L&T Construction

Infrastructure

Design of Crane Beam & Columns in


Power House Cavern

Lata-Tapovan HEP

L&T Construction
Infrastructure
PROJECT: LATA TAPOVAN HEP
TITLE:

Structural design of crane RCC beam & column

L&T Document No.

Date

24-Jan-2014

Designed

Checked

Sheet no.

AA

PS

LOAD DATA:(a) FOR FULL LOAD (165T) CAPACITY


(Ref. Clearance & Loading data for EOT Cranes; Doc. No. 5601-003-H143-PVM-W-039)

Span of the crane

18.1

Side and vertical clearance

0.95

Loading capacity of the crane

165

Weight of Crane

74

Weight of Trolly/Crab

40

Total no. of wheels on each side of the crane

Nos.

Static wheel load of loaded crane

27.3

Load Factor (All)

1.5

(1) Max. Wheel load of loaded crane

32

(2) Lateral wheel load of loaded crane

1.33

Longitudinal wheel load of loaded

1.4

Total longitudinal crane load on beam

11.2

No. of nodes on which long. Force is applied

10

Nos.

1.12

t/node

(3) Long. Force on each node

(4) Self weight of the system has been calculated using "selfweight" command in Staad
(5) Weight of slab on beam

6.3

(6) Live Load over slab

48t

48t

0.3

2.5 /2

0.5 t/m )
CRANE LOADING AT FULL LOAD CAPACITY:48t

0.6

0.6

48t
0.6

1.95

t/m

1.56

t/m

48t
4.4

48t
0.6

48t
0.6

48t
0.6

(b) FOR CONSTRUCTION STAGE LOADING (10T)


Max. Object weight

10

Weight of Crane

74

Weight of Trolly/Crab

40

Total no. of wheels on each side of the crane

Nos.

Static wheel load of the unloaded crane

9.1

Max. Load on each wheel of the crane due to object wt.

0.6

Impact factor

1.25

Load Factor (All)

1.5

12.12

(1) Max. Wheel load of the crane

L&T Construction
Infrastructure
PROJECT: LATA TAPOVAN HEP
TITLE:

Structural design of crane RCC beam & column

L&T Document No.

Date

24-Jan-2014

Designed

Checked

Sheet no.

AA

PS

0.324

Longitudinal wheel load of the crane

0.621

Total longitudinal crane load on beam

4.97

No. of nodes on which long. Force is applied

10

Nos.

0.50

t/node

(2) Lateral wheel load of the crane

(3) Long. Force on each node


CRANE LOADING FOR STAGE CONSTRUCTION:18.17t

18.17t
0.6

0.6

18.17t

18.17t
0.6

18.17t
4.4

0.6

18.17t

18.17t
0.6

0.6

(4) Self weight of the system has been calculated using "selfweight" command in Staad

18.17t

L&T Construction
Infrastructure
PROJECT: LATA TAPOVAN HEP
TITLE:

L&T Document No.

Date

24-Jan-2014

Designed Checked

Structural design of crane RCC beam & column

AA

PS

Sheet no.
-

STAAD RESULTS FOR FULL LOAD CAPACITY OF CRANE


Beam End Forces for the whole system:Beam

L/C

Node

Fx Mton

Fy Mton

Fz Mton

Mx kNm

My kNm

Mz kNm

Max Fx

177 LOAD GENERATION, LOAD #177, (23 of 135)

182.49

-0.292

0.395

-9.108

-31.165

7.358

Min Fx

78

163 LOAD GENERATION, LOAD #163, (9 of 135)

-4.613

2.949

0.332

-3.241

-11.611

34.514

Max Fy

77

169 LOAD GENERATION, LOAD #169, (15 of 135)

3.236

54.838

-1.378

-32.922

-8.903

278.24

Min Fy

77

171 LOAD GENERATION, LOAD #171, (17 of 135)

46

3.49

-53.923

1.214

-32.922

-22.254

213.344

Max Fz

68

20 LOAD GENERATION, LOAD #20, (1 of 135)

36

-0.01

0.02

1.882

23.979

9.137

0.4

Min Fz

83

12 COMBINATION1

48

59.865

1.031

-2.049

-7.562

-162.943

-14.808

Max Mx

50

20 LOAD GENERATION, LOAD #20, (1 of 135)

26

-0.036

0.011

0.879

36.617

-48.158

0.394

Min Mx

55

20 LOAD GENERATION, LOAD #20, (1 of 135)

31

0.006

-0.013

-0.456

-34.812

3.311

-0.782

Max My

32

15 COMBINATION1

16

1.302

9.497

-0.915

-7.991

86.306

80.312

Min My

83

12 COMBINATION1

49

72.839

1.031

-2.049

-7.562

-253.381

-60.326

Max Mz

77

177 LOAD GENERATION, LOAD #177, (23 of 135)

4.082

41.203

-1.378

-32.922

-8.903

558.905

Min Mz

81

163 LOAD GENERATION, LOAD #163, (9 of 135)

46

35.903

-3.912

-1.214

22.254

32.922

-282.506

Max

182.49

54.838

1.882

36.617

86.306

558.905

Min

-4.613

-53.923

-2.049

-34.812

-253.381

-282.506

L&T Construction
Infrastructure
PROJECT: LATA TAPOVAN HEP
TITLE:

L&T Document No.

Date

24-Jan-2014

Designed Checked

Structural design of crane RCC beam & column

AA

PS

Sheet no.
-

STAAD RESULTS FOR FULL LOAD CAPACITY OF CRANE


Beam End Forces for top crane beam:Beam

L/C

Node

Fx Mton

Fy Mton

Fz Mton

Mx kNm

My kNm

Mz kNm

Max Fx

77

163 LOAD GENERATION, LOAD #163, (9 of 135)

4.412

33.048

-1.378

-32.922

-8.903

397.064

Min Fx

23

47 LOAD GENERATION, LOAD #47, (28 of 135)

11

-0.677

0.828

0.245

21.393

-38.784

30.192

Max Fy

77

169 LOAD GENERATION, LOAD #169, (15 of 135)

3.236

54.838

-1.378

-32.922

-8.903

278.24

Min Fy

77

171 LOAD GENERATION, LOAD #171, (17 of 135)

46

3.49

-53.923

1.214

-32.922

-22.254

213.344

Max Fz

68

20 LOAD GENERATION, LOAD #20, (1 of 135)

36

-0.01

0.02

1.882

23.979

9.137

0.4

Min Fz

77

12 COMBINATION1

1.507

10.846

-1.378

-32.922

-8.903

107.608

Max Mx

50

20 LOAD GENERATION, LOAD #20, (1 of 135)

26

-0.036

0.011

0.879

36.617

-48.158

0.394

Min Mx

12 COMBINATION1

1.671

9.667

-0.79

-32.927

40.155

83.72

Max My

32

15 COMBINATION1

16

1.302

9.497

-0.915

-7.991

86.306

80.312

Min My

41

20 LOAD GENERATION, LOAD #20, (1 of 135)

21

-0.05

0.013

0.577

33.108

-50.831

0.408

Max Mz

77

177 LOAD GENERATION, LOAD #177, (23 of 135)

4.082

41.203

-1.378

-32.922

-8.903

558.905

Min Mz

59

133 LOAD GENERATION, LOAD #133, (114 of 135)

36

0.55

-8.665

1.335

33.305

40.776

-28.479

Max

4.412

54.838

1.882

36.617

86.306

558.905

Min

-0.677

-53.923

-1.378

-32.927

-50.831

-28.479

L&T Construction
Infrastructure
PROJECT: LATA TAPOVAN HEP
TITLE:

L&T Document No.

Date

24-Jan-2014

Designed Checked

Structural design of crane RCC beam & column

AA

PS

Sheet no.
-

STAAD RESULTS FOR FULL LOAD CAPACITY OF CRANE


Beam End Forces for tie crane beam:Beam

L/C

Node

Fx Mton

Fy Mton

Fz Mton

Mx kNm

My kNm

Mz kNm

Max Fx

79

28 LOAD GENERATION, LOAD #28, (9 of 135)

1.339

-0.068

0.002

0.77

0.619

-2.921

Min Fx

78

163 LOAD GENERATION, LOAD #163, (9 of 135)

-4.613

2.949

0.332

-3.241

-11.611

34.514

Max Fy

79

275 LOAD GENERATION, LOAD #275, (121 of 135)

-1.534

3.115

0.504

-0.908

-16.754

36.292

Min Fy

173 LOAD GENERATION, LOAD #173, (19 of 135)

-3.123

-3.788

0.083

-2.306

5.442

60.607

Max Fz

79

12 COMBINATION1

-1.468

3.096

0.504

-0.908

-16.754

35.65

Min Fz

62

20 LOAD GENERATION, LOAD #20, (1 of 135)

34

0.001

0.001

-0.184

2.435

4.076

0.033

Max Mx

80

13 COMBINATION1

-4.131

2.837

0.312

3.795

-8.032

28.435

Min Mx

78

12 COMBINATION1

-0.57

3.058

0.332

-3.241

-11.611

35.319

Max My

79

12 COMBINATION1

48

-1.468

-3.045

0.504

-0.908

18.323

33.858

Min My

79

12 COMBINATION1

-1.468

3.096

0.504

-0.908

-16.754

35.65

Max Mz

174 LOAD GENERATION, LOAD #174, (20 of 135)

-3.469

-3.787

0.083

-2.306

5.442

60.758

Min Mz

15

184 LOAD GENERATION, LOAD #184, (30 of 135)

-0.34

0.448

0.054

-1.662

-0.608

-22.63

Max

1.339

3.115

0.504

3.795

18.323

60.758

Min

-4.613

-3.788

-0.184

-3.241

-16.754

-22.63

L&T Construction
Infrastructure
PROJECT: LATA TAPOVAN HEP
TITLE:

L&T Document No.

Date

24-Jan-2014

Designed Checked

Structural design of crane RCC beam & column

AA

PS

Sheet no.
-

STAAD RESULTS FOR FULL LOAD CAPACITY OF CRANE


Beam End Forces for Columns:Beam

L/C

Node

Fx Mton

Fy Mton

Fz Mton

Mx kNm

My kNm

Mz kNm

Max Fx

177 LOAD GENERATION, LOAD #177, (23 of 135)

182.49

-0.292

0.395

-9.108

-31.165

7.358

Min Fx

64

103 LOAD GENERATION, LOAD #103, (84 of 135)

36

-2.601

0.001

-0.547

-31.639

9.326

-0.477

Max Fy

10

180 LOAD GENERATION, LOAD #180, (26 of 135)

49.837

3.191

-0.208

22.101

-8.587

219.405

Min Fy

81

163 LOAD GENERATION, LOAD #163, (9 of 135)

46

35.903

-3.912

-1.214

22.254

32.922

-282.506

Max Fz

12 COMBINATION1

95.003

-0.285

0.395

-9.108

-68.78

-19.911

Min Fz

83

12 COMBINATION1

48

59.865

1.031

-2.049

-7.562

-162.943

-14.808

Max Mx

12 COMBINATION1

20.513

0.336

-0.588

31.252

0.005

23.889

Min Mx

55

20 LOAD GENERATION, LOAD #20, (1 of 135)

31

0.006

-0.013

-0.456

-34.812

3.311

-0.782

Max My

81

12 COMBINATION1

46

9.625

-1.007

-1.214

22.254

32.922

-65.097

Min My

83

12 COMBINATION1

49

72.839

1.031

-2.049

-7.562

-253.381

-60.326

Max Mz

10

180 LOAD GENERATION, LOAD #180, (26 of 135)

49.837

3.191

-0.208

22.101

-8.587

219.405

Min Mz

81

163 LOAD GENERATION, LOAD #163, (9 of 135)

46

35.903

-3.912

-1.214

22.254

32.922

-282.506

Max

182.49

3.191

0.395

31.252

32.922

219.405

Min

-2.601

-3.912

-2.049

-34.812

-253.381

-282.506

L&T Construction
Infrastructure
PROJECT: LATA TAPOVAN HEP
TITLE:

L&T Document No.

Date

24-Jan-2014
Sheet no.

Designed Checked

Structural design of crane RCC beam & column

AA

PS

STAAD RESULTS FOR FULL LOAD CAPACITY OF CRANE


Support Reactions:Moment

Horizontal Vertical Horizontal


Node
Max Fx

L/C

Fx Mton

2 11 COMBINATION1

Fy Mton

Fz Mton

Mx kNm

My kNm

Mz kNm

6.43

576.57

21.916

204.946

Min Fx

45 44 LOAD GENERATION, LOAD #44, (26 of 120)

-1.956

197.486

66.541

Max Fy

35 108 LOAD GENERATION, LOAD #108, (90 of 120)

-1.905

561.894

109.693

Min Fy

2 11 COMBINATION1

6.43

576.57

21.916

204.946

Max Fz

42 18 COMBINATION1

7.297

648.483

-29.409

33.066

Min Fz

42 15 COMBINATION1

-0.185

12.858

19.133

33.066

Max Mx

42 18 COMBINATION1

7.297

648.483

-29.409

33.066

Min Mx

42 13 COMBINATION1

-0.083

-3.998

1.738

33.066

Max My

12 11 COMBINATION1

3.093

307.443

56.642

271.696

Min My

32 18 COMBINATION1

2.358

248.116

-55.035

230.058

Max Mz

12 36 LOAD GENERATION, LOAD #36, (18 of 120)

3.093

307.443

56.642

535.319

Min Mz

37 133 LOAD GENERATION, LOAD #133, (115 of 120)

-0.024

-1.581

-0.081

-258.206

Max

561.894

7.297

648.483

56.642

535.319

Min

-1.956

-0.185

-3.998

-55.035

-258.206

L&T Construction
Infrastructure
PROJECT: LATA TAPOVAN HEP
TITLE:

L&T Document No.

Date

24-Jan-2014

Designed

Structural design of crane RCC beam & column

Checked

AA

PS

Sheet no.
-

STAAD RESULTS FOR CONSTRUCTION STAGE


Beam End Forces for the whole system:Beam

L/C

Node

Fx Mton

Fy Mton

Fz Mton

Mx kNm

My kNm

Mz kNm

Max Fx

177 LOAD GENERATION, LOAD #177, (23 of 135)

213.848

-0.55

0.556

-15.267

-41.667

13.486

Min Fx

80

164 LOAD GENERATION, LOAD #164, (10 of 135)

-6.29

2.999

0.57

5.24

-17.972

31.093

Max Fy

77

169 LOAD GENERATION, LOAD #169, (15 of 135)

3.918

60.191

-2.088

-69.436

-16.01

322.898

Min Fy

183 LOAD GENERATION, LOAD #183, (29 of 135)

3.995

-59.201

-1.254

-74.455

-20.395

380.419

Max Fz

59

19 COMBINATION1

31

0.893

9.67

2.368

48.284

56.935

80.436

Min Fz

83

12 COMBINATION1

48

75.075

2.572

-3.051

-7.677

-220.71

-16.712

Max Mx

41

19 COMBINATION1

21

1.434

12.471

1.228

65.843

-55.476

119.214

Min Mx

12 COMBINATION1

2.354

14.34

-1.254

-74.455

66.915

118.635

Max My

32

15 COMBINATION1

16

1.793

14.123

-1.432

-12.312

158.549

115.484

Min My

83

12 COMBINATION1

49

91.13

2.572

-3.051

-7.677

-355.354

-130.207

Max Mz

77

177 LOAD GENERATION, LOAD #177, (23 of 135)

4.764

46.483

-2.088

-69.436

-16.01

600.6

Min Mz

81

175 LOAD GENERATION, LOAD #175, (21 of 135)

46

40.644

-4.249

-1.8

37.444

69.436

-307.537

Max

213.848

60.191

2.368

65.843

158.549

600.6

Min

-6.29

-59.201

-3.051

-74.455

-355.354

-307.537

L&T Construction
Infrastructure
PROJECT: LATA TAPOVAN HEP
TITLE:

L&T Document No.

Date

24-Jan-2014

Designed

Structural design of crane RCC beam & column

Checked

AA

PS

Sheet no.
-

STAAD RESULTS FOR CONSTRUCTION STAGE


Beam End Forces for top crane beam:Beam

L/C

Node

Fx Mton

Fy Mton

Fz Mton

Mx kNm

My kNm

Mz kNm

Max Fx

77

163 LOAD GENERATION, LOAD #163, (9 of 135)

5.019

38.572

-2.088

-69.436

-16.01

448.816

Min Fx

23

47 LOAD GENERATION, LOAD #47, (28 of 135)

11

-0.662

1.059

0.323

38.562

-51.501

40.25

Max Fy

77

169 LOAD GENERATION, LOAD #169, (15 of 135)

3.918

60.191

-2.088

-69.436

-16.01

322.898

Min Fy

183 LOAD GENERATION, LOAD #183, (29 of 135)

3.995

-59.201

-1.254

-74.455

-20.395

380.419

Max Fz

59

19 COMBINATION1

31

0.893

9.67

2.368

48.284

56.935

80.436

Min Fz

77

12 COMBINATION1

2.158

16.435

-2.088

-69.436

-16.01

164.505

Max Mx

41

19 COMBINATION1

21

1.434

12.471

1.228

65.843

-55.476

119.214

Min Mx

12 COMBINATION1

2.354

14.34

-1.254

-74.455

66.915

118.635

Max My

32

15 COMBINATION1

16

1.793

14.123

-1.432

-12.312

158.549

115.484

Min My

77

13 COMBINATION1

2.158

16.435

1.2

-29.358

-83.136

164.505

Max Mz

77

177 LOAD GENERATION, LOAD #177, (23 of 135)

4.764

46.483

-2.088

-69.436

-16.01

600.6

Min Mz

59

133 LOAD GENERATION, LOAD #133, (114 of 135)

36

0.612

-7.961

1.405

46.095

43.104

-48.838

Max

5.019

60.191

2.368

65.843

158.549

600.6

Min

-0.662

-59.201

-2.088

-74.455

-83.136

-48.838

L&T Construction
Infrastructure
PROJECT: LATA TAPOVAN HEP
TITLE:

L&T Document No.

Date

24-Jan-2014

Designed

Structural design of crane RCC beam & column

Checked

AA

PS

Sheet no.
-

STAAD RESULTS FOR CONSTRUCTION STAGE


Beam End Forces for tie beam:Beam

L/C

Node

Fx Mton

Fy Mton

Fz Mton

Mx kNm

My kNm

Mz kNm

Max Fx

79

29 LOAD GENERATION, LOAD #29, (10 of 135)

1.223

-0.053

0.029

0.942

-0.091

-2.104

Min Fx

80

164 LOAD GENERATION, LOAD #164, (10 of 135)

-6.29

2.999

0.57

5.24

-17.972

31.093

Max Fy

79

275 LOAD GENERATION, LOAD #275, (121 of 135)

-2.716

3.317

0.771

-1.406

-25.622

40.564

Min Fy

173 LOAD GENERATION, LOAD #173, (19 of 135)

-3.929

-3.795

0.146

-2.821

7.91

58.015

Max Fz

79

12 COMBINATION1

-2.657

3.306

0.771

-1.406

-25.622

40.218

Min Fz

62

20 LOAD GENERATION, LOAD #20, (1 of 135)

34

0.001

0.001

-0.172

1.982

3.801

0.024

Max Mx

80

12 COMBINATION1

-6.125

3.044

0.57

5.24

-17.972

32.625

Min Mx

78

12 COMBINATION1

-1.323

3.272

0.48

-4.475

-16.334

39.921

Max My

79

12 COMBINATION1

48

-2.657

-3.091

0.771

-1.406

28.04

32.699

Min My

79

12 COMBINATION1

-2.657

3.306

0.771

-1.406

-25.622

40.218

Max Mz

174 LOAD GENERATION, LOAD #174, (20 of 135)

-4.291

-3.794

0.146

-2.821

7.91

58.105

Min Mz

15

184 LOAD GENERATION, LOAD #184, (30 of 135)

-0.941

0.798

0.108

-1.905

-1.642

-15.459

Max

1.223

3.317

0.771

5.24

28.04

58.105

Min

-6.29

-3.795

-0.172

-4.475

-25.622

-15.459

L&T Construction
Infrastructure
PROJECT: LATA TAPOVAN HEP
TITLE:

L&T Document No.

Date

24-Jan-2014

Designed

Structural design of crane RCC beam & column

Sheet no.

Checked

AA

PS

STAAD RESULTS FOR CONSTRUCTION STAGE


Beam End Forces for Columns:Beam

L/C

Node

Fx Mton

Fy Mton

Fz Mton

Mx kNm

My kNm

Mz kNm

Max Fx

58 108 LOAD GENERATION, LOAD #108, (90 of 120)

35

552.163

1.905

-90.608

Min Fx

1 47 LOAD GENERATION, LOAD #47, (29 of 120)

-5.734

-0.401

-6.43

21.916

41.355

-81.912

Max Fy

64 112 LOAD GENERATION, LOAD #112, (94 of 120)

36

182.951

14.778

0.024

-0.081

-0.754

939.126

Min Fy

55 118 LOAD GENERATION, LOAD #118, (100 of 120)

31

184.6

-11.141

0.056

0.731

-3.409

-761.815

Max Fz

73 15 COMBINATION1

41

13.575

3.074

0.185

19.133

-30.609

163.511

Min Fz

73 18 COMBINATION1

41

13.575

3.074

-7.297

-29.409

52.833

163.511

Max Mx

19 11 COMBINATION1

11

32.514

1.366

-3.093

56.642

-10.192

47.98

Min Mx

55 18 COMBINATION1

31

33.378

1.419

-2.358

-55.035

-21.52

55.2

Max My

55 16 COMBINATION1

31

33.378

1.419

-5.435

26.691

61.883

55.2

Min My

73 18 COMBINATION1

42

55.957

3.074

-7.297

-29.409

-648.483

-131.91

Max Mz

64 112 LOAD GENERATION, LOAD #112, (94 of 120)

36

182.951

14.778

0.024

-0.081

-0.754

939.126

Min Mz

55 118 LOAD GENERATION, LOAD #118, (100 of 120)

31

184.6

-11.141

0.056

0.731

-3.409

-761.815

Max

552.163

14.778

0.185

56.642

61.883

939.126

Min

-5.734

-11.141

-7.297

-55.035

-648.483

-761.815

L&T Construction
Infrastructure
PROJECT: LATA TAPOVAN HEP
TITLE:

L&T Document No.

Date

24-Jan-2014

Designed

Structural design of crane RCC beam & column

Sheet no.

Checked

AA

PS

STAAD RESULTS FOR CONSTRUCTION STAGE


Support Reactions:-

Node
Max Fx

L/C

Horizontal

Vertical

Horizontal

Fx Mton

Fy Mton

Fz Mton

2 11 COMBINATION1

Moment
Mx kNm

My kNm

Mz kNm

6.43

576.57

21.916

204.946

Min Fx

45 44 LOAD GENERATION, LOAD #44, (26 of 120)

-1.956

197.486

66.541

Max Fy

35 108 LOAD GENERATION, LOAD #108, (90 of 120)

-1.905

561.894

109.693

Min Fy

2 11 COMBINATION1

6.43

576.57

21.916

204.946

Max Fz

42 18 COMBINATION1

7.297

648.483

-29.409

33.066

Min Fz

42 15 COMBINATION1

-0.185

12.858

19.133

33.066

Max Mx

42 18 COMBINATION1

7.297

648.483

-29.409

33.066

Min Mx

42 13 COMBINATION1

-0.083

-3.998

1.738

33.066

Max My

12 11 COMBINATION1

3.093

307.443

56.642

271.696

Min My

32 18 COMBINATION1

2.358

248.116

-55.035

230.058

Max Mz

12 36 LOAD GENERATION, LOAD #36, (18 of 120)

3.093

307.443

56.642

535.319

Min Mz

37 133 LOAD GENERATION, LOAD #133, (115 of 120)

-0.024

-1.581

-0.081

-258.206

Max

561.894

7.297

648.483

56.642

535.319

Min

-1.956

-0.185

-3.998

-55.035

-258.206

L&T Construction
Infrastructure
PROJECT:
TITLE:

LATA TAPOVAN HEP


Structural design of crane RCC beam & column

L&T Document No.

Date

24-Jan-2014

Designed

Checked

Sheet no.

AA

PS

COLUMN DESIGN PARAMETERS:-

Depth of column

0.9

40 mm

Width of column

1.1

Dia. of bar to be used

25

mm

No. of bars

16

Nos.

Clear cover of concrete

Effective cover of concrete

d'

0.1

Grade of concrete

fck

25

N/mm

2
2

1100 mm

Grade of steel

fy

415

N/mm

Area of concrete section

Ac

m2

Area of steel reinforcement

As

0.008

Percentage of reinforcement

0.79

m
%

Unsupported length of column in final stage

9.80

Unsupported length of column in constr. Stage z

9.7

Unsupported length of column in constr. Stage y

9.7

900 mm

ANALYSIS RESULTS:For full load capacity,


Case-1: Maximum vertical load and maximum moment

Factored Load

Pu

561.894

Factored moment about Z

Muz

282.506

kN-m

Factored moment about Y

Muy

253.381

kN-m

L&T Construction
Infrastructure
PROJECT:
TITLE:

LATA TAPOVAN HEP


Structural design of crane RCC beam & column

Case-2: Minimum vertical load and maximum moment


Factored Load

Pu

Factored moment about Z

Muz

kN-m

Factored moment about Y

Muy

kN-m

For construction stage loading,


Case-1: Maximum vertical load and maximum moment
Factored Load

Pu

561.894

Factored moment about Z

Muz

939.126

kN-m

Factored moment about Y

Muy

648.483

kN-m

Case-2: Minimum vertical load and maximum moment


Factored Load

Pu

Factored moment about Z

Muz

939.1

kN-m

Factored moment about Y

Muy

648.5

kN-m

L&T Document No.

Date

24-Jan-2014

Designed

Checked

Sheet no.

AA

PS

L&T Construction
Infrastructure
PROJECT:

LATA TAPOVAN HEP


Structural design of crane RCC beam &
column

TITLE:
Grade of Concrete
Grade of Steel

L&T Document No.

Date

24-Jan-2014

Designed
AA

fck

MPa

M 25

fy

MPa

Fe 415

Checked

Sheet no.

PS

FixedFixed

End Constraint

Full Load Capacity


Stage

Construction Stege

Unit

Case-1

Case-2

Case-1

Case-2

9.80

9.80

9.7

9.7

9.80

9.80

9.7

9.7

Px

kN

5618.9

0.0

5618.9

0.0

Mz

kN-m

282.5

0.0

939.1

939.1

My

kN-m

253.4

0.0

648.5

648.5

By

1.1

1.1

1.1

1.1

Bz

0.9

0.9

0.9

0.9

Bar dia

mm

25

25

25

25

No. of bars

nos.

16

16

16

16

Unsupported length in Y dir


Unsupported length in Z dir

Factored Forces & Moments

Cross section

Clear Cover
Effective Cover

mm

40

40

40

40

mm

52.5

52.5

52.5

52.5

d'/By

0.048

0.048

0.048

0.048

d'/Bz

0.058

0.058

0.058

0.058

p%

0.793

0.793

0.793

0.793

p/fck

0.032

0.032

0.032

0.032

d'

Percentage of Steel
Effective length factor

0.65

0.65

0.65

0.65

Effective length in Y dirn

Ly

6.37

6.37

6.31

6.31

Lz

6.37

6.37

6.31

6.31

Load eccentricity

ey

0.40

0.40

0.40

0.40

Minimum eccentricity

ez

0.04

0.04

0.04

0.04

Mz (min)

kN-m

2248

2248

Mx (min)

kN-m

240

239

5.79

5.79

5.73

5.73

Effective length in Z dir

Moments for min. eccentricity


Slenderness ratio

Ly/By
Lz/Bz

Additional slenderness mom.


Constants for calculating Pb
(Refer table 60, SP 16)
Value of Pb

7.08

7.08

7.01

7.01

Maz

kN-m

0.00

0.00

0.00

0.00

May

kN-m

0.00

0.00

0.00

0.00

k1y

0.219

0.219

0.219

0.219

k2y

0.424

0.424

0.424

0.424

k1z

0.208

0.208

0.208

0.208

k2z

0.332

0.332

0.332

0.332

5753

5753

5753

5753

Pby

kN

Pbz

kN

5398

5398

5398

5398

kN

13494

13494

13494

13494

1.00

1.00

1.00

1.00

Pux
Reduction factor, k

ky
kz

Reduced Add. Mom.

0.97

1.00

0.97

1.00

Maz,r

kN-m

0.00

0.00

0.00

0.00

May,r

kN-m

0.00

0.00

0.00

0.00

L&T Construction
Infrastructure
PROJECT:
TITLE:
Design Forces & Moments

LATA TAPOVAN HEP


Structural design of crane RCC beam &
column

Date

24-Jan-2014

Designed

Checked

Sheet no.

AA

PS

Pu

kN

5619

5619

Muz

kN-m

2248

2248

939

Muy

kN-m

253

648

648

kN

Pu / fckBD
Rounded values of

L&T Document No.

0.24

0.00

0.24

0.00

p/fck

0.04

0.08

0.08

0.08

d'/By

0.05

0.05

0.05

0.05

d'/Bz

0.10

0.10

0.10

0.10

Value of Mu,l / fckBD2

0.14

0.11

0.14

0.10

(Refer charts 43-46, SP 16)

0.13

0.11

0.13

0.12

Muy,l

3675

2995

3812

2723

Muz,l

2784

2450

2896

2673

Pu / Pux

0.416

0.000

0.416

0.000

1.361

1.000

1.361

1.000

Muy / Muy,l

0.069

0.000

0.170

0.238

Muz / Muz,l

0.807

0.000

0.776

0.351

0.773

0.000

0.798

0.590

SAFE

SAFE

SAFE

SAFE

Mu,l