology, The h d l thanks h k to a wide d range of f qualitative l and d quantitative tools, aims to optimize the manufacturing and transactional processes through reduction of their variability. variability The 5 stages in the DMAIC approach are:

Six Sigma

(G)

DEFINE MEASURE ANALYZE IMPROVE CONTROL

LEAN SIX X SIGMA MI INIBOOK

(G)

This symbol indicates that the word is included in the Glossary (page 325)
1

Arcidiacono G., Calabrese C., Yang K.: Leading processes to lead companies: Lean Six Sigma. DOI 10-1007/978-88-470-2492-2, Springer-Verlag Italia 2012

Introduction: DMAIC approach


Problem identification

Define

Optimized process monitoring

Control

6
ze ly a An

Measure

Measurements and data collection

Im pr ov e

LEAN SIX X SIGMA MI INIBOOK

Generation and implementation i l t ti of f corrective actions

Data interpretation and root causes analysis


2

Introduction: Lean methodology

Lean

methodology aims to relentlessly identify and eliminate waste in order to maximize speed and flexibility of business processes in order to deliver what is needed, when needed and in the q quantity y needed by y the Customer. Terms like Lean Manufacturing or Lean Production are deliberately not used, as the Lean method can be widely used in a variety of processes such as production processes and transactional processes, for example:

(G) ( )

LEAN SIX X SIGMA MI INIBOOK

Lean Production or Manufacturing for production processes Lean L Office for Offi f service/support i / processes Lean Design inside the Research & Development process

Introduction to Waste

What is the meaning of w waste(G)? It is the use of resources (time, material, labor, etc.) for doing something that customers are not willing to pay for, and so it does not add value to the product or service provided. provided Eliminating waste improves the value of products and services. Th Lean The L hil philosophy h highlights hi hli ht 8 macro-categories t i of f waste: t
Overproduction D f Defects Transportation Inventory y Waiting Over-processing M ti Motion Underutilized people
4

LEAN SIX X SIGMA MI INIBOOK

The 8 Wastes
Description
Batch Production Production on forecast

Waste Category

Root Causes

Goals
Produce j just the necessary, y, in the right g time at the right quality

O Overproduction d ti
Lack of standardization Lack of training Lack of error proofing system Poor quality of supply Obsolete process Batch Production Inefficient layout Long set-up time

Overproduction p happens pp when a process p produces p more products/services than necessary

Defects

Production of defective parts/services that cant be sold to the Customer. Defects can be scraps or reworks, which add tremendous costs to organizations

Produce right first time Stop the process when the defect occurs, solve the problem in order to remove it d fi iti l definitively Minimize the movement by arranging processes in close proximity to each other

Transportation

Unnecessary transport of materials

Inventory

Too many finished goods in inventory, WIP inventory, raw material inventory

Batch Production Long set-up time Bottleneck Lack of continuous flow Push organization

The inventory must be dimensioned based on the real actual usage and on the supplier delivery time

Waiting

Customer waiting, waiting for materials, waiting for employees

Bottleneck Lack of continuous flow Lack of standardization Unbalanced workload

Maximize value adding time to reduce waiting and to arrange processes in a continuous flow approach

Over-processing

Unnecessary processes or operations

y Not Value Added activity Lack of investigation of Customer needs Activity by tradition Inefficient layout and process flow Lack of standardization Lack of involvement Old Culture

Optimize Value Added activities to remove all the unnecessary steps

Motion

Not Value Added movement of people and machines

Remove unnecessary motion and improve disposition of material in the workplace People are the most important resource in a company: lets involve them as much as possible in company activities

LEAN SIX X SIGMA MI INIBOOK

Underutilized People

Not using peoples skills, people are seen as a source of labor and are not involved in finding solutions/opportunities to improve processes

Introduction: Lean Thinking approach

Every time a Lean expert looks at a process optimization he/she must consider the 5 Lean Thinking principles:
Identify the value of the product/service and process from Customers point of view

1 LEAN PRINCIPLE

Value

2 LEAN PRINCIPLE

Value Stream

Map the process value stream to discover and understand what is value for the Customer

3 LEAN PRINCIPLE

Flow

Value added processes must be arranged in a continuous flow without delays and interruptions, so Lead Time is red ced (ideal situation reduced sit ation one piece iece flow) flo ) Produce to Customer demand (the right product, in the right time and in the right quantity)

4 LEAN PRINCIPLE

Pull
5 LEAN PRINCIPLE

LEAN SIX X SIGMA MI INIBOOK

Perfection

Move from a reactive point of view to a proactive one, to establish a continuous improvement process of performance (looking for new Customer expectations and new possibilities to eliminate waste)
6

Introduction: Kaizen Event approach

Objective:

KAIZEN(G) means to become good through change. A Kaizen event is a focused effort to improve activity. A multi-functional team is created and, for a period of 3-5 days, focuses on resolving a specific problem. The main objectives of a Kaizen event are to solve problems and/or eliminate waste

When to use it:

Kaizen events are mostly used to develop activity such as:

LEAN SIX X SIGMA MI INIBOOK

5S Standard Work Changeover Reduction (SMED) Kanban implementation Flow Improvement p Cell Design Problem solving activities TPM & OEE implementation

Introduction: Kaizen Event approach


1. BEFORE KAIZEN EVENTS SET THE TARGET
Identify the goal of the event; for example: - Space reduction - Inventory reduction - Cycle time reduction - Productivity - Customer Satisfaction Identify the team (typically 5-8 people); for example: - Kaizen Leader and Co-Leader Co Leader - Manufacturing Engineer - Product Engineer - Material Planner - Safety - Quality Specialist

IDENTIFY OPPORTUNITY

KAIZEN TEAM

The activity should be linked to one or more company goals

2. DURING KAIZEN EVENTS (3-5 days) CURRENT STATE ANALYSIS FUTURE STATE ANALYSIS
Identify improvements, reduce or eliminate waste, describe Future State, implement actions

INITIAL TRAINING

RUN THE NEW PROCESS


Test the action implemented, new data collection and results analysis

ACTION PLAN & CLOSURE


Action plan of open points to be implemented (Kaizen Newspaper), prepare presentation for Kaizen Event Event, closure activity

The initial training aims to introduce the activity for the next 3-5 days and must not be longer than 2 hours

Data collection, problem description, Process Mapping, Current State performance definition

3. AFTER KAIZEN EVENTS NEW PROCESS CONSOLIDATION


Standardize process measurements

ACTION PLAN IMPLEMENTATION

STANDARDIZATION OF NEW PROCESS


Control plan of process measurements

EXTENTION OF THE RESULTS IN NEW AREAS


Identify opportunity to deploy the results on similar areas

LEAN SIX X SIGMA MI INIBOOK

Kaizen Newspaper implementation

Introduction: Kaizen Events vs LSS Project


Lean Six Sigma g Project j
Wide 3-5 months Lean Six Sigma Training
(Black Belt; Green Belt or Yellow Belt)

Elements of comparison p
Circumscribed 3 5 days 3-5

Kaizen Events

Scope

Duration

(depending on Kaizen Event)

T Training Multifunctional Team Depending on project Generally high Part time involvement

Kaizen specific training, on the job training Multifunctional Team


(or sometimes natural teams)

Team

Team size

5-8 people Generally low Full time involvement


9

Depth of analysis

LEAN SIX X SIGMA MI INIBOOK

Involvement

The power of Lean Six Sigma


SIX SIGMA PURPOSE: Variability reduction

LEAN PURPOSE: S d and Speed d flexibility fl ibili through h h waste identification and elimination
END

LEAN SIX SIGMA APPROACH


END

N value Not l added dd d activities reduction/elimination

LEAN SIX X SIGMA MI INIBOOK

Variability reduction

The final process is fast fast and capable

10

DEFINE

LEAN SIX X SIGMA MI INIBOOK

Arcidiacono G., Calabrese C., Yang K.: Leading processes to lead companies: Lean Six Sigma. DOI 10-1007/978-88-470-2492-2, Springer-Verlag Italia 2012
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

11

DEFINE

Define phase is the first step of a Lean Six Sigma project and

th f therefore it is i necessary to t determine: d t i

LEAN SIX X SIGMA MI INIBOOK

the snapshot of the process through mapping (identifying value added activities and not value added activities) the Customer (external or internal) weakness and critical points of process the scope of the project and therefore the ring of intervention point of view, called Critical a measureable indicator from Customer p (G) To Quality (CTQ ), and customer satisfaction analysis through a proactive approach instead of reactive an estimation i i of f potential i l benefit b fi (economic ( i and/or d/ strategic, i written i (G) inside the summary document called Project Charter ), achievable p of improvements p planned during p g thanks to the implementation project development
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

12

SIPOC Diagram

Objective:

SIPOC(G) Diagram maps the process from a macroscopic point of view. It should be used during the early stages of an improvement project in order to capture p sufficient detail to be able to manage g the process p

Overview:
S = Supplier I = Input, X Variable P = Process, Macro-level O = Output, Y Variable C = Customer
MEASURE ANALYZE IMPROVE CONTROL

LEAN SIX X SIGMA MI INIBOOK

DEFINE

13

SIPOC Diagram

The six steps to construct SIPOC:

1.

Identify Customers (G) (external and/or internal)

2.

Identify f process Outputs O

3.

Locate Macro-process boundaries (start and end of process)

4.

Determine Process Owner (G)

5.

Define p process Inputs p and Relative Suppliers pp

LEAN SIX X SIGMA MI INIBOOK

6.

Repeat the procedure using a TOP-DOWN approach (start from the p to reach more detailed analysis). y ) During g the p process macroprocess mapping, distinguish value added phases (VA) from not value added ones (NVA) (see page 19)

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

14

SIPOC Diagram

Useful q questions during g SIPOC construction:

Who is the Customer?

Is the Customer inside or outside the company?

What does the Customer need from the process?

What are the Outputs of the process?

Where does the examined Process start and end (project ring)?

Does the process describe the as-is situation or the process desired?

What are the Inputs? What are the specifications agreed upon in terms of Inputs with Suppliers?

LEAN SIX X SIGMA MI INIBOOK

Who are the Suppliers?

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

15

Process Mapping

Objective:

The process mapping will describe, at a high level, the analyzed process to identify critical points, both value added and not value added activities

Overview:

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

16

Process Mapping: Basic flow diagram


Objective:
identify the main steps of a process: starting and final points id identify if the h decision-making d ii ki cycles l i in the h process
ICONS FOR REPRESENTATION Question mark Direction of logical flow Input/Output Process phase Start/Finish of process
MEASURE ANALYZE IMPROVE CONTROL

LEAN SIX X SIGMA MI INIBOOK

DEFINE

17

Process Mapping: Functional flow diagram


FUNCTION 3 FUNCTION 4

FUNCTION 1

FUNCTION 2

Obj ti Objective:
to highlight links among departments/functions in a process flow clarify the roles and responsibilities

LEAN SIX X SIGMA MI INIBOOK

The horizontal line represents the transfer of functional responsibility

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

18

Value Added and Not Value Added

In a process it is possible to identify three main kinds of activities:

Value Added Activity (VA(G)):

Activity that increases the value of the product/service from the customers point of view Something that the customer is willing to pay for

Not Value Added Activity (NVA(G)):

Activity that does not add any value to the product/service

Business Value Added Activity (BVA(G)):

Activity that does not add any value to the product/service but is necessary from a business operations point of view

To be enhanced

To be reduced

To be removed

LEAN SIX X SIGMA MI INIBOOK

Example of a company process


MEASURE ANALYZE IMPROVE CONTROL

DEFINE

19

Process Mapping: Activity flow diagram


Objective:
NOT VALUE ADDED PHAS ES

VALUE ADDED PHAS ES

to visualize process complexity to identify decisional cycles and bottlenecks

Yes

to determine Not Value Added phase for product/service (waste(G))

No

Value added p phase (VA) ( )



Yes

No

Customer willing to pay for it Step that physically transforms the product/service Phase that produces right first time product/service Non essential phases for output production: Defects, , reworks Testing Checking Transporting, motion, waiting Overproduction, Inventory

Not value added phase (NVA)

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

20

Waste Walk

Objective: j

The Waste Walk aims to consider the flow of a product / service from start to finish (Example from raw materials to finished goods) and highlights all forms of waste along the way
END

When to use it:

LEAN SIX X SIGMA MI INIBOOK

The method is very useful to highlight the macro-waste in a process and then to start an improvement action plan with low investment and high return activities on the business processes
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

21

Waste Walk: operative procedure

How to p perform a waste walk:

LEAN SIX X SIGMA MI INIBOOK

1. Select a p product/service p provided 2. Go through the end-to-end process following the product and pay attention to detail 3. Identify the waste referring to the eight categories of Lean methodology 4 Collect 4. C ll t on a piece i of f paper all ll the th information i f ti related l t dt to th the waste t detected 5. If possible, try to quantify the entity of the waste (, time, resources, etc.) 6. Clearly describe how wastes are created in the process 7. Generate possible ideas for waste elimination or reduction
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

22

Waste Walk: operative procedure

Example p of a format for collection of necessary y information during a Waste Walk analysis:

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

23

Waste Walk: operative procedure

Example p of data collection:

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

24

Spaghetti Diagram

Objective:

The Spaghetti Diagram is a visual description of actual flows (usually material and/or people flows). It is an effective tool to see the shortcomings in a process such as excessive material movements, movements long walking distances and layouts that are not designed based on actual process needs

O Overview: i

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

25

Spaghetti Diagram

How to build a Spaghetti Diagram:

1.

Identify the product, file, information, person and material to follow through

2.

Take a p pen and the facility y layout, y , drawn on p paper p ( (or layout y of the area in q question)

3.

Follow the product, information and people flow step by step and draw the actual movement paths on a piece of paper and measure the path distances

Example of a file managed through a service company process

4 1 2 3

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

26

Spaghetti Diagram

Example of Spaghetti Diagram before and after an optimization activity on S U process (SMED Single Set-Up Si l Minute Mi E h Exchange of f Die) Di )
PLASTIC MOLDING MACHINE

PLASTIC MOLDING MACHINE

Before

After

LEAN SIX X SIGMA MI INIBOOK

M Movement of f two operators during d i a set-up activity i i


MEASURE ANALYZE IMPROVE CONTROL

DEFINE

27

Product Family Matrix

Objective: j

Product Family Matrix is a tool used to group many products into the product family. The product will belong to a family if the processes or components necessary to produce it are similar to those of other products in that family

When to use it:

LEAN SIX X SIGMA MI INIBOOK

The tool is used before performing a value stream analysis. When product variety is low, it is possible to have one Value Stream Map for each kind of product. However, in most companies there are hundreds of products and it is impossible to draw hundreds of Value Stream Maps. In this case it is useful to group products into families

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

28

Product Family Matrix

How to build a Product Family Matrix:

1.

2.

3.

4.

Place different kinds of product line by line Place processes or components according to product type in columns (pay attention to the downstream processes that generally differentiate the product) For each product, highlight the processes or components used Identify f the Product Family by degree of f similarity in columns used
Dont Don t spend a lot of time in ProPro duct Family Matrix construction; it is not a value added activity for Family A the customer It is advisable to build up a Value Stream Mapping for each family, Family B starting from the biggest family in terms of quantity sold to the Family C customer
MEASURE ANALYZE IMPROVE CONTROL

Overview:

LEAN SIX X SIGMA MI INIBOOK

DEFINE

29

Value Stream Mapping (VSM)

Objective: j

Value Stream Mapping (VSM(G)) is a diagram of every step involved in the material and information flow necessary to bring the product/service from the order to delivery phase. Value Stream Mapping is a very good starting point to identify opportunities for improvements

Overview:

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

30

Value Stream Mapping (VSM): Roadmap


STEP 1:
Draw the Current State situation; gather the information directly from the shopfloor Current State Map

How to perform a Value Stream analysis:

STEP 2:
Identify potential improvements (Kaizen events t or projects) j t ) to t reach h the th desired d i d situation (Future State)

STEP 3:
Draw the Future State Map

STEP 4:
Build an action plan to pass from the Current State to the Future State situation (Value Stream Plan)
ANALYZE IMPROVE CONTROL

X SIGMA MI INIBOOK LEAN SIX

Always use pencil and paper


MEASURE

DEFINE

31

Value Stream Mapping (VSM): Current State

Guidelines to build a Value Stream Map:

1.

Identify the product family to analyze (use, if necessary, the Product Family Matrix)

2.

Go to the shopfloor and begin mapping, starting from the customer, and go back upstream through the entire flow. Describe step by step processes and gather information such as:

Customer information

I t Intermediate di t inventories i t i and d their th i location l ti

How the information flow runs inside the company

Production input of the single process

Process Cycle Time, Set-Up time, Number of operators for each step, WIP

Lead Time(G)

LEAN SIX X SIGMA MI INIBOOK

MEASURE

Supplier information
ANALYZE IMPROVE CONTROL

DEFINE

32

Value Stream Mapping (VSM): Current State


A I F E

Example of a Current State Map:

B C G D

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

33

Value Stream Mapping: Standard Icons


NAME DESCRIPTION PRACTICAL NOTES
Gather information such as:

These icons are the common language to do the Value Stream Analysis

ICON

XYZ

Prod 1 10000 parts/years Prod 2 25000 parts/years ...

Customers/Suppliers
(page 33)

Use to show Customers, Suppliers and External processes. Place in the top right/left corner of the diagram

Customer/Supplier Name Customer/Supplier location (Europe, USA etc.) Number of products required Mix of products Batch B t h size/delivery i /d li l lead d ti time ( (supplier) li )

STEP1

NAME OF PROCESS

Process Step B

Use to show a process, (exclude elementary work tasks)

Identify Process Name Identify kind of process

Example of information for a process: No. of Operators (VSM icon

Data Box

Use to show all important information concerning each process/customer/supplier. This is generally placed under each process C
ANALYZE IMPROVE

LEAN SIX X SIGMA MI INIBOOK

Cycle Time/Set Up Time/Uptime No. of Shifts Batch Size Wip % Defects (PPM,DPMO)
CONTROL

DEFINE

MEASURE

34

Value Stream Mapping: Standard Icons


NAME DESCRIPTION PRACTICAL NOTES
How to calculate time; example:

ICON

600 pieces

Inventory D

Use to show inventory; try to quantify the inventory in terms of parts, inventory value and time

4.4 days

average Customer requests 30,000 parts/year average Customer demand per day 30000/220 (220 days d in i 1 year) )= 136 parts/day inventory time: 600/136= 4.4 days

2X Week

Id if Identify: Use to identify kind of shipment


shipment method (truck; airplane; ship) delivery frequency date of shipment

1 X Month

Shipment Method

1 X Month

LEAN SIX X SIGMA MI INIBOOK

E
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

35

Value Stream Mapping: Standard Icons


NAME
Movement of finished goods to the customer or movement from supplier to the company Material is produced and moved to the next step process when not needed

ICON

DESCRIPTION

PRACTICAL NOTES
This icon is used if a supplier is involved during the production cycle

External transportation F

Movement of material in push logic G Communication between processes in an electronic flow

This happens when production is based on schedule but not on C Customer demand d d

Electronic Information H

Example: IT system information

Manual information

U to describe Use d ib a manual l information flow

Example: production schedule delivery schedule

LEAN SIX X SIGMA MI INIBOOK

Weekly Schedule

Information I
MEASURE

Use to identify information


ANALYZE IMPROVE

Identify f the frequency f of f the information


CONTROL

DEFINE

36

Value Stream Mapping: Standard Icons


NAME DESCRIPTION PRACTICAL NOTES

ICON

Buffer or safety stock

Used to indicate the buffer/safety stock

3 days d

The level of buffer stock must be measured (in days or number of parts) p ) under the icon

Supermarket L

A controlled inventory y of p parts that pull the production from an upstream process

Replenishment is based on actual consumption of stock. stock If the supermarket is not used, the upstream process doesnt produce any product on supermarket (Pull System)

Used usually for a request from a process to a supermarket/warehouse

Withdrawal (Pull material) M

Used to represent a pull material

LEAN SIX X SIGMA MI INIBOOK

FIFO
MEASURE

First In First Out Sequence

Used to represent transfer of material between processes in a FIFO sequence


ANALYZE IMPROVE

The first p part that goes g into the process is the first part to go out. (Example: Conveyor)
CONTROL

DEFINE

37

Value Stream Mapping: Standard Icons


NAME DESCRIPTION PRACTICAL NOTES

ICON

Withdrawal Kanban N

Used to instruct the material handler to take and transfer parts from a supermarket/inventory to a downstream process

Production Kanban O

Used to engage the upstream process to produce what is necessary for replenishment of supermarket/inventory

1 - The upstream process produces what has been consumed from the supermarket 2 - The downstream process withdraws from supermarket what it needs in the right quantity

Signal Kanban P

This signal is used when the reorder point (G) is reached and a new batch must be produced

The batch kanban is necessary when supplying process must produce in batches because of Changeovers

Kanban Post Q

LEAN SIX X SIGMA MI INIBOOK

Used to show place where Kanban are collected to be taken from material handler to replenish l i h processes

The kanban post could be a mailbox which collects the kanban card or a place which collects bins/balls, etc.

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

38

Value Stream Mapping: Standard Icons


NAME
The icon is used to indicate levelling of production quantity rather than batching Used to highlight a point where the inventory level is checked visually

ICON

DESCRIPTION

PRACTICAL NOTES

Level load production R

Tool T l to intercept i batches b h of f kanban and levelling the volume and mix over a period of time (Every part every day)

Visual Checking and scheduling S

Gathering of information through visual checks. Visual management is one of the most important and q concepts p in lean frequent deployment To get a global view of what is

Improvement activity T

Used to highlight improvement at needed to reach a lean flow. flow The improvement can be Kaizen a specific point of the process Workshop, Six Sigma project, stream
Problem Solving activities, etc.
The timeline is used to calculate the Process Cycle Efficiency, i.e. the ratio between Value-Added Activities and Not Value Added Activities:

IMPROVEMENT

Timeline U
MEASURE

LEAN SIX X SIGMA MI INIBOOK

Lead Time

The timeline shows value added times (Cycle Times) and nonvalue added times. times Use this to calculate Lead Time and Total Cycle Time
ANALYZE IMPROVE

DEFINE

CONTROL

39

Value Stream Mapping (VSM): Future State

What does Lean do in a value stream? Key elements for a good future state map design:

1. Identify and eliminate sources of overproduction

2. Produce product/service with takt-time rhythm (identify Takt Time)

3. Create continuous flow, where possible

4 Where a continuous flow is not possible, 4. possible use pull system for process connection instead of a push system (using supermarket)

5. Reduce batch size and, where possible, introduce the one piece flow approach

6. Send the scheduling to the process nearest the Customer (Pace-Maker process). Will the customer pull from a finished goods supermarket or directly from shipping?

7 Level 7. L l mix i / volume l production d i at the h Pace-Maker P M k process

LEAN SIX X SIGMA MI INIBOOK

8. Identify potential improvements for each process step (Change-over, Standard , TPM, , Variability y reduction, , Kanban, , Cell Design, g , Problem Solving) g) Work,

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

40

Value Stream Mapping (VSM): Future State

How to reach the Future State Map:

Kanban

Supermarket

Supermarket

Supermarket

One piece flow

Cycle Time Reduction

LEAN SIX X SIGMA MI INIBOOK

Six Sigma Project

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

41

Value Stream Mapping (VSM): Future State

Example of a Future State Map:

Q L M T

S O

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

42

Value Stream Mapping (VSM): Future State

Example of a Value Stream Map:

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

43

CTQ-Tree Diagram

Objective:

Tree Diagram is a tool moving from VOC(G) (Voice Of the Customer) to one or more CTQs, translating the customers voice into objectively measurable indicators. indicators

Overview:
B A

R Request i customers in language l


B

LEAN SIX X SIGMA MI INIBOOK

The CTQ expresses customer needs in a clear, unmistakable l language that h everybody b d can understand
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

44

Kano Diagram

Objective:

Kano Diagram is a tool that aims to identify the important aspects to drive Customer Satisfaction (G)

Overview:
Must Be: Qualities that are present and what
POST-IT

POST-IT

customers expect to be present (e.g. product or service must be safe)

POST-IT

More is Better: These qualities are directly

POST-IT POST-IT POST IT POST-IT

correlated to customer satisfaction. The more present they are, the bigger the Customer Satisfaction

POST-IT

Delighters: Qualities unexpectedly found by


POST-IT

LEAN SIX X SIGMA MI INIBOOK

the Customer and consequently, if present, increase his/her satisfaction

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

45

Project Charter

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

46

Project Charter

Contents of Project Charter:

Title

Indicate project title

Scope

Team

Describe in more detail the purpose of the project, in order to better explain the meaning of the title Insert the people who are involved in the project deployment: Team Leader Team Members Process Owner: Owner of the area (Department/Office) involved in the project Champion/Sponsor: is the financial backer of the project Six Sigma

Duration

Identify project duration (4-5 months)

CTQ

Identify the project CTQ to be analyzed (it could be one or more than one), the current value and the expected value (target) at the end of the project

Savings S i (G)

Insert the value of financial benefits ( (in terms of revenue and/or cost) ) that should be achieved when the CTQ target is reached at the end of the project (benefits per year)

Constraints

LEAN SIX X SIGMA MI INIBOOK

Phases
MEASURE

Identify the constraints which must be respected during the project development g g the start-up p date for each p phase, , expected p closure date and the real p percentage g Highlight of progress (Project Charter is an ongoing document and the starting point of all project meetings)
ANALYZE IMPROVE CONTROL

DEFINE

47

COPQ: Cost Of Poor Quality

Cost of Poor Quality, called COPQ(G) (Cost Of Poor Quality), are those costs due to poor performance of manufacturing and/or transactional processes and include labor costs, energy, materials, depreciation, i which hi h must be b sustained i d to avoid id generating i non-conformity f i or in response to their occurrence A possible model for COPQ could be the following:

COSTS OF QUALITY

CO OPQ

Prevention costs Checking costs Costs due to internal defects Costs due to external defects

LEAN SIX X SIGMA MI INIBOOK

COSTS OF NON CONFORMITY

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

48

COPQ: Cost Of Poor Quality (example)

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

49

MEASURE

Arcidiacono G., Calabrese C., Yang K.: Leading processes to lead companies: Lean Six Sigma.
MEASURE ANALYZE IMPROVE CONTROL

LEAN SIX X SIGMA MI INIBOOK

DOI 10-1007/978-88-470-2492-2, Springer-Verlag Italia 2012 51

DEFINE

MEASURE

Measure phase is the second step of a Lean Six Sigma project,

where: h

a rational data collection is p performed for the scope p chosen: this collection requires effective and efficient planning in order to create a database of knowledge to record the process which will highlight g g tt the ec critical t ca issues ssues from o a an object objective ve sta standpoint po t the data is interpreted through statistical tools (in case of samples, to test their significance and how they are seen/shown overviewed)

the reliability of data is verified

LEAN SIX X SIGMA MI INIBOOK

process performance is calculated through the proper KPI (OEE, Takt Time, Process Sigma, Process Capability etc.)

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

52

Sampling

Objective:

Gather a subset of data (n) representative of the population (N)

Wh to use it: When When the observation of all data (population) would:

LEAN SIX X SIGMA MI INIBOOK

require too many financial resources take longer than the time at ones disposition destroy destroy the entire population (e.g. (e g in case of destructive tests)

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

53

Sampling
Sampli Sampling ing Stratified Random Sampling Samp pling Systematic Sampli Sampling ing Subgroups Subgroups Sampling Sampli ing

Rules to obtain sample overview: Random

Sampling Samp Sampling pling g strategy

Process configuration (population)

Sample

LEAN SIX X SIGMA MI INIBOOK

Description Description

Each element has an equal chance e of f being g selected

The sample respects the population n proportions

Each sample unit is collected "m m" units every y "m"

X units are selected at equally e qually spaced intervals of time e (seconds, , minutes, , hours, etc.)

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

54

Sampling

Sample size calculation to estimate the populations mean (formula for continuous data):
2

2s n= d
Formula (i)

where:

LEAN SIX X SIGMA MI INIBOOK

n = Sample size s = Standard deviation or its estimate 2 = factor corresponding to a Confidence Interval of 95% (th exact (the t value l is i 1.96) 1 96) d = Precision required in mean estimation

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

55

Sampling

Sample size calculation for the estimation of the population proportion (formula for discrete data):

2 F l (ii) n= ( p)(11 p) Formula d

where:

LEAN SIX X SIGMA MI INIBOOK

MEASURE

n = Sample size p = Proportion estimation (if it is not known use p = 0.50) 2 = factor corresponding to a Confidence Interval of 95% (the exact value is 1.96) q in p proportion p estimation d = Precision required
ANALYZE IMPROVE CONTROL

DEFINE

56

Sampling

Formulas (i) and (ii) are valid if the sample size is less than 5% in comparison with population size

n < 0.05 0 05 N

If the sample size is more than 5% of the size of the population, it is possible to adjust the sample size obtained with (i) and (ii) using the formula below:

n= correct

LEAN SIX X SIGMA MI INIBOOK

n 1 +n
ANALYZE

CORRECTIVE FORMULA

N
IMPROVE CONTROL

DEFINE

MEASURE

57

Basic Statistics

Obj ti Objective:

Represent the main statistical properties of a set of data (sample or population)

Characteristics:

Location parameters

Mean, Mean Mode, Mode Median, Median Quartiles, Quartiles Percentiles

Dispersion parameters

Range, Standard Deviation, Variance

Shape parameters

LEAN SIX X SIGMA MI INIBOOK

Skewness, Kurtosis

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

58

Basic Statistics
Location parameters

The location parameters aim to identify the most frequent values of distributing data Dispersion parameters

The dispersion parameters can assess the variability of data Shape parameters

LEAN SIX X SIGMA MI INIBOOK

The shape parameters are used to assess whether the data collected are arranged according to a symmetrical distribution

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

59

Basic Statistics
Location parameters:
X =
i i

X
N

Mean Mode
The value, among data, with highest frequency

Median

The value having the characteristic that one half of the values is larger and the other half smaller. The value divides the set of data into two equal parts (it is the mean of the two central values if the number of data is even) The value of a concept p for which three q quarters ( (75%) ) of the value are larger g and one quarter (25%) is smaller The value of a concept, thus one quarter (25%) of the value is greater and three quarters (75%) are smaller

First Quartile (Q1)

Third Quartile (Q3)

Dispersion parameters:
Range = xmax xmin
=
N 1 ( X i X )2

Range Standard (StDev)

Deviation

(X
2 =

X )2

LEAN SIX X SIGMA MI INIBOOK

Variance
MEASURE ANALYZE

N 1

DEFINE

IMPROVE

CONTROL

60

Basic Statistics
Shape parameters:
The value that measures the asymmetry of distribution:

Skewness

xi x N Skewness = s ( N 1)( N 2 )

(
3

Skewness < 0: the distribution is shifted to the right Skewness > 0: the distribution is shifted to the left Skewness Sk = 0: 0 the th distribution di t ib ti is i symmetrical ti l The Kurtosis is a measure of how the distribution of the analyzed l d data d differs d ff f from a normal l distribution: d b

Kurtosis

Kurtosis =

xi x N ( N 1) s ( N 1)( N 2 )( N 3)

(
4

Kurtosis < 0: the distribution has a softer peak, shoulders are bigger and tails are thinner than a normal distribution Kurtosis > 0: the distribution has a sharper peak, shoulders are finer, and tails are larger than a normal distribution

LEAN SIX X SIGMA MI INIBOOK

3 ( N 1) ( N 2 )( N 3)

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

61

Basic Statistics

A graphic explanation of the meaning of Skewness, a symmetry parameter, is as f ll follows:

S<0

S=0

S>0

LEAN SIX X SIGMA MI INIBOOK

Distribution skewed to the right (the mode is shifted to higher values of the distribution)
MEASURE ANALYZE

Symmetrical distribution

Distribution skewed to the left (the mode is shifted to lower values of the distribution)
IMPROVE CONTROL

DEFINE

62

Basic Statistics

A graphic explanation of the meaning of the Kurtosis, a symmetry parameter, is as follows:

K<0

K=0

K>0

LEAN SIX X SIGMA MI INIBOOK

Distribution with flat shape


MEASURE

N Normal l di distribution ib i
ANALYZE IMPROVE

Distribution with sharp shape


CONTROL

DEFINE

63

Basic Statistics

MINITAB: Stat > Basic Statistics > Display Descriptive Statistics

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

64

Basic Statistics
A

Insert the column of the sample to be analyzed y in terms of basic statistics


B

Select all parameters of interest


B

LEAN SIX X SIGMA MI INIBOOK

MINITAB Output:

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

65

Confidence Interval

What is it?

The Confidence Interval (CI)(G) is the interval that contains the mean (or proportion, median, standard deviation) of the population with a probability of 95%

When to use it:

The Confidence Interval is used to identify whether the analyzed sample belongs to a certain population

Overview:
Sample mean

LEAN SIX X SIGMA MI INIBOOK

Interval within which is located, with a probability of 95%, the mean of the population from which the sample comes
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

66

Confidence Interval

The formula for determining the width of the Confidence Interval for the mean of f a sample l is: i

CI = X 2

s n
Example: Estimation of the mean width of f a particular ti l mechanical h i l part t X = 21.0 21 0 mm s = 0.25 mm n = 25

where:

X = Sample mean

CI = 95% Confidence interval

n = Sample size

CI = (21.0 098 ) ( 21, 0 CI = 0, 0.098)

s = Sample standard deviation*

LEAN SIX X SIGMA MI INIBOOK

*when the population standard deviation is known, use it instead of the sample standard deviation (s)
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

67

Confidence Interval

The following formula is used to determine the width of the Confidence I Interval l for f the h proportion i of f a sample: l

CIP = p 2

p (1(1 p) ) n

where:

p = Sample proportion estimate

Example: Estimate in order to assess the proportion of defects in a specific process p = 0.15 0 n = 25
CI = (0.15 0.0714)

CI = 95% Confidence Interval

p size n = Sample

LEAN SIX X SIGMA MI INIBOOK

p
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

68

Graphical Summary

Objective:

The tool aims to give graphical and statistical representation of the parameters found in the collected data

Characteristics ( (see p page g 72): )


A B C
(G)

Histogram with reference curve y Test Normality presence

Basic Statistics

D E

LEAN SIX X SIGMA MI INIBOOK

Verification of Outliers Confidence Interval

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

69

Graphical Summary

MINITAB:

Stat > Basic Statistics > Graphical Summary

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

70

Graphical Summary

A A

Insert the column containing the sample to be analyzed


B

Insert potential stratification factors


C C

LEAN SIX X SIGMA MI INIBOOK

Choose the level of confidence to determine the width of the Confidence Intervals

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

71

Graphical Summary

MINITAB: Output
B A C

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

72

Graphical Summary
A
This is a schematic Bar Chart (Histogram) The chart is useful to check on a qualitative way the pattern of data collected in terms of mean, variability and presence of any abnormalities b li i such h as outliers, li mixture i of f two di distributions, ib i etc. This chart shows the normal curve that best fits the data shown

It reports the results of the Anderson-Darling statistical test in order to verify the normality of the sample:
if the P-Value (G) is bigger than the threshold value chosen (generally ) it is p possible to say y that the sample p comes from a 0.05, that is 5%), normal distribution if the P-Value is less than the threshold value chosen, the sample data doesnt respect a normal distribution

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

73

Graphical Summary
C
This section has a summary of data through the usage of the parameters of location, location dispersion, dispersion symmetry and sample size (see pages 60 and 61) Location parameters: Mean, Median, First Quartile, Third Quartile Dispersion parameters: Minimum, Maximum, Standard Deviation (StDev) Shape parameters: Skewness, Kurtosis

D
D is a graph of the sample data through the use of the Boxplot The symbols * highlight points that may not belong to the same d distribution b of f the h remaining d data These points are called Outliers and can often be associated with special events

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

74

Graphical Summary
E
Seen in this chart are confidence intervals (with confidence level of 95%) for the estimation on population, which the sample of the analyzed data comes from: Confidence Interval for mean Confidence Interval for median Confidence Interval for Standard Deviation

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

75

Boxplot

Objective:

The Boxplot is a tool useful for studying the distribution of coll lected d data d and d to obtain b information f on position, dispersion, d and d symmetry

When to use it:

LEAN SIX X SIGMA MI INIBOOK

With the Boxplot you can see if any Outliers exist (if yes, yes an invesinves tigation must be done to find out the reasons), or if there are any points not belonging to the same distribution of the remaining data, they must be probed, too

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

76

Boxplot
Graph > Boxplot

MINITAB:

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

77

Boxplot

Select the variable stored in a single column to be plotted

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

78

Boxplot

B F E C A

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

79

Boxplot

Lower Quartile or First Quartile (Q1): Cut-off point for lowest 25% of data

Upper or Third Quartile (Q3): Cut-off point for lowest 75% of data (or highest 25% of data)

Median (Q2): Cut-off point for 50% of data (50th percentile)

y distant from the rest of data, i.e. Outliers: Observations that are numerically unusually large or small data points (verify why they are present!). Minitab uses the quartile method

Lean6
QUARTILE METHOD
IMPROVE CONTROL

LS= Q3 + 1,5 ( Q3 - Q1 ) LI = Q1 -1,5 ( Q3 - Q1 )

Upper whisker and Lower whisker: These are estimates of the upper and lower limits of the data set (excluding outliers)

LEAN SIX SIGMA MINIBOOK

F
MEASURE

Range: Maximum Minimum


ANALYZE

DEFINE

80

Gage R&R

Objective:

Gage R&R is a measurement of the capability of a measurement system to obtain the same measurement reading consistently with repeated measurement takings. Gage R&R decomposes the total variation in measured d data d i into part to part variation i i and d measurement variation, i i and determines the capability of the measurement system by comparing measurement variation vs total variation

Components of Variation :

2total = 2 part to part + 2 measurement


2 repeatability + 2 reproducibility

LEAN SIX X SIGMA MI INIBOOK

The measurement system is valid if the greater part of variability is attributable to the process (part to part)
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

81

Gage R&R

LEAN SIX X SIGMA MI INIBOOK

(Source: AIAG, Automotive Industry Action Group)


MEASURE ANALYZE IMPROVE CONTROL

DEFINE

82

Gage R&R (Continuous Data)

Gage R&R Test Plan (Manual):

1.

2.

3.

LEAN SIX X SIGMA MI INIBOOK

4 4.

Each operator will measure each part multiple times (recommended 3 times) The data must be balanced, i.e., each operator p must measure the same p part equal q number of times The selected parts must be representative of the range of variation of the process Operators should carry out the tests blindly blindly , i.e. i e without being influenced by other operators measurements, and sequence their measurement jobs randomly
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

83

Gage R&R (Continuous Data)

Gage R&R Test Plan (Automatically Created by Minitab):

MINITAB: Quality Tools > Gage Study > Create Gage R&R Study Worksheet

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

84

Gage R&R (Continuous Data)


A C

Select the number of parts to be measured


D B

Enter part number/name


C

Select the number of operators


F D

Enter the name/label for operators


E

Select the number of replicates


F

LEAN SIX X SIGMA MI INIBOOK

Select this option if you want to randomize the test


MEASURE ANALYZE IMPROVE CONTROL

DEFINE

85

Gage R&R (Continuous Data)

MINITAB: Output

A A

Standard order of test (without randomization)


B

Randomized test run order


C

Part number to be measured in each run


D

Operator number/name
E

LEAN SIX X SIGMA MI INIBOOK

Measurement data to be entered


MEASURE ANALYZE IMPROVE CONTROL

DEFINE

86

Gage R&R (Continuous Data)

Analysis of Gage R&R with MINITAB:

Stat > Quality Tools > Gage Study > Gage R&R Study (Crossed)

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

87

Gage R&R (Continuous Data)


A A B C B

Gage R&R Study (Crossed)


Enter the parts name/label column

Enter operators name/label column


D C

Enter the measurements data column


D

LEAN SIX X SIGMA MI INIBOOK

Choose the most appropriate analysis method

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

88

Gage R&R (Continuous Data)

C F

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

89

Gage R&R (Continuous Data)


A
Each set of bars represents a source of variation. By default there are % Contribution and % StudyVar, but if you enter the option of Tolerance (or the Historical Tolerance) , it shows a third bar % Tolerance In a good measurement system the biggest contributor of variability should be the Part-to-Part Variation Note that, in case of % StudyVar and % Tolerance, the sum of the bar heights of repeatability and reproducibility will not be equal to the bar height of Gage R&R. This is because the standard deviations will not add up (unlike )

B
The R-chart shows the variability in the measurements for each operator Specifically, it shows: - each dot in the R-chart for a particular operator shows the range (maximum-minimum) of repeated measurements; if they are same, same the range will be zero - the Center line is calculated by averaging all the ranges for each subgroup of repeated measurements for each part - Control Limits ( (UCL and LCL) ) are computed p by y using g the variance within the subgroups

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

90

Gage R&R (Continuous Data)


C
The X-bar chart shows Part-to-Part variation by displaying the mean of repeated measurements of each part Specifically, it shows: - the dots in the chart represent, for each operator, the mean of repeated measurements of each part - the Center Line represents the mean of all measurements from all operators and all parts - Control Limits (UCL and LCL) are calculated from measurement data The measurement system is acceptable when plotted dots are out of control limits The variation caused by Repeatability should be much smaller than Part-to-Part variation

D
This chart shows the dotted plots for the measured values of each part aggregating all operators In the chart, circles are individual measurements, solid dots represent mean value l of f measurements for f each h part Ideally: - measurements for each part should closely cluster together, with little variation - part-to-part measurement variation should be much larger than the variation of f measurements on the h same part

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

91

Gage R&R (Continuous Data)


E
Measurement by operator graph may help to determine if reproducibility will affect the measurements It shows all the measurements taken by different operators: the circles show averages. averages The line connects the mean measurements for each operator With this graph, we can also determine whether the total variability in the parts is the same for each operator (variability should have similar mean and variation)

Guidelines AIAG
Line condition Parallel to X-axis parallel to X-axis Not p Indication Operators yield similar measurement means Operators yield different measurement means This indicates operators means. o erators meamea sure in different ways
ANALYZE IMPROVE CONTROL

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

92

Gage R&R (Continuous Data)


F
This Operator*Part Interaction chart shows lines that connect the mean measurements for each operator measuring each part; each line indicates an operator In an ideal situation, all lines should be coincidental with each other, indicating no operator induced measurement variation among all parts

Guidelines AIAG
Indication The operators measure parts in a similar way An operator consistently yields measurements higher or lower than others The results of the operators operators measurements are affected by different parts

Line condition

Virtually parallel

A line is substantially higher or lower than others

LEAN SIX X SIGMA MI INIBOOK

Non parallel or crossed lines

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

93

Gage R&R (Continuous Data)


A

Identifying significance of source of variability by p value:


A

For a main effect, effect a p value less than 5% indicates its significance and for an interaction less than 25% may indicate its significance.
B

Rule of thumb: Performance level of a gage (threshold values of acceptability)

B C C
MEASURE ANALYZE

LEAN SIX X SIGMA MI INIBOOK

NDC (Number of Distinct Categories) 5


IMPROVE CONTROL

DEFINE

94

Gage R&R (Attribute Discrete Data)

Gage R&R Test Plan:

Example of Gage R&R Test for Good/Not Good Judgments

LEAN SIX X SIGMA MI INIBOOK


MEASURE

Select 20-30 p parts that can show the variability y of the p process Use an expert to evaluate all selected parts in order to create a standard reference value Use 2 or 3 operators to evaluate all parts and give good/not good ratings Apply randomization and blinding in the test
ANALYZE IMPROVE CONTROL

DEFINE

95

Gage R&R (Attribute Discrete Data)

MINITAB: S > Quality Stat Q Tools > Attribute A Agreement A Analysis A

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

96

Gage R&R (Attribute Discrete Data)


A A B C D E

Use this option when data are grouped in columns

Use this option when different evaluation trials are stored in different columns
C

E Enter the h number b of f operators


D

Enter the number of trials


E

LEAN SIX X SIGMA MI INIBOOK

Enter the standard reference value (if available)

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

97

Gage R&R (Attribute Discrete Data)

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

98

Gage R&R (Attribute Discrete Data)


A
This chart shows the consistency in responses for each operator For each operator the blue dot shows the percentage of consistency in his/her answers the red line gives the 95% confidence interval for the percentage of consistency in his/her answers the blue X provides the upper and lower confidence limits

LEAN SIX X SIGMA MI INIBOOK

This chart is g generated when there is a standard as reference This chart shows the correctness of responses for each operator (accuracy in the answer) For each operator, the chart provides the following information: the blue dot shows the percentage of f consistency with the standard of reference The red line represents 95% confidence interval of the percentage of consistency with the standard of reference The blue X represents the upper and lower limit points of the confidence interval
ANALYZE IMPROVE CONTROL

DEFINE

MEASURE

99

Gage R&R (Attribute Discrete Data)


A Comparing operators B B C Percentage consistency for each operator (without comparing with standard)

C Confidence Intervals on percentage consistency C i operators with i h standard d d D Comparing E Percentage correctness of each operator F D E F Confidence Intervals on correctness

Rule of Thumb: Performance evaluation standard for attribute tt ib t Gage G R&R B E

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

100

Gage R&R (Attribute Discrete Data)


B C B A Comparison between operators Percentage of consistency between different operators (similar to the concept of reproducibility)

C Confidence Interval for percentage consistency D Comparison of all operators with standard D E F F E Percentage of correctness among all operators vs standard Confidence Interval Rule of Thumb: Performance evaluation standard for Gage g R&R with discrete attributes B E

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

101

Gage R&R & Minitab

Minitab Assistant helps you to choose the right Gage R&R methodology

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

102

Pareto Diagram

Obj i Objective:

Pareto diagram can help to identify high priority actions or areas, by graphically displaying them in terms of frequencies or scores in decreasing order, which allows us to focus our intervention and resources in key areas

Features:

LEAN SIX X SIGMA MI INIBOOK

This tool will allow management to focus on high impact area This is also a supporting tool for diagnosis of current situation and determination of priorities

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

103

Pareto Diagram

MINITAB:

Stat > Quality Tools > Pareto Chart

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

104

Pareto Diagram
A B B C D A

Insert the column that contains defect labels (names)


B

LEAN SIX X SIGMA MI INIBOOK

Raw data
MEASURE

Grouped data
ANALYZE

I Insert t the th column l th t contains that t i f frequency of occurrences for defects


IMPROVE CONTROL

DEFINE

105

Pareto Diagram

MINITAB: Output
A

80-20 Rule

A is the item that is most critical to business: C Completely l l removing i defect d f type A would reduce total defects by 48.7%

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

106

Normality Test

Objective: j

The normality test is a statistical test that checks the validity of the assumption on data to be normally distributed. This normality assumption is critical for many statistical analyses

Statistical tools that need normality y assumption: p

1-Sample t 2-Sample p t Paired t-Test

ANOVA

Control Chart for continuous data

LEAN SIX X SIGMA MI INIBOOK

Capability Analysis

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

107

Normality Test

MINITAB:

Stat > Basic Statistics > Normality Test

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

108

Normality Test
A

LEAN SIX X SIGMA MI INIBOOK

Insert the column that contains data to be tested for normality


MEASURE ANALYZE IMPROVE CONTROL

DEFINE

109

Normality Test

MINITAB: Output

A
A

Data are not normal because the P-Value is less than 0.05

P-Value > 0.05

Data are normal Data are not normal


ANALYZE IMPROVE CONTROL

LEAN SIX X SIGMA MI INIBOOK

P-Value < 0.05


MEASURE

DEFINE

110

Capability Analysis

Objective:

Capability Analysis or Process Capability Analysis (G) is a study to determine the ability of current process to satisfy customer required specifications

Basic Assumptions:

Normal data Stable process


LSL USL LSL USL

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

111

Capability Analysis
Short Term (ST)
Actual capability index

Potential capability index

Cp =
B

USL LSL US S 6 ST

USL LSL C pk = min i ; 3 ST 3 ST

LSL

USL

Cp p does not take into account the process p centering


LSL USL

Cpk takes into account the process centering

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

112

Capability Analysis
Long Term (LT)
Actual performance capability index

Potential performance capability index

A
LSL USL

Pp =
B

USL LSL 6 LT

USL LSL ; Ppk = min 3 LT 3 LT

Pp p does not take into account the p process centering


LSL USL

Ppk takes into account the process centering

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

113

Capability Analysis

MINITAB: Stat > Quality Tools > Capability Sixpack > Normal

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

114

Capability Analysis
A A B

Insert the column that contains process data to be assessed for capability p y
B C

Insert subgroup size by either inin puting a number or a subgroup index column
C

Insert lower specification limit


D

LEAN SIX X SIGMA MI INIBOOK

I Insert upper specification ifi i limit li i


MEASURE ANALYZE IMPROVE CONTROL

DEFINE

115

Capability Analysis

MINITAB: Output
D

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

116

Capability Analysis
A
Xbar chart assesses y of subthe stability groups means

MINITAB: Output
D
This chart shows the histogram for the data set and fitted normal distribution curves for both long term and short term variation

B
S chart assesses the stability of subgroups variances i

E
This graph checks normality of the data

C
This chart shows the trend of subgroups variations

F
This graph displays the values of Cp, Cpk, Pp, Ppk, StDev PPM based on short term and long term, and displays the natural variation of the process vs specifications

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

117

Calculation of DPMO

Objective:

DPMO(G), i.e. Defects Per Million of Opportunity is a performance indicator calculated as a ratio of number of defects divided by the maximum number of potential defects in a batch of units inspected

Definitions:

U = number of units inspected D = number of total defects O = number of opportunities for defect per unit inspected. It is the maximum number of potential defects of all failure modes for a unit

INIBOOK LEAN SIX X SIGMA MI

DPO =
MEASURE

D U O
ANALYZE IMPROVE CONTROL

DEFINE

118

Calculation of Process Sigma

Objective:

Process Sigma (G) calculates Sigma level of a process based on defects detected in a batch of units

Calculation procedure:

DPO =
=1-

51 1000 2
51 = 0.9745 1000 2

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

119

Takt Time

Objective:

The Takt Time (G) represents the rhythm of production/delivery that a pro(workstation, Cell, etc.) ) must respect p to satisfy y customer demand. Each cess ( step of the process must produce to Takt Time to ensure a stable flow of outputs to meet customer requirements

Calculation method:
Available Time (Time) Customer Demand (pcs/Time) Cycle Time Takt Time
Available Time: Total available time minus planned downtime (example: Breaks) Customer Demand: Total expected demand from Customer (pieces per unit of time) Cycle Time: Total manual working time for one cycle (Touch Time) plus automatic run time. In case of production mix, the weighted mean (weighted on quantity) can be useful
ANALYZE IMPROVE CONTROL

TAKT TIME =

LEAN SIX X SIGMA MI INIBOOK

N Operators necessary =

DEFINE

MEASURE

120

Takt Time

Step n1: Determine how fast the process (Takt Time) must be

Customer Demand: 35000 units/year Time per shift: 8 hours (1 shift per day) Breaks (2 x 15 minutes): 30 minutes

TAKT TIME =

Time per shift (8 hours x 3600 seconds) = 28800 s Breaks(30 minutes x 60 seconds) = 1800 s Available time= 27000 s Customer Demand / day = 35000 / 220 = 159 pieces

27000 159

= 170 s

The customer buys goods at the rate of one every 170 seconds. This is the Target frequency which all processes must reach to produce each part or component to meet customer demand

Step n2: Identify how many people are necessary for each process to satisfy Customer demand
Takt Time =170 s

Traditional production line


Time (s)

No. Operators = necessary 240

510 170

=3O Ops.
Takt Time =170 s

Op 1 Op 4 1,5 Min/pc

Op 2

60
Op. 1 Op. 2

Time e (s)

120

90
Op. 3 Op. 4

170
Operator p
Op. 1

170
Op. 2

170
Op. 3

Op 3

1 Min/pc

2 Min/pc

4 Min/pc

Cycle time = 60 + 120 + 240 + 90 = 510 s


(total time necessary for the production of one piece)

LEAN SIX X SIGMA MI INIBOOK

New asset: the contribution of the three operators in the production of each piece is the same and equal to Takt Time
ANALYZE IMPROVE CONTROL

DEFINE

MEASURE

121

Overall Equipment Effectiveness (OEE)

Objective:

The OEE(G) (Overall Th (O ll Equipment E i Effectiveness) Eff i )i is a powerful f l method h d to monitor i and d improve the efficiency of manufacturing and transactional processes. OEE is frequently used as a key metric in TPM (Total Productive Maintenance) and Lean programs. One of the h main i goals l i is to reduce d what h are called ll d the h Six Si Bi Big L Losses clustered l d in i three h categories: Downtime, Speed and Quality losses
CATEGORY
Equipment failure Unplanned maintenance

SIX BIG LOSSES

EXAMPLE

NOTES
The threshold value between a breakdown and a minor stoppage can change from company to company (in most common situations 5 minutes) Ag good way y to reduce this kind of loss is SMED ( (set-up p reduction methodology)

Breakdowns
Setup/Changeover M t i l/O Material/Operator t shortages h t Warm up Time Parts jam Checking Framed p pieces Equipment wear Lack of equipment knowledge Operator inefficiency Scraps Reworks Scraps Reworks
ANALYZE

Downtime Loss

Setup Speed Loss Speed Loss Quality Loss Quality Loss


MEASURE

Downtime Loss

Minor Stoppages

The general definition of minor stoppages is a stop less than 5 minutes that does not require Maintenance operator intervention

Reduced Speed

These kinds of causes prevent the process from operating at maximun speed (theoretical speed) Scraps produced during start up phase Scraps or reworks produced during production phase
IMPROVE CONTROL

Start Up Losses

LEAN SIX X SIGMA MI INIBOOK

Scraps and reworks

DEFINE

122

Overall Equipment Effectiveness (OEE)


TOTAL AVAILABLE TIME PLANNED SHUT DOWN
DOWNTIME LOSS

Overview:

SCHEDULED PRODUCTION TIME

OPERATING TIME
SPEED LOSS

BREAKDOWN SET-UP

Availability Performance

RUNNING TIME
QUALITY LOSS

MINOR STOPPAGES REDUCED SPEED

VALUE ADDED TIME

START UP LOSSES SCRAPS & REWORKS

Quality

Value Added Time

Not Value Added Time

LEAN SIX X SIGMA MI INIBOOK

OEE =
MEASURE

Value Added Time =% Scheduled production Time


ANALYZE

OEE represents the percentage of production time spent making good pieces (no quality loss), as fast as possible (no speed loss), without interruption (no downtime)
IMPROVE CONTROL

DEFINE

123

Overall Equipment Effectiveness (OEE)

How to calculate OEE index:


Number of acceptable units produced

OEE =

X 100%

eo et ca number u be o of u units ts t that at cou could have ave bee been produced p o uce Theoretical in the scheduled time running at standard speed

Formula based on units it

Standard speed p = 110 pieces/minutes p

Number of good units produced = 11253 pieces


PKG CLEANING PKG MINOR STOP PKG CHARGE MATERIAL PKG

SET UP

Total time = 280 minutes

LEAN SIX X SIGMA MI INIBOOK

OEE =
X 100% = 30800

11253 11253

110 x 280

X 100% = 36%

Average OEE = 60% World Class OEE = 85%

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

124

Overall Equipment Effectiveness (OEE)

How to calculate OEE index considering the three OEE factors:

OEE = Availability x Performance x Quality x 100%

Availability = X 100 %

Operating Time Scheduled Production Time

World Class = 90%

Performance = Operating time X 100 %

Total pieces x Theoretical time to produce 1 unit X 100 %

World Class = 95%

Quality =

Good pieces

World Class = 99,9%

T l pieces Total i

Number of good pieces produced x Theoretical time to produce 1 unit

LEAN SIX X SIGMA MI INIBOOK

OEE =
MEASURE

X 100%
Scheduled production time
ANALYZE IMPROVE CONTROL

Formula based on time


125

DEFINE

Overall Equipment Effectiveness (OEE)

Example of the OEE data collection:

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

126

Overall Equipment Effectiveness (OEE)

How to apply OEE on a transactional process:


Organization Problem Computer breakdowns Activity change Organization problems Scheduled stoppages Activity Change C Computer Stops/Breakdown Auxiliary activities Lack of operator. Lack of information. Role & Responsibility. Lack of flexibility Generally stoppages > 5 minutes Time to start a new application Underload. IT Test

Scheduled stoppages

Non quality (scraps; rework; recheck)

OEE =

Value Added Time =% Scheduled Time

LEAN SIX X SIGMA MI INIBOOK

TOTAL AVAILABLE TIME MEASURE

SCHEDULED TIME

VALUE ADDED TIME ANALYZE IMPROVE CONTROL

DEFINE

127

Time Series Plot

Objective: j

Time Series Plot is a tool to analyze a potential time trend in a sequence of data

Features:

It is a tool to analyze any trends over time, to assess the need to stratify the data (eg. cyclic patterns), to explore and validate the data before applying other tools (eg. Regression modeling)

Featur re

LEAN SIX X SIGMA MI INIBOOK

Time
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

128

Time Series Plot


Stat > Time Series > Time Series Plot

MINITAB:

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

129

Time Series Plot


A A

Select the column that contains the data to study y time trends

LEAN SIX X SIGMA MI INIBOOK

Select Stamp and insert the columns containing appropriate time index labels for the data

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

130

Time Series Plot


A

Time Series Plot of Production

32000

31000

30000

29000

28000

It is possible to observe an increasing trend for production over time


B B

P Production

27000

26000

25000

24000

23000

5 5 6 6 6 05 05 05 05 06 -0 -0 -0 -0 t-0 rrbugar ov en ag fe gi se lu ap ap n g m m 9 8 6 10 28 10 516 18 13

Possible cyclic pattern: stratification might g be needed (eg. day of the week)

LEAN SIX X SIGMA MI INIBOOK

Date

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

131

Run Chart

Objective:

Run Chart is a tool that identifies possible special causes for the process performance variation

Features:

Common Causes(G): Random causes are not attributable to special p events, but to natural variability inherent in all processes Special Causes(G): Special causes may be associated with special events, or else l the h result l of f temporal l trends d (Clustering Cl i , Mixture Mi , Trend, Oscillation). If they are present the process will be out of control

CAUTION:

LEAN SIX X SIGMA MI INIBOOK

The e use o of a Run u C Chart a t doesnt oes t require equ e normality o a ty assu assumption pt o in process data
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

132

Run Chart

Patterns that indicate special causes:

Clustering is a pattern characterized by grouped data in a certain area of the graph (Clustering

could be caused by variation in measurement systems, batch-batch variation, sampling issues)

Mixture is a pattern in which a few points are near the median (Mixture is usually caused by a

combination of two populations or processes operating at different levels) Trend is a pattern in a sequence of points increasing or decreasing (Trend could be caused by such things as worn out tools and fatigue of workers) Oscillation indicates fluctuating data that moves up and down rapidly and could mean that the process is unstable

Clustering

Mixture

Trend

Oscillation

LEAN SIX X SIGMA MI INIBOOK

Run is defined as the number of consecutive points that are on the same side than the median
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

133

Run Chart
Stat > Quality Tools > Run Chart

MINITAB:

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

134

Run Chart
A A B

Input column that contains the data to be plotted in run chart


B

Input p subgroup g p size


C C

LEAN SIX X SIGMA MI INIBOOK

For subgroup data, select either subgroup mean or median to be plotted in order to track the change in central tendency

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

135

Run Chart
Run Chart of Sales

19000000

18000000

17000000

6000000 16000000

15000000

Sales

14000000

Median

13000000

12000000

11000000 2
11 13,0 6 0 202 0,202 0,798 Number of runs up or down: Expected number of runs: Longest run up or down: A pprox P-Value P V l for f Trends: T d A pprox P-Value for Oscillation:

10000000 4 6 8 10 12 14 Observation 16
19 15,7 2 0 953 0,953 0,047

18

20

22

24

Number of runs about median: Expected number of runs: Longest run about median: A Approx P V l for P-Value f C lustering: l t i Approx P-Value for Mixtures:

A A

LEAN SIX X SIGMA MI INIBOOK

The P-Value is less than 0.05 and indicates that there is significant oscillation
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

136

ANALYZE

LEAN SIX X SIGMA MI INIBOOK

Arcidiacono G., Calabrese C., Yang K.: Leading processes to lead companies: Lean Six Sigma. DOI 10-1007/978-88-470-2492-2, Springer-Verlag Italia 2012
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

137

ANALYZE

Analyze y is the third step p in a Lean Six Sigma g project p j roadmap. p In

this phase we try to:

LEAN SIX X SIGMA MI INIBOOK

Explore the relationships among variables and start root cause y of major j p problems analysis Conduct cause - effect analysis for trouble shooting y p Discover the real root causes rather than take care of symptoms Use statistical significance testing as a tool to identify key variables for response

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

138

Cause-Effect Diagram

Objective:

The Cause-Effect Diagram is a visual tool that can help to identify the relationship between an effect and its possible root causes

The Cause-Effect Diagram is also an effective tool for quality management and Brainstorming(G). It is one of the common tools for Lean Six Sigma projects and problem solving techniques

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

139

Cause-Effect Diagram

Why use the Cause-Effect Cause Effect Diagram?

It is easy y to understand and is a comprehensive p graphic g p template p that can logically display complex cause and effect relationships It can improve the understanding of a detailed relationship between cause and d effect ff t

When to use it:

LEAN SIX X SIGMA MI INIBOOK

If there is a large number of possible root causes When the relationship between cause and effect is not clear

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

140

Cause-Effect Diagram

How to build a Cause-Effect Diagram: g

LEAN SIX X SIGMA MI INIBOOK

1. Define the p problem and identify y the effect to be analyzed y 2. Identify the categories of possible root causes (commonly used categories: Measurements, Machines, Man/Personnel, Materials, Methods, Mother Nature/Environment) 3. Identify potential causes and group them into categories. The method of the 5 Whys can be used to determine the exact relationship between causes and effect g to the p possible degree g of influence towards 4. Sort the causes according the effect

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

141

Cause-Effect Diagram

MINITAB:

Stat > Quality Tools > Cause-and-Effect

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

142

Cause-Effect Diagram
A A

Enter the columns that contain the g of causes main categories


B B

Enter the columns that contain the secondary causes


C

LEAN SIX X SIGMA MI INIBOOK

Enter the effect to be analyzed

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

143

Cause-Effect Diagram
A

MINITAB: Output
Main cause categories g
B

Effect
B C

Root causes drill down by 5 whys:


C Why Y happens? Because of Machine Why machine influences Y? Because X16 Why X16 influences machine? Because X16.1 X16.2 e X16.3 Why y

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

144

Statistical Hypothesis Testing

Objective: j

Statistical Hypothesis Testing is used to make an inference or conclusion for a population, starting from sample data observation

Typical applications of Hypothesis Testing are:

LEAN SIX X SIGMA MI INIBOOK

the comparison of means between two or more groups the comparison of variances between two or more groups the comparison of proportions, also extracted from samples of different sizes

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

145

Statistical Hypothesis Testing

There are many types of hypothesis testing. We need to select the right H othesis Testing Hypothesis Testin method for the right ri ht problem, roblem as illustrated ill strated by b the folfol lowing table:
PURPOSE PURPOSE

HYPHOTESIS TESTING HYPHOTESIS

1-Sample t To compare means between two groups

To compare means between a sample and a reference known mean

2-Sample 2 Sample t

Mean comp parison

Paired t-TEST

To compare means between two groups when data are paired To compare means between more than two groups

ANOVA (F TEST)

Variance comparison c

Variance Test

To compare variances between two or more groups

LEAN SIX X SIGMA MI INIBOOK

Pro oportion com mparison

Chi- Square Test

To compare proportions between two or more groups

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

146

Hypothesis Testing: 1-Sample t

Objective:

The 1-Sample t test compares the mean of a sample with a given value

Fundamental Assumptions:

Data should be normally distributed

How to read the test result:

It is based on P-Value
There is no significant difference between the population mean, from which the sample comes, and the given value The e popu population at o mean ea is ss significantly g ca t y different ee tt than a t the eg given ve value
ANALYZE IMPROVE CONTROL

P V l > 0.05 P-Value 0 05

LEAN SIX X SIGMA MI INIBOOK

P V l 0.05 P-Value 0 05
MEASURE

DEFINE

147

Hypothesis Testing: 1-Sample t


Stat > Basic Statistic > 1-Sample t

MINITAB:

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

148

Hypothesis Testing: 1-Sample t


A A

Enter the column that contains the sample data


B

Enter the value that y you want to compare with the mean
B C

Choose additional graph to illustrate the result

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

149

Hypothesis Testing: 1-Sample t


A

MINITAB: Output
You can graphically observe if the Confidence Interval for the population mean contains the given reference value, if the interval doesnt contain the value, it indicates that population mean is not equal to the given value
A B

INIBOOK LEAN SIX X SIGMA MI

With P-Value 0.05, it indicates that the population p p mean is statistically y and significantly different than the given value

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

150

Hypothesis Testing: 2-Sample t

Objective:

The 2-Sample t test compares the means of 2 populations

Fundamental Assumption:

Data are normally distributed

How to read the test result:

It is based on P P-value value

P-Value > 0.05

There is no statistically significant difference between the two population means The two population means are significantly different
ANALYZE IMPROVE CONTROL

LEAN SIX X SIGMA MI INIBOOK

P V l 0.05 P-Value 0 05
MEASURE

DEFINE

151

Hypothesis Testing: 2-Sample t


Stat > Basic Statistic > 2-Sample t

MINITAB:

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

152

Hypothesis Testing: 2-Sample t


A A

Select this option if the two samples are arranged in one column
B

Select this option if the two samples of data are in different columns
C

Choose graphical display options


D C

LEAN SIX X SIGMA MI INIBOOK

Choose this option if two variances are tested to be the same (page 168)

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

153

Hypothesis Testing: 2-Sample t


A A

MINITAB: Output
It is visually possible to observe if two groups have equal means (two clusters of points will be at the same height if means are equal)
B

If the P value is less than 0.05, it indicates that two population means are statistically and significantly different

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

154

Hypothesis Testing: Paired t-Test

Objective:

Paired t-Test is a hypothesis test that compares the mean differences paired samples). It is useful when we want to of two related samples (p eliminate li i t the th presence of f significant i ifi t differences diff among sample l members (person, machine, etc.) from the tests. For example, we can p the effects of two different machines use Paired t-Test to compare (Machine A and B) on the same part The Paired t-Test would likely create tighter Confidence Intervals, b because only l the h variation i i in i paired i d difference diff i considered is id d

Fundamental Assumptions:

LEAN SIX X SIGMA MI INIBOOK

Two data sets have to be matched The distribution of the difference of data must be normal
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

155

Hypothesis Testing: Paired t-Test

Example of paired data collection:

How to read the test results:

The testing result is based on P-Value


There is no statistically significant difference for two matched data sets There is a statistically significant difference in two matched data sets
ANALYZE IMPROVE CONTROL

P-Value > 0.05

LEAN SIX X SIGMA MI INIBOOK

P V l 0.05 P-Value 0 05
MEASURE

DEFINE

156

Hypothesis Testing: Paired t-Test


Stat > Basic Statistic > Paired t

MINITAB:

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

157

Hypothesis Testing: Paired t-Test


A A

Select this option (samples in columns) if two data sets are in different columns and select columns for two samples
B

Select graphic display options for the h test ( (e.g., select l hi histogram of f differences)

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

158

Hypothesis Testing: Paired t-Test


A

MINITAB: Output
This graphic display is to check if the confidence interval contains zero. If yes, it indicates H0 cannot be rejected i.e. there is no significant difference for two data p pairs
B

If P-Value is 0.05, it indicates that two data pairs are statistically different

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

159

Hypothesis Testing: ANOVA

Objective:

ANOVA is a Hypothesis Testing procedure that can compare the means of 2 or more groups ANOVA is also an analysis procedure that can perform key tests for other statistical methods such as Regressions and DOE

F d Fundamental t lA Assumptions:* ti *

Data is normally distributed Variances V i are th the same for f all ll groups (page ( 168)
There is no significant g differences among gg group p means At least one group mean is significantly different than others
ANALYZE IMPROVE CONTROL

P-Value P Value > 0 0.05 05

P-Value 0.05
MEASURE

LEAN SIX X SIGMA MI INIBOOK

* Residuals analysis can be used to identify the goodness of the analytical model (also used in Regression, page186)
160

DEFINE

Hypothesis Testing: ANOVA


Stat > ANOVA > One-Way
A A

MINITAB:

Select: One Way (Unstacked). When sample data are placed in different columns One-Way. When all sample data are placed l di in one column l

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

161

Hypothesis Testing: ANOVA

A A

Enter the response columns to be analyzed

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

162

Hypothesis Testing: ANOVA


A A

MINITAB: Output
When P-Value is 0.05, it indicates that at least one population mean is statistically and significantly different than others
B

LEAN SIX X SIGMA MI INIBOOK

Visually, overlapping Confidence I t Intervals l (indicated (i di t d by b the th red d line li crossing 3 groups) highlights there is no significant difference on means for these groups. groups Non-overlapping Non overlapping ConfiConfi dence Intervals indicates significant differences

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

163

Hypothesis testing: Chi-Square

Objective:

The Chi-Square test aims to compare proportions or frequencies of y several g groups p occurrences by

Note:

Normal distribution of data is not required

P-Value > 0.05

There is no difference between the proportions (frequencies) ( q ) of samples p The proportion (frequencies) of at least one group is statistically different than others

LEAN SIX X SIGMA MI INIBOOK

P-Value 0.05

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

164

Hypothesis Testing: Chi-Square

MINITAB: Stat > Tables > Chi-Square Test (Table in Worksheet)

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

165

Hypothesis Testing: Chi-Square

A A

E t the Enter th columns l containing t i i the groups to compare

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

166

Hypothesis Testing: Chi-Square

MINITAB: Output
A

Highlighted Items: The calculated Chi Square statistic i value l b by the h f formula: l
2 =

( Observed Expected )
Expected

LEAN SIX X SIGMA MI INIBOOK

A
MEASURE ANALYZE IMPROVE

P-Value 0.05 is needed to indicate statistical significance between groups. For example, P-Value of 0.226 indicates there is no significant differences among groups
CONTROL

DEFINE

167

Hypothesis Testing: Test for Equal Variances

Objective:

This test compares Variances of several groups to determine if they are equal

Fundamental Assumptions:

It is necessary y to choose the most appropriate pp p method based on the distribution of data: Normally distributed data F-Test (for 2 samples) and Bartletts Test (for more

than 2 samples) General continuous distribution Levenes Test Th There i no statistically is i i ll significant i ifi diff difference on VarV iances of groups There is at least one group Variance that is significantly different from others
ANALYZE IMPROVE CONTROL

P-Value > 0.05

LEAN SIX X SIGMA MI INIBOOK

P-Value 0.05
MEASURE

DEFINE

168

Hypothesis Testing: Test for Equal Variances

MINITAB: Stat > Basic Statistics > Test for Equal Variances

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

169

Hypothesis Testing: Test for Equal Variances


A A

Enter response variable


B

Enter the columns containing the factors in the model

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

170

Hypothesis Testing: Test for Equal Variances

MINITAB: Output
A

Minitab will choose F-Test F Test or Bartlett Bartletts s Test depending on the number of groups. We have to choose the right test (Bartlett or Levene) based on the distribution of data (normal or generic continuous distribution)
A

LEAN SIX X SIGMA MI INIBOOK

W need We d to see P-Value PV l 0.05 0 05 in order to determine whether there is a significant difference in group variances

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

171

Hypothesis Testing: Test for Equal Variances


A

MINITAB: Output
Minitab also gives graphical outputs, p p-values values and Con Confidence Intervals
B A

Minitab output in case of 2 samples analysis

LEAN SIX X SIGMA MI INIBOOK

B
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

172

Hypothesis Testing & Minitab

Minitab Assistant helps you to choose the right Hypothesis Testing:

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

173

Scatter Diagram

Objective:

Scatter Diagram is a graph that can be used to determine a possible correlation between a pair of input and output variables There are 3 possible situations:

CTQ Q (x)

CTQ Q (x)

Variable (x)

Variable (x)

CTQ Q (x)

Variable (x)

LEAN SIX X SIGMA MI INIBOOK

Positive Correlation
MEASURE

Negative Correlation
ANALYZE IMPROVE

No Correlation
CONTROL

DEFINE

174

Scatter Diagram
G h Scatterplot Graph> S l

MINITAB:

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

175

Scatter Diagram
A

Enter the column that contains output variable (Response or Y variable)


B A B

Enter the column that contains input variable (X variable)

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

176

Scatter Diagram

MINITAB: Output
A A

Scatterplot of Output 1 vs Input 1

350

325

S tt Diagram Scatter Di i a graphic is hi plot that displays Input-Output data pairs in X-Y axes

Output 1

300

275

This plot can be used to qualitatively observe if there is a dependency relationship between 2 variables (potential correlation)

250 7 Input 1 8 9 10

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

177

Regression: Fitted Line Plot

Objective:

Regression is an analytical tool that can be used to establish, if it exists, a mathematical model between Input and Output variables (see Analytical Approach, page p g 183) )

Fundamental Assumptions:

Variable Y Continuous Variable X Continuous Residuals random variable


8 7 6

Y (Output)
4 3 2 1 0 1 2 3

(Example of Fitted Regression line)


4 5 6 7 8 9 10

LEAN SIX X SIGMA MI INIBOOK

X (Input)
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

178

Regression: Fitted Line Plot

For a Fitted Regression model, model there is a commonly used performance indicator that can measure how good this model fits the data This indicator, called R-Squared (R-Sq%, or R-Sq), tells you the percentage of variations in data (from 1% to 100%) that can be explained by the regression model and is calculated by:

R - Sq =

explained var iation total var iation

R-Sq 70

The mathematical model explains the data correcorre lation well The mathematical model doesn doesnt t explain the data cor correlation well
ANALYZE IMPROVE CONTROL

LEAN SIX X SIGMA MI INIBOOK

R S < 70 R-Sq
MEASURE

DEFINE

179

Regression: Fitted Line Plot


Stat > Regression > Fitted Line Plot

MINITAB:

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

180

Regression: Fitted Line Plot


A B C B A

Insert the column that contains Output (Y variable)

Insert the column that contains In Input (X variable)


C

Examples of fitted line p plot, with different types p yp of models:

Choose an appropriate model form (linear, quadratic, or cubic) for Regression. It may be useful to make a Scatter Diagram first to observe the pattern in data Cubic
ANALYZE IMPROVE CONTROL

LEAN SIX X SIGMA MI INIBOOK

Linear
MEASURE

Quadratic

DEFINE

181

Regression: Fitted Line Plot

MINITAB: Output
A

Minitab provides the graphical illustration of a Fitted Regression line model, a Scatter Diagram of all data as well as calg culated R-squared value

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

182

Regression: Analytical Approach


Stat > Regression > Regression

MINITAB:

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

183

Regression: Analytical Approach


A A

Insert the column that contains Output (Y variable)


B

Insert the column that contains Input (X variable)

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

184

Regression: Analytical Approach


A

MINITAB: Output p
Explicit Linear Regression equation with estimated coefficients
A B B

Significance tests of coefficients. If P-Value is 0.05, then the predictors are significant
C

R-sq value is calculated, and indicates how well the Regression model fits the data
D D

LEAN SIX X SIGMA MI INIBOOK

In this test, if P-Value is 0.05 then it indicates that the Regression relationship is significant
ANALYZE IMPROVE CONTROL

DEFINE

MEASURE

185

Regression: Assumptions

Residual analysis (also applicable for Fitted Line Plot):


Residuals Versus the Fitted Values
1 0 -1

Residuals R id l not tb be related l t dt to X Residuals should be independent of time Residuals should be near constant regardless of predicted Y values Residuals should be normally distributed
A

Residual Plots for Output 1

Normal Probability Plot of the Residuals

99

90

Percent

50

Minitab generates 4 graphs to verify these four assumptions


Residuals Versus Input 1
250 275 325 350
1,5 1,0 0,5 0,0 -0,5 -1,0 -1,5

1 2 300 Fitted Value

Standardized Residual

10

-2

-1 0 1 Standardized Residual

(response is Output 1)

Histogram of the Residuals


1 0

Residuals Versus the Order of the Data

4,8

3,6

Frequency

0,0 1,5 2 4 6

Stan ndardized Residual

1,2 , 1 -1

Standardized Resid dual

2,4

LEAN SIX X SIGMA MI INIBOOK

-1,5

-1,0 -0,5 0,0 0,5 1,0 Standardized Residual

8 10 12 14 Observation Order

16

18

20

10

Input 1

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

186

IMPROVE

LEAN SIX X SIGMA MI INIBOOK

Arcidiacono G., Calabrese C., Yang K.: Leading processes to lead companies: Lean Six Sigma. DOI 10-1007/978-88-470-2492-2, Springer-Verlag Italia 2012
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

187

IMPROVE

The Improve phase is the fourth step of the DMAIC Lean Six Sigma roadmap. In this step the existing process will be changed and optimized:

LEAN SIX X SIGMA MI INIBOOK

This process optimization will be based on sound data analysis, a g understanding g of the relationship p between key yp process thorough responses/performance metrics and key process variables, so this process optimization will be more likely to achieve real results b k d by backed b statistical t ti ti l confidence fid The improvement will take into account Lean applications, typical of Lean methodology and mindset, in order to reduce waste and to increase process efficiency The process optimization is based on scientific approach, real and accurate data. It is not based on subjective judgments
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

188

5S Program

Objective:

The 5S Program is a system for creating and maintaining a work environment clean, orderly, efficient and safe. The benefits of this method can be evaluated in terms of Quality, Safety and Productivity:
Safety
Reduce the likelihood of accident Making the workplace more ergonomic and comfortable

Productivity

Quality
Eliminate the p possibility y of using g parts previously discarded Eliminate the possibility of using inappropriate tools

Eliminate wastes of time looking g for equipment or items necessary for the job Reduce cycle times Maintain efficient equipment through proper p p maintenance and cleaning g

Overview:
SET IN ORDER SHINE STANDARDISE SUSTAIN

LEAN SIX X SIGMA MI INIBOOK

SORT

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

189

5S Program
OBJECTIVE
Try to answer these questions: What is the use of this object? Why do I have it? How often is it used?

STEP 5S

PRACTICAL NOTES

SORT

Identify what is needed and what is not needed in the workplace. Eliminate or segregate what is not necessary

SET IN ORDER

Organize and arrange everything you need in the workplace so it can be quickly found, used and stored

Place all necessary items in the best possible location, at the point of use Use the 'visual' area approach (standard and not standard must be easily identified) U labels Use l b l and d boards b d to t make k clear l th the inventory, i t equipment i t and d other items so that everybody can understand the workplace Clean inside, under, over and around machinery and furniture. The cleaning of machine is a very important point because it can help prevent damage before it happens

SHINE

Clean and maintain order in the workplace, q p , floors into the shopfloor/office p equipment,

STANDARDISE

Maintain and improve the standard of the first 3S

Introduce changes to the workstations that make cleaning and removal of dirt at the root easy and quick Use checklist to perform daily tasks of cleaning, maintenance and organization Identify areas and responsibilities

LEAN SIX X SIGMA MI INIBOOK

SUSTAIN

Make the standard 5S a daily habit and part of everyday work

Strengthen the workstation habits according to the 5S approach. Use audits with a Steering Team and relative corrective actions. Continuous improvement of 5S Use, if necessary, the OPL (One Point Lesson) and information board

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

190

5S Program

How to conduct a 5S event in practical steps:

1. Identify the area where the 5S system (production, warehouse, shipping, quality laboratory) is implemented quality, 2. Divide the area into zones and related people in charge 3. Define a Steering Team Team* 4. Define roles of area responsible y Steering g Team responsibilities p 5. Identify 6. Define the 5S Checklist and audit standard format 7. Establish the terms and timetable for implementing audit 8. Implement the 5S information board

LEAN SIX X SIGMA MI INIBOOK

* See the examples of format in Kaizen standard form session (page 310)
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

191

5S Program

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

192

5S Program
STEP 1: Assess the 5S performance at the end of Kaizen Event using the audit format STEP 2:
Identify 5S current performance and plan an action list in order to improve it

How to measure 5S performance:

STEP 3:
Conduct audit in order to detect the improvement effectiveness

STEP 4:
G to Step Go S 2 2

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

193

5S Program

Some tips before getting started:

LEAN SIX X SIGMA MI INIBOOK

For the success of 5S implementation go through employee involvement Make sure that employees p y understand the 5S system y and why y it is so important p for them and for the company Start with a pilot phase and then extend the approach to other areas It I is necessary in the h first f phase h of f implementation l for f everyone to sacrifice f and d appreciate the real benefits of the approach The manager g should sponsor p the activity y Make responsibilities clear and understood by everybody Make the process as visual as possible Link the 5S program to all other Kaizen activities (e.g. Standard Work, SMED, TPM, Six Sigma projects etc.) If possible, possible integrate the 5S program with safety program
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

194

Standard Work

Objective:

Standard Work (G) is the most effective combination of manpower, materials and machinery to produce something in the time, quality and quantity required q by y the customer. This is done through g continuous observation and improvement of the workplace. Standard Work is characterized by three main elements: Takt Time; Standard Work in process and Work sequence

Definition:

Standard Work in process: The minimum work-in-process work in process needed to maintain Standard Work. Standard WIP can be parts completed and in the machine after auto cycle, parts placed in equipment with cycle times bigger than Takt Time, and parts handled h dl d by b the h operators on the h production d i line li

Work sequence: The sequence of steps and activities that need to be performed in order to complete the production process
MEASURE ANALYZE IMPROVE CONTROL

LEAN SIX X SIGMA MI INIBOOK

Takt Time (see page 120)


195

DEFINE

Standard Work

Step 1: analyze the operator Cycle Time

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

196

Standard Work
A A Define the activity and the team involved in it B Identify the main tasks to complete a cycle C Measure, where possible, Measure possible one entire cycle recording the single task time and the cumulative time D

Step 1: analyze the operator Cycle Time

B C D

LEAN SIX X SIGMA MI INIBOOK

MEASURE

Each task must be between 5 and 10 s D Document the h complete l sequence of f the h operator Generally, in order to have a robust time, it is necessary to repeat the measurement from 7 to 10 times Use the chronometer and teach the operators p how to measure by themselves During measurement try to identify potential improvements
ANALYZE IMPROVE

For each task identify mean and lowest repeatable performance. The time will be equal to the mean if the lowest repeatable is smaller than mean
CONTROL

DEFINE

197

Standard Work
Available Time: Total available time minus planned downtime (example: Breaks) Customer Demand: Total expected demand from Customer (pieces per unit of time) Cycle Time: Total manual working time for one cycle (Touch Time) plus automatic run time. In case of production mix, the weighted mean (weighted on quantity) can be useful

Step 2: understand the relation between Cycle Time and Takt Time
Available Time (Time) Customer Demand (pcs/Time) Cycle Time Takt Time
A

TAKT TIME =

N Operators necessary =

CAUTION (LEAN METHODOLOGY BASIC CONCEPT):

Customer demand increase Takt Time Decrease (increment of speed rate) No. Operator needed increase

LEAN SIX X SIGMA MI INIBOOK

Customer demand decrease Takt Time Increase (reduction of speed rate) No. Operator needed decrease

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

198

Standard Work
Opearting time per shift Shift No Daily demand Supervisor Process Capacity Form Process Base Time Machine Manual Time (s) 3 6 5 45 150 300 65 70 200 15 100 180 1,8 2,9 2,0 Machine Time (s) # Pieces /Change Change Time Tool Change Time (s) Tool Change Total Time (s) Processing Capacity Remarks 27600 s 1 400 pieces Mrs. Brown

Step 3: measure machine process capacity

Observation Date

Company

Part No

Process

21.09.2010 XFS Factory Cylinder Assembly Line 23

Step #

Process Description

1 D10 TEST3

Press

HL 345

19,8 73,9 52,0

1394 374 531 Maximum capacity 374 pieces

Drilling

Testing

LEAN SIX X SIGMA MI INIBOOK

Total:

14

Maximum daily production:

374

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

199

Standard Work
Opearting time per shift 27600 s 1 400 pieces Mrs. Brown Shift No Daily demand Supervisor Process Capacity Form Process Tool Change # Pieces /Change 100 70 150 300 B 2,0 52,0 531 200 2,9 73,9 374 Maximum capacity 374 pieces 180 1,8 19,8 1394 Change Time Tool Change Time (s) Total Time (s) Remarks Processing Capacity

Step 3: measure machine process capacity


A Identify machine process during the cycle B

Observation Date

Company

Part No

Process

21.09.2010 XFS Factory Cylinder Assembly Line 23

Base Time Machine Time (s) 15 65 45

Step #

Process Description

Machine

Manual Time (s)

Press

HL 345

A C
Maximum daily production: 374

Drilling

D10

Testing

TEST3

For each cycle, identify machine cycle time. Manual contribution and pieces change time to calculate one process cycle time C Calculate machine capacity as the ratio of f operating ti ti time per shift hift and d total t t l time for each machine; example: Press Total Cycle time = 19.8 s Operating p g time = 27600 s Maximum capacity = 1394 pieces

Total:

14

LEAN SIX X SIGMA MI INIBOOK

MEASURE

The capacity sheet is used to highlight machine capacity Identifies process bottlenecks: in the example Drilling Process has a maximum capacity of 374 pieces. At a daily demand of 400 pieces the machine is not capable of reaching customer needs Use one worksheet for each cell
ANALYZE IMPROVE

DEFINE

CONTROL

200

Standard Work
= Machine = Manual = Walking = Takt Time

Step 4: analyze interaction between operator and equipment


21.09.2010 XFS Factory Cylinder Assembly Line 23
Opearting time per shift Daily demand Takt Time (s) Supervisor 27600 s 400 pieces 69 Mrs. Brown Standard Work Combination Form Standard
Time
5 10 15 20 25 30 35

Observation Date Company Part No Process

Operation Working Time (s)


40 45 50 55 60 65 70 75 80 85 90 95 100 105

Step #

Task/Activity Description Task/Activity 3 5 2 15 10 2 30 2 2 20 3 60 3 2

Man. Auto Walk

Activity 1

A ti it 2 Activity

Activity 3

Activity 4

Activity 5

Activity 6

LEAN SIX X SIGMA MI INIBOOK

Activity y7

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

201

Standard Work
= Machine = Manual = Walking = Takt Time

Step 4: analyze interaction between operator and equipment


Opearting time per shift Daily demand Takt Time (s) Supervisor 27600 s 400 pieces 69 Mrs. Brown

Observation Date Company Part No Process

21.09.2010 XFS Factory Cylinder Assembly Line 23

A Identify the main steps (task/activity) necessary to complete one cycle

S Standard tandard Work Combination Form


Time
5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105

Operation Working Time (s)

Step #

Task/Activity Description Task/Activity 3 2 60 3 3 2 2

Man. Auto Walk

Activity 1

Activity 2

B Identify Id tif for f each h step t th operator, the t machine and walk time contribution C

Activity 3

Activity 4

5
30

Activity 5

A C

15

10

Activity 6

Activity 7

20

Identify on the sheet the operator steps, machine phases and walk steps. Highlight the Takt Time line

LEAN SIX X SIGMA MI INIBOOK

The Standard Work combination sheet could be a good starting point for improvement identification Combines Man and equipment interactions Identifies the relation between Takt Time and process Cycle Time It could be useful to have one sheet for each operator
MEASURE ANALYZE IMPROVE

DEFINE

CONTROL

202

Standard Work
50

Step 5: map operator workload and make comparison with Takt Time
T S R E J D I C B A H G F P O N M Q
45 Storage on floor 40 Checks 5 2

TAKT TIME = 69 s

30 Moves to assembly worstation 3 2 4 2 2 5 2 5 2 3 25 Downloads machine 2 g machine cycle y 2 Waiting 20 Starts machine cycle 2 Loads machine 2 15 Moves to machine 2 Downloads machine 1 Waiting machine cycle 1 5 Starts machine cycle 1 0 Picks part and loads machine 1

Searches tool

Reduce: Reduce: 5S 5S - Tools Tools at at "point "point of of use" use" Eliminate: Eliminate: Attach Attach the the workstations workstations

Tim me (s)
Operator 1
Reduce: Reduce: Relayout Relayout Eliminate: Eliminate: Introduce Introduce standard standard WIP WIP

35 Assembly 5

Tim me (s)

Operator 2

Operator 3

10

Compare operator workloads with Takt Time

"AS-IS" Operator Cycle time

TAKT TIME = 69 s
S T E J D I C B A H G F P O N M Q R

For each operator map the as as-is is workload Determine the workload distribution for all the cell operators

Time (s) (

O Operator t 1

O Operator t 2

O Operator t 3

LEAN SIX X SIGMA MI INIBOOK

Balance operators workload in order to reach the Takt Time rhythm


MEASURE ANALYZE IMPROVE CONTROL

DEFINE

203

Standard Work

Step 6: prepare Standard Work sequence configuration according to Takt Time

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

204

Standard Work

Step 6: prepare Standard Work sequence configuration according to Takt Time


A For each workstation identify Standard Work-in-process (the minimum workin-process needed to maintain Standard Work), safety precautions and quality control B B In this part of the sheet, sheet highlight the movements of the operators involved in the process

LEAN SIX X SIGMA MI INIBOOK

MEASURE

It could be useful to have one sheet for each configuration of the cell Involve the team during sheet preparation
ANALYZE IMPROVE

C The configuration identifies: - No. Pieces WIP (in the example = 2) - Takt T kt Time Ti (i the (in th example l = 95) - Cycle time (in the example = 380)
CONTROL

DEFINE

205

Standard Work

Step 7: balance workload according to Customer Demand

LEAN SIX X SIGMA MI INIBOOK

For each Takt Time the configuration should change Identify work sequence to have balanced operator workload Create the playbook, p y the collection of different configurations The playbook should be placed next to the workstation so that operators can read the work sequence when necessary
ANALYZE IMPROVE CONTROL

DEFINE

MEASURE

206

Standard Work

Japanese experience:

At the beginning be innin of the 20th century, cent r especially es eciall in the USA, USA industrial ind strial engineers en ineers designed desi ned and imim plemented the standards of work, which often caused tense labor-management relationships. After the 1950s, in Japan, work standards were run by quality circles and constantly improved and revised by y workers. This p practice was p proven to be very y effective and empowering p g( (Imai, 1997) )

Features of a g good Standard Work ( (Imai, 1997): )

1. 2.

LEAN SIX X SIGMA MI INIBOOK

Standards are the best, easiest, and safest way to do a job They preserve know-how and expertise. Years of experience and knowledge can be lost by the loss of employees 3. They provide a way to measure performance 4. Correct standards show the relationship between cause and effect, leading to desired effects 5. Standards provide a basis for maintenance and improvement 6 They provide a set of visual signs on how to do the job 6. 7. Standards are a basis for training 8. They are a basis for auditing 9. They are a mean to prevent recurrence of errors 10. Standards minimize variability
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

207

Cell Design

What is a Cell:

A Cell C ll(G) is i a workplace k l i which in hi h equipment, i t people, l machinery, hi materials t i l and methods are arranged to have a continuous production flow (Continuous Flow). It allows the One piece flow principle: an operator can process the entire product from beginning to end without interruption. The cell generally runs for a family of products. A typical configuration is the U shape. p

Overview:

From traditional line to CELL DESIGN

LEAN SIX X SIGMA MI INIBOOK

Full-size cardboard cutouts


MEASURE ANALYZE IMPROVE

Cell Layout example


CONTROL

DEFINE

208

Cell Design

U shape cell advantages:


Allows a better balance of workload Promotes Visual Management approach Reduces movements along the line Improves p communication

Assembly

Dr rilling

Testin ng

Molding

Packaging P

Allows multi-processing Identifies abnormalities easily Does not interrupt the production inside the cell through the supply of materials from o tside thanks to outside, water ater s spider ider More flexibility in changing the Takt rhythm

LEAN SIX X SIGMA MI INIBOOK

Finished goods
MEASURE

Raw materials
ANALYZE IMPROVE CONTROL

DEFINE

209

Cell Design

How to implement a cell? Follow the operating steps below:

LEAN SIX X SIGMA MI INIBOOK


MEASURE ANALYZE

Categorize products in Product Family Determine Takt Time for each family (using, if necessary weighted mean) Make a study of f the elementary steps and relative times Workload balance and Standard Work Design g the U shape p cell in terms of: Layout & workstation Number of operators necessary to reach customer demand Movements Materials management and Standard WIP Simulate, where necessary, the cell with full-size cardboard cut-outs Cell implementation performance and relative g goals for the cell designed g Set p Establish a continuous improvement approach (perfection)
IMPROVE CONTROL

DEFINE

210

Cell Design

Practical tips during cell design and implementation:

Tools and materials should be located where needed (Point Of Use) During cell design think about the reduction of walking distance y movements Reduce unnecessary Materials must be in front of the workstation Use Safety first approach (the workplace must be safe and ergonomic) M t i l supply Materials l should h ld be b simple i l and d immediate i di t Use 5S and Visual Management

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

211

Cell Design

Example of cell and cell management:

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

212

SMED - Single Minute Exchange of Die

Objective:

The Single Minute Exchange of Die (SMED) is a method that aims to reduce the changeover time of machine equipment, or in general a production/service process

Definition:

Changeover time: it is the time required to prepare a device, machine, process, or system from the last piece of the previous batch to the first good d piece i of f the th next t batch b t h
AVAILABLE TIME

PRODUCT A
Last piece of A

CHANGEOVER
First good piece of B CHANGEOVER TIME

LEAN SIX X SIGMA MI INIBOOK

PRODUCT B

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

213

SMED - Single Minute Exchange of Die

When to use it:

Capacity problem: it is necessary to reduce the changeover time in order to gain time available for production:
CHANGEOVER
Time useful for more production d i

Before

PRODUCTION

PRODUCTION

After

PRODUCTION

CHANGEOVER

PRODUCTION

Need flexibility: if the changeover time decreases the batch size can be smaller and consequently the flexibility of production can increase:
CHANGEOVER
The mix of products at the end of the available time is bigger

Before

PRODUCT A

PRODUCT B

LEAN SIX X SIGMA MI INIBOOK

After
MEASURE

PRODUCT A

CHANGEOVER

PRODUCT B
ANALYZE

CHANGEOVER PRODUCT C CHANGEOVER


IMPROVE CONTROL

DEFINE

214

SMED - Single Minute Exchange of Die

How to perform a SMED activity:

1.

Analyze actual procedure and elementary steps to realize the changeover (use a videotape p if p possible, especially p y in multi-person p changeover) g )

2.

Establish goals (WIP; batch size; changeover time reduction, etc.)

3.

pp y the g general p procedure for set-up p reduction ( (see next p page) g ) Apply

4.

Perform a test to validate the new set-up procedure

5.

y new improvement p opportunities pp Identify

6.

Create a new standard operating procedure

CAUTION: Definition of external and internal activity

LEAN SIX X SIGMA MI INIBOOK

EXTERNAL ACTIVITY: Activity that can be performed when the machine/process is running INTERNAL ACTIVITY: Activity that can be performed only when the machine/process is stopped
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

215

SMED - Single Minute Exchange of Die

How to apply the general procedure:

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

216

SMED - Single Minute Exchange of Die

How to collect data according to changeover activities:

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

217

SMED - Single Minute Exchange of Die

Practical tips to improve changeover time performance:

LEAN SIX X SIGMA MI INIBOOK

Use checklist to identify all the material necessary to perform the changeover activities Prepare all the raw materials before stopping the machine Check the raw materials to avoid placing the wrong one Try to plan the set-up in order to reduce the activity between the previous batch and d the h next one Try to perform the pre-heating of molds before machine stoppage in order to reduce scraps because of incorrect temperature of the machine Use, visual changeover where possible Try to standardize size of screws and bolts, height of dies, etc. as much as possible Use q quick lock and q quick release systems y If possible, use before and after approach, all material in line approach, kit management approach or product family approach

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

218

SMED - Single Minute Exchange of Die

Typical proportions of the activities in a changeover process:


Attachments
(Dies, equipment, tools)

Adjustments

Materials preparation
(Raw material, clamps, dies, etc.)

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

219

SMED - Single Minute Exchange of Die

Changeover optimization examples:

Use Visual Management to identify the right equipment for the changeover

All the tools necessary for the set-up must be prepared before changeover starts

LEAN SIX X SIGMA MI INIBOOK

With before and after material management approach the production is already prepared for next batch
MEASURE ANALYZE

Use quick fastener system to reduce the attachment time as much as possible
IMPROVE CONTROL

DEFINE

220

Kanban

Objective:

Kanban(G) means signboard. Kanban can be used in many applications in various processes. It is primarily used as an instruction mechanism that controls the production, production movement of goods, goods material, material or parts, parts or jobs. jobs For example, in controlling production, Kanban will tell you what to produce, when to produce, and how much to produce

Benefits of Kanban:

LEAN SIX X SIGMA MI INIBOOK

It is a basic tool for the pull system in production and supply processes It effectively reduces the inventory level of work in process (WIP), thus reducing wastes It reacts effectively with fluctuating demands from customers or downstream It is used to connect two processes with very different lead times It is a visual management g system y

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

221

Kanban

Withdrawal Kanban and Production Kanban:


Production Kanban: is used to control production with detailed command including duction, detailed information relating to quantity, type, destination etc.

Withdrawal Kanban: is used to order supplies/materials or command movement of process material/parts/semi-finished goods flows

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

222

Kanban

Types of Withdrawal Kanbans:

Customer Kanban Transfers material from plant to customer Move Kanban Transfers material between work processes pp Kanban Supplier Pulls material from supplier to plant

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

223

Kanban

Types of Production Kanban:

Production Kanban Card Gives instructions how to make one piece or one container Trigger gg Kanban Instructs us to produce one batch Used when the processes require set-up. The Kanban authorizes production only when the number of units to replenish is equal to the Economic Economic Order Quantity Quantity

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

224

Kanban
EDDLT = Expected Demand During Lead Time (n pcs) AD = Average Demand per day (n pcs/day) OQ = Order Quantity (n pcs) ROP = Reorder Point (n pcs) AIL = Average Inventory Level (n pcs) AIL = OQ / 2 + SS LT = Total Lead Time (Production LT + Delivery LT (Days )) SS = Safety Stock (n pcs) SS = n extra days x AD Q= Size of container (n pcs)

Kanban sizing (analytical approach):

SOME PRACTICAL TIPS:

The minimun number of kanban is 2

EDDLT = AD x LT ROP = EDDLT + SS

The Kanban number must be increased to one unit if the

process starts with one empty bin

If the bin is at the point of usage the Kanban number must be

LEAN SIX X SIGMA MI INIBOOK

increased by one unit


MEASURE ANALYZE

n Kanban K b = ROP / Q
IMPROVE CONTROL

DEFINE

225

Kanban

How to implement Kanban Process:

Perform Kanban sizing Realize physical Kanban (bins, cards, etc.) Organize supermarket (Example kanban Implement FIFO mechanism collection point) Use Visual Management approach (blackboard, labels, colored bins, etc.) Organize point of collection T i the Train th people l involved i l d in i kanban k b process Implement Kanban performance dashboard (Inventory level; Number of stock shortages, etc.)

LEAN SIX X SIGMA MI INIBOOK

CAUTION: Dont forget to start from products with high inventory turn index
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

226

Kanban
Move Kanban Supplier Kanban

Kanban Card Designs:

Customer Kanban

LEAN SIX X SIGMA MI INIBOOK

P d ti K Production Kanban b C Card d

T i Trigger Kanban K b

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

227

Heijunka

What is Heijunka?

Heijunka(G) can be defined as pursuit of even distribution of production volume and production mix over time

Why Heijunka is beneficial?

Customer demands for products are uneven and non smooth in nature. However the production processes work well at an even and smooth pace, However, pace Heijunka can effectively convert uneven demands into even ones and predictable production process by leveling production volume and mix H ij k can be Heijunka b used d in i combination bi i with i h other h Lean L tools, l such h as Kanban, K b and SMED to create smooth value flow

C Components t of f Heijunka: H ij k

LEAN SIX X SIGMA MI INIBOOK

1. Production leveling 2 Product mix leveling 2. 3. Heijunka box


MEASURE ANALYZE IMPROVE CONTROL

DEFINE

228

Heijunka

Why Production Volume Leveling?

Fluctuations in customer demand often create greater disturbances in upper stream processes and supply chains Chasing Ch i variations i i i demand in d d with i h fluctuation fl i in i production d i often f causes: alternating overtime and idle time, quality problems, higher costs and stressed out workers
Demand Production

What is Production volume Leveling?


1988 / 4 = 497 1748 / 4 = 437 1588 / 4 = 397
MEASURE ANALYZE IMPROVE CONTROL

LEAN SIX X SIGMA MI INIBOOK

DEFINE

229

Heijunka

Why Product Mix Leveling?

Large batches of the same product may reduce number of changeovers, but it usually causes long lead time and high inventory level Variations in daily y work loads will lead to uneven work p pace, p possibly y creating g excessive idle time, overtime, and reducing quality A daily production schedule with stable product mix and stable work load will make a stable p production p process

What is Product Mix Leveling?

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

230

Heijunka

A Product Mix Leveling Example:

LEAN SIX X SIGMA MI INIBOOK

Batches, uneven daily loads


MEASURE ANALYZE

Stable mix, stable daily loads


IMPROVE CONTROL

DEFINE

231

Heijunka

What is Heijunka box?

The Heijunka box is a visual scheduling tool for Heijunka application, both production volume leveling and product mix leveling are visually displayed

LEAN SIX X SIGMA MI INIBOOK

April
MEASURE

5
ANALYZE

7
IMPROVE

10

11

12
CONTROL

DEFINE

232

TPM - Total Productive Maintenance

Objective:

Total Productive Maintenance (TPM) is a methodology focused on the technical aspects of manufacturing processes. It aims to increase plant and equipment productive performances through employees employees empowerment and skills. For that reason the real owner of the methodology is not only maintenance but all the production system

TPM pillars:
Early equipment management Office TPM Education and training Safety, Health and environment

Total T l Productive P d i Maintenance M i i based is b d on 8* pillars ill

Focus improvement Autonomous Maintenance Planned Maintenance Quality maintenance

LEAN SIX X SIGMA MI INIBOOK

* The number of pillars can change from company to company


MEASURE ANALYZE IMPROVE CONTROL

DEFINE

233

TPM - Total Productive Maintenance

Overview:

The TPM methodology is represented by a temple where at the base there are two important points: lean waste culture and 5S approach (dont forget to use them everytime you look at the process optimization)

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

234

TPM - Total Productive Maintenance PLANNED MAINTENANCE


Planned maintenance aims to move away from reactive maintenance to a proactive approach (planned maintenance). The activity is complementary to autonomous maintenance and generally requires the maintenance team. It aims to improve the technique and practice of maintenance, due to the increase of skills and ability to use diagnostic techniques. The ideal goal is Zero breakdowns

What is the meaning of the 8 pillars?

FOCUS IMPROVEMENT

Focus Improvement, or Kobetsu Kaizen, aims to maximize the overall system efficiency (generally measured d with h OEE index) d ) through h h the h elimination l of f equipment/process losses. It is one of the most important activities because of its rapid implementation and impact dimension. This pillar is strictly related to all other pillars

AUTONOMOUS MAINTENANCE

QUALITY MAINTENANCE
Quality Maintenance aims to create and maintain the conditions of the process from which the products come in order to ensure the quality level required by the customer. The starting point is not the product but the process control and consequently the management of its conditions (eg. pressure, temperature, density, flow rate, etc.) to maintain the desired result

LEAN SIX X SIGMA MI INIBOOK

Autonomous maintenance is the involvement of production workers in machine/equipment management through the transfer of some activity like daily inspection, lubrication, cleaning, minor repairs, etc. typical of a maintenance team. The operator is the expert p on the equipment q p and for this reason he is primarily responsible for machine care. Continuous improvement is the basis of this pillar
MEASURE ANALYZE

DEFINE

IMPROVE

CONTROL

235

TPM - Total Productive Maintenance EDUCATION & TRAINING


Education and training pillar is the basis of TPM. Its goal is to ensure that all people involved in TPM have all the skills necessary to support the change. Improving knowledge and skills of operators will not only increase their operational abilities, but encourage pride in their work, work with great benefits to all. The two main ways to reach this are on the job training and self-development

What is the meaning of the 8 pillars?

EARLY EQUIPMENT MANAGEMENT

Early Equipment Management is a structured process focusing on reducing the complexity associated with the operation and maintenance of equipment. It helps to extend the principles of Lean to the design and manufacture of equipment

OFFICE TPM

SAFETY, HEALTH, ENVIRONMENT


This pillar is really important for all company systems. TPM doesn doesnt t only mean more efficiency of equipment or less defects, but also eliminates all problems related to safety and environment. The main goal is to create a workplace that is organized, safe and environmentally i ll oriented i d

LEAN SIX X SIGMA MI INIBOOK

The Office TPM pillar aims to involve the nonproductive p o uct ve departments epa t e ts to focus ocus o on bette better p plant a t pe performance. The pillar helps administrative functions in defining their goals to support the TPM process in the production area

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

236

Priority y Matrix

Objective:

LEAN SIX X SIGMA MI INIBOOK

Priority Matrix can be used to quantify the degree of correlation between Input and Output variables In addition, it is often used to identify the best solutions according to g g them appropriately pp p y( (e.g. g it can be useful when consensus is criteria, weighting not reached in making a group decision) In a Lean Six Sigma project, this method can be used in Measure Phase to id if linkage identify li k b between i input and d output variables. i bl It I can be b used d in i Improve I Phase to identify key variables/solutions to be implemented in order to solve p the problem

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

237

Priority y Matrix

How to Build a Priority Matrix*:

1. 2.

Identify criteria for evaluating different solutions Team members assign weight to all criteria. For each member, all weight assigned to criteria should added up to 1 (0 is allowed in weighting)

LEAN SIX X SIGMA MI INIBOOK

* The example is related to a case of selecting the optimal solution in which four people suggest the selection criteria and the weight to be associated with the solutions to implement
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

238

Priority y Matrix

3.

Sum the values for each criteria to get the total weight

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

239

Priority y Matrix

4.

5.

Each evaluator assigns a score of 1, 3 or 5 to rate the ability of each solution to satisfy a criterion Sum the scores from all evaluators and multiply the result by the weight assigned i d for f each h criteria, it i and d fill out t the th following f ll i matrix ti

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

240

Priority y Matrix

6.

Sum the values for all rows to get the total score for each solution. The solution with the highest score means that this solution is the best one in terms of ability to fairly satisfy all weighted criteria

LEAN SIX X SIGMA MI INIBOOK

A
MEASURE

This is the solution that has the highest impact based on weighted criteria
ANALYZE IMPROVE CONTROL

DEFINE

241

FMEA

Objective:

LEAN SIX X SIGMA MI INIBOOK

FMEA(G) (Failure Modes and Effects Analysis y ) is used to identify y a detailed list of failure modes of a product or process and their corresponding causes and then rate them with severity level, likelihood of occurrence and d detection d t ti in i order d to t manage system t risk ik In Lean Six Sigma projects, FMEA can be used as a systematic method to link inputs with outputs, assign priority levels and degree of relationship, or to assess risk associated with different solutions to be implemented. For these reasons this technique can be applied to different stages of DMAIC

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

242

FMEA

RPN (Risk Priority Number) is a risk management index that is the product of the following follo in 3 values: al es: O: Occurrence or probability of occurrence, which relates to causes S: Severity of the failure effect D: Detection, Chance of detecting the failure before it happens

Rule of Thumb:

LEAN SIX X SIGMA MI INIBOOK

Corrective C i action i must be b taken k if RPN value l exceeds d a threshold h h ld (e.g., 100) or severity exceeds 8
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

243

FMEA

1. 2.

Identify potential failure modes Identify potential failure effect and its severity (Severity)

3 3.

Identify the failure causes and the likelihood of occurrence (Occurrence)

4.

Identify the effectiveness of current system to detect failure (Detection)

5.

Multiply the values (S, O, D) to determine the risk level of each failure mode (RPN)

6 6.

Identify Id f the h corrective actions f for the h f failure l modes d that h h have h high h RPN value (greater than the threshold value) or when Severity value is more than t a 8 (9 o or 10) 0)

LEAN SIX X SIGMA MI INIBOOK

7.

Recalculate RPN after improvement. Check the improvement until both y values are acceptable p RPN and Severity
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

244

FMEA

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

245

FMEA

Example of FMEA application:

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

246

DOE

Objective: j

DOE(G) (Design Of Experiments) is a methodology that builds, through wellplanned experiments and analysis of the experimental results, the analytical model relating to the cause-effect cause effect relationship between input and output variables

Fundamental Assumptions:

LEAN SIX X SIGMA MI INIBOOK

Residuals (difference between actual response and model prediction) is normally distributed Residuals are independent of Xs (Input variables) Residuals are independent of predicted Ys (Fitted Value) Residuals are independent of time Wh t When to use it it: DOE can be used in Analyze Phase to identify key variables and interactions p DOE can also be used in the Improve p Phase to that influence the output. identify best parameter settings (Inputs) to optimize the Output variable
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

247

DOE

1. 2.

Define the problem Select output (response) variable y

3.

Select experimental p factors ( (input p variables), ) their levels and values

4.

Select the experimental design in order to manage the number of tests. You can choose Full Factorial Design, which is a complete combination of all the levels of all factors, or Fractional Factorial Design, which is a selected portion of full factorial design. Fractional Factorial is economical but it lacks some information (some data analysis issues can be handled via alias structure, resolution and confounding)

5 5.

Conduct experiments properly (randomization may be needed, needed proper data collection, etc.)

LEAN SIX X SIGMA MI INIBOOK

6 6.
MEASURE

Analyze the experimental data


ANALYZE IMPROVE CONTROL

DEFINE

248

DOE
Replicates p

Types of factorial experiments: Run = a x b x c x d x x n

General Full Factorial Design Number of levels for factor A

Number of levels for Factor B Number of factors Number of levels Degree of fraction: q = 1 half fraction 50% q = 2 fraction 25% q = 3 1/8 fraction 12,5%

2 Level Full Factorial Design

Run = n x 2k
Replicates

2 Level L l Fractional F i l Factorial F i l Design D i

kq R = n x 2k-q Run

Es.

LEAN SIX X SIGMA MI INIBOOK

Full Factorial Design for 3 factors

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

249

DOE

Create an experimental plan by MINITAB: Stat > DOE > Factorial > Create Factorial Design

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

250

DOE

C C

Select desirable experimental plan (Full or Fractional)


D B

Choose the number of factors

LEAN SIX X SIGMA MI INIBOOK

Choose the number of replicates


MEASURE ANALYZE IMPROVE

Choose factor name, variable type (Text or Numeric), level type (coded +1 and -1 or actual values)
CONTROL

DEFINE

251

DOE
B A

MINITAB: Output

Experimental plan created


B

LEAN SIX X SIGMA MI INIBOOK

Experimental design information displayed in session window

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

252

DOE

Manage statistical analysis plan S > DOE > Factorial Stat F l > Analyze A l F Factorial l Design D

A B

Select S l t column l that th t contains t i Output O t t (Y) data

LEAN SIX X SIGMA MI INIBOOK

Enter the factors and interactions to be studied


MEASURE ANALYZE IMPROVE CONTROL

DEFINE

253

DOE
CAUTION: Eliminate factors (one at a time) until all remaining ones are significant

MINITAB: Output

B A

A For any main effect, two way, three way or higher h h order d interaction, it is significant only if its P-Value < 0.05 B Regression coefficients for the analytical model C C Global importance of factors: if its PValue is < 0.05 , then at least one single g factor or interaction (2 way or 3 way, etc.) is significant

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

254

DOE

DOE Graphs

Stat > DOE > Factorial > Factorial Plots

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

255

DOE
A

Enter response variable


B B

LEAN SIX X SIGMA MI INIBOOK

Enter factors to be analyzed

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

256

DOE
A

MINITAB: Output

CAUTION: Graphical results must be supported by statistical analysis

Main Effects Plot


A

The greater magnitude in slope indicates larger main effect

Interaction Plot Parallel lines indicate that there is no significant interaction effect
MEASURE ANALYZE IMPROVE CONTROL

LEAN SIX X SIGMA MI INIBOOK

DEFINE

257

DOE: Assumptions p

Residual analysis S > DOE > Analyze Stat A l Factorial F i l Design(Graphs) D i (G h )

Residuals must be independent of Xs

Residuals must be independent of time

Residuals must be independent of predicted Ys (Fitted Value)


MEASURE ANALYZE IMPROVE CONTROL

LEAN SIX X SIGMA MI INIBOOK

Residuals should be normally distributed


258

DEFINE

CONTROL

LEAN SIX X SIGMA MI INIBOOK

Arcidiacono G., Calabrese C., Yang K.: Leading processes to lead companies: Lean Six Sigma. DOI 10-1007/978-88-470-2492-2, Springer-Verlag Italia 2012
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

259

CONTROL

Control is the final step of Lean Six Sigma roadmap; the ob-

jective of this phase is to:

LEAN SIX X SIGMA MI INIBOOK

Test the quality level because it is the result of previous Lean Six Sigma steps Validate the method and its effectiveness used in improvement Standardize the method if its effectiveness is proven p control plan p to sustain the improved p long g term Implement performance Use visual management and an error proofing system to maintain hi h l high level l performance f Verify the applicabilities and possible extensions of the method for other possible problems or company areas
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

260

Control Chart

Objective:

C Control l Charts Ch are useful f l tools l that h can verify f and d monitor the h stability bl of performance levels for manufacturing, transactional and service processes Control Charts are tools that can be used to identify special causes in the process

Features:

Common Cause: The cause, random in nature and not related to any y special p event, is behind natural inherent variability shown in processes Special Cause: The cause is often associated with special events. The result of a Special Cause is that the process often shows a trend, trend seasonality or other nonnon random patterns

LEAN SIX X SIGMA MI INIBOOK

A process is stable stable if it is only influenced by random causes (common causes)


MEASURE ANALYZE IMPROVE CONTROL

DEFINE

261

Control Chart: Individuals


When to use it:
When it is necessary to monitor individual continuous variables

UCL = + L CL = LCL = L
Formula for control limits calculation

LEAN SIX X SIGMA MI INIBOOK

Control limits are specified by the Upper Control Limit (UCL) and Lower Control Limit (LCL), They determine the range for natural variation due to random causes. Any variation beyond UCL or LCL will be considered as out of control and likely caused by a special event
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

262

Control Chart: Individuals

MINITAB: Stat > Control Charts > Variables Charts for Individuals

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

263

Control Chart: Individuals


A A B

Enter the column that contains Output (Y) It is possible to customize the value of K to determine the type of test desired

LEAN SIX X SIGMA MI INIBOOK

Use this option to select desirable tests in order to identify potential non random patterns

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

264

Control Chart: Individuals

MINITAB: Output
I Chart of Set-up Time
UCL=78,10 ,

80

70 _ X=54,97

A point outside control limit indicating the presence of special cause

60

50

Indiv vidual Value

40 LCL=31,84

30

It is necessary to investigate the causes that lead this out of control situation, in order to intervene and correct the problem

20

10 12 15 18 21 Observation 24 27

A
30

LEAN SIX X SIGMA MI INIBOOK

33

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

265

Control Chart: Individuals

Rules to determine out of control and non random trends

LEAN SIX X SIGMA MI INIBOOK

One or more points out of control limits (usually 3-sigma lines) Two out of three points are beyond 2-sigma line (warning line) but usually within 3-sigma line Four out of five points fall beyond1-sigma line from center Eight consecutive points fall on one side of centerline Six consecutive points are in ascending or descending order 15 consecutive points are in zone C (both above or below centerline) 14 consecutive points are alternating up and down (zig-zag) 8 consecutive points alternate around centerline, but none in zone C Non random patterns are observed

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

266

Control Chart: Xbar-R


When to use it:
It is necessary y to monitor subgroups of continuous variables Xbar-R Xb R charts h are often f used d in high volume production process monitoring p g

LEAN SIX X SIGMA MI INIBOOK

Control limits are specified by the Upper Control Limit (UCL) and Lower Control Limit (LCL). They determine the range for natural variation due to random causes. Any variation beyond UCL or LCL will be considered as out of control and likely caused by special events
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

267

Control Chart: Xbar-R

Rational subgroups are samples that can be used to assess:

Within group variation Between groups variation

Subgroup

Subgroup

Control limits calculation: R Chart

Xbar Chart

UCL = x + A2 R

U C L = D4 R CL = R

where

CL = x
MEASURE

X SIGMA MI INIBOOK LEAN SIX

LCL = x A2 R

LC L = D 3 R
ANALYZE IMPROVE CONTROL

DEFINE

268

Control Chart: Xbar-R

MINITAB: Stat > Control Charts > Variables Chart for Subgroups > Xbar-R

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

269

Control Chart: Xbar-R


A A B

Select this option if the data are arranged in different columns

Enter the columns that contain Y responses (sample element results)


C

LEAN SIX X SIGMA MI INIBOOK

With this command, command choose all tests for ideniden tifying out of control and non-random patterns, or select only the tests that you want to use

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

270

Control Chart: Xbar-R


A A B C

Select this option if all observations are in one column

Enter the column that contains response Y to be analyzed


C

LEAN SIX X SIGMA MI INIBOOK

Enter the column that contains subgroup labels


MEASURE ANALYZE IMPROVE CONTROL

DEFINE

271

Control Chart: Xbar-R


Xbar-R Chart
1

MINITAB: Output
A B
_ _ X=32,364 U C L=33,753

34

33

S ample M ean

32

Xbar Chart: Each point in the chart represents a mean of a sample p


LC L=30,975

31 9 12 15 Sample 18 21 24 27 30

4,8

U C L=5,091

Presence of a special cause


C
_ R=2,408

3,6

Sample Ra ange

2,4

1,2 LC L=0 L 0 9 12 15 Sample 18 21 24 27 30

0,0 00

LEAN SIX X SIGMA MI INIBOOK

R Chart: Each point represents the range value in a sample


ANALYZE IMPROVE CONTROL

DEFINE

MEASURE

272

Control Chart: P Chart


When to use it:

UCL Upper Control Limit UCL

To monitor the state of inspection units, with 2 states, pass/failure, good/bad, etc. p is often the ratio of f l failure (d (discrete attribute b variables) bl )

UCL = p + 3 CL = p

p (1 p ) n

LCL Lower Control Limit LCL

LCL = p 3

p (1 p ) n
Formula to calculate control limits

LEAN SIX X SIGMA MI INIBOOK

Control limits are specified by the Upper Control Limit (UCL) and Lower Control Limit ( (LCL). ) They y determine the range g for natural variation due to random causes. Any variation beyond UCL or LCL will be considered as out of control and likely caused by special events
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

273

Control Chart: P Chart

MINITAB:

Stat > Control Charts > Attributes Chart > P

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

274

Control Chart: P Chart

Enter the column that contains number of non conformity


A B

Enter the column that contains sample sizes

LEAN SIX X SIGMA MI INIBOOK

Select out of control and non random patterns test. possible to make y your own choice It is p

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

275

Control Chart: P Chart


P Chart of Non conformity

MINITAB: Output

0,16 UCL 0 1429 UCL=0,1429

0,14

0,12

0,10 _ P=0,0676

Proportion

0,08

0,06

0,04

0,02 LCL=0 6 8 10 12 14 Sample 16 18 20 22 24

0,00

LEAN SIX X SIGMA MI INIBOOK

In this example, the process appears in the state of statistical control


MEASURE ANALYZE IMPROVE CONTROL

DEFINE

276

Control Chart & Minitab

Minitab Assistant helps you to choose the right Control Chart:

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

277

Poka Yoke

Objective:

Poka Yoke (G) (or Mistake Proofing) is one of the techniques that aims to reach the Zero Defect Quality through the usage of devices or procedures which allows detection of an error that could lead to waste (scraps, reworks, breakdowns etc.). Poka Yoke could be a design choice (Poka Yoke design) or a detection system on the process (Poka Yoke P Process) )

Poka Yoke basic concept:

LEAN SIX X SIGMA MI INIBOOK

A An error increases i its i economic i impact i if the h time i between b when h i it h happens and its discovery increases people p make mistakes but it is p possible to p prevent It is natural that p human errors becoming defects before they happen Dont try to do better next time: act now!

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

278

Poka Yoke

Why a mistake could happen:


Material Method

Machine

Mistake
Lack of experience Lack of Standardardization M hi Readability Machine R d bilit F Forgetfulness f l Misunderstanding Bad Identification

LEAN SIX X SIGMA MI INIBOOK

Measurement

Man

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

279

Poka Yoke

Poka yoke strategy and examples:

MIST TAKE

Could d happen

Prevention area

LEAN SIX X SIGMA MI INIBOOK

DEFINE

Alr ready happened

Detection area

MEASURE

ANALYZE

IMPROVE

CONTROL

280

Poka Yoke

Types of Quality Inspections (Shingo):


Good Products

1. Judgment Inspection: Discover defects after the facts, sort out bad products

Inspection Defects

Disadvantages: costly difficult to eliminate all defects if human inspection is used no feedback to process

2 Statistical Process Control (SPC): 2. A sampling based inspection and process feedback

Error Error Error

LEAN SIX X SIGMA MI INIBOOK

Disadvantages of SPC (Shingo): it is a sample inspection, so if the process is not capable, it cannot catch all the defects the feedback is usually slow

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

281

Poka Yoke

Desirable Types of Quality Inspections (Shingo):

1. Successive Check
Error Error
Feedback

Successive check is to let the immediate downstream process check output of the immediate upstream process

Error

2. Self Check
Error
Feedback Feedback

Defects

Feedback

Defects

Feedback

Defects

Self check is to let current process check itself and trouble shoot the process immediately if defect occurs
Feedback

Error Defects Defects Defects

3. Source Inspection
Error Error Error
MEASURE ANALYZE IMPROVE CONTROL

LEAN SIX X SIGMA MI INIBOOK

S Source inspection i i i is b based d on the h id idea of f di discovering i and d correcting i errors b before f errors b become a defect d f

DEFINE

282

Poka Yoke

Basic Principles of Good Quality Inspections (Shingo):

1. 2. 3. 4.

Always 100% Inspection Judgment about defects should be done objectively Inspection should be done automatically at low cost When a defect occurs, information should be immediately given as feedback and root causes immediately investigated 5 Discover hidden root causes one at a time 5. time, and eliminate them one by one 6. It is desirable to track the source of root cause therefore automatic inspection devices should be installed (Source Inspection)

Poka Yoke System for Perfect Quality Inspection:

LEAN SIX X SIGMA MI INIBOOK

1. . Poka o a Yoke o e device ev ce s should ou be c cheap, eap, ab able e to pe perform o 100% 00% inspection, spect o , a and g gives ves results instantly 2. Poka Yoke system can detect abnormalities by detection technology and/or process procedures
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

283

Poka Yoke

3 Types of Regulatory Mechanisms for Poka Yoke:

1. Control:

When abnormalities occur, the Poka Yoke system will halt the operations

Example: Coffee Pot

Type of Inspection: Source Inspection

Poka Yoke Detection Mechanism: Cheap Device

LEAN SIX X SIGMA MI INIBOOK

This automatic coffee pot is equipped with a pause and serve feature. The lid of the pot presses up p the button ( (shown above right), g ) releasing g a valve which allows the coffee to p pour into the p pot. If you remove the pot before brewing is finished, the valve closes, so coffee is not spilled
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

284

Poka Yoke

3 Types of Regulatory Mechanisms for Poka Yoke:

2. Warning:

When abnormalities occur, the Poka Yoke system will send warning

Example 1: Bathroom Poka Yoke

Some people may hang coat in a bathroom stall and then walk out without it. A stall door in a bathroom is designed so you cannot unlatch the door without dropping your coat unless you remove the coat first

Type of Inspection: Source Inspection Poka Yoke Detection Mechanism: Smart layout design

Example p 2: Warning g Color

LEAN SIX X SIGMA MI INIBOOK

In a hospital, the circular ring changes from purple to pink when water exceeds 40 degrees Celsius to avoid hurting patients
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

285

Poka Yoke

3 Types of Regulatory Mechanisms for Poka Yoke:

3 Mistake 3. Mi k proof: f
Example 2: Signatures Sheet

When abnormalities occur, the Poka Yoke system will make mistakes impossible to happen

Example 1: Electrical Plug

British 240v/50Hz electricity can injure people so electrical plugs are designed so that live electrical pins are never exposed: 1. the position and orientation of the pin are such that the plug can only fit one way in the socket 2. the pins are insulated near the plug body so that an electric shock is not possible via the exposed pin if the plug is not pushed all the way in but still making contact

Engineering change form requires different signatures depending on the nature of the change being considered. Sometimes engineers would get too many signatures, and sometimes not enough

LEAN SIX X SIGMA MI INIBOOK

The revised Th d form f identifies d f the h nature of f the h change h in the h columns l and d indicates unnecessary signatures in gray. Creating forms that help the user fill them out correctly is a part of mistake-proofing
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

286

Visual Management

Objective:

Visual Management(G) is a method that makes all processes in a company visual and tangible. Applying visual management will make the workplace well ll structured t t d and d processes will ill be b clear l t everybody to b d at t all ll levels l l (from top management to shopfloor). In other words Make it visual

Why to use it:

Visual Management has many advantages:

LEAN SIX X SIGMA MI INIBOOK


MEASURE ANALYZE

The detection of normal and abnormal operating conditions is easy and rapid Time reduction Space reduction Costs reduction in general waste reduction
IMPROVE CONTROL

DEFINE

287

Visual Management

How to implement Visual Management:

1.

2 2.

3.

LEAN SIX X SIGMA MI INIBOOK

4 4.

Decide what message is necessary to send or which mistakes you want to prevent from f h happening. i D i this During hi step it i is i really ll important i to identify communication at all levels Design a simple visual tool tool to clearly communicate your message (colored lines, colored bins; visual dashboard; Andon; Kanban card, gage, checklist etc.). It is necessary to involve people Test the visual impact on people and ask for feedback from those involved M k all Make ll the th adjustments dj t t or changes h necessary to t improve i th comthe munication effects

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

288

Visual Management

Visual Management examples:

LEAN SIX X SIGMA MI INIBOOK

Not standard condition: the material rack is not in the designated place

Standard condition: the material rack is in its designated place

Files are organized Fil i d with ith colored labels (each color represents a different year) y )

Blue bi Bl bins i indicate di t raw material. Yellow bins indicate WIP materials

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

289

Visual Management

Visual Management examples:

LEAN SIX X SIGMA MI INIBOOK

5S Dashboard: the information board allows employees at all levels to see the 5S status for each area in which 5S method is implemented

Red lines and labels indicate a place where scrap parts are segregated

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

290

Visual Management

Visual Management examples:

LEAN SIX X SIGMA MI INIBOOK

Strategy deployment activity board: Team department dashboard to assess the follow up phase of the annual strategy deployment cycle

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

291

Visual Management

Visual Management examples:

LEAN SIX X SIGMA MI INIBOOK

Manufacturing cell information board

Andon (G) for production control

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

292

OPL - One Point Lesson

Objective:

The One Point Lesson (OPL(G)) is a method that allows a rapid and effective transfer of information from the leader of a group to its memb bers. It must t be b written itt as simple i l as possible ibl and d should h ld follow f ll th 80the 80 20 rule and use 80% pictures and 20% words (or less). The lesson should take from 5 to 10 minutes

Types of OPL:

LEAN SIX X SIGMA MI INIBOOK

Basic information One Point Lesson: used to transfer essential basic inin formation, practical know-how and know-how of methods prevent oc Problem/Defect One Point Lesson: used to teach how to p currence of a specific problem Improvement/Kaizen: describes the main characteristic and key measures in an improvement activity
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

293

OPL - One Point Lesson

One point lesson formats

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

294

OPL - One Point Lesson

Why is OPL important?

To train people fast on a precise item To strengthen their understanding of the functions of machines, lines and processes in general (both manufacturing and transactional) To teach people about specific problems/defects in the process in order to eliminate their occurrence

Who should use the OPL?

Team leader or process expert

Where should the OPL activities happen?

LEAN SIX X SIGMA MI INIBOOK

At the Gemba (shopfloor, next to the machine, next to the computer g etc.) ) in the case of software training,
MEASURE ANALYZE IMPROVE CONTROL

DEFINE

295

OPL - One Point Lesson

One point lesson example

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

296

OPL - One Point Lesson

One point lesson example

LEAN SIX X SIGMA MI INIBOOK

DEFINE

MEASURE

ANALYZE

IMPROVE

CONTROL

297

Lean Six Sigma Checklist

LEAN SIX X SIGMA MI INIBOOK

Arcidiacono G., Calabrese C., Yang K.: Leading processes to lead companies: Lean Six Sigma. DOI 10-1007/978-88-470-2492-2, Springer-Verlag Italia 2012

299

Define Checklist

Some steps to check Define phase completion:

LEAN SIX X SIGMA MI INIBOOK

= Activity completed
300

Measure Checklist

Some steps to check Measure phase completion:

LEAN SIX X SIGMA MI INIBOOK

301

Analyze Checklist

Some steps to check Analyze phase completion:

LEAN SIX X SIGMA MI INIBOOK

302

Improve Checklist

Some steps to check Improve phase completion:

LEAN SIX X SIGMA MI INIBOOK

303

Control Checklist

Some steps to check Control phase completion:

LEAN SIX X SIGMA MI INIBOOK

304

APPENDIX A: Process Sigma Table (I)

LEAN SIX X SIGMA MI INIBOOK

305

APPENDIX A: Process Sigma Table (II)

LEAN SIX X SIGMA MI INIBOOK

306

APPENDIX B: Kinds of variables

This summary could be useful for the correct selection of indicators during the h implementation i l i of f a Lean L Si Sigma Six Si project j

CONTINUOUS
(eg. weight, height, length)

VARIABLE Discrete Attributes


(eg. good/not good, pass/fail)

DISCRETE Discrete Numerical


(eg. Number of complaints or errors in invoices)
307

LEAN SIX X SIGMA MI INIBOOK

APPENDIX C: Kaizen Leader Standard Form

Waste Walk Analysis format example

LEAN SIX X SIGMA MI INIBOOK

308

APPENDIX C: Kaizen Leader Standard Form

5S format example

LEAN SIX X SIGMA MI INIBOOK

309

APPENDIX C: Kaizen Leader Standard Form

5S format example

LEAN SIX X SIGMA MI INIBOOK

310

APPENDIX C: Kaizen Leader Standard Form

5S format example

LEAN SIX X SIGMA MI INIBOOK

311

APPENDIX C: Kaizen Leader Standard Form

5S format example

LEAN SIX X SIGMA MI INIBOOK

312

APPENDIX C: Kaizen Leader Standard Form

Standard Work: Cycle Time Observation Form

LEAN SIX X SIGMA MI INIBOOK

313

APPENDIX C: Kaizen Leader Standard Form

Standard Work: Process Capacity Form

LEAN SIX X SIGMA MI INIBOOK

314

APPENDIX C: Kaizen Leader Standard Form

Standard Work: Standard Work Combination Form

LEAN SIX X SIGMA MI INIBOOK

315

APPENDIX C: Kaizen Leader Standard Form

OPL - Basic information

LEAN SIX X SIGMA MI INIBOOK

316

APPENDIX C: Kaizen Leader Standard Form

OPL - Problem/Defect

LEAN SIX X SIGMA MI INIBOOK

317

APPENDIX C: Kaizen Leader Standard Form

OPL - Improvement/Kaizen

LEAN SIX X SIGMA MI INIBOOK

318

APPENDIX C: Kaizen Leader Standard Form

Kaizen Newspaper example:

LEAN SIX X SIGMA MI INIBOOK

319

APPENDIX C: Kaizen Leader Standard Form

Kaizen performance:

LEAN SIX X SIGMA MI INIBOOK

320

Index
COPQ, 48 Cost of Poor Quality, Quality see COPQ CTQ-Tree Diagram, 44 Design Of Experiments (DOE), 247 DOE see Design DOE, D i Of Experiments E i Failure Modes and Effects Analysis, see FMEA g see Cause-Effect Diagram g Fishbone Diagram, Fitted Line Plot, see Regression FMEA, 242 Functional Flow Diagram, 18 Gage R&R: Continuous Data, 83 Discrete Data Attributes, 95 G hi l S Graphical Summary, 69 Hypothesis Testing: 1-Sample t, 147 2-Sample t, 151 ANOVA, 160
321

1-Sample t, see Hypothesis Testing 2-Sample t, t see Hypothesis Testing 5S Program, 189

Activity Flow Diagram, 20 ANOVA see Hypothesis ANOVA, H h i Testing T i

Basic Flow Diagram, 17 Basic Statistics, 58 Boxplot, 76

LEAN SIX X SIGMA MI INIBOOK

Calculation of DPMO, 118 Calculation of Process Sigma, 119 Capability Analysis, 111 Cause and Effect Diagram, 138 Cell Design, 208 Chi S Chi-Square, see H Hypothesis th i T Testing ti Confidence Interval, 66 Control Chart for attributes: P Chart, 273 Control Chart for continuous variables: Individual, 262 Xbar-R, 267

Index

Chi-Square, 164 Paired t-Test, t Test 155 Test for Equal Variances, 168

Individual, see Control Chart for continuous variables Ishikawa I hk (Diagram), (D ) see C Cause and d Eff Effect D Diagram

Kaizen Events, 7 Kanban, 221 Kano Diagram, 45

Process Capability Analysis, see Capability Analysis Process Mapping, 16 Process Sigma: see Calculation of Process Sigma Process Sigma table table, 305 Product Family Matrix, 28 Project Charter, 46

Normality Test, 107

Regression: Analytical Approach, 183 Fitted Line Plot, 178 , 132 Run Chart,

Overall Equipment Effectiveness, OEE, 122 One Point Lesson, OPL, 293

LEAN SIX X SIGMA MI INIBOOK

P Chart, Ch C Control l Ch Chart f for attributes ib Paired t-Test, see Hypothesis Testing Pareto Diagram, 103 Poka Yoke, 278 Priority Matrix, 237

Sampling, 53 Scatter Diagram, 174 Standard Work, Work 195 SIPOC Diagram, 13 Single Minute Exchange of Die (SMED), 213 SMED, see Single Minute Exchange of Die S h i Diagram, Spaghetti Di 25 Statistical Hypothesis Testing, 145
322

Index

Takt Time, 120 Test for Equal Variances, see Hypothesis Testing Time Series Plot, 128

Variables (Kind of), 307 Value Added and Not Value Added Added, 19 Value Stream Mapping, 30 Visual Management, 287

Waste Walk, 21

Xbar-R, see Control Chart for continuous variables

LEAN SIX X SIGMA MI INIBOOK

323

Glossary
A

Andon: Andon is any visual indicator signaling the current status of a step in the production/process system. It alerts team leaders or supervisors in case of existing or emerging production/process problems. B

Brainstorming: A group based creativity technology that is designed to generate and select ideas for problems solving.

BVA, Business Value Added activity: Activity that does not add any value to the product/service but is necessary from a business operations point of view. C

Cell: It is a workplace in which equipment, people, machinery, materials and methods are arranged in order to have continuous p production flow.

Confidence Interval (CI): is the interval which, with a likely probability, contains the mean (or proportion, median, standard deviation) of the population, where the sample comes from.

LEAN SIX X SIGMA MI INIBOOK

Common Cause: The cause, random in nature and not related to any special event, is behind natural inherent variability displayed in processes.
325

Glossary

COPQ, Cost Of Poor Quality: COPQ are the costs related to poor performance of manufacturing or transactional processes.

CTQ, Critical To Quality: The key measurable features of a product or process whose performance standards or specification p limits must be met in order to satisfy y the customer.

Customer: The client, internal or external, is the recipient of a process / product / service.

Customer Satisfaction: is a measure of how products and services supplied by a company meet customer expectation. expectation Customer expectation should be objectively and accurately measured by collecting and analyzing Voice Of the Customer (VOC). It is the starting point for identifying improvements. D

DMAIC: Stands for 5 phases of Lean Six Sigma methodology: Define, Measure, Analyze, Improve,

Control.

DOE, , Design g Of Experiment: p DOE is a methodology gy that builds, , through g well-planned p experiments p and analysis of the experimental results, the analytical model relating to the cause-effect relationship between input and output variables.

LEAN SIX X SIGMA MI INIBOOK

DPMO, Defects Per Million of Opportunity: pp y DPMO is a p performance indicator calculated as a ratio of number of defects divided by maximum number of potential defects in a batch of units inspected.
326

Glossary
F

FMEA, Failure Modes and Effects Analysis: FMEA is a tool that can be used to identify a detailed list of failure modes of a product or process and their corresponding causes and then rate them with a severity level, a likelihood of occurrence and detection in order to manage the system risk. H

Heijunka: is one of the elements of Just in Time and it is the process of smoothing the type and quantity of production over a fixed period of time. J

Jidoka: This term means automation with human intelligence. It means that an automated process is sufficiently y aware of itself so that it will detect p process malfunctions or product p defects, , stop p itself and alert the operator. K

Kaizen: means to to become good through change change. A Kaizen event is a focused effort for make an improvement activity.

LEAN SIX X SIGMA MI INIBOOK

Kanban: It is a method used in many applications in various processes. It is primarily used as an instruction mechanism that controls the production, production movement of goods, goods material, material or parts, parts or jobs. jobs
327

Glossary
L

LCL, Lower Control Limit: Represents the lower limit of a stable distribution for the variability of a process (VOP).

Lead Time: is the time between the p placing g of an order and the receipt p of g goods/services ordered ( (it is also possible to speak about Production Lead Time, Delivery Lead Time etc.).

Lean: is the methodology that aims to identify and eliminate wastes in order to maximize speed and flexibility of business processes so we can deliver what is needed, when needed and in the quantity needed by the Customer.

LSL, Lower Specification Limit: Represents the lower limit of a tolerance region that is acceptable by the customer. customer N

NVA, , Non Value Added activity: y Activity y that does not add any y value to the p product/service. O

LEAN SIX X SIGMA MI INIBOOK

OEE, Overall Equipment Effectiveness: is a powerful method to monitor and improve the efficiency of manufacturing and transactional processes.
328

Glossary

OPL, One Point Lesson: is a method that allows a rapid and effective transfer of information from the leader of a group to its members. members

Outlier: An observation that is numerically distant from the rest of the data. P

Poka Yoke: It is one of the techniques that aims to reach the Zero Defect Quality through the usage of devices or procedures, which allows detection of an error that could lead to waste.

Process Capability Analysis: Also called Capability Analysis, is a performance index used to measure the ability of a process (VOP) to meet the specification limits defined by customers (VOC).

Process Owner: is the owner of the p process, usually y the head of a department p or office in which the Lean Six Sigma project is implemented.

Process Sigma: Process Sigma is a performance metric that is based on comparing specification length with the standard deviation (Sigma) of process. This performance index is related to defective rates.

Project Charter: is a document which contains key information on implementing a Lean Six Sigma project.

LEAN SIX X SIGMA MI INIBOOK

P-Value: is a measure of how much evidence we have against g the importance p of a factor. The smaller the P-Value, the stronger the evidence. A P-Value of < 0.05 is an indication of statistically significant evidence.
329

Glossary
R

Rational subgroups: The rational subgroups are samples chosen in a way that maximize the variability between samples when there are special causes present and the variability within the sample is minimized.

Reorder Point (ROP): is the inventory level of an item which signals the need for placement of a replenishment order, taking into account the consumption of the item during order Lead Time and the quantity required for safety stock.

Residual: Difference between actual value of data and predicted value from mathematical models (derived by Regression or Design Of Experiments). S

Savings: Economic or strategic benefits resulting from improvement/project activities.

SIPOC: High level process mapping to describe any kind of process (Supplier, (Supplier Input, Input Process, Process Output, Output Customer).

LEAN SIX X SIGMA MI INIBOOK

Standard Work: It is the most effective combination of manpower, materials and machinery to produce something in the time, time quality and quantity required by customer. customer
330

Glossary

Six Sigma: A well structured and disciplined operating strategy (structured according to the DMAIC phases), h ) t to measure, analyze l and di improve th the performance f in i terms t of f operational ti l excellence. ll Th The Six Si Sigma methodology is sufficiently flexible and adaptable to different business contexts.

SMED: Single Minute Exchange of Die is a method that aims to reduce the changeover time of equipment, machine or a production/service process in general.

Special Cause: The cause that is often associated with a special event and the result of a special cause often lets the process form a trend, seasonality or other non random patterns. T

Takt Time: It represents the rhythm of production/delivery that a process (workstation, Cell, etc.) must respect to satisfy i f customer demand. d d U

UCL, Upper Control Limit: Represents the upper limit of a stable distribution for the variability of a UCL process (VOP).

LEAN SIX X SIGMA MI INIBOOK

USL, Upper Specification Limit: Represents the upper limit of a tolerance region that is acceptable by the customer. customer
331

Glossary

V VA, Value Added activity: An activity that increases the value of the product/service from the customers point of view. It is something that customers are willing to pay for.

Visual Management: It is a method that makes all processes within a company visual and tangible.

VOC, Voice Of The Customer: The Voice of the Customer is how the customer perceives the product/process/service in comparison with their desires.

VOP, Voice VOP V i Of Process: P Th Voice The V i of f the h Process P is i what h the h process/product/service / d / i is i able bl to ded liver.

VSM, Value Stream Mapping: It is a diagram of every step involved in the material and information flow necessary to bring the product/service from the order to delivery phase. W

LEAN SIX X SIGMA MI INIBOOK

Waste: It is the use of resources (time, (time material, material labor, labor etc.) etc ) for doing something that the customers are not willing to pay for and, therefore, does not add value to the product or service provided.

332

References

- Arcidiacono G. (2006) Keys to success for Six Sigma, Proceedings of ICAD2006, Fourth International C f Conference on Axiomatic A i ti Design, D i Firenze Fi (It l ) (Italy).

- Arcidiacono G., Calabrese C., Rossi S. (2007) Six Sigma: Manuale per Green Belt, Springer-Verlag Italia, Milano.

- Breyfogle F.W., (2003) Implementing Six sigma: smarter solutions using statistical methods, Wiley, Hoboken.

- Imai M. (1997) Gemba Kaizen: A Commonsense, Low-Cost Approach to Management, McGraw-Hill, New York.

- Marchwinski C., Shook J., Schroeder A. (2008) Lean lexicon: a graphical glossary for lean thinkers, Cambridge, The Lean Enterprise Institute.

- Liker J. (editor) (1997) Becoming Lean: Inside Stories of U.S. Manufacturers, Productivity Press, Portland.

- Keats B.J., J , Montgomery g y D.C. ( (1996) ) Statistical applications pp in p process control, M. Dekker, , New York.

- Ohno T. (1988) Toyota Production System: Beyond Large-Scale Production, Productivity Press, Portland.

- Pyzdek T., T Keller P. P (2010) The Six Sigma Handbook, McGraw-Hill, McGraw Hill New York. York
333

LEAN SIX X SIGMA MI INIBOOK

- Rother M., Harris R. (2010) Creating continuous flow, CUOA Lean Enterprise Center, Massachusetts.

References

- Rother M., Harris R., Wilson E. (2003) Making Materials Flow: a lean material-handling guide for operations, ti production-control, d ti t l and d engineering i i professionals f i l , Lean L E t Enterprise i Institute, I tit t CamC bridge.

- Rother M., Harris R. (2010) Creating continuous flow, CUOA Lean Enterprise Center, Massachusetts.

- Rother M., Shook J.R. (2003) Learning to see: Value-Stream Mapping to Create Value and Eliminate Muda, The Lean Enterprise Institute, Cambridge.

- Shingo S. (1986) Zero Quality Control: Source Inspection and the Poka-Yoke System, Productivity Press, Stamford.

- Shingo S. (1989) A study of the Toyota Production System From an Industrial Engineering Viewpoint, Productivity Press, Cambridge (MA).

LEAN SIX X SIGMA MI INIBOOK

- Womack J.P., Jones D.T. (2003) Lean thinking: banish waste and create wealth in your corporation, Free press, London.