FLETE TERRESTRE

1. FLETE TERRESTRE A. POR PESO 1


DESCRIPCION UND CANTIDAD KG PARCIAL KG TOTAL

CEMENTO PORTLAND TIPO I (42.5KG) MADERA EN SU TOTALIDAD

BOL P2 KG KG KG GLB

117.00 718.00 536.00 116.54 100.00 1.00 TOTAL

42.50 0.56 1.00 1.00 1.00 1.00 KG

4972.50 402.08 536.00 116.54 100.00 500.00 6627.12 COSTO POR KG FLETE S/. 0.209 1381.75

ACERO
ALAMBRE Y CLAVO Y PERNO OTROS FLETE LOCAL

1. FLETE TERRESTRE B. POR VOLUMEN


DESCRIPCION UND CANTIDAD VOL. UNITARIO VOL. CARROCERIA N VIAJES

ALCANTARILLA TMC PINTURA- PEGAMENTO, ACCESORIOS- OTROS FLET LOCAL

M UND GLB

26.00 15.00 50.00

0.40 0.30 0.30

24.00 24.00 24.00

0.43 0.19 0.63

TOTAL

VIAJES

KG

1.25 COSTO POR VJE FLETE S/. 700.000 872.08

MONTO TOTAL DE FLETE

2253.84