OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.

Page 1 of 2

63-INQ13-XXX-DC-01

BQ1018 I BILL OF QUANTITY LOCATION (PIPEBRIDGE JACK-UP PROPOSAL ON FOUNDATION) Foundation INSIDE TANK FARM

1) PUMP FOUNDATION GEOMETRY LENGTH OF FOUNDATION WIDTH OF FOUNDATION FOUNDATION THICKNESS HEIGHT ABOVE GROUND HEIGHT UNDER GROUND PROPOSED PILE SIZE NOS. OF PILES REQUIRED ESTIMATED PENETRATION LENGTH 2) CONCRETE PUMP F'DN CONC. VOLUME REQ'D LEAN CONC. REQUIRED 3) REINFORCEMENT i) REBAR LENGTH QTY. REBAR SIZE REBAR SPACING UNIT WEIGHT OF REBAR WEIGHT OF REBAR ii) REBAR LENGTH QTY. REBAR SIZE REBAR SPACING UNIT WEIGHT OF REBAR WEIGHT OF REBAR TOTAL REBAR WEIGHT 4) EXCAVATION WORK & FORMWORK ESTIMATED EXCAVATION DEPTH ESTIMATED EXCAVATION VOLUME FORMWORK AREA REQ'D = = = 1.05 m 3 16.80 m 2 13.20 m = = = T 30 = = = = = = T 30 = = = = 5.20 m 40 nos. Bar 150 mm 5.549 kg/m 1.15 Tons. 5.20 m 40.00 nos. Bar 150 mm 5.549 kg/m 1.15 Tons. 2.31 Tons. (LONGITUDINAL) (MAIN) = =
3 9.90 m 3 0.45 m

= = = = = = = =

3.00 m 3.00 m 1.10 m 0.10 m

Pile

1.00 m 350 mm dia. Micro Pile 2.00 nos. 27.5 m GRADE- C 35

fy =

2 460 N/mm

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 2 of 2

63-INQ13-XXX-DC-01

BQ1018 II BQ SUMMARY (PIPEBRIDGE JACK-UP PROPOSAL ON FOUNDATION)

SUPERSTRUCTURE TOTAL STEEL WEIGHT REQUIRED

1 tons.

SUBSTRUCTURE TOTAL NOS. OF FOUNDATION = 4 TOTAL NOS. OF PILES REQUIRED = 8 PROPOSED PILE SIZE = 350 ESTIMATED PENETRATION LENGTH = 27.5 TOTAL CONC. VOLUME REQUIRED = 39.60 LEAN CONC. REQUIRED = 1.80 TOTAL REBAR WEIGHT = 9.23 TOTAL NOS. OF REBAR DRILLING POINT WITH HILTI CHEMICAL TO EXT'G FOOTING = 160 LENGTH OF DRILLING TO EXT'G FOOTING = 150 DIA. OF DRILLING HOLE TO EXT'G FOOTING = 25 TOTAL EXCAVATION VOLUME = 67.20 TOTAL FORMWORK REQ'D = 52.80

nos. nos. mm dia. Micro Pile m m3 m3 Tons. nos. mm mm m3 m2

GOVEMENT SUBMISSION COST TO BE SEPERATELY CONSIDERED.