A-Z ENGINEERING & MANAGEMENT SERVICES

PROJECT : SAADIYAT ST. REGIS BEACH RESORT

SITE NO.: HMR - 831 SHEET No. Related I.R. ref.

CHECK SHEET FOR FLOOR SCREED AND CONCRETE TOPPINGS

SECTION OF WORK

LOCATION
CHECKED BY CHECKED BY CHECKED BY SUBCONTRACTOR / CONSULTANT / HMR / DATE DATE DATE

STAGE

ITEM

Check Bulit in items complete e.g. Services 1. trunking 2. Check waterproofing is done if required. Checke surface preparation eg. Scabbling, removal of loose material, dirt, oil or grease etc.

MEP BK FULF

MEP COORD.

SE/PE

SE/PE

SE/PE

SE/PE

3. PREPARATION

SE/PE 4. Check reinfiorcing mesh if required SUE/PE 5. Establish datums for finish level of screed QCE APPROVAL TO PROCEED SE/PE 1. Check correct mix proportion

SE/PE

SUE/PE

QCE

SE/PE

APPLICATION Check surface finish and level are acceptable and 2. within the tolerance.

SE/PE

SE/PE

SUE-SURVEY ENGINEER, SE-SITE ENGINEER, PE-PROJECT ENGINEER, MEP COORD.-MEP COORDINATOR, QCE-QUALITY CONTROL ENGINEER `

Doc. No.: HMR-831-C-QAC-009-F05

Rev. 01