PRESENTATION OUTLINE
1. INTRODUCTION 2. REHABILITATION OF EXISTING POWER STATIONS 3. BUILDING NEW POWER PLANTS 4. DEMAND SIDE MANAGEMENT 5. SOLAR GEYSER PROJECT-CASE STUDY 2 6. OTHER SOLAR ENERGY INITIATIVES UNDER CONSIDERATION 7. CONCLUSION
1. INTRODUCTION
HYDRO ENERGY SOLAR ENERGY WIND ENERGY GEOTHERMAL AND BIOMASS ENERGIES ETC
SOLAR ENERGY MOST ABUNDANT OF ALL ENERGY SOURCES SOLAR ENERGY TECHNOLOGIES CAN BE USED FOR
HEATING COOLING AGRICULTURE APPLICATIONS ELECTRICITY AND NATURAL LIGHTING
1. INTRODUCTION
SOUTHERN AFRICA SOLAR ENERGY POTENTIAL ESTIMATED AT BETWEEN 25,000 - 30,000 TWh/YEAR (Tera Watt Hour/Year)
GLOBAL SOLAR IRRADIATION IDENTIFIED IN NORTHERN ZAMBIA OF 2300 KWH/M2/YEAR
SOLAR ENERGY HAS NOT BEEN UTILISED FULLY ZAMBIAS ELECTRICAL ENERGY LARGELY BASED ON HYDRO ENERGY
99% HYDRO ENERGY 1% THERMAL ENERGY (NON-RENEWABLE)
AS EARLY AS 2000 ZAMBIA AND THE REGION FORECASTED A POWER DEFICIT TO OCCUR BY 2011 HOWEVER THE DEFICIT OCCURRED EARLIER DUE TO THE UNPRECEDENTED ECONOMIC GROWTH IN ZAMBIA AS WELL AS THE REGION (ZAMBIA 7.1%, REGION 5.2% IN 2010) ZESCO HOWEVER HAD FORESEEN THIS CHALLENGE AND HAD FORMULATED A BUSINESS PLAN THAT INCLUDED
REHABILITATION OF EXISTING POWER STATIONS BUILDING OF NEW POWER PLANTS DEMAND SIDE MANAGEMENT TO INCLUDE RENEWABLE ENERGY
1. INTRODUCTION
1. INTRODUCTION
IN S T A L L E D C A P A C IT Y v s A N N U A L M A X IM U M D E M A N D
6 0 ,0 0 0 5 0 ,0 0 0 4 0 ,0 0 0 3 0 ,0 0 0 2 0 ,0 0 0 1 0 ,0 0 0 0 IN S T A L L E D C A P A C IT Y MW
MW
1998
2000
2002
2004
2006
2008
2010
2012
Available Capacity
YEAR
SAPP PROJECTED ENERGY DEFICIT BY 2007
3 4
1 2 3 4 5 6 7 8
KNBE (Zesco) ITT(Zesco/TATA) Kalungwishi(IPP) Maamba Coal Fired Station (IPP) (NAVA BHARAT) EMCO COAL FIRED KGLHEPS(IPP) Lusiwasi (Zesco) Lunzua (Zesco)
MW
1000 1100 1200 1300 1400 1500 1600 1700
TIME OF DAY
0:01:00 0:38:00 1:15:00 1:52:00 2:29:00 3:06:00 3:43:00 4:20:00 4:57:00 5:34:00 6:11:00 6:48:00 7:25:00 8:02:00 8:39:00 9:16:00 9:53:00 10:30:00 11:07:00 11:44:00 12:21:00 12:58:00 13:35:00 14:12:00 14:49:00 15:26:00 16:03:00 16:40:00 17:17:00 17:54:00 18:31:00 19:08:00 19:45:00 20:22:00 20:59:00 21:36:00 22:13:00 22:50:00 23:27:00
7. CONCLUSION
SOLAR GEYSERS & CFLS TO RESULT IN SAVINGS OF ABOUT 300MW IN THE INITIAL PHASE THIS IS ALMOST 3 TIMES INSTALLED CAPACITY AT VICTORIA FALLS POWER STATION OF 108MW TO CONSTRUCT A 300MW HYDRO POWER PLANT WOULD COST USD 600 MILLION AND WOULD TAKE 4 TO 5 YEARS TO COMPLETE
7. CONCLUSION
THE INITIAL POWER SAVING OF 300MW WILL MITIGATE LOAD SHEDDING (POWER DEFICIT) & ALLOW MORE CUSTOMERS TO BE CONNECTED THE ELECTRICITY CONSUMPTION PROFILE WILL BECOME MUCH SMOOTHER, RESULTING IN MORE EFFICIENT USE OF GENERATION AND TRANSMISSION INFRASTRUCTURE
7. CONCLUSION
THE SOLAR GEYSER PROJECT IS PART OF STRATEGIC BUSINESS PLAN TO COMPLIMENT THE BUILDING OF NEW POWER PLANTS AND GROWING THE CUSTOMER BASE. THE PROJECT IS COMMERCIALLY VIABLE AND HAS SIGNIFICANT BENEFITS TO CUSTOMERS. THE SAVED CLEAN ENERGY WILL GO A LONG WAY IN ENHANCING ECONOMIC DEVELOPMENT AND ENVIRONMENTAL PROTECTION.