Académique Documents
Professionnel Documents
Culture Documents
50 % Utility
Pressure Loss
(Heat Consumption)
Demand Charge
Energy Charge Peak
DITP-F-04 :
1.
2.
Turnover
3.
4.
5.
Workshop 1:
18 2555
. 54
.-. 55
Based Line
KPIs
Report
/
Action Plan
Base line ??
??
??
??
DITP-F-05 :
(Work Plan)
DITP-F-05 :
(Work Plan)
26
Workshop 2:
PACKAGING
Cumulative
Thousands
32,000
28,000
90%
24,000
20,000
70%
16,000
Baht
Item
P37500000
P39080000
P39007000
P31000100 *
% usage
30%
26%
18%
9%
83%
P34000000
P33000000
P32000000
P36000000
P30100000
P31000100
P39007000
P39080000
8,000
4,000
50%
P37500000
12,000
30%
10%
Cumulative
Supply Days
Actual
KPI
25
15
15
10
33
15
17
1
* consignment
Supply days
Actual
KPI
()
Stock
RAW MATERIALS
R230060000
13
R240040000
25
R230070000
27
R230020000
35
P37500000
25
15
P39080000
15
10
P39007000
33
15
P31000100
17
30
20
PREPARATION LINE
112
50
107
50
64
30
GINACA
415
300
JUICE PLANT
267
200
30%
15%
863,560
PACKAGING
4,240,452
SPAREPART
DICER
ELECTRICAL GROUP
1,093,510
FINISHED GOODS
>6
65,000,000
71,197,522
Location Code
Fast/Slow Moving
30
:
Visual Control
S/O
S/O
C
:
:
48.8% (1.9 )
34.9% (1.3 )
** 0.6 **
Inventory Turn
4.9 5.7
Cost Saving 3.2
- Turn
4.9
- Turn
5.2
- Cost Saving 2.1
(....)
59% ( >50%)
17,805 /
33% ( > 30%)
50% 83%
(....)
Turn
5.2 ( 5.7 )
Cost Saving 2.1
Dead/Slow 0.5 ( 1 )
0.2