PETROCHEMICAL CORPORATION OF SINGAPORE (PRIVATE) LIMITED BID FORM 6 COMMERCIAL QUOTATION-4 (Cont'd) Bidder________________ _____________________________________________________________________________ COST BREAKDOWN FOR

MISCELLANEOUS CIVIL ITEMS (WORK I) S/N Category 4 Civil a Structure Item 1.Shelter SubTotal 2.PipeRack 21Steel 22FireProof 23Concrete(foundation) 24Pile 25Others SubTotal 3.SteelStructure 31Steel 32FireProof 33Concrete(foundation) 34Pile 35Others SubTotal 4.PipeSteelSupports 41Steel 41aCantileverPipeSupport 41bStanchions SubTotal 5.PlatformConnectingtoNewtank 51Steel 6.BundwallCrossOverPlatform 61Steel SubTotal ton 4.90 ton 2 m 3 m nos Unit m
2

Qty

Cost

Remarks

ton 2 m 3 m

ton ton

0.7 0.7

ton

1.60

Total