Vous êtes sur la page 1sur 32

Ljt designs

2006
Open Concept Kitchen Remodel


KITCHEN REMODEL
BEFORE...
COMPLETED IN 3 WEEKS FROM THE TIME CONSTRUCTION
BEGAN
DURING...
INSTALLED NEW LARGER WINDOWS AND ADDED ANOTHER IN THE CORNER
DURING...
CREATED ISLAND WITH STOVE AND DOWNDRAFT
AFTER...
DURING...
INSTALLED NEW WIDER PATIO DOOR
BEFORE...
REMOVED MANTLE AND PENINSULA
DURING...
CLOSED OPENING TO DEN ON RIGHT WALL AND CREATED ARCHED
OPENING TO FOYER/HALL
AFTER...
NEW MANTEL, CORBELS AND WALL OF CABINETRY/REFRIGERATOR
AFTER...
BEFORE...
CLOSED DOORWAY to office
AND REMOVED PANTRY
Installed wainscot in the hall and office and painted
DURING...

AFTER...
WALL WITH PANTRY AND OPENING TO DEN REPLACED WITH
REFRIGERATOR AND CABINETRY
BEFORE...
WALL ON RIGHT REMOVED; REFRIGERATOR RELOCATED;
BOOKCASE EXPANDED
BEFORE...
REPLACED WALL WITH PENINSULA
WHICH OPENED KITCHEN INTO DINING AREA
DURING...
THE WALL IS NOW REMOVED WHICH CREATED AN OPEN CONCEPT
DURING...
ENLARGED BOOKCASE; PENINSULA WITH SEATING REPLACED WALL WITH
REFRIGERATOR; STOVETOP RELOCATED TO ISLAND; 2 OVENS MOVED TO
PENINSULA
DURING...
RECESSED CAN LIGHTING ADDED
BEFORE...
INSTALLED A NEW BAY WINDOW FOR ADDITIONAL NATURAL LIGHT
DURING...
NATURAL LIGHT NOW POURS THROUGH IN ALL DIRECTIONS
Lots of sunlight pours
into new bay window
DURING...
ADDED HARDWOOD FLOORS
AFTER...
A GORGEOUS LIGHT-FILLED OPEN KITCHEN
AFTER...
LIGHT FIXTURE OVER ISLAND
DURING...
INSTALLING GRANITE COUNTERS
DURING...
BUILDING NEW BOOKCASE;
INSTALLING APPLIANCES
DURING...
WAITING FOR LIGHT FIXTURE
DURING...
INSTALLING LIGHT FIXTURE OVER DINING TABLE
AFTER...
ENLARGED ARCHED OPENING TO LIVING ROOM AND ADDED SCONCES

Vous aimerez peut-être aussi