BLAST FURNACE -APRIL 2014
QUARTERLY
MONTHLY
ANNUAL
QUARTERLY
3
Instrumentation Maintenance Plan for the month-BF
10
4
11
3
11
8
11
8 8
4 4 6,13,20,27
4 4 6,13,20,27
0 0
0
20 19
1 1 4/11/2014
1 1 4/16/2014
1 1 03/04/20104
2 2 03/04/2014,11/04/2014
1 1 4/9/2014
1 1 4/11/2014
1 0
1 1 4/3/2014
1 1 4/6/2014
1 1 4/3/2014
1 1 4/14/2014
1 1 4/10/2014
1 1 4/14/2014
1 1 4/8/2014
1 1 4/9/2014
1 1 4/11/2014
1 1 4/10/2014
1 1 4/12/2014
1 1
1 1 4/3/2014
Planned Achieved
25 24
3 3
11 10
8 4
0 0
Planned Achieved REASON
0 0 NOT IN LINE
1 0 TO BE DONE IN SHUT DOWN
1 0 TO BE DONE IN SHUT DOWN
PENDING JOBS OF ANNUAL PLANNER FOR THE MONTH-APRIL 2014
1 0
ADJUST THE RANGE BY HART THEN TO
CALIBRATE
1 0 NEED PLATFORM TO WORK AT THIS PLACE
1 0 sent for repair
1 0 sent for repair
1 0 sent for repair. Not charging
1 0 sent for repair
1 0 lost
PENDING JOBS OF MARCH-2014
DATE
1 WTI-0101A
2 WTI-0102A
3 WTI-0103A
4 WTI-0104A
5 WTI-0105A
16 WTI-0101B
17 WTI-0102B
18 WTI-0103B
19 WTI-0104B
20 WTI-0105B
21 WTI-0106B
20/04/2014 22 WTI-0107B
27/04/2014 23 WTI-0108B
13/04/2014 24 WTI-0109B
25 WTI-0110B
26 WTI-0111B
27 WTI-0112B
28 WTI-0113B
29 WTI-0114B
30 WTI-0115B
34 WIT-0901
38 PT-0201
39 PT-0202
71 PT-0504
72 PT-0505
73 PT-0506
Maintenance Plan for the year-BF
Sr.No Checklist
1 Monthly maintenance plan
2 Calibration of measuring equip.(Inhouse)
3 Calibration of measuring equip.(Inhouse)
4 Calibration of measuring equip.(Inhouse)
5 Calibration of measuring equip.(External)
Sr.No Checklist
1 G Shift Checklist
2 Monthly checklist
2.1 COOLER FAN CHECKLIST
Instrumentation Maintenance Plan for the month- April-14
3/4/2014
2.2 TELEPHONE PA
2.3 WINDBOX
2.4 PMD SMD
2.5 PROPORTIONING SYSTEM
2.6 SINTER SYSTEM
2.7 LIME HANDLING SYSTEM
2.8 Flux and Fuel dedusting
2.9 Gas Analyser
3 Head ESP /dedusting
3.1 LPG System
3.2 Main Exhaust Fan
3.3 Lubrication System
3.4 Proportioning dedusting
3.5 Screening dedusting
3.6 Fire alarm Main Sinter
3.7 Tail End dedusting
3 SHUTDOWN JOB CHECKLIST
Sr.No DESCRIPTION
1 WEIGH HOPPER
2 WEIGH FEEDER
3
PENDING JOBS OF ANNUAL PLANNER FOR THE MONTH-APRIL 2014
DONE TO BE DONE
WEIGH HOPPER 1 (ORE)
WEIGH HOPPER 2 (ORE)
WEIGH HOPPER 3 (ORE)
WEIGH HOPPER 4 (ORE)
WEIGH HOPPER 5 (ORE)
WEIGH FEEDER 1 (ORE)
WEIGH FEEDER 2 (ORE)
WEIGH FEEDER 3 (ORE)
WEIGH FEEDER 4 (ORE)
WEIGH FEEDER 5 (ORE)
WEIGH FEEDER 6 (ORE)
WEIGH FEEDER 7 (DUST)
WEIGH FEEDER 8 (DOLOMITE)
WEIGH FEEDER 9 (LIME STONE)
WEIGH FEEDER 10 (FUEL)
WEIGH FEEDER 11 (FUEL)
WEIGH FEEDER 12 (BURNT LIME)
WEIGH FEEDER 13 (BURNT LIME)
WEIGH FEEDER 14 (COLD RETURN)
WEIGH FEEDER 15 (COLD RETURN)
C3M WEIGH SCALE HALF YEARLY 1 1
PMD PRESSURE TRANSMITTER
SMD PRESSURE TRANSMITTER
HEAD ESP INLET PRESSURE TX.
MAIN EXHAUST FAN INLET PRESSURE TX.
MAIN EXHAUST FAN OUTLET PRESSURE TX.
Frequency Planned Achieved
Monthly
Quarterly
Half yearly
Yearly
Yearly
Frequency Planned Achieved Date
Daily 30
Monthly 1 1 4/17/2014
Instrumentation Maintenance Plan for the month- April-14
SINTER PLANT-APRIL 2014
5 5 YEARLY
QUARTERLY
MONTHLY
5
15
Monthly 1 1 4/14/2014
Monthly 1 1 4/8/2014
Monthly 1 1 4/9/2014
Monthly 1 1 4/10/2014
Monthly 1 1 4/10/2014
Monthly 1 1 4/26/2014
Monthly 1 1 4/6/2014
Monthly 1 1 4/7/2014
Monthly 1 1 4/7/2014
Monthly 1 1
Monthly 1 1 4/17/2014
Monthly 1 1
Monthly 1 1 4/16/2014
Monthly 1 1 4/4/2014
Monthly 1 1 4/8/2014
Monthly 1 1 4/7/2014
Monthly 1 1
Frequency Planned Achieved REASON
PENDING JOBS OF ANNUAL PLANNER FOR THE MONTH-APRIL 2014