Vous êtes sur la page 1sur 1

eni Iraq b.v.

- Zubair Oil Field Development Project


Work Package of Existing DGS Modification

EXPANSION

BELLOWS

INSTALLATION

Form No. QIR-122

Report No.:
Sheet

of

Reference : Piping Fabrication & Erection Procedure No. 00250600DBPC4066M - (Attach. 3)

LINE No. :

_______________________

DRAWING No.________________________

AREA

______ __________________

BELLOWS I.D. No. : _______________


SIGNATURE & DATE

DESCRIPTION
1.
2.
3.
4.
5.
6.
7.

Sign

Date

BELLOWS DRY & CLEAR OF DEBRIS


STOPS INSTALLED & SECURE
END TO END LENGTH PER DRAWING
BEVELS CHECKED
FLOW DIRECTION CHECKED
RELEASED FOR WELDING
BOLTS REMOVE AFTER TEST

REMARKS :

THE ABOVE INSTALLATION HAS BEEN SATISFACTORILY COMPLETED IN ACCORDANCE WITH THE DRAWINGS &
SPECIFICATIONS.
SIGNED:________________________________________NAME:________________________________DATE:__________________
CONSTRUCTION
SIGNED:______________________________________ NAME:________________________________ DATE: __________________
QCI
SIGNED:________________________________________NAME:________________________________DATE:__________________
Company

Vous aimerez peut-être aussi