AYRE S.A.

PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

30

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

30

TUBERIA 5/8

PIE

$ 2.32

$ 69.60

$ 0.00

TUBERIA 1/2

PIE

$ 1.66

$ 0.00

30

TUBERIA 3/8

PIE

$ 1.10

$ 33.00

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

30

ARMAFLEX 5/8

PIE

$ 0.23

$ 6.90

ARMAFLEX 1/2

PIE

$ 1.66

$ 0.00

ARMAFLEX 3/8

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

CODOS 5/8

$ 0.64

$ 1.92

CODOS 1/2

$ 0.72

$ 0.00

CODOS 3/8

$ 0.50

$ 1.50

CODOS 1/4

$ 0.40

$ 0.00

VARILLA DE PLATA 5%

$ 1.80

$ 7.37

VALVULA SOLENOIDE 115V, 7/8

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 6.90

30

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 14.10

SOPORTES

$ 5.00

$ 30.00

30

PROPANO

$ 0.40

$ 12.00

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

4.095
3.75

30
30

COSTO MATERIALTOTAL

$ 183.29

COSTO MATERIAL POR PIE

30

MANO DE OBRA

COSTO TOTAL

$ 6.11

PIE

$ 7.00

$ 210.00

$ 393.29

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

1,343.28

0.625

32.04

21.23

636.90

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

4.44

133.17

32.04

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

37.06

13.90

9.65

28.95

7.72

34.74

142.26

1,930.00

35.51

133.17

9.07

272.13

96.50

579.00

7.72

231.60

386.00

482.50

579.00

675.50

0.5

3,537.52
117.92

133.70

4,011.00

7,548.52

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

56

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

56

TUBERIA 5/8

PIE

$ 2.32

$ 129.92

$ 0.00

TUBERIA 1/2

PIE

$ 1.66

$ 0.00

56

TUBERIA 3/8

PIE

$ 1.10

$ 61.60

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

56

ARMAFLEX 5/8

PIE

$ 0.23

$ 12.88

ARMAFLEX 1/2

PIE

$ 1.66

$ 0.00

ARMAFLEX 3/8

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

5.6

CODOS 5/8

$ 0.64

$ 3.58

CODOS 1/2

$ 0.72

$ 0.00

5.6

CODOS 3/8

$ 0.50

$ 2.80

CODOS 1/4

5.044

$ 0.40

$ 0.00

VARILLA DE PLATA 5%

$ 1.80

$ 9.08

VALVULA SOLENOIDE 115V, 7/8

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 12.88

56

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 26.32

11.2

SOPORTES

$ 5.00

$ 56.00

56

PROPANO

$ 0.40

$ 22.40

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

56
56

COSTO MATERIALTOTAL

$ 337.46

COSTO MATERIAL POR PIE

56

MANO DE OBRA

COSTO TOTAL

$ 6.03

PIE

$ 7.00

$ 392.00

$ 729.46

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78
32.04
21.23

2,507.46
1,188.88

10.81

37.25

17.95

12.74

11.00

7.33

5.79

4.44

248.58

32.04

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

69.17

13.90

9.65

54.04

7.72

34.74

175.23

1,930.00
35.51

248.58

9.07

507.98

96.50

1,080.80

7.72

432.32

386.00

482.50

579.00

675.50

0.625
0.5
0.375
0.25

6,513.04
116.30

133.70

7,487.20

14,000.24

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

34

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

34

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

34

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

TUBERIA 5/8

PIE

$ 2.32

$ 0.00

34

TUBERIA 1/2

PIE

$ 1.66

$ 56.44

34

TUBERIA 3/8

PIE

$ 1.10

$ 37.40

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

ARMAFLEX 5/8

PIE

$ 0.23

$ 0.00

34

ARMAFLEX 1/2

PIE

$ 1.66

$ 56.44

ARMAFLEX 3/8

$ 0.00

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

CODOS 5/8

$ 0.64

$ 0.00

3.4

CODOS 1/2

$ 0.72

$ 2.45

3.4

CODOS 3/8

$ 0.50

$ 1.70

CODOS 1/4
0
4.085875 VARILLA DE PLATA 5%
VALVULA SOLENOIDE 115V, 7/8

$ 0.40

$ 0.00

$ 1.80

$ 7.35

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 7.82

34

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 15.98

6.8

SOPORTES

$ 5.00

$ 34.00

34

PROPANO

$ 0.40

$ 13.60

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

4.25

COSTO MATERIALTOTAL

$ 233.18

COSTO MATERIAL POR PIE

34

MANO DE OBRA

COSTO TOTAL

$ 6.86

PIE

$ 7.00

$ 238.00

$ 471.18

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

0.625

32.04

1,089.29

0.5

21.23

721.82

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

4.44
32.04

1,089.29

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

13.90

47.25

9.65

32.81

7.72

34.74

141.94

1,930.00

35.51

150.93

9.07

308.41

96.50

656.20

7.72

262.48

386.00

482.50

579.00

675.50

4,500.42
132.37

133.70

4,545.80

9,046.22

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

21

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

21

TUBERIA 5/8

PIE

$ 2.32

$ 48.72

$ 0.00

TUBERIA 1/2

PIE

$ 1.66

$ 0.00

21

TUBERIA 3/8

PIE

$ 1.10

$ 23.10

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

21

ARMAFLEX 5/8

PIE

$ 0.23

$ 4.83

ARMAFLEX 1/2

PIE

$ 1.66

$ 0.00

ARMAFLEX 3/8

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

2.1

CODOS 5/8

$ 0.64

$ 1.34

CODOS 1/2

$ 0.72

$ 0.00

2.1

CODOS 3/8

$ 0.50

$ 1.05

CODOS 1/4

$ 0.40

$ 0.00

VARILLA DE PLATA 5%

$ 1.80

$ 6.78

VALVULA SOLENOIDE 115V, 7/8

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 4.83

21

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 9.87

4.2

SOPORTES

$ 5.00

$ 21.00

21

PROPANO

$ 0.40

$ 8.40

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

3.7665
2.625

21
21

COSTO MATERIALTOTAL

$ 129.92

COSTO MATERIAL POR PIE

21

MANO DE OBRA

COSTO TOTAL

$ 6.19

PIE

$ 7.00

$ 147.00

$ 276.92

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

940.30

0.625

32.04

21.23

445.83

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

4.44

93.22

32.04

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

25.94

13.90

9.65

20.27

7.72

34.74

130.85

1,930.00

35.51

93.22

9.07

190.49

96.50

405.30

7.72

162.12

386.00

482.50

579.00

675.50

0.5

2,507.53
119.41

133.70

2,807.70

5,315.23

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

30

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

30

TUBERIA 5/8

PIE

$ 2.32

$ 69.60

$ 0.00

TUBERIA 1/2

PIE

$ 1.66

$ 0.00

30

TUBERIA 3/8

PIE

$ 1.10

$ 33.00

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

30

ARMAFLEX 5/8

PIE

$ 0.23

$ 6.90

ARMAFLEX 1/2

PIE

$ 1.66

$ 0.00

ARMAFLEX 3/8

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

CODOS 5/8

$ 0.64

$ 1.92

CODOS 1/2

$ 0.72

$ 0.00

CODOS 3/8

$ 0.50

$ 1.50

CODOS 1/4

$ 0.40

$ 0.00

VARILLA DE PLATA 5%

$ 1.80

$ 7.37

VALVULA SOLENOIDE 115V, 7/8

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 6.90

30

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 14.10

SOPORTES

$ 5.00

$ 30.00

30

PROPANO

$ 0.40

$ 12.00

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

4.095
3.75

30
30

COSTO MATERIALTOTAL

$ 183.29

COSTO MATERIAL POR PIE

30

MANO DE OBRA

COSTO TOTAL

$ 6.11

PIE

$ 7.00

$ 210.00

$ 393.29

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

1,343.28

0.625

32.04

21.23

636.90

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

4.44

133.17

32.04

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

37.06

13.90

9.65

28.95

7.72

34.74

142.26

1,930.00

35.51

133.17

9.07

272.13

96.50

579.00

7.72

231.60

386.00

482.50

579.00

675.50

0.5

3,537.52
117.92

133.70

4,011.00

7,548.52

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

56

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

56

TUBERIA 5/8

PIE

$ 2.32

$ 129.92

$ 0.00

TUBERIA 1/2

PIE

$ 1.66

$ 0.00

56

TUBERIA 3/8

PIE

$ 1.10

$ 61.60

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

56

ARMAFLEX 5/8

PIE

$ 0.23

$ 12.88

ARMAFLEX 1/2

PIE

$ 1.66

$ 0.00

ARMAFLEX 3/8

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

5.6

CODOS 5/8

$ 0.64

$ 3.58

CODOS 1/2

$ 0.72

$ 0.00

5.6

CODOS 3/8

$ 0.50

$ 2.80

CODOS 1/4

5.044

$ 0.40

$ 0.00

VARILLA DE PLATA 5%

$ 1.80

$ 9.08

VALVULA SOLENOIDE 115V, 7/8

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 12.88

56

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 26.32

11.2

SOPORTES

$ 5.00

$ 56.00

56

PROPANO

$ 0.40

$ 22.40

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

56
56

COSTO MATERIALTOTAL

$ 337.46

COSTO MATERIAL POR PIE

56

MANO DE OBRA

COSTO TOTAL

$ 6.03

PIE

$ 7.00

$ 392.00

$ 729.46

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78
32.04
21.23

2,507.46
1,188.88

10.81

37.25

17.95

12.74

11.00

7.33

5.79

4.44

248.58

32.04

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

69.17

13.90

9.65

54.04

7.72

34.74

175.23

1,930.00
35.51

248.58

9.07

507.98

96.50

1,080.80

7.72

432.32

386.00

482.50

579.00

675.50

0.625
0.5
0.375
0.25

6,513.04
116.30

133.70

7,487.20

14,000.24

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

34

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

34

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

34

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

TUBERIA 5/8

PIE

$ 2.32

$ 0.00

34

TUBERIA 1/2

PIE

$ 1.66

$ 56.44

34

TUBERIA 3/8

PIE

$ 1.10

$ 37.40

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

ARMAFLEX 5/8

PIE

$ 0.23

$ 0.00

34

ARMAFLEX 1/2

PIE

$ 1.66

$ 56.44

ARMAFLEX 3/8

$ 0.00

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

CODOS 5/8

$ 0.64

$ 0.00

3.4

CODOS 1/2

$ 0.72

$ 2.45

3.4

CODOS 3/8

$ 0.50

$ 1.70

CODOS 1/4
0
4.085875 VARILLA DE PLATA 5%
VALVULA SOLENOIDE 115V, 7/8

$ 0.40

$ 0.00

$ 1.80

$ 7.35

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 7.82

34

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 15.98

6.8

SOPORTES

$ 5.00

$ 34.00

34

PROPANO

$ 0.40

$ 13.60

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

4.25

COSTO MATERIALTOTAL

$ 233.18

COSTO MATERIAL POR PIE

34

MANO DE OBRA

COSTO TOTAL

$ 6.86

PIE

$ 7.00

$ 238.00

$ 471.18

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

0.625

32.04

1,089.29

0.5

21.23

721.82

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

4.44
32.04

1,089.29

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

13.90

47.25

9.65

32.81

7.72

34.74

141.94

1,930.00

35.51

150.93

9.07

308.41

96.50

656.20

7.72

262.48

386.00

482.50

579.00

675.50

4,500.42
132.37

133.70

4,545.80

9,046.22

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

21

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

21

TUBERIA 5/8

PIE

$ 2.32

$ 48.72

$ 0.00

TUBERIA 1/2

PIE

$ 1.66

$ 0.00

21

TUBERIA 3/8

PIE

$ 1.10

$ 23.10

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

21

ARMAFLEX 5/8

PIE

$ 0.23

$ 4.83

ARMAFLEX 1/2

PIE

$ 1.66

$ 0.00

ARMAFLEX 3/8

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

2.1

CODOS 5/8

$ 0.64

$ 1.34

CODOS 1/2

$ 0.72

$ 0.00

2.1

CODOS 3/8

$ 0.50

$ 1.05

CODOS 1/4

$ 0.40

$ 0.00

VARILLA DE PLATA 5%

$ 1.80

$ 6.78

VALVULA SOLENOIDE 115V, 7/8

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 4.83

21

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 9.87

4.2

SOPORTES

$ 5.00

$ 21.00

21

PROPANO

$ 0.40

$ 8.40

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

3.7665
2.625

21
21

COSTO MATERIALTOTAL

$ 129.92

COSTO MATERIAL POR PIE

21

MANO DE OBRA

COSTO TOTAL

$ 6.19

PIE

$ 7.00

$ 147.00

$ 276.92

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

940.30

0.625

32.04

21.23

445.83

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

4.44

93.22

32.04

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

25.94

13.90

9.65

20.27

7.72

34.74

130.85

1,930.00

35.51

93.22

9.07

190.49

96.50

405.30

7.72

162.12

386.00

482.50

579.00

675.50

0.5

2,507.53
119.41

133.70

2,807.70

5,315.23

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

564
0

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

428

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

136

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

564

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

428

TUBERIA 5/8

PIE

$ 2.32

$ 992.96

136

TUBERIA 1/2

PIE

$ 1.66

$ 225.76

564

TUBERIA 3/8

PIE

$ 1.10

$ 620.40

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

428

ARMAFLEX 5/8

PIE

$ 0.23

$ 98.44

136

ARMAFLEX 1/2

PIE

$ 1.66

$ 225.76

ARMAFLEX 3/8

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

42.8

CODOS 5/8

$ 0.64

$ 27.39

13.6

CODOS 1/2

$ 0.72

$ 9.79

56.4

CODOS 3/8

$ 0.50

$ 28.20

CODOS 1/4
0
67.9655 VARILLA DE PLATA 5%
VALVULA SOLENOIDE 115V, 7/8
0

$ 0.00

$ 0.40

$ 0.00

$ 1.80

$ 122.34

$ 100.00

$ 0.00

70.5

REFRIGERANTE

LBS

$ 1.84

$ 129.72

564

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 265.08

112.8

SOPORTES

$ 5.00

$ 564.00

564

PROPANO

$ 0.40

$ 225.60

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

COSTO MATERIALTOTAL

$ 3,535.44

COSTO MATERIAL POR PIE

564

MANO DE OBRA

COSTO TOTAL

$ 6.27

PIE

$ 7.00

$ 3,948.00

$ 7,483.44

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

19,164.13

32.04

4,357.17

0.5

21.23

11,973.72

0.375

10.81

37.25

17.95

12.74

11.00

7.33

5.79

4.44

1,899.89

32.04

4,357.17

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

528.67

13.90

188.99

9.65

544.26

7.72
34.74
1,930.00
35.51

2,361.12
2,503.60

9.07

5,116.04

96.50

10,885.20

7.72

4,354.08

386.00

482.50

579.00

675.50

0.625

0.25

68,234.03
120.98

133.70

75,406.80

143,640.83

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

37

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

37

TUBERIA 5/8

PIE

$ 2.32

$ 85.84

$ 0.00

TUBERIA 1/2

PIE

$ 1.66

$ 0.00

37

TUBERIA 3/8

PIE

$ 1.10

$ 40.70

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

37

ARMAFLEX 5/8

PIE

$ 0.23

$ 8.51

ARMAFLEX 1/2

PIE

$ 1.66

$ 0.00

ARMAFLEX 3/8

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

3.7

CODOS 5/8

$ 0.64

$ 2.37

CODOS 1/2

$ 0.72

$ 0.00

3.7

CODOS 3/8

$ 0.50

$ 1.85

CODOS 1/4

$ 0.40

$ 0.00

VARILLA DE PLATA 5%

$ 1.80

$ 7.83

VALVULA SOLENOIDE 115V, 7/8

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 8.51

37

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 17.39

7.4

SOPORTES

$ 5.00

$ 37.00

37

PROPANO

$ 0.40

$ 14.80

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

4.3505
4.625

37
37

COSTO MATERIALTOTAL

$ 224.80

COSTO MATERIAL POR PIE

37

MANO DE OBRA

COSTO TOTAL

$ 6.08

PIE

$ 7.00

$ 259.00

$ 483.80

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

1,656.71

0.625

32.04

21.23

785.51

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

4.44

164.24

32.04

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

45.70

13.90

9.65

35.71

7.72

34.74

151.14

1,930.00

35.51

164.24

9.07

335.63

96.50

714.10

7.72

285.64

386.00

482.50

579.00

675.50

0.5

4,338.62
117.26

133.70

4,946.90

9,285.52

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

21

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

21

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

21

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

TUBERIA 5/8

PIE

$ 2.32

$ 0.00

21

TUBERIA 1/2

PIE

$ 1.66

$ 34.86

21

TUBERIA 3/8

PIE

$ 1.10

$ 23.10

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

ARMAFLEX 5/8

PIE

$ 0.23

$ 0.00

21

ARMAFLEX 1/2

PIE

$ 1.66

$ 34.86

ARMAFLEX 3/8

$ 0.00

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

CODOS 5/8

$ 0.64

$ 0.00

2.1

CODOS 1/2

$ 0.72

$ 1.51

2.1

CODOS 3/8

$ 0.50

$ 1.05

CODOS 1/4
0
3.670688 VARILLA DE PLATA 5%
VALVULA SOLENOIDE 115V, 7/8

$ 0.40

$ 0.00

$ 1.80

$ 6.61

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 4.83

21

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 9.87

4.2

SOPORTES

$ 5.00

$ 21.00

21

PROPANO

$ 0.40

$ 8.40

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

2.625

COSTO MATERIALTOTAL

$ 146.09

COSTO MATERIAL POR PIE

21

MANO DE OBRA

COSTO TOTAL

$ 6.96

PIE

$ 7.00

$ 147.00

$ 293.09

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

0.625

32.04

672.80

0.5

21.23

445.83

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

4.44

32.04

672.80

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

13.90

29.18

9.65

20.27

7.72

34.74

127.52

1,930.00

35.51

93.22

9.07

190.49

96.50

405.30

7.72

162.12

386.00

482.50

579.00

675.50

2,819.52
134.26

133.70

2,807.70

5,627.22

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

24

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

24

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

24

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

TUBERIA 5/8

PIE

$ 2.32

$ 0.00

24

TUBERIA 1/2

PIE

$ 1.66

$ 39.84

24

TUBERIA 3/8

PIE

$ 1.10

$ 26.40

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

ARMAFLEX 5/8

PIE

$ 0.23

$ 0.00

24

ARMAFLEX 1/2

PIE

$ 1.66

$ 39.84

ARMAFLEX 3/8

$ 0.00

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

CODOS 5/8

$ 0.64

$ 0.00

2.4

CODOS 1/2

$ 0.72

$ 1.73

2.4

CODOS 3/8

$ 0.50

$ 1.20

CODOS 1/4

3.7665

$ 0.40

$ 0.00

VARILLA DE PLATA 5%

$ 1.80

$ 6.78

VALVULA SOLENOIDE 115V, 7/8

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 5.52

24

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 11.28

4.8

SOPORTES

$ 5.00

$ 24.00

24

PROPANO

$ 0.40

$ 9.60

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

COSTO MATERIALTOTAL

$ 166.19

COSTO MATERIAL POR PIE

24

MANO DE OBRA

COSTO TOTAL

$ 6.92

PIE

$ 7.00

$ 168.00

$ 334.19

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

0.625

32.04

768.91

0.5

21.23

509.52

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

4.44

32.04

768.91

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

13.90

33.35

9.65

23.16

7.72

34.74

130.85

1,930.00

35.51

106.54

9.07

217.70

96.50

463.20

7.72

185.28

386.00

482.50

579.00

675.50

3,207.42
133.64

133.70

3,208.80

6,416.22

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

28

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

28

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

28

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

TUBERIA 5/8

PIE

$ 2.32

$ 0.00

28

TUBERIA 1/2

PIE

$ 1.66

$ 46.48

28

TUBERIA 3/8

PIE

$ 1.10

$ 30.80

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

ARMAFLEX 5/8

PIE

$ 0.23

$ 0.00

28

ARMAFLEX 1/2

PIE

$ 1.66

$ 46.48

ARMAFLEX 3/8

$ 0.00

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

CODOS 5/8

$ 0.64

$ 0.00

2.8

CODOS 1/2

$ 0.72

$ 2.02

2.8

CODOS 3/8

$ 0.50

$ 1.40

CODOS 1/4
0
3.89425 VARILLA DE PLATA 5%
VALVULA SOLENOIDE 115V, 7/8

$ 0.40

$ 0.00

$ 1.80

$ 7.01

$ 100.00

$ 0.00

3.5

REFRIGERANTE

LBS

$ 1.84

$ 6.44

28

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 13.16

5.6

SOPORTES

$ 5.00

$ 28.00

28

PROPANO

$ 0.40

$ 11.20

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

COSTO MATERIALTOTAL

$ 192.99

COSTO MATERIAL POR PIE

28

MANO DE OBRA

COSTO TOTAL

$ 6.89

PIE

$ 7.00

$ 196.00

$ 388.99

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

0.625

32.04

897.06

0.5

21.23

594.44

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

4.44

32.04

897.06

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

13.90

38.91

9.65

27.02

7.72

34.74

135.29

1,930.00

35.51

124.29

9.07

253.99

96.50

540.40

7.72

216.16

386.00

482.50

579.00

675.50

3,724.62
133.02

133.70

3,743.60

7,468.22

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

18

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

18

TUBERIA 5/8

PIE

$ 2.32

$ 41.76

$ 0.00

TUBERIA 1/2

PIE

$ 1.66

$ 0.00

18

TUBERIA 3/8

PIE

$ 1.10

$ 19.80

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

18

ARMAFLEX 5/8

PIE

$ 0.23

$ 4.14

ARMAFLEX 1/2

PIE

$ 1.66

$ 0.00

ARMAFLEX 3/8

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

1.8

CODOS 5/8

$ 0.64

$ 1.15

CODOS 1/2

$ 0.72

$ 0.00

1.8

CODOS 3/8

$ 0.50

$ 0.90

CODOS 1/4

$ 0.40

$ 0.00

VARILLA DE PLATA 5%

$ 1.80

$ 6.58

VALVULA SOLENOIDE 115V, 7/8

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 4.14

18

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 8.46

3.6

SOPORTES

$ 5.00

$ 18.00

18

PROPANO

$ 0.40

$ 7.20

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

3.657
2.25

18
18

COSTO MATERIALTOTAL

$ 112.13

COSTO MATERIAL POR PIE

18

MANO DE OBRA

COSTO TOTAL

$ 6.23

PIE

$ 7.00

$ 126.00

$ 238.13

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

805.97

0.625

32.04

21.23

382.14

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

4.44

79.90

32.04

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

22.23

13.90

9.65

17.37

7.72

34.74

127.04

1,930.00

35.51

79.90

9.07

163.28

96.50

347.40

7.72

138.96

386.00

482.50

579.00

675.50

0.5

2,164.20
120.23

133.70

2,406.60

4,570.80

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

22

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

22

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

22

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

TUBERIA 5/8

PIE

$ 2.32

$ 0.00

22

TUBERIA 1/2

PIE

$ 1.66

$ 36.52

22

TUBERIA 3/8

PIE

$ 1.10

$ 24.20

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

ARMAFLEX 5/8

PIE

$ 0.23

$ 0.00

22

ARMAFLEX 1/2

PIE

$ 1.66

$ 36.52

ARMAFLEX 3/8

$ 0.00

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

CODOS 5/8

$ 0.64

$ 0.00

2.2

CODOS 1/2

$ 0.72

$ 1.58

2.2

CODOS 3/8

$ 0.50

$ 1.10

CODOS 1/4
0
3.702625 VARILLA DE PLATA 5%
VALVULA SOLENOIDE 115V, 7/8

$ 0.40

$ 0.00

$ 1.80

$ 6.66

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 5.06

22

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 10.34

4.4

SOPORTES

$ 5.00

$ 22.00

22

PROPANO

$ 0.40

$ 8.80

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

2.75

COSTO MATERIALTOTAL

$ 152.79

COSTO MATERIAL POR PIE

22

MANO DE OBRA

COSTO TOTAL

$ 6.94

PIE

$ 7.00

$ 154.00

$ 306.79

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

0.625

32.04

704.84

0.5

21.23

467.06

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

4.44

32.04

704.84

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

13.90

30.57

9.65

21.23

7.72

34.74

128.63

1,930.00

35.51

97.66

9.07

199.56

96.50

424.60

7.72

169.84

386.00

482.50

579.00

675.50

2,948.82
134.04

133.70

2,941.40

5,890.22

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

20

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

20

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

20

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

TUBERIA 5/8

PIE

$ 2.32

$ 0.00

20

TUBERIA 1/2

PIE

$ 1.66

$ 33.20

20

TUBERIA 3/8

PIE

$ 1.10

$ 22.00

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

ARMAFLEX 5/8

PIE

$ 0.23

$ 0.00

20

ARMAFLEX 1/2

PIE

$ 1.66

$ 33.20

ARMAFLEX 3/8

$ 0.00

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

CODOS 5/8

$ 0.64

$ 0.00

CODOS 1/2

$ 0.72

$ 1.44

CODOS 3/8

$ 0.50

$ 1.00

CODOS 1/4
0
3.63875 VARILLA DE PLATA 5%
VALVULA SOLENOIDE 115V, 7/8

$ 0.40

$ 0.00

$ 1.80

$ 6.55

$ 100.00

$ 0.00
$ 4.60

2.5

REFRIGERANTE

LBS

$ 1.84

20

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 9.40

SOPORTES

$ 5.00

$ 20.00

20

PROPANO

$ 0.40

$ 8.00

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

COSTO MATERIALTOTAL

$ 139.39

COSTO MATERIAL POR PIE

20

MANO DE OBRA

COSTO TOTAL

$ 6.97

PIE

$ 7.00

$ 140.00

$ 279.39

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

0.625

32.04

640.76

0.5

21.23

424.60

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

4.44

32.04

640.76

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

13.90

27.79

9.65

19.30

7.72

34.74

126.41

1,930.00

35.51

88.78

9.07

181.42

96.50

386.00

7.72

154.40

386.00

482.50

579.00

675.50

2,690.22
134.51

133.70

2,674.00

5,364.22

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

40

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

40

TUBERIA 5/8

PIE

$ 2.32

$ 92.80

$ 0.00

TUBERIA 1/2

PIE

$ 1.66

$ 0.00

40

TUBERIA 3/8

PIE

$ 1.10

$ 44.00

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

40

ARMAFLEX 5/8

PIE

$ 0.23

$ 9.20

ARMAFLEX 1/2

PIE

$ 1.66

$ 0.00

ARMAFLEX 3/8

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

CODOS 5/8

$ 0.64

$ 2.56

CODOS 1/2

$ 0.72

$ 0.00

CODOS 3/8

$ 0.50

$ 2.00

CODOS 1/4

4.46

$ 0.40

$ 0.00

VARILLA DE PLATA 5%

$ 1.80

$ 8.03

VALVULA SOLENOIDE 115V, 7/8

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 9.20

40

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 18.80

SOPORTES

$ 5.00

$ 40.00

40

PROPANO

$ 0.40

$ 16.00

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

40
40

COSTO MATERIALTOTAL

$ 242.59

COSTO MATERIAL POR PIE

40

MANO DE OBRA

COSTO TOTAL

$ 6.06

PIE

$ 7.00

$ 280.00

$ 522.59

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

1,791.04

0.625

32.04

21.23

849.20

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

4.44

177.56

32.04

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

49.41

13.90

9.65

38.60

7.72

34.74

154.94

1,930.00

35.51

177.56

9.07

362.84

96.50

772.00

7.72

308.80

386.00

482.50

579.00

675.50

0.5

4,681.95
117.05

133.70

5,348.00

10,029.95

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

840
0

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

380

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

460

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

840

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

380

TUBERIA 5/8

PIE

$ 2.32

$ 881.60

460

TUBERIA 1/2

PIE

$ 1.66

$ 763.60

840

TUBERIA 3/8

PIE

$ 1.10

$ 924.00

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

380

ARMAFLEX 5/8

PIE

$ 0.23

$ 87.40

460

ARMAFLEX 1/2

PIE

$ 1.66

$ 763.60

ARMAFLEX 3/8

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

38

CODOS 5/8

$ 0.64

$ 24.32

46

CODOS 1/2

$ 0.72

$ 33.12

84

CODOS 3/8

$ 0.50

$ 42.00

CODOS 1/4
0
124.5613 VARILLA DE PLATA 5%
VALVULA SOLENOIDE 115V, 7/8
0

$ 0.00

$ 0.40

$ 0.00

$ 1.80

$ 224.21

$ 100.00

$ 0.00

105

REFRIGERANTE

LBS

$ 1.84

$ 193.20

840

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 394.80

168

SOPORTES

$ 5.00

$ 840.00

840

PROPANO

$ 0.40

$ 336.00

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

COSTO MATERIALTOTAL

$ 5,507.85

COSTO MATERIAL POR PIE

840

MANO DE OBRA

COSTO TOTAL

$ 6.56

PIE

$ 7.00

$ 5,880.00

$ 11,387.85

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

17,014.88

32.04

14,737.48

0.5

21.23

17,833.20

0.375

10.81

37.25

17.95

12.74

11.00

7.33

5.79

4.44

1,686.82

32.04

14,737.48

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

469.38

13.90

639.22

9.65

810.60

7.72
34.74
1,930.00
35.51

4,327.26
3,728.76

9.07

7,619.64

96.50

16,212.00

7.72

6,484.80

386.00

482.50

579.00

675.50

0.625

0.25

106,301.51
126.55

133.70

112,308.00

218,609.51

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

29

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

29

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

29

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

TUBERIA 5/8

PIE

$ 2.32

$ 0.00

29

TUBERIA 1/2

PIE

$ 1.66

$ 48.14

29

TUBERIA 3/8

PIE

$ 1.10

$ 31.90

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

ARMAFLEX 5/8

PIE

$ 0.23

$ 0.00

29

ARMAFLEX 1/2

PIE

$ 1.66

$ 48.14

ARMAFLEX 3/8

$ 0.00

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

CODOS 5/8

$ 0.64

$ 0.00

2.9

CODOS 1/2

$ 0.72

$ 2.09

2.9

CODOS 3/8

$ 0.50

$ 1.45

CODOS 1/4
0
3.926188 VARILLA DE PLATA 5%
VALVULA SOLENOIDE 115V, 7/8

$ 0.40

$ 0.00

$ 1.80

$ 7.07

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 6.67

29

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 13.63

5.8

SOPORTES

$ 5.00

$ 29.00

29

PROPANO

$ 0.40

$ 11.60

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

3.625

COSTO MATERIALTOTAL

$ 199.69

COSTO MATERIAL POR PIE

29

MANO DE OBRA

COSTO TOTAL

$ 6.89

PIE

$ 7.00

$ 203.00

$ 402.69

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

0.625

32.04

929.10

0.5

21.23

615.67

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

4.44

32.04

929.10

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

13.90

40.30

9.65

27.99

7.72

34.74

136.40

1,930.00

35.51

128.73

9.07

263.06

96.50

559.70

7.72

223.88

386.00

482.50

579.00

675.50

3,853.92
132.89

133.70

3,877.30

7,731.22

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

66

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

66

TUBERIA 5/8

PIE

$ 2.32

$ 153.12

$ 0.00

TUBERIA 1/2

PIE

$ 1.66

$ 0.00

66

TUBERIA 3/8

PIE

$ 1.10

$ 72.60

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

66

ARMAFLEX 5/8

PIE

$ 0.23

$ 15.18

ARMAFLEX 1/2

PIE

$ 1.66

$ 0.00

ARMAFLEX 3/8

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

6.6

CODOS 5/8

$ 0.64

$ 4.22

CODOS 1/2

$ 0.72

$ 0.00

6.6

CODOS 3/8

$ 0.50

$ 3.30

CODOS 1/4

5.409
8.25

$ 0.40

$ 0.00

VARILLA DE PLATA 5%

$ 1.80

$ 9.74

VALVULA SOLENOIDE 115V, 7/8

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 15.18

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 31.02

13.2

SOPORTES

$ 5.00

$ 66.00

66

PROPANO

$ 0.40

$ 26.40

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

66

66
66

COSTO MATERIALTOTAL

$ 396.76

COSTO MATERIAL POR PIE

66

MANO DE OBRA

COSTO TOTAL

$ 6.01

PIE

$ 7.00

$ 462.00

$ 858.76

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78
32.04
21.23

2,955.22
1,401.18

10.81

37.25

17.95

12.74

11.00

7.33

5.79

4.44

292.97

32.04

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

81.52

13.90

9.65

63.69

7.72

34.74

187.91

1,930.00
35.51

292.97

9.07

598.69

96.50

1,273.80

7.72

509.52

386.00

482.50

579.00

675.50

0.625
0.5
0.375
0.25

7,657.47
116.02

133.70

8,824.20

16,481.67

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

16

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

16

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

16

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

TUBERIA 5/8

PIE

$ 2.32

$ 0.00

16

TUBERIA 1/2

PIE

$ 1.66

$ 26.56

16

TUBERIA 3/8

PIE

$ 1.10

$ 17.60

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

ARMAFLEX 5/8

PIE

$ 0.23

$ 0.00

16

ARMAFLEX 1/2

PIE

$ 1.66

$ 26.56

ARMAFLEX 3/8

$ 0.00

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

CODOS 5/8

$ 0.64

$ 0.00

1.6

CODOS 1/2

$ 0.72

$ 1.15

1.6

CODOS 3/8

$ 0.50

$ 0.80

CODOS 1/4

3.511

$ 0.40

$ 0.00

VARILLA DE PLATA 5%

$ 1.80

$ 6.32

VALVULA SOLENOIDE 115V, 7/8

$ 100.00

$ 0.00
$ 3.68

REFRIGERANTE

LBS

$ 1.84

16

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 7.52

3.2

SOPORTES

$ 5.00

$ 16.00

16

PROPANO

$ 0.40

$ 6.40

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

COSTO MATERIALTOTAL

$ 112.59

COSTO MATERIAL POR PIE

16

MANO DE OBRA

COSTO TOTAL

$ 7.04

PIE

$ 7.00

$ 112.00

$ 224.59

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

0.625

32.04

512.61

0.5

21.23

339.68

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

4.44

32.04

512.61

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

13.90

22.23

9.65

15.44

7.72

34.74

121.97

1,930.00

35.51

71.02

9.07

145.14

96.50

308.80

7.72

123.52

386.00

482.50

579.00

675.50

2,173.02
135.81

133.70

2,139.20

4,312.22

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

16

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

16

TUBERIA 5/8

PIE

$ 2.32

$ 37.12

$ 0.00

TUBERIA 1/2

PIE

$ 1.66

$ 0.00

16

TUBERIA 3/8

PIE

$ 1.10

$ 17.60

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

16

ARMAFLEX 5/8

PIE

$ 0.23

$ 3.68

ARMAFLEX 1/2

PIE

$ 1.66

$ 0.00

ARMAFLEX 3/8

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

1.6

CODOS 5/8

$ 0.64

$ 1.02

CODOS 1/2

$ 0.72

$ 0.00

1.6

CODOS 3/8

$ 0.50

$ 0.80

CODOS 1/4

3.584

$ 0.40

$ 0.00

VARILLA DE PLATA 5%

$ 1.80

$ 6.45

VALVULA SOLENOIDE 115V, 7/8

$ 100.00

$ 0.00
$ 3.68

REFRIGERANTE

LBS

$ 1.84

16

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 7.52

3.2

SOPORTES

$ 5.00

$ 16.00

16

PROPANO

$ 0.40

$ 6.40

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

16
16

COSTO MATERIALTOTAL

$ 100.28

COSTO MATERIAL POR PIE

16

MANO DE OBRA

COSTO TOTAL

$ 6.27

PIE

$ 7.00

$ 112.00

$ 212.28

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

716.42

0.625

32.04

21.23

339.68

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

4.44

71.02

32.04

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

19.76

13.90

9.65

15.44

7.72

34.74

124.51

1,930.00

35.51

71.02

9.07

145.14

96.50

308.80

7.72

123.52

386.00

482.50

579.00

675.50

0.5

1,935.31
120.96

133.70

2,139.20

4,074.51

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

66

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

66

TUBERIA 5/8

PIE

$ 2.32

$ 153.12

$ 0.00

TUBERIA 1/2

PIE

$ 1.66

$ 0.00

66

TUBERIA 3/8

PIE

$ 1.10

$ 72.60

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

66

ARMAFLEX 5/8

PIE

$ 0.23

$ 15.18

ARMAFLEX 1/2

PIE

$ 1.66

$ 0.00

ARMAFLEX 3/8

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

6.6

CODOS 5/8

$ 0.64

$ 4.22

CODOS 1/2

$ 0.72

$ 0.00

6.6

CODOS 3/8

$ 0.50

$ 3.30

CODOS 1/4

5.409
8.25

$ 0.40

$ 0.00

VARILLA DE PLATA 5%

$ 1.80

$ 9.74

VALVULA SOLENOIDE 115V, 7/8

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 15.18

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 31.02

13.2

SOPORTES

$ 5.00

$ 66.00

66

PROPANO

$ 0.40

$ 26.40

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

66

66
66

COSTO MATERIALTOTAL

$ 396.76

COSTO MATERIAL POR PIE

66

MANO DE OBRA

COSTO TOTAL

$ 6.01

PIE

$ 7.00

$ 462.00

$ 858.76

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78
32.04
21.23

2,955.22
1,401.18

10.81

37.25

17.95

12.74

11.00

7.33

5.79

4.44

292.97

32.04

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

81.52

13.90

9.65

63.69

7.72

34.74

187.91

1,930.00
35.51

292.97

9.07

598.69

96.50

1,273.80

7.72

509.52

386.00

482.50

579.00

675.50

0.625
0.5
0.375
0.25

7,657.47
116.02

133.70

8,824.20

16,481.67

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

29

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

29

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

29

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

TUBERIA 5/8

PIE

$ 2.32

$ 0.00

29

TUBERIA 1/2

PIE

$ 1.66

$ 48.14

29

TUBERIA 3/8

PIE

$ 1.10

$ 31.90

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

ARMAFLEX 5/8

PIE

$ 0.23

$ 0.00

29

ARMAFLEX 1/2

PIE

$ 1.66

$ 48.14

ARMAFLEX 3/8

$ 0.00

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

CODOS 5/8

$ 0.64

$ 0.00

2.9

CODOS 1/2

$ 0.72

$ 2.09

2.9

CODOS 3/8

$ 0.50

$ 1.45

CODOS 1/4
0
3.926188 VARILLA DE PLATA 5%
VALVULA SOLENOIDE 115V, 7/8

$ 0.40

$ 0.00

$ 1.80

$ 7.07

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 6.67

29

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 13.63

5.8

SOPORTES

$ 5.00

$ 29.00

29

PROPANO

$ 0.40

$ 11.60

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

3.625

COSTO MATERIALTOTAL

$ 199.69

COSTO MATERIAL POR PIE

29

MANO DE OBRA

COSTO TOTAL

$ 6.89

PIE

$ 7.00

$ 203.00

$ 402.69

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

0.625

32.04

929.10

0.5

21.23

615.67

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

4.44

32.04

929.10

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

13.90

40.30

9.65

27.99

7.72

34.74

136.40

1,930.00

35.51

128.73

9.07

263.06

96.50

559.70

7.72

223.88

386.00

482.50

579.00

675.50

3,853.92
132.89

133.70

3,877.30

7,731.22

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

888
0

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

592

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

296

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

888

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

592

TUBERIA 5/8

PIE

$ 2.32

$ 1,373.44

296

TUBERIA 1/2

PIE

$ 1.66

$ 491.36

888

TUBERIA 3/8

PIE

$ 1.10

$ 976.80

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

592

ARMAFLEX 5/8

PIE

$ 0.23

$ 136.16

296

ARMAFLEX 1/2

PIE

$ 1.66

$ 491.36

ARMAFLEX 3/8

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

59.2

CODOS 5/8

$ 0.64

$ 37.89

29.6

CODOS 1/2

$ 0.72

$ 21.31

88.8

CODOS 3/8

$ 0.50

$ 44.40

CODOS 1/4
0
103.0615 VARILLA DE PLATA 5%
VALVULA SOLENOIDE 115V, 7/8
0

$ 0.00

$ 0.40

$ 0.00

$ 1.80

$ 185.51

$ 100.00

$ 0.00

111

REFRIGERANTE

LBS

$ 1.84

$ 204.24

888

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 417.36

177.6

SOPORTES

$ 5.00

$ 888.00

888

PROPANO

$ 0.40

$ 355.20

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

COSTO MATERIALTOTAL

$ 5,623.03

COSTO MATERIAL POR PIE

888

MANO DE OBRA

COSTO TOTAL

$ 6.33

PIE

$ 7.00

$ 6,216.00

$ 11,839.03

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

26,507.39

32.04

9,483.25

0.5

21.23

18,852.24

0.375

10.81

37.25

17.95

12.74

11.00

7.33

5.79

4.44

2,627.89

32.04

9,483.25

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

731.24

13.90

411.32

9.65

856.92

7.72
34.74
1,930.00
35.51

3,580.36
3,941.83

9.07

8,055.05

96.50

17,138.40

7.72

6,855.36

386.00

482.50

579.00

675.50

0.625

0.25

108,524.49
122.21

133.70

118,725.60

227,250.09

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

49

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

49

TUBERIA 5/8

PIE

$ 2.32

$ 113.68

$ 0.00

TUBERIA 1/2

PIE

$ 1.66

$ 0.00

49

TUBERIA 3/8

PIE

$ 1.10

$ 53.90

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

49

ARMAFLEX 5/8

PIE

$ 0.23

$ 11.27

ARMAFLEX 1/2

PIE

$ 1.66

$ 0.00

ARMAFLEX 3/8

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

4.9

CODOS 5/8

$ 0.64

$ 3.14

CODOS 1/2

$ 0.72

$ 0.00

4.9

CODOS 3/8

$ 0.50

$ 2.45

CODOS 1/4

4.7885
6.125

$ 0.40

$ 0.00

VARILLA DE PLATA 5%

$ 1.80

$ 8.62

VALVULA SOLENOIDE 115V, 7/8

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 11.27

49

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 23.03

9.8

SOPORTES

$ 5.00

$ 49.00

49

PROPANO

$ 0.40

$ 19.60

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

49
49

COSTO MATERIALTOTAL

$ 295.96

COSTO MATERIAL POR PIE

49

MANO DE OBRA

COSTO TOTAL

$ 6.04

PIE

$ 7.00

$ 343.00

$ 638.96

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78
32.04
21.23

2,194.02
1,040.27

10.81

37.25

17.95

12.74

11.00

7.33

5.79

4.44

217.51

32.04

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

60.52

13.90

9.65

47.29

7.72

34.74

166.35

1,930.00

35.51

217.51

9.07

444.48

96.50

945.70

7.72

378.28

386.00

482.50

579.00

675.50

0.625
0.5
0.375
0.25

5,711.94
116.57

133.70

6,551.30

12,263.24

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

18

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

18

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

18

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

TUBERIA 5/8

PIE

$ 2.32

$ 0.00

18

TUBERIA 1/2

PIE

$ 1.66

$ 29.88

18

TUBERIA 3/8

PIE

$ 1.10

$ 19.80

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

ARMAFLEX 5/8

PIE

$ 0.23

$ 0.00

18

ARMAFLEX 1/2

PIE

$ 1.66

$ 29.88

ARMAFLEX 3/8

$ 0.00

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

CODOS 5/8

$ 0.64

$ 0.00

1.8

CODOS 1/2

$ 0.72

$ 1.30

1.8

CODOS 3/8

$ 0.50

$ 0.90

CODOS 1/4
0
3.574875 VARILLA DE PLATA 5%
VALVULA SOLENOIDE 115V, 7/8

$ 0.40

$ 0.00

$ 1.80

$ 6.43

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 4.14

18

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 8.46

3.6

SOPORTES

$ 5.00

$ 18.00

18

PROPANO

$ 0.40

$ 7.20

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

2.25

COSTO MATERIALTOTAL

$ 125.99

COSTO MATERIAL POR PIE

18

MANO DE OBRA

COSTO TOTAL

$ 7.00

PIE

$ 7.00

$ 126.00

$ 251.99

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

0.625

32.04

576.68

0.5

21.23

382.14

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

4.44

32.04

576.68

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

13.90

25.01

9.65

17.37

7.72

34.74

124.19

1,930.00

35.51

79.90

9.07

163.28

96.50

347.40

7.72

138.96

386.00

482.50

579.00

675.50

2,431.62
135.09

133.70

2,406.60

4,838.22

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

18

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

18

TUBERIA 5/8

PIE

$ 2.32

$ 41.76

$ 0.00

TUBERIA 1/2

PIE

$ 1.66

$ 0.00

18

TUBERIA 3/8

PIE

$ 1.10

$ 19.80

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

18

ARMAFLEX 5/8

PIE

$ 0.23

$ 4.14

ARMAFLEX 1/2

PIE

$ 1.66

$ 0.00

ARMAFLEX 3/8

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

1.8

CODOS 5/8

$ 0.64

$ 1.15

CODOS 1/2

$ 0.72

$ 0.00

1.8

CODOS 3/8

$ 0.50

$ 0.90

CODOS 1/4

$ 0.40

$ 0.00

VARILLA DE PLATA 5%

$ 1.80

$ 6.58

VALVULA SOLENOIDE 115V, 7/8

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 4.14

18

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 8.46

3.6

SOPORTES

$ 5.00

$ 18.00

18

PROPANO

$ 0.40

$ 7.20

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

3.657
2.25

18
18

COSTO MATERIALTOTAL

$ 112.13

COSTO MATERIAL POR PIE

18

MANO DE OBRA

COSTO TOTAL

$ 6.23

PIE

$ 7.00

$ 126.00

$ 238.13

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

805.97

0.625

32.04

21.23

382.14

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

4.44

79.90

32.04

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

22.23

13.90

9.65

17.37

7.72

34.74

127.04

1,930.00

35.51

79.90

9.07

163.28

96.50

347.40

7.72

138.96

386.00

482.50

579.00

675.50

0.5

2,164.20
120.23

133.70

2,406.60

4,570.80

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

18

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

18

TUBERIA 7/8

PIE

$ 3.64

$ 65.52

TUBERIA 5/8

PIE

$ 2.32

$ 0.00

TUBERIA 1/2

PIE

$ 1.66

$ 0.00

18

TUBERIA 3/8

PIE

$ 1.10

$ 19.80

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

18

ARMAFLEX 7/8

PIE

$ 0.30

$ 5.40

ARMAFLEX 5/8

PIE

$ 0.23

$ 0.00

ARMAFLEX 1/2

PIE

$ 1.66

$ 0.00

ARMAFLEX 3/8

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

1.8

CODOS 7/8

$ 1.60

$ 2.88

CODOS 5/8

$ 0.64

$ 0.00

CODOS 1/2

$ 0.72

$ 0.00

1.8

CODOS 3/8

$ 0.50

$ 0.90

CODOS 1/4
0
3.82125 VARILLA DE PLATA 5%
VALVULA SOLENOIDE 115V, 7/8

$ 0.00

$ 0.40

$ 0.00

$ 1.80

$ 6.88

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 4.14

18

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 8.46

3.6

SOPORTES

$ 5.00

$ 18.00

18

PROPANO

$ 0.40

$ 7.20

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

2.25

18

18

COSTO MATERIALTOTAL

$ 139.18

COSTO MATERIAL POR PIE

18

MANO DE OBRA

COSTO TOTAL

$ 7.73

PIE

$ 7.00

$ 126.00

$ 265.18

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

1,264.54

0.875

44.78

32.04

21.23

382.14

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

104.22

4.44

32.04

32.04

231.41

128.54

89.36

68.13

46.32

30.88

55.58

12.35

13.90

9.65

17.37

7.72

34.74

132.75

1,930.00

35.51

79.90

9.07

163.28

96.50

347.40

7.72

138.96

386.00

482.50

579.00

675.50

0.625
0.5

2,686.14
149.23

133.70

2,406.60

5,092.74

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

18

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

18

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

18

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

18

TUBERIA 5/8

PIE

$ 2.32

$ 41.76

18

TUBERIA 1/2

PIE

$ 1.66

$ 29.88

TUBERIA 3/8

PIE

$ 1.10

$ 0.00

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

18

ARMAFLEX 5/8

PIE

$ 0.23

$ 4.14

18

ARMAFLEX 1/2

PIE

$ 1.66

$ 29.88

ARMAFLEX 3/8

$ 0.00

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

1.8

CODOS 5/8

$ 0.64

$ 1.15

1.8

CODOS 1/2

$ 0.72

$ 1.30

CODOS 3/8

$ 0.50

$ 0.00

CODOS 1/4
0
3.739125 VARILLA DE PLATA 5%
VALVULA SOLENOIDE 115V, 7/8

$ 0.40

$ 0.00

$ 1.80

$ 6.73

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 4.14

18

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 8.46

3.6

SOPORTES

$ 5.00

$ 18.00

18

PROPANO

$ 0.40

$ 7.20

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

2.25

COSTO MATERIALTOTAL

$ 152.64

COSTO MATERIAL POR PIE

18

MANO DE OBRA

COSTO TOTAL

$ 8.48

PIE

$ 7.00

$ 126.00

$ 278.64

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

805.97

0.625

32.04

576.68

21.23

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

4.44

79.90

32.04

576.68

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

22.23

13.90

25.01

9.65

7.72

34.74

129.90

1,930.00

35.51

79.90

9.07

163.28

96.50

347.40

7.72

138.96

386.00

482.50

579.00

675.50

0.5

2,945.92
163.66

133.70

2,406.60

5,352.52

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

42

UNIDAD
TUBERIA 7/8

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

42

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

42

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

TUBERIA 7/8

PIE

$ 3.64

$ 0.00

42

TUBERIA 5/8

PIE

$ 2.32

$ 97.44

42

TUBERIA 1/2

PIE

$ 1.66

$ 69.72

TUBERIA 3/8

PIE

$ 1.10

$ 0.00

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

ARMAFLEX 7/8

PIE

$ 0.30

$ 0.00

42

ARMAFLEX 5/8

PIE

$ 0.23

$ 9.66

42

ARMAFLEX 1/2

PIE

$ 1.66

$ 69.72

ARMAFLEX 3/8

$ 0.00

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

CODOS 7/8

$ 1.60

$ 0.00

4.2

CODOS 5/8

$ 0.64

$ 2.69

4.2

CODOS 1/2

$ 0.72

$ 3.02

CODOS 3/8

$ 0.50

$ 0.00

CODOS 1/4
0
4.724625 VARILLA DE PLATA 5%
VALVULA SOLENOIDE 115V, 7/8

$ 0.40

$ 0.00

$ 1.80

$ 8.50

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 9.66

42

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 19.74

8.4

SOPORTES

$ 5.00

$ 42.00

42

PROPANO

$ 0.40

$ 16.80

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

5.25

COSTO MATERIALTOTAL

$ 348.96

COSTO MATERIAL POR PIE

42

MANO DE OBRA

COSTO TOTAL

$ 8.31

PIE

$ 7.00

$ 294.00

$ 642.96

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

0.875

44.78

1,880.59

32.04

1,345.60

0.625
0.5

21.23

0.375

10.81

0.25

37.25

17.95

12.74

11.00

7.33

5.79

4.44

186.44

32.04

1,345.60

32.04

231.41

128.54

89.36

68.13

46.32

30.88

12.35

51.88

13.90

58.36

9.65

7.72

34.74

164.13

1,930.00

35.51

186.44

9.07

380.98

96.50

810.60

7.72

324.24

386.00

482.50

579.00

675.50

6,734.86
160.35

133.70

5,615.40

12,350.26

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

326
0

UNIDAD
TUBERIA 7/8

36

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

254

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

156

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

206

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

36

TUBERIA 7/8

PIE

$ 3.64

$ 131.04

254

TUBERIA 5/8

PIE

$ 2.32

$ 589.28

156

TUBERIA 1/2

PIE

$ 1.66

$ 258.96

206

TUBERIA 3/8

PIE

$ 1.10

$ 226.60

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

36

ARMAFLEX 7/8

PIE

$ 0.30

$ 10.80

254

ARMAFLEX 5/8

PIE

$ 0.23

$ 58.42

156

ARMAFLEX 1/2

PIE

$ 1.66

$ 258.96

ARMAFLEX 3/8

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

3.6

CODOS 7/8

$ 1.60

$ 5.76

25.4

CODOS 5/8

$ 0.64

$ 16.26

15.6

CODOS 1/2

$ 0.72

$ 11.23

20.6

CODOS 3/8

$ 0.50

$ 10.30

CODOS 1/4
0
48.61075 VARILLA DE PLATA 5%
VALVULA SOLENOIDE 115V, 7/8
0
40.75

$ 0.00

$ 0.40

$ 0.00

$ 1.80

$ 87.50

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 74.98

326

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 153.22

65.2

SOPORTES

$ 5.00

$ 326.00

326

PROPANO

$ 0.40

$ 130.40

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

COSTO MATERIALTOTAL

$ 2,349.71

COSTO MATERIAL POR PIE

326

MANO DE OBRA

COSTO TOTAL

$ 7.21

PIE

$ 7.00

$ 2,282.00

$ 4,631.71

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

2,529.07

0.875

44.78

11,373.10

0.625

32.04

4,997.93

0.5

21.23

4,373.38

0.375

10.81

37.25

17.95

12.74

11.00

7.33

5.79

208.44

4.44

1,127.51

32.04

4,997.93

32.04

231.41

128.54

89.36

68.13

46.32

30.88

111.17

12.35

313.74

13.90

216.78

9.65

198.79

7.72
34.74
1,930.00

1,688.74
-

35.51

1,447.11

9.07

2,957.15

96.50

6,291.80

7.72

2,516.72

386.00

482.50

579.00

675.50

0.25

45,349.35
139.11

133.70

43,586.20

88,935.55

AYRE S.A.
PRESUPUESTO DE TUBERIA DE COBRE

DISTANCIA
TUBERIA 2-5/8

2618
0

UNIDAD
TUBERIA 7/8

36

PROY:

TUBERIA 2-1/8

TUBERIA 5/8

1654

FECHA:

TUBERIA 1-5/8

TUBERIA 1/2

1048

UNIDAD:

TUBERIA 1-3/8

TUBERIA 3/8

2498

TUBERIA 1-1/8

TUBERIA 1/4

CANT

DESCRIPCION

UNIDAD

COSTO PIE $

COSTO TOT $

TUBERIA 2-5/8

PIE

$ 18.33

$ 0.00

TUBERIA 2-1/8

PIE

$ 0.00

TUBERIA 1-5/8

PIE

$ 11.66
$ 8.01

TUBERIA 1-3/8

PIE

$ 6.83

$ 0.00

TUBERIA 1-1/8

PIE

$ 6.00

$ 0.00

36

TUBERIA 7/8

PIE

$ 3.64

$ 131.04

1654

TUBERIA 5/8

PIE

$ 2.32

$ 3,837.28

1048

TUBERIA 1/2

PIE

$ 1.66

$ 1,739.68

2498

TUBERIA 3/8

PIE

$ 1.10

$ 2,747.80

TUBERIA 1/4

PIE

$ 0.56

$ 0.00

ARMAFLEX 2-5/8

PIE

$ 1.93

$ 0.00

ARMAFLEX 2-1/8

PIE

$ 0.93

$ 0.00

ARMAFLEX 1-5/8

PIE

$ 0.66

$ 0.00

ARMAFLEX 1-3/8

PIE

$ 0.57

$ 0.00

ARMAFLEX 1-1/8

PIE

$ 0.38

$ 0.00

36

ARMAFLEX 7/8

PIE

$ 0.30

$ 10.80

1654

ARMAFLEX 5/8

PIE

$ 0.23

$ 380.42

1048

ARMAFLEX 1/2

PIE

$ 1.66

$ 1,739.68

ARMAFLEX 3/8

PIE

$ 1.66

$ 0.00

CODO 2-5/8

$ 11.99

$ 0.00

CODO 2-1/8

$ 6.66

$ 0.00

CODO 1-5/8

$ 4.63

$ 0.00

CODO 1-3/8

$ 3.53

$ 0.00

CODO 1-1/8

$ 2.40

$ 0.00

3.6

CODOS 7/8

$ 1.60

$ 5.76

165.4

CODOS 5/8

$ 0.64

$ 105.86

104.8

CODOS 1/2

$ 0.72

$ 75.46

249.8

CODOS 3/8

$ 0.50

$ 124.90

CODOS 1/4
0
344.199 VARILLA DE PLATA 5%
VALVULA SOLENOIDE 115V, 7/8
0
327.25

$ 0.00

$ 0.40

$ 0.00

$ 1.80

$ 619.56

$ 100.00

$ 0.00

REFRIGERANTE

LBS

$ 1.84

$ 602.14

2618

CABLE PARA TERMOSTATO

PIE

$ 0.47

$ 1,230.46

523.6

SOPORTES

$ 5.00

$ 2,618.00

2618

PROPANO

$ 0.40

$ 1,047.20

FILTRO SECADOR 5 TONS 3/8

$ 20.00

$ 0.00

FILTRO SECADOR 10 TONS 7/8

$ 25.00

$ 0.00

FILTRO SECADOR 15 TONS 7/8

$ 30.00

$ 0.00

FILTRO SECADOR 20 TONS 1-1/8

$ 35.00

$ 0.00

COSTO MATERIALTOTAL

$ 17,016.03

COSTO MATERIAL POR PIE

2618

MANO DE OBRA

COSTO TOTAL

$ 6.50

PIE

$ 7.00

$ 18,326.00

$ 35,342.03

COSTO PIE LPS COSTO TOT LPS


353.77

2.625

225.04

2.125

154.59

1.625

131.82

1.375

115.80

1.125

70.25

2,529.07

0.875

44.78

74,059.50

0.625

32.04

33,575.82

0.5

21.23

53,032.54

0.375

10.81

37.25

17.95

12.74

11.00

7.33

5.79

208.44

4.44

7,342.11

32.04

33,575.82

32.04

231.41

128.54

89.36

68.13

46.32

30.88

111.17

12.35

2,043.02

13.90

1,456.30

9.65

2,410.57

7.72
34.74
1,930.00

11,957.47
-

35.51

11,621.30

9.07

23,747.88

96.50

50,527.40

7.72

20,210.96

386.00

482.50

579.00

675.50

0.25

328,409.38
125.44

133.70

350,026.60

678,435.98