Inventory of Departmental Key Performance Indicators(KPIs) Mining Financial 1 Proft variance Measures the percentage variance in the actual proft amount and the budgeted proft amount. Following rating scale to be adhered : 5- 100% and above achievement 4- Between 86%-99% achievement 3- Between 76%-85% achievement 2- Between 61%-75% achievement 1- Below 60% achievement Actual proft (in Rs.) Budgeted proft (in Rs.) 2 Proft variance per tonne Measures the percentage variance in the actual proft amount per tonne and the budgeted proft amount per tonne. Following rating scale to be adhered : 5- 100% and above achievement 4- Between 86%-99% achievement 3- Between 76%-85% achievement 2- Between 61%-75% achievement 1- Below 60% achievement Actual proft (in Rs. per tonne) Budgeted proft (in Rs. per tonne) 3 Selling price per tonne Measures the variance in the actual selling price per tonne and the budgeted selling price for the year. Following scale to be adhered to for rating: 5- if the actual selling price per tonne is 100% of the budget 4- if the actual selling price per tonne is between 91 to 99% of the budget 3- if the actual selling price per tonne is between 81 to 90% of the budget 2- if the actual selling price per tonne is between 61 to 80% of the budget 1- if the actual selling price per tonne is below 60% of the budget Actual selling price (in Rs. per tonne) Budgeted selling price (in Rs. per tonne) x 100 x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\2 Financial 4 Production cost per tonne Measures the expenditure registered at the end of the reporting period per ton of coal mined. Following scale to be adhered to for rating: 5- if the actual production cost is less than or equal to 90%the budget 4- if the actual production cost is between 91 to 95% of the budget 3- if the actual production cost is between 96 to 100% of the budget 2- if the actual production cost is between 101% to 105% of the budget 1- if the actual production cost is above 105% of the budget Actual cost (in Rs. per tonne) Budgeted cost (in Rs. per tonne) 5 OB Removal cost per cubic metre Measures the expenditure registered at the end of the reporting period per cubic metre of mineral rocks or coal mined. Following scale to be adhered to for rating: 5- if the actual OB removal cost is less than or equal to 90% the budget 4- if the actual OB removal cost is between 91 to 95% of the budget 3- if the actual OB removal cost is between 96 to 100% of the budget 2- if the actual OB removal cost is between 101% to 105% of the budget 1- if the actual OB removal cost is above 105% of the budget Actual cost (in Rs. per cubic metre) Budgeted cost (in Rs. per cubic metre) 6 Explosive consumption per cubic metre of OBR Measures the amount of explosives measured in kilograms used for dislocating one cubic metre of spoil broken from the solid rock. Following scale to be adhered to for rating: 5- if the actual OB removed is 91% or above of the budget 4- if the actual OB removed is between 81 to 90% of the budget 3- if the actual OB removed is between 71 to 80% of the budget 2- if the actual OB removed is between 61 to 70% of the budget 1- if the actual OB removed is less than 60% of the budget Actual cubic metre of OB removed per kg of explosives consumed Budgeted cubic metre of OB removed per kg of explosives consumed x 100 x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\3 Financial 7 Wagon Under & Over loading charges per tonne Measures the actual charges of under and over loading incurred relative to the budgeted under and over loading charges to be incurred. Following scale to be adhered to for rating: 5- if the actual under & over loading cost is less than or equal to 90% the budget 4- if the actual under & over loading cost is between 91 to 95% of the budget 3- if the actual under & over loading cost is between 96 to 100% of the budget 2- if the actual under & over loading cost is between 101% to 105% of the budget 1- if the actual under & over loading cost is over 105% of the budget Actual under & over loading charges incurred (in Rs. per tonne) Budgeted under & over loading charges incurred (in Rs. per tonne) 8 % Technical accuracy of NIT specifcations Measures the percentage of contracts which are re-tendered because of technical discrepancies in NIT specifcations. Following scale to be adhered to for rating: 5- if no contracts were re-tendered due to technical discrepancies 4- if the number of contracts that were re-tendered is less than 5% of the total number of contracts 3- if the number of contracts that were re-tendered is between 6 to 10% of the total number of contracts 2- if the number of contracts that were re-tendered is between 11 to 15% of the total number of contracts 1- if the number of contracts that were re-tendered is more than 15% of the total number of contracts Number of contracts re-tendered due to technical discrepancies in NIT specifcations 9 Addition of new legal case (Mining related) Measures the number of legal cases added during the year because of the discrepancies caused by Mining department. Following scale to be adhered to for rating: 5- if the number of legal cases added during the year is zero 4- if the number of legal cases added during the year is upto 2 3- if the number of legal cases added during the year is between 3 to 4 2- if the number of legal cases added during the year is between 4 to 5 1- if the number of legal cases added during the year is more than 5 Number of Mining related cases added during the year x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\4 Financial 10 % Technical accuracy in scrutiny of bid documents Measures the percentage of repair contracts which are re-tendered because of technical discrepancies in scrutiny of bid documents. Following scale to be adhered to for rating: 5- if no contracts were re-tendered due to technical discrepancies 4- if the number of contracts that were re-tendered is less than 5% of the total number of contracts 3- if the number of contracts that were re-tendered is between 6 to 10% of the total number of contracts 2- if the number of contracts that were re-tendered is between 11 to 15% of the total number of contracts 1- if the number of contracts that were re-tendered is more than 15% of the total number of contracts Number of contracts re-tendered due to technical discrepancies in scrutiny of bid documents 11 Production manshifts loss due to accidents Measures the total number of productive manshifts lost because of accidents or fatalities. Following scale to be adhered to for rating: 5- if the number of shifts in which production could not be done because of accidents is zero 4- if the number of shifts in which production could not be done because of accidents is upto 1% of the total shifts 3- if the number of shifts in which production could not be done because of accidents is between 1 to 2% of the total shifts 2- if the number of shifts in which production could not be done because of accidents is between 2 to 3% of the total shifts 1- if the number of shifts in which production could not be done because of accidents is more than 3% of the total shifts Number of shifts in which production could not be done because of accidents Total number of manshifts 12 Store cost per tonne Measures the store cost incurred for per ton in the current year relative to the budgeted store cost. Following scale to be adhered to for rating: 5- if the actual store cost is less than or equal to 90% the budget 4- if the actual store cost is between 91 to 95% of the budget 3- if the actual store cost is between 96 to 100% of the budget 2- if the actual store cost is between is between 101% to 105% of the budget 1- if the actual store cost over 105% of the budget Actual store cost (In Rs. per tonne) Budgeted store cost (in Rs. per tonne) x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\5 Financial 13 Coal sales realization per ton Measures the percentage variation in the realization amount of per tonne of coal relative to the estimated realization for that year. Following scale to be adhered to for rating: 5- if the actual coal sale realization per tonne is 100% of the projected realization per tonne 4- if the actual coal sale realization per tonne is between 91 to 99% of the projected realization per tonne 3- if the actual coal sale realization per tonne is between 81 to 90% of the projected realization per tonne 2- if the actual coal sale realization per tonne is between 61 to 80% of the projected realization per tonne 1- if the actual coal sale realization per tonne is below 60% of the projected realization per tonne Actual realization (In Rs. per tonne) from the sale of coal during the year Projected realization (in Rs. per tonne) from the sale of coal for the year 14 Bonus earned against coal quantity despatched Measures the total amount of bonus which is earned for despatching additional coal vis a vis threshhold . Following scale to be adhered to for rating: 5- if the bonus received is 91% or above of the target 4- if the bonus received is between 81 to 90% of the target 3- if the bonus received is between 71 to 80% of the target 2- if the bonus received is between 61 to 70% of the target 1- if the bonus received is less than 60% of the target Actual bonus (in Rs.) received during the year Targeted bonus (in Rs.) to be received during the year 15 Cash against sales realized Measures the percentage of cost realisation in current year. Following scale to be adhered to for rating: 5- if the realization amount is 91% or above of the total billed amount 4- if the realization amount is between 81 to 90% of the total billed amount 3- if the realization amount is between 71 to 80% of the total billed amount 2- if the realization amount is between 61 to 70% of the total billed amount 1- if the realization amount is less than 60% of the total billed amount Total amount realized (in Rs.) Total billed amount (in Rs.) in the current year x 100 x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\6 Financial 16 Stone / Shale / Extraneous material compensation Measures the reduction in the total amount of Stone / Shale / Extraneous material compensation which has been paid to the customers. Following scale to be adhered to for rating: 5- if no Stone / Shale / Extraneous material compensation has been paid 4- if the Stone / Shale / Extraneous material compensation per tonne is less than the last year's Stone / Shale / Extraneous material compensation 3- if the Stone / Shale / Extraneous material compensation per tonne is equal to the last year's Stone / Shale / Extraneous material compensation 2- if the Stone / Shale / Extraneous material compensation per tonne is more than the last year's Stone / Shale / Extraneous material compensation per tonne by 1% 1- if the Stone / Shale / Extraneous material compensation per tonne is more than the last year's Stone / Shale / Extraneous material compensation per tonne by more than 1% Stone / Shale / Extraneous material compensation paid (Rs./per tonne) in the previous year Stone / Shale / Extraneous material compensation paid (Rs./per tonne) in the previous year in the current year 17 Demurrage free despatch Measures the percentage of dispatch schedule without any demurrage levied on it. Following scale to be adhered to for rating: 5- if the proportional number of demurrage levied is 0 to 5% of total number of times demurrage levied on the subsidiary during the year 4- if the proportional number of demurrage levied is 6 to 10% of total number of times demurrage levied on the subsidiary during the year 3- if the proportional number of demurrage levied is 11 to 15% of total number of times demurrage levied on the subsidiary during the year 2- if the proportional number of demurrage levied is 16 to 20% of total number of times demurrage levied on the subsidiary during the year 1- if the proportional number of demurrage levied is 20% or more than 20% of total number of times demurrage levied on the subsidiary during the year Proportional number of times demurrage levied due to non - availability of coal Total number of times demurrage levied on the subsidiary during the year x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\7 Financial 18 Variable Cost Index Measures the diference between the standard variable overheads absorbed in production and the actual variable overheads incurred. Note: Variable cost includes overtime, sunday deployment, power and POL. Following scale to be adhered to for rating: 5- if the actual variable cost per tonne is less than or equal to 90% the budget 4- if the actual variable cost per tonne is between 91 to 95% of the budget 3- if the actual variable cost per tonne is between 96 to 100% of the budget 2- if the actual variable cost per tonne is between 101% to 105% of the budget 1- if the actual variable cost per tonne is over 105% of the budget" Actual variable cost (in Rs. per tonne) Budgeted variable cost (in Rs. per tonne) 19 Production manshifts loss due to IR problems Measures the total number of productive manshifts lost because of IR problems Following scale to be adhered to for rating: 5- if the number of shifts in which production could not be done because of IR problems is zero 4- if the number of shifts in which production could not be done because of IR problems is upto 1% of the total shifts 3- if the number of shifts in which production could not be done because of IR problems is between 1 to 2% of the total shifts 2- if the number of shifts in which production could not be done because of IR problems is between 2 to 3% of the total shifts 1- if the number of shifts in which production could not be done because of IR problems is more than 3% of the total shifts Number of shifts in which production could not be done because of IR problems Total number of manshifts 20 Dispatch target achievement overall (Rs.) % Measures the sector wise despatch against the sector wise target. Following scale to be adhered to for rating: 5- if the actual dispatch value is 91% or above of the target value 4- if the actual dispatch value is between 81 to 90% of the target value 3- if the actual dispatch value is between 71 to 80% of the target value 2- if the actual dispatch value is between 61 to 70% of the target value 1- if the actual dispatch value is less than 60% of the target value Actual despatch (in Rs.) Targeted despatch (in Rs.) x 100 x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\8 Financial 21 Loss Variance per tonne Measures the percentage variance in the actual loss amount per tonne and the budgeted loss amount per tonne. Following rating scale to be adhered : 5- 100% and above achievement 4- Between 86%-99% achievement 3- Between 76%-85% achievement 2- Between 61%-75% achievement 1- Below 60% achievement a. Budgeted loss per tonne - actual loss per tonne Budgeted loss per tonne b. i. If the answer of above is positive, then add 100 to the answer to get achievement % ii. If the answer of above is negative, then subtract 100 to the answer to get achievement % x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\9 Customer 1 Coal grade materialization Measures the total amount of coal dispatched as per declared grade which shows improvement in coal quality Following scale to be adhered to for rating: 5- if 91% or above quantity of coal despatched is as per the declared grade 4- if 81 to 90% quantity of coal despatched is as per the declared grade 3- if 71 to 80% quantity of coal despatched is as per the declared grade 2- if 61 to 70% quantity of coal despatched is as per the declared grade 1- if 60% or less than 60% quantity of coal despatched as per the declared grade Total coal dispatched within declared grade (in tonnes) Total coal dispatched (in tonnes) 2 Reduction in unauthorised absenteeism Measures the volume of time lost due to unauthorised absence from the workplace or from a duty or obligation. Following scale to be adhered to for rating: 5- if the unauthorised absenteeism % in the current year is 0 % 4- if the unauthorised absenteeism % in the current year is 1 to 3% 3- if the unauthorised absenteeism % in the current year is 4 to 6% 2- if the unauthorised absenteeism % in the current year is 7 to 9% 1- if the unauthorised absenteeism % in the current year is 10% or more than 10% Unauthorised absenteeism % in the current year 3 Dispatch target achievement by road mode Measures the percentage achievement of the dispatch target through road mode relative to the budgeted dispatch target. Following scale to be adhered to for rating: 5- if the quantity dispatched by road is 91% or above of the budgeted quantity 4- if the quantity dispatched by road is between 81 to 90% of the budgeted quantity 3- if the quantity dispatched by road is between 71 to 80% of the budgeted quantity 2- if the quantity dispatched by road is between 61 to 70% of the budgeted quantity 1- if the quantity dispatched by road is less than 60% of the budgeted quantity Actual coal dispatched through road (in tonnes) Budgeted coal to be dispatched through road (in tonnes) x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\10 Customer 4 Grievance redressal index Measures the number of grievances of employees that have been addressed. Note: A complaint register should be maintained. Following scale to be adhered to for rating: 5- if the number of grievances redressed is 91% or above of the grievances recorded 4- if the number of grievances redressed is between 81 to 90% of the grievances recorded 3- if the number of grievances redressed is between 71 to 80% of the grievances recorded 2- if the number of grievances redressed is between 61 to 70% of the grievances recorded 1- if the number of grievances redressed is less than 60% of the grievances recorded No. of grievances redressed during the year Total No. of grievances recorded during the year 5 Inventory in terms of months Consumption - mining related spares Measures the number of months running for which inventory is being purchased and stocked. Note: Running inventory = Total inventory - Dead inventory. Following scale to be adhered to for rating: 5- if actual inventory (in months) is equal or less than the inventory norm 4- if actual inventory (in months) is upto 10% of the inventory norm 3- if actual inventory (in months) is between 11 to 20 % of the inventory norm 2- if actual inventory (in months) is between 21 to 30% of the inventory norm 1- if actual inventory (in months) is above 31% of the inventory norm Inventory in value as on 31st March Total consumption in value during the year x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\11 Customer 6 Inventory in terms of months Consumption - mining related consumable Measures the number of months running for which inventory is being purchased and stocked. Note: Running inventory = Total inventory - Dead inventory. Following scale to be adhered to for rating: 5- if actual inventory (in months) is equal or less than the inventory norm 4- if actual inventory (in months) is upto 10% of the inventory norm 3- if actual inventory (in months) is between 11 to 20 % of the inventory norm 2- if actual inventory (in months) is between 21 to 30% of the inventory norm 1- if actual inventory (in months) is above 31% of the inventory norm Inventory in value as on 31st March Total consumption in value during the year 7 Timely reply of Parliament/RTI Queries Measures the number of RTIs which have been replied on time relative to total number of RTIs which have been replied. Following scale to be adhered to for rating: 5- if the number of Parliament/RTI Queries replied within time is 100% 4- if the number of Parliament/RTI Queries replied on time is between 98%-99% of the total queries received 3- if the number of Parliament/RTI Queries replied on time is between 96%-97% of the total queries received 2- if the number of Parliament/RTI Queries replied on time is between 91%-95% of the total queries received 1- if the number of Parliament/RTI Queries replied on time is less than 90% of the total queries received Number of Parliament/RTI Queries replied on time Total number of Parliament/RTI Queries replied x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\12 Customer 8 Coal delivered under E auction Measures the amount of value paid orders refunded due to non supply of required quantity of coal during the year. Following scale to be adhered to for rating: 5- if the quantity delivered under e-auction is 91% or above of the quantity booked 4- if the quantity delivered under e-auction is between 81 to 90% of the quantity booked 3- if the quantity delivered under e-auction is between 71 to 80% of the quantity booked 2- if the quantity delivered under e-auction is between 61 to 70% of the quantity booked 1- if the quantity delivered under e-auction is less than 60% of the quantity booked Total order delivered (in tonnes) Total coal booked under e auction (in tonnes) 9 Dispatch target achievement overall (quantity) % Measures the sector wise despatch against the sector wise target. Following scale to be adhered to for rating: 5- if the quantity dispatched is 91% or above of the target 4- if the quantity dispatched is between 81 to 90% of the target 3- if the quantity dispatched is between 71 to 80% of the target 2- if the quantity dispatched is between 61 to 70% of the target 1- if the quantity dispatched is less than 60% of the target Actual despatch (in tonnes) Targeted despatch (in tonnes) 10 Out of stock situation - Centralized items Measures the number of times an item was unavailable in the stores, when demanded. Following scale to be adhered to for rating: 5- if the number of NA issued for non indented items is zero 4- if the number of NA issued for non indented items is between 1 to 4 3- if the number of NA issued for non indented items is between 5 to 6, 2- if the number of NA issued for non indented items is between 7 to 12, 1- if the number of NA issued for non indented items is more than 12. Number of NA issued for non-indented items in current year x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\13 Customer 11 Out of stock situation - Decentralized items Measures the number of times an item was unavailable in the stores, when demanded. Following scale to be adhered to for rating: 5- if the number of NA issued for non indented items is zero 4- if the number of NA issued for non indented items is between 1 to 4 3- if the number of NA issued for non indented items is between 5 to 6, 2- if the number of NA issued for non indented items is between 7 to 12, 1- if the number of NA issued for non indented items is more than 12. Number of NA issued for non-indented items in current year 12 Welfare expenditure Measures the amount of expenditure incurred on welfare activities relative to the budgeted expenditure to be incurred on welfare activities. Following scale to be adhered to for rating: 5- if the actual welfare expenditure is 91% or above of the budgeted welfare 4- if the actual welfare expenditure is between 81 to 90% of the budgeted welfare 3- if the actual welfare expenditure is between 71 to 80% of the budgeted welfare 2- if the actual welfare expenditure is between 61 to 70% of the budgeted welfare 1- if the actual welfare expenditure is less than 60% of the budgeted welfare Actual welfare expenditure (in Rs.) Budgeted welfare expenditure (in Rs.) x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\14 Customer 13 Utilization of manshift Measures the efciency with which manshift hours are being utilized measured by the actual attendance rate during the period relative to the budgeted attendance. Following scale to be adhered to for rating: 5- if the actual manshifts used are 91% or above vis a vis the budgeted manshifts 4- if the actual manshifts used are between 81 to 90% of the budgeted manshifts 3- if the actual manshifts used are between 71 to 80% of the budgeted manshifts 2- if the actual manshifts used are between 61 to 70% of the budgeted manshifts 1- if the actual manshifts used are less than 60% of the budgeted manshifts Actual manshifts used during the period Total budgeted manshifts during the period 14 Number of tripartite/bipartite meetings Measures the number of tripartite/bipartite meetings which have been conducted during the year relative to the number of meetings to be conducted. Following scale to be adhered to for rating: 5- if the number of meetings held are 91% or above of the targeted meetings 4- if the number of meetings held are between 81 to 90% of the targeted meetings 3- if the number of meetings held are between 71 to 80% of the targeted meetings 2- if the number of meetings held are between 61 to 70% of the targeted meetings 1- if the number of meetings held are less than 60% of the targeted meetings Actual number of tripartite/ bipartite meetings held Budgeted number of tripartite bipartite meetings to be held 15 Sand Stowing Measures the degree to which the unsafe mining is minimised by doing appropriate sand stowing taking the statutory guidelines into consideration. Following rating scale to be adhered for rating : 5- If percentage is between 91% -100% 4- If percentage is between 81%-90% 3- If percentage is between 71%-80% 2- If percentage is between 61%-70% 1- If percentage is 60% or less than 60% Actual Sand stowing done (in cubic meter) Target Sand stowing to be done (in cubic meter) as per statutory requirement x 100 x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\15 Customer 16 Explosive Utilization Measures the utilization of explosives which is determined by the quantity used vis a vis quantity demanded for use. Following scale to be adhered to for rating: 5- if the quantity of explosives used is 91% or above of the quantity demanded 4- if the quantity of explosives used is between 81 to 90% of the quantity demanded 3- if the quantity of explosives used is between 71 to 80% of the quantity demanded 2- if the quantity of explosives used is between 61 to 70% of the quantity demanded 1- if the quantity of explosives used is less than 60% of the quantity demanded Quantity of explosives used (in kg.) Quantity of explosives demanded (in kg.) 17 Dispatch target achievement by rail mode Measures the percentage achievement of the dispatch target through road mode relative to the budgeted dispatch target. Following scale to be adhered to for rating: 5- if the quantity dispatched by road is 91% or above of the budgeted quantity 4- if the quantity dispatched by road is between 81 to 90% of the budgeted quantity 3- if the quantity dispatched by road is between 71 to 80% of the budgeted quantity 2- if the quantity dispatched by road is between 61 to 70% of the budgeted quantity 1- if the quantity dispatched by road is less than 60% of the budgeted quantity Actual tonnes of coal dispatched through rail (in tonnes) Budgeted tonnes of coal to be dispatched through rail (in tonnes) 18 Variation in Reported Mined out Coal & Coal Dispatched as per In- situ measurement Measures the degree to which the variation in Reported Mined out Coal & Coal Dispatched is identifed as per In-situ measurement keeping the guidelines of yellow book into consideration. Following scale to be adhered to for rating: 5- if the variation is +1 or more than +1 4- if the variation is +1 to -1 3- if the variation is -1 to -3 2- if the variation is -3 to -4 1- if the variation is -4 to -5 or more than -5 Variation as identifed as per In-situ measurement. x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\16 Customer 19 Variation in physically measured OB & Reported OBR as per In-situ measurement Measures the degree to which the variation in physically measured OB & Reported OB removal is identifed as per In-situ measurement keeping the guidelines of yellow book into consideration. Following scale to be adhered to for rating: 5- if the variation is +1 or more than +1 4- if the variation is +1 to -0 3- if the variation is 0 to -1 2- if the variation is -1 to -2 1- if the variation is -2 or more than -2 Variation as identifed as per In-situ measurement. 20 Dust suppression & control through water spraying Measures the number of cases of PM beyond permissible limits. Following rating scale to be adhered for rating : 5- If percentage is 0 % 4- If percentage is between 1% -10% 3- If percentage is between 11%-20% 2- If percentage is between 21%-30% 1- If percentage is more than 30% Number of cases of PM beyond permissible limits Total number of sample 21 Sump Development Measures the degree to which the implementation of Annual Action Plan for accumulation of water for pumping purpose has been implemented. Following rating scale to be adhered for rating : 5- If percentage is between 91% -100% 4- If percentage is between 81%-90% 3- If percentage is between 71%-80% 2- If percentage is between 61%-70% 1- If percentage is 60% or less than 60% Actual volume of sump created (in cubic metre) Planned volume of sump to be created (in cubic metre) x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\17 Customer 22 UG Equipment utilization (on roll basis) Measures the actual utilization of equipments by against the norm. Following scale to be adhered to for rating: 5- if the actual utilization of UG equipments is 91% or above of the utilization as per norm 4- if the actual utilization of UG equipments is between 81 to 90% of the utilization as per norm 3- if the actual utilization of UG equipments is between 71 to 80% of the utilization as per norm 2- if the actual utilization of UG equipments is between 61 to 70% of the utilization as per norm 1- if the actual utilization of UG equipments is less than 60% of the utilization as per norm Actual utilization of UG equipments Utilization of UG equipments as per norm 23 OC Equipment utilization (on roll basis) Measures the actual utilization of equipments by against the norm. Following scale to be adhered to for rating: 5- if the actual utilization of OC equipments is 91% or above of the utilization as per norm 4- if the actual utilization of OC equipments is between 81 to 90% of the utilization as per norm 3- if the actual utilization of OC equipments is between 71 to 80% of the utilization as per norm 2- if the actual utilization of OC equipments is between 61 to 70% of the utilization as per norm 1- if the actual utilization of OC equipments is less than 60% of the utilization as per norm Actual utilization of OC equipments Utilization of OC equipments as per norm 24 Maturity of mining related tender - centralised item Measures the number of tenders which were fnalized within validity period relative to the total number of tenders placed. Following scale to be adhered to for rating: 5- if the number of tenders fnalized within validity period is 91% and above of the tenders foated 4- if the number of tenders fnalized within validity period is between 81 to 90% of the tenders foated 3- if the number of tenders fnalized within validity period is between 71 to 80% of the tenders foated 2- if the number of tenders fnalized within validity period is between 61 to 70% of the tenders foated 1- if the number of tenders fnalized within validity period is less than 60% of the tenders foated Number of tenders fnalized within the validity period Number of tenders foated during the year x 100 x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\18 Customer 25 Maturity of mining related tender - decentralised item Measures the number of tenders which were fnalized within validity period relative to the total number of tenders placed. Following scale to be adhered to for rating: 5- if the number of tenders fnalized within validity period is 91% and above of the tenders foated 4- if the number of tenders fnalized within validity period is between 81 to 90% of the tenders foated 3- if the number of tenders fnalized within validity period is between 71 to 80% of the tenders foated 2- if the number of tenders fnalized within validity period is between 61 to 70% of the tenders foated 1- if the number of tenders fnalized within validity period is less than 60% of the tenders foated Number of tenders fnalized within the validity period Number of tenders foated during the year 26 % of sized coal dispatched by rail Measures the percentage of sized (crushed) coal dispatched as per the Annual Action Plan (AAP). Note: the grade of dispatched coal should be as per the MoU target. Following scale to be adhered to for rating: 5- if the quantity of sized coal is 91% or above vis a vis the total quantity dispatched 4- if the quantity of sized coal is between 81 to 90% vis a vis the total quantity dispatched 3- if the quantity of sized coal is between 71 to 80% vis a vis the total quantity dispatched 2- if the quantity of sized coal is between 61 to 70% vis a vis the total quantity dispatched 1- if the quantity of sized coal is less than 60% or less vis a vis the total quantity dispatched Quantity of sized (crushed) coal dispatched Total quantity of coal dispatched x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\19 Customer 27 HEMM Availability % Measures the efectiveness with which HEMM equipments are being maintained for ensuring their optimum availability to produce OB & Coal. Following scale to be adhered to for rating: 5- if the actual availability is above the CMPDI norm 4- if the actual availability is equal to the CMPDI norm 3- if the actual availability is less than to the CMPDI norm by by to 5% 2- if the actual availability is less than to the CMPDI norm by 10% 1- if the actual availability is less than to the CMPDI norm by 15% or more Actual availability Availability norm as per CMPDI 28 UG Equipemnt Availability % Measures the efectiveness with which UG equipments are being maintained for ensuring their optimum availability to produce OB & Coal. Following scale to be adhered to for rating: 5- if the actual availability is above the CMPDI norm 4- if the actual availability is equal to the CMPDI norm 3- if the actual availability is less than to the CMPDI norm by by to 5% 2- if the actual availability is less than to the CMPDI norm by 10% 1- if the actual availability is less than to the CMPDI norm by 15% or more Actual availability Availability norm as per CMPDI x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\20 Internal Process 1 Departmental Coal Production achievement % - annual Measures the actual quantity of coal produced for the organisation v/s target. Following scale to be adhered to for rating: 5- if the actual coal production is 91% or above of the targeted production 4- if the actual coal production is between 81 to 90% of the targeted production 3- if the actual coal production is between 71 to 80% of the targeted production 2- if the actual coal production is between 61 to 70% of the targeted production 1- if the actual coal production is less than 60% of the targeted production Actual Coal Production (in tonnes) Budgeted Coal Production (in tonnes) 2 Departmental OB removal achievement % - annual Measures the actual quantity of OB removed for the organisation v/s target. Following scale to be adhered to for rating: 5- if the actual OB removed is 91% or above of the targeted removal 4- if the actual OB removed is between 81 to 90% of the targeted removal 3- if the actual OB removed is between 71 to 80% of the targeted removal 2- if the actual OB removed is between 61 to 70% of the targeted removal 1- if the actual OB removed is less than 60% of the targeted removal Actual OB Removed (in cubic meter) Budgeted OB Removal (in cubic meter) 3 % Departmental OC coal production - annual Measures the total percentage of actual coal production being done from open cast mines relative to the budgeted open cast production. Following scale to be adhered to for rating: 5- if the actual OC production is 91% or above of the targeted production 4- if the actual OC production is between 81 to 90% of the targeted production 3- if the actual OC production is between 71 to 80% of the targeted production 2- if the actual OC production is between 61 to 70% of the targeted production 1- if the actual OC production is less than 60% of the targeted production Actual OC production (in tonnes) Budgeted OC production (in tonnes) x 100 x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\21 Internal Process 4 % Departmental UG coal production - annual Measures the total percentage of actual coal production being done from under ground mines relative to the budgeted under ground production. Following scale to be adhered to for rating: 5- if the actual UG production is 91% or above of the targeted production 4- if the actual UG production is between 81 to 90% of the targeted production 3- if the actual UG production is between 71 to 80% of the targeted production 2- if the actual UG production is between 61 to 70% of the targeted production 1- if the actual UG production is less than 60% of the targeted production Actual UG production (in tonnes) Budgeted UG production (in tonnes) 5 % Departmental Quarterly Coal Production schedule adherence Measures the degree to which coal production targets were achieved on quarterly basis during the measurement period of time. Following scale to be adhered to for rating: 5- if the number of quarters in which targets are achieved is 100% 4- if the number of quarters in which targets are achieved is 75% 3- if the number of quarters in which targets are achieved is 50% 2- if the number of quarters in which targets are achieved is 25% 1- if the number of quarters in which targets are achieved is 0% No. of quarters in which targets were achieved 4 6 % Departmental Quarterly OB Production schedule adherence Measures the degree to which OB removal targets were achieved on quarterly basis during the measurement period of time. Following scale to be adhered to for rating: 5- if the number of quarters in which targets are achieved is 100% 4- if the number of quarters in which targets are achieved is 75% 3- if the number of quarters in which targets are achieved is 50% 2- if the number of quarters in which targets are achieved is 25% 1- if the number of quarters in which targets are achieved is 0% No. of quarters in which targets were achieved 4 x 100 x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\22 Internal Process 7 % Departmental Shift Coal Production schedule adherence Measures the degree to which coal production targets were achieved on shift basis during the measurement period of time. Following scale to be adhered to for rating: 5- if the number of shifts in which targets are achieved are 91% or above of the target 4- if the number of shifts in which targets are achieved are between 81 to 90% of the target 3- if the number of shifts in which targets are achieved are between 71 to 80% of the target 2- if the number of shifts in which targets are achieved are between 61 to 70% of the target 1- if the number of shifts in which targets are achieved are less than 60% of the target Number of shifts in a quarter in which targets were achieved Total number of shifts in a quarter 8 % Departmental Shift OB Production schedule adherence Measures the degree to which OB removal targets were achieved on shift basis during the measurement period of time. Following scale to be adhered to for rating: 5- if the number of shifts in which targets are achieved are 91% or above of the target 4- if the number of shifts in which targets are achieved are between 81 to 90% of the target 3- if the number of shifts in which targets are achieved are between 71 to 80% of the target 2- if the number of shifts in which targets are achieved are between 61 to 70% of the target 1- if the number of shifts in which targets are achieved are less than 60% of the target Number of shifts in a quarter in which targets were achieved Total number of shifts in a quarter 9 Departmental Output per man shift - Overall Measures the actual overall output per manshift relative to the budgeted overall output. Following scale to be adhered to for rating: 5- if the actual OMS achieved is 91% or above of the bugdet 4- if the actual OMS achieved is between 81 to 90% of the bugdet 3- if the actual OMS achieved is between 71 to 80% of the bugdet 2- if the actual OMS achieved is between 61 to 70% of the bugdet 1- if the actual OMS achieved is less than 60% of the bugdet Actual OMS Budgeted OMS x 100 x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\23 Internal Process 10 Departmental Output per man shift (Underground) Measures the actual overall underground output per manshift relative to the budgeted overall output. Following scale to be adhered to for rating: 5- if the actual OMS achieved is 91% or above of the bugdet 4- if the actual OMS achieved is between 81 to 90% of the bugdet 3- if the actual OMS achieved is between 71 to 80% of the bugdet 2- if the actual OMS achieved is between 61 to 70% of the bugdet 1- if the actual OMS achieved is less than 60% of the bugdet Actual OMS Budgeted OMS 11 Departmental Output per man shift (Open cast) Measures the actual overall open cast output per manshift relative to the budgeted overall output. Following scale to be adhered to for rating: 5- if the actual OMS achieved is 91% or above of the bugdet 4- if the actual OMS achieved is between 81 to 90% of the bugdet 3- if the actual OMS achieved is between 71 to 80% of the bugdet 2- if the actual OMS achieved is between 61 to 70% of the bugdet 1- if the actual OMS achieved is less than 60% of the bugdet Actual OMS Budgeted OMS 12 Compliance to Safety committee observations Measures the adherence to safety norms of the PIT safety committee. Following scale to be adhered to for rating: 5- if the number of observations complied with are 91% or above of the total 4- if the number of observations complied with are between 81 to 90% of the total 3- if the number of observations complied with are between 71 to 80% of the total 2- if the number of observations complied with are between 61 to 70% of the total 1- if the number of observations complied with are less than 60% of the total No. of observations received from pit safety committee complied Total no. of observations x 100 x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\24 Internal Process 13 Night shift inspections & report submission Measures the number of night inspections which have been carried out relative to scheduled number of inspections to be carried out. Following scale to be adhered to for rating: 5- if number of night inspections done is 91% or above vis a vis the scheduled number of inspections required to be done 4- if number of night inspections done is between 81 to 90% of the scheduled number of inspections required to be done 3- if number of night inspections done is between 71 to 80% of the scheduled number of inspections required to be done 2- if number of night inspections done is between 61 to 70% of the scheduled number of inspections required to be done 1- if number of night inspections done is less than 60% of the scheduled number of inspections required to be done Actual number of night inspections done Scheduled number of night inspections to be done as per statutory law 14 UG inspection rate Measures the efciency with which the UG inspections are being carried out relative to the number of working days. Following scale to be adhered to for rating: 5- if number of night inspections done is 91% or above vis a vis the scheduled number of inspections required to be done 4- if number of night inspections done is between 81 to 90% of the scheduled number of inspections required to be done 3- if number of night inspections done is between 71 to 80% of the scheduled number of inspections required to be done 2- if number of night inspections done is between 61 to 70% of the scheduled number of inspections required to be done 1- if number of night inspections done is less than 60% of the scheduled number of inspections required to be done Actual number of inspections conducted Total number of working days 15 Updation of face support - Roof Bolts Measures the number of roof bolts installed and % completion against face progress. Following scale to be adhered to for rating: 5- if the number of roof bolts installed is 91% or above of the target 4- if the number of roof bolts installed is between 81 to 90% of the target 3- if the number of roof bolts installed is between 71 to 80% of the target 2- if the number of roof bolts installed is between 61 to 70% of the target 1- if the number of roof bolts installed is less than 60% of the target No of roof bolts installed No. of bolts required to be installed as per support plan x 100 x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\25 Internal Process 16 Finalization of coal transportation contract Measures the efciency in fnalizing the coal transportation contracts before the expiry of the same relative to total number of contracts in place. Following scale to be adhered to for rating: 5- if the number of contracts fnalized by due date are 91% and above 4- if the number of contracts fnalized by due date are between 81 to 90% 3- if the number of contracts fnalized by due date are between 71 to 80% 2- if the number of contracts fnalized by due date are between 61 to 70% 1- if the number of contracts fnalized by due date are less than 60% Number of contracts fnalized on or before expiry of the existing contract Total number of coal transport contracts that are required to be renewed 17 Construction of preparatory stoppings & Sectionalisation of the U/G area Measures the sectionlisation of u/g section after completion of development or as per the programme if the section is not being simultaneously depillered. Following scale to be adhered to for rating: 5- if the number of ventilation stoppings completed is 91% or above of the target 4- if the number of ventilation stoppings completed is between 81 to 90% of the target 3- if the number of ventilation stoppings completed is between 71 to 80% of the target 2- if the number of ventilation stoppings completed is between 61 to 70% of the target 1- if the number of ventilation stoppings completed is between 81 to 90% of the target Actual number of stoppings completed within the defned timeframe Targeted number of stoppings to be completed 18 Timely preparation & submission of material budget Measures the preparation of material budget and its submission to head quarter within scheduled time period. Following scale to be adhered to for rating: 5- On or before time 4- if delayed by a wee 3- if delayed by 2 weeks 2- if delayed by 3 weeks 1- If never submitted. Note: The target for submission is August. Delay measured in days x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\26 Internal Process 19 Contract worker non-compliance index Measures the non-compliance with respect to contract worker related issues. Following scale to be adhered to for rating: 5- if number of violations in current year is zero 4- if number of violations in current year is less than previous year 3- if number of violations in current year is equal to previous year, 2- if number of violations in current year is more than previous year 1- if number of violations in current year is double than previous year No. of violated cases reported in the current year No. of violated cases reported in the previous year 20 Utilisation of revenue budget Measures the actual utilisation/expenditure against the provision. Following rating scale to be adhered for rating : 5- If percentage is 91% and above 4- If percentage is between 81%-90% 3- If percentage is between 71%-80% 2- If percentage is between 71%-60% 1- If percentage is less than 60 Actual revenue cost per cubic metre Budgeted revenue cost per cubic metre 21 Number of safety violations identifed in mining dept by DGMS Measures the total number of safety violations identifed in the mining dept by DGMS. Following scale to be adhered to for rating: 5- if number of violations identifed is 91% or above of the actual number violations in mining dept 4- if number of violations identifed is between 81 to 90% of the actual number violations in mining dept 3- if number of violations identifed is between 71 to 80% of the actual number violations in mining dept 2- if number of violations identifed is between 61 to 70% of the actual number violations in mining dept 1- if number of violations identifed is less than 60% of the actual number violations in mining dept Number of safety violations identifed in mining dept. Total number of safety violations identifed x 100 x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\27 Internal Process 22 Number of safety violations identifed in mining dept by ISO auditors Measures the total number of safety violations identifed in the mining dept by ISO auditors. Following scale to be adhered to for rating: 5- if number of violations identifed is 91% or above of the actual number violations in mining dept 4- if number of violations identifed is between 81 to 90% of the actual number violations in mining dept 3- if number of violations identifed is between 71 to 80% of the actual number violations in mining dept 2- if number of violations identifed is between 61 to 70% of the actual number violations in mining dept 1- if number of violations identifed is less than 60% of the actual number violations in mining dept Number of safety violations identifed in mining dept. Total number of safety violations identifed 23 Coal stock reduction Measures the % reduction in stock of coal in current year as compared to last year. Following scale to be adhered to for rating: 5- if the coal stock is less than that of previous year 4- if the coal stock is equal to previous year 3- if the coal stock is more than the previous year by upto 5% 2- if the coal stock is more than the previous year by upto 10% 1- if the coal stock is more than the previous year by upto 15% Coal stock as on 31st March of the current year Coal stock as on 31st March of the previous year 24 Audit Paragraph A measure that highlights the degree to which documentation and process execution is in sync with the standard operating procedures of the company. Following scale to be adhered to for rating: 5- if the number of audit paragraphs that have been dropped is 100% 4- if the number of audit paragraphs that have been dropped is between 91 to 99% of the number raised 3- if the number of audit paragraphs that have been dropped is between 81 to 90% of the number raised 2- if the number of audit paragraphs that have been dropped is between 61 to 80% of the number raised 1- if the number of audit paragraphs that have been dropped is less than 60% of the number raised Actual number of audit paragraphs dropped Actual number of audit paragraphs raised x 100 x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\28 Internal Process 25 % Performance appraisal participation rate Measures the % of employees who submitted the flled goal sheets at the start of the year within the stipulated time frame out of the total number of employees who were required to fll up the goal sheets. Following scale to be adhered to for rating: 5- if the number of employees who have submitted their appraisal form by due date is 100% 4- if the number of employees who have submitted their appraisal form by due date is between 95 to 99% of the total target population of the eligible employees 3- if the number of employees who have submitted their appraisal form by due date is between 91 to 94% of the total target population of the eligible employees 2- if the number of employees who have submitted their appraisal form by due date is between 81 to 90% of the total target population of the eligible employees 1- if the number of employees who have submitted their appraisal form by due date is less than 80% of the total target population of the eligible employees Number of employees who submitted their appraisal form within the due date Total target population of the eligible employees 26 % Performance appraisal completed on time Measures the proportion of employee performance appraisals completed as scheduled (at the end of the year) from the total appraisals due. Following scale to be adhered to for rating: 5- if the number of employees who have been appraised by due date is 100% 4- if the number of employees who have been appraised by due date is between 95 to 99% of the total target population of the eligible employees 3- if the number of employees who have been appraised by due date is between 91 to 94% of the total target population of the eligible employees 2- if the number of employees who have been appraised by due date is between 81 to 90% of the total target population of the eligible employees 1- if the number of employees who have been appraised by due date is less than 80% of the total target population of the eligible employees No. of employees appraised by due date Total target population of the employees x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\29 Internal Process 27 Timely preparation of Manpower Budget. Measures the timeliness and efciency with which manpower budget is formulated and the delay is measured in terms of mandays. Following scale to be adhered to for rating: 5- On or before time 4- if delayed by a week 3- if delayed by 2 weeks 2- if delayed by 3 weeks 1- If never submitted. Delay measured in terms of weeks 28 % Maintenance backlog Measures the number of machines which have undergone scheduled maintenance. Following scale to be adhered to for rating: 5- if the number of machines undergone schedule maintenance is 91% or above of the target 4- if the number of machines undergone schedule maintenance is between 81 to 90% of the target 3- if the number of machines undergone schedule maintenance is between 71 to 80% of the target 2- if the number of machines undergone schedule maintenance is between 61 to 70% of the target 1- if the number of machines undergone schedule maintenance is less than 60% of the target Number of machines undergone scheduled maintenance Number of machines identifed for scheduled maintenance 29 Timely renewal of AMC / RC / statutory licenses Measures the percentage of AMC / RC that are renewed within 2 months from the expiry date.. Following scale to be adhered to for rating: 5- if the number of AMC / RC /statutory licenses renewed within 2 months is 91% or above 4- if the number of AMC / RC /statutory licenses renewed within 2 months is between 81 to 90% 3- if the number of AMC / RC /statutory licenses renewed within 2 months is between 71 to 80% 2- if the number of AMC / RC /statutory licenses renewed within 2 months is between 61 to 70% 1- if the number of AMC / RC /statutory licenses renewed within 2 months is less than 60% Number of AMC / RC /statutory licenses renewed on or within 2 months of the expiry date Total number of AMC / RC / statutory licenses renewed x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\30 Internal Process 30 Maintenance of siding stock / Coal safety stock Measures the number of times in coal stockout/loading shortage related situation occurred in the current year due to non availiability of coal at the siding point. Following scale to be adhered to for rating: 5- if the number of times coal stockout/loading shortage related situation occurred during the year is 0% of total rakes despatched 4- if the number of times coal stockout/loading shortage related situation occurred during the year is 1 to 5% of total rakes despatched 3- if the number of times coal stockout/loading shortage related situation occurred during the year is 6 to 10% of total rakes despatched 2- if the number of times coal stockout/loading shortage related situation occurred during the year is 11 to 20% of total rakes despatched 1- if the number of times coal stockout/loading shortage related situation occurred during the year is more than 20% of total rakes despatched Number of times coal stockout or loading shortage related situation occurred during the year Total rakes despatched 31 Compliance of DGMS violations Measures the adherence to compliance with regards to the DGMS violations relative to the total number of violations identifed. Following scale to be adhered to for rating: 5- if the number of violations complied is 91% or above of the violations identifed 4- if the number of violations complied is between 81 to 90% of the violations identifed 3- if the number of violations complied is between 71 to 80% of the violations identifed 2- if the number of violations complied is between 61 to 70% of the violations identifed 1- if the number of violations complied is less than 60% of the violations identifed Number of DGMS violations complied Total number of DGMS violations identifed x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\31 Internal Process 32 Compliance of ISO auditor violations Measures the adherence to compliance with regards to the ISO auditor violations relative to the total number of violations identifed. Following scale to be adhered to for rating: 5- if the number of violations complied is 91% or above of the violations identifed 4- if the number of violations complied is between 81 to 90% of the violations identifed 3- if the number of violations complied is between 71 to 80% of the violations identifed 2- if the number of violations complied is between 61 to 70% of the violations identifed 1- if the number of violations complied is less than 60% of the violations identifed Number of violations complied Total number of violations identifed by ISO auditor 33 Timely submission of monthly report Measures the number of times when monthly report of power requirement and availability of power is submitted to subsidiaries and MoC on time. Following scale to be adhered to for rating: 5- if the number of reports submitted on time is 91% or above of the total reports submitted 4- if the number of reports submitted on time is between 81 to 90% of the total reports submitted 3- if the number of reports submitted on time is between 71 to 80% of the total reports submitted 2- if the number of reports submitted on time is between 61 to 70% of the total reports submitted 1- if the number of reports submitted on time is less than 60% of the total reports submitted Number of times monthly report was submitted on time Total number of months when report was submitted 34 Annual MIS reports submitted on time Measures the delay in submission of annual report beyond stipulated date. Note: 30th June is the deadline for each year. Following scale to be adhered to for rating: 5- On or before time 4- if delayed by a week 3- if delayed by 2 weeks 2- if delayed by 3 weeks 1- If never submitted. Delay measured in days x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\32 Internal Process 35 Coal stock measurement - monthly Measures the actual number of coal stock measurements which have been done and the report for same has been sent to the HQ on time relative to the targeted number of measurements to be carried out. Following scale to be adhered to for rating: 5- if the number of reports submitted on time is 91% or above of the total reports submitted 4- if the number of reports submitted on time is between 81 to 90% of the total reports submitted 3- if the number of reports submitted on time is between 71 to 80% of the total reports submitted 2- if the number of reports submitted on time is between 61 to 70% of the total reports submitted 1- if the number of reports submitted on time is less than 60% of the total reports submitted Number of coal stock measurements carried out & reports sent to the HQ within schedule time Total number of coal stock measurements to be carried out 36 Coal stock measurement - quarterly Measures the actual number of coal stock measurements which have been done and the report for same has been sent to the HQ on time relative to the targeted number of measurements to be carried out. Following scale to be adhered to for rating: 5- if the number of reports submitted on time is 91% or above of the total reports submitted 4- if the number of reports submitted on time is between 81 to 90% of the total reports submitted 3- if the number of reports submitted on time is between 71 to 80% of the total reports submitted 2- if the number of reports submitted on time is between 61 to 70% of the total reports submitted 1- if the number of reports submitted on time is less than 60% of the total reports submitted Number of coal stock measurements carried out & reports sent to the HQ within schedule time Total number of coal stock measurements to be carried out x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\33 Internal Process 37 Coal stock measurement - half yearly Measures the actual number of coal stock measurements which have been done and the report for same has been sent to the HQ on time relative to the targeted number of measurements to be carried out. Following scale to be adhered to for rating: 5- if the number of reports submitted on time is 91% or above of the total reports submitted 4- if the number of reports submitted on time is between 81 to 90% of the total reports submitted 3- if the number of reports submitted on time is between 71 to 80% of the total reports submitted 2- if the number of reports submitted on time is between 61 to 70% of the total reports submitted 1- if the number of reports submitted on time is less than 60% of the total reports submitted Number of coal stock measurements carried out & reports sent to the HQ within schedule time Total number of coal stock measurements to be carried out 38 Coal stock measurement - annually Measures the actual number of coal stock measurements which have been done and the report for same has been sent to the HQ on time relative to the targeted number of measurements to be carried out. Following scale to be adhered to for rating: 5- if the number of reports submitted on time is 91% or above of the total reports submitted 4- if the number of reports submitted on time is between 81 to 90% of the total reports submitted 3- if the number of reports submitted on time is between 71 to 80% of the total reports submitted 2- if the number of reports submitted on time is between 61 to 70% of the total reports submitted 1- if the number of reports submitted on time is less than 60% of the total reports submitted Number of coal stock measurements carried out & reports sent to the HQ within schedule time Total number of coal stock measurements to be carried out 39 Prohibitory orders issued under section 22 by DGMS Measures the number of prohibitory orders which have been issued under section 22 which can be either a notice for closure or for immediate closure. Following scale to be adhered to for rating: 5- if no order is issued 1- if any order is issued Number of orders issued x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\34 Internal Process 40 Machine Idle Hour due to non availability of coal Measures the actual time which for which machine is kept idle due to non availability of coal. Following scale to be adhered to for rating: 5- if the number of idle hours due to non avaliability of coal is less than 1% of the total available working hours 4- if the number of idle hours due to non avaliability of coal is more than 1% but less than 2% of the total available working hours 3- if the number of idle hours due to non avaliability of coal is more than 2% but less than 3% of the total available working hours 2- if the number of idle hours due to non avaliability of coal is more than 3% but less than 4% of the total available working hours 1- if the number of idle hours due to non avaliability of coal is more than 4% of the total available working hours Actual idle hours per day due to non availability of coal Available hours (Breakdown hours + maintenance hours + travel time) 41 Indent processing Measures the extent to which the indent that has been submitted to MM for initiating procurement is complete from all respect for initiating procurement . Following scale to be adhered to for rating: 5- if the actual number of indents where Technical Scrutiny & other parameters were furnished after approval of indent by Competent Authority on request of Material Management Department is 0% 4- if the actual number of indents where Technical Scrutiny & other parameters were furnished after approval of indent by Competent Authority on request of Material Management Department is between 1% to 2% of the total indents submitted 3- if the actual number of indents where Technical Scrutiny & other parameters were furnished after approval of indent by Competent Authority on request of Material Management Department is between 3% to 5% of the total indents submitted 2- if the actual number of indents where Technical Scrutiny & other parameters were furnished after approval of indent by Competent Authority on request of Material Management Department is between 6% to 8% of the total indents submitted 1- if the actual number of indents where Technical Scrutiny & other parameters were furnished after approval of indent by Competent Authority on request of Material Management Department is 8% or above of the total indents submitted Number of indents where Technical Scrutiny & other parameters were furnished after approval of indent by Competent Authority Department Total number of Indents submitted to MM Department x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\35 Internal Process 42 Hired HEMM OB removal achievement % Measures the actual quantity of OB removed for the organisation v/s target. Following scale to be adhered to for rating: 5- if the actual OB removed is 91% or above of the targeted removal 4- if the actual OB removed is between 81 to 90% of the targeted removal 3- if the actual OB removed is between 71 to 80% of the targeted removal 2- if the actual OB removed is between 61 to 70% of the targeted removal 1- if the actual OB removed is less than 60% of the targeted removal Actual OB Removed (in cubic metre) Targeted OB Removal (in cubic metre) 43 % Hired HEMM OC coal production Measures the total percentage of actual coal production being done from open cast mines relative to the budgeted open cast production. Following scale to be adhered to for rating: 5- if the actual OC production is 91% or above of the targeted production 4- if the actual OC production is between 81 to 90% of the targeted production 3- if the actual OC production is between 71 to 80% of the targeted production 2- if the actual OC production is between 61 to 70% of the targeted production 1- if the actual OC production is less than 60% of the targeted production Actual OC production (in tonnes) Budgeted OC production (in tonnes) 44 % Hired HEMM Quarterly Coal Production schedule adherence Measures the degree to which coal production targets were achieved on quarterly basis during the measurement period of time. Following scale to be adhered to for rating: 5- if the number of quarters in which targets are achieved is 100% 4- if the number of quarters in which targets are achieved is 75% 3- if the number of quarters in which targets are achieved is 50% 2- if the number of quarters in which targets are achieved is 25% 1- if the number of quarters in which targets are achieved is 0% No. of quarters in which targets were achieved 4 x 100 x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\36 Internal Process 45 % Hired HEMM Quarterly OB Production schedule adherence Measures the degree to which OB removal targets were achieved on quarterly basis during the measurement period of time. Following scale to be adhered to for rating: 5- if the number of quarters in which targets are achieved is 100% 4- if the number of quarters in which targets are achieved is 75% 3- if the number of quarters in which targets are achieved is 50% 2- if the number of quarters in which targets are achieved is 25% 1- if the number of quarters in which targets are achieved is 0% No. of quarters in which targets were achieved 4 46 % Hired HEMM Shift Coal Production schedule adherence Measures the degree to which coal production targets were achieved on shift basis during the measurement period of time. Following scale to be adhered to for rating: 5- if the number of shifts in which targets are achieved are 91% or above of the target 4- if the number of shifts in which targets are achieved are between 81 to 90% of the target 3- if the number of shifts in which targets are achieved are between 71 to 80% of the target 2- if the number of shifts in which targets are achieved are between 61 to 70% of the target 1- if the number of shifts in which targets are achieved are less than 60% of the target Number of shifts in a quarter in which targets were achieved Total number of shifts in a quarter 47 % Hired HEMM Shift OB Production schedule adherence Measures the degree to which OB removal targets were achieved on shift basis during the measurement period of time. Following scale to be adhered to for rating: 5- if the number of shifts in which targets are achieved are 91% or above of the target 4- if the number of shifts in which targets are achieved are between 81 to 90% of the target 3- if the number of shifts in which targets are achieved are between 71 to 80% of the target 2- if the number of shifts in which targets are achieved are between 61 to 70% of the target 1- if the number of shifts in which targets are achieved are less than 60% of the target Number of shifts in a quarter in which targets were achieved Total number of shifts in a quarter x 100 x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\37 Internal Process 48 Hired HEMM Output per man shift (Open cast) Measures the actual overall open cast output per manshift relative to the budgeted overall output. Following scale to be adhered to for rating: 5- if the actual OMS achieved is 91% or above of the bugdet 4- if the actual OMS achieved is between 81 to 90% of the bugdet 3- if the actual OMS achieved is between 71 to 80% of the bugdet 2- if the actual OMS achieved is between 61 to 70% of the bugdet 1- if the actual OMS achieved is less than 60% of the bugdet Actual OMS Budgeted OMS 49 Updation of face support - Support item Measures the number of support items installed and % completion against face progress. Following scale to be adhered to for rating: 5- if the number of support items installed is 91% or above of the target 4- if the number of support items installed is between 81 to 90% of the target 3- if the number of support items installed is between 71 to 80% of the target 2- if the number of support items installed is between 61 to 70% of the target 1- if the number of support items installed is less than 60% of the target No of support units installed No. of units required to be installed as per support plan 50 CCDA claim processing Measures the degree to which CCDA claims has been processed within the stipulated timelines. Following scale to be adhered to for rating: 5- if the number of CCDA claims processed within 15 days is 91% or above 4- if the number of value paid orders refunded is between 81 to 90% 3- if the number of value paid orders refunded is between 71 to 80% 2- if the number of value paid orders refunded is between 61 to 70% 1- if the number of value paid orders refunded is 60% or less than 60% Number of CCDA claims processed within 15 days from the date of receipt Total number of CCDA claims to be processed x 100 x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\38 Internal Process 51 Quarterly random testing of Explosive Measures the degree to which the quality of explosive is being ensured by doing timely random testing of the same in consultation with CMPDI . Following rating scale to be adhered for rating : 5- If percentage is between 91% -100% 4- If percentage is between 81%-90% 3- If percentage is between 71%-80% 2- If percentage is between 61%-70% 1- If percentage is 60% or less than 60% Actual velocity of explosive Velocity as per norm 52 Powder Factor Measures the degree to which the explosives are optimally getting utilised to produce optimum level of fragmentation. Following scale to be adhered to for rating: 5- if the power quantity being used is 91% or above of the targeted quantity 4- if the power quantity being used is between 81 to 90% of the targeted quantity 3- if the power quantity being used is between 71 to 80% of the targeted quantity 2- if the power quantity being used is between 61 to 70% of the targeted quantity 1- if the power quantity being used is less than 60% of the targeted quantity Actual Powder factor Targeted Powder factor 53 Detonator factor for UG Measures the degree to which the explosives are optimally getting utilised to produce optimum level of fragmentation. Following scale to be adhered to for rating: 5- if the detonator quantity being used is 91% or above of the targeted quantity 4- if the detonator quantity being used is between 81 to 90% of the targeted quantity 3- if the detonator quantity being used is between 71 to 80% of the targeted quantity 2- if the detonator quantity being used is between 61 to 70% of the targeted quantity 1- if the detonator quantity being used is less than 60% of the targeted quantity Actual Detonator factor Targeted Detonator factor x 100 x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\39 Internal Process 54 Explosive Availability Measures the availability of explosives which is determined by the quantity demanded vis a vis quantity ofered for use. Following scale to be adhered to for rating: 5- if the quantity of explosives made available is 91% or above of the quantity demanded 4- if the quantity of explosives made available is between 81 to 90% of the quantity demanded 3- if the quantity of explosives made available is between 71 to 80% of the quantity demanded 2- if the quantity of explosives made available is between 61 to 70% of the quantity demanded 1- if the quantity of explosives made available is less than 60% of the quantity demanded Quantity of explosives made available (in kg.) Quantity of explosives demanded (in kg.) 55 Coal tub factor Measures the efciency with which tub is being used with regards to the capacity of the tub. Following scale to be adhered to for rating: 5- if the quantity of coal reported is 96% or above of the capacity of the tub 4- if the quantity of coal reported is between 91 to 95% of the capacity of the tub 3- if the quantity of coal reported is between 86 to 90% of the capacity of the tub 2- if the quantity of coal reported is between 81 to 85% of the capacity of the tub 1- if the quantity of coal reported is less than 80% of the capacity of the tub Actual tonnes of coal reported Number of tubs reported x Capacity of tub x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\40 Internal Process 56 Maintenance of Logbook / Record as per prescribed format Measures the number of actual entries that have been made in the log book or records have been kept vis-e-vis the entries that are required to be made in the logbook or records to be kept. Following scale to be adhered to for rating: 5- if the actual number of entries available in the logbook is 91% or above 4- if the actual number of entries available in the logbook is between 81 to 90% of the required entries 3- if the actual number of entries available in the logbook is between 71 to 80% of the required entries 2- if the actual number of entries available in the logbook is between 61 to 70% of the required entries 1- if the actual number of entries available in the logbook is less than 60% of the required entries Number of actual entries that have been made in the log book or records that have been kept properly Number of entries that are required to be made in the logbook or records to be kept x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\41 Learning and Growth 1 Vocational training index Measures the % of achieved trained individuals, out of the total plant trained individuals. Following scale to be adhered to for rating: 5- if the number of employees provided refresher training is 100% 4- if the number of employees provided refresher training is between 96% to 99% of the budgeted employees 3- if the number of employees provided refresher training is between 91 to 95% of the budgeted employees 2- if the number of employees provided refresher training is between 85 to 90% of the budgeted employees 1- if the number of employees provided refresher training is less than 85% of the budgeted employees Actual number of employees provided refresher training Budgeted number of employees to be provided refresher training 2 % Periodic medical examination achievement rate Measures the % of employees who have been sponsored for periodic medical examination relative to the targeted number of employees to be sponsored. Following scale to be adhered to for rating: 5- if the number of employees sponsored is 91% or above of the target 4- if the number of employees sponsored is between 81 to 90% of the target 3- if the number of employees sponsored is between 71 to 80% of the target 2- if the number of employees sponsored is between 61 to 70% of the target 1- if the number of employees sponsored is less than 60% of the target Number of employees sponsored for periodic medical examination Targeted number of employees to be sponsored and examined for periodic medical examination x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\42 Learning and Growth 3 New districts added Measures the efectiveness with which the planned number of new districts have been added in the production zone. Following scale to be adhered to for rating: 5- if the number of new districts added is 91% or above of the target 4- if the number of new districts added is between 81 to 90% of the target 3- if the number of new districts added is between 71 to 80% of the target 2- if the number of new districts added is between 61 to 70% of the target 1- if the number of new districts added is less than 60% of the target Number of new districts added Number of new districts planned to be added 4 Utilisation of capital budget Measures the actual utilisation/expenditure against the provision. Following rating scale to be adhered for rating : 5- If percentage is 91% and above 4- If percentage is between 81%-90% 3- If percentage is between 71%-80% 2- If percentage is between 71%-60% 1- If percentage is less than 60% Actual utilization of budget (in Rs.) Allocated capital budget (in Rs.) 5 % Utilisation of CSR budget Measures the degree of delay in implementation of CSR initiatives within the measurement period. Following rating scale to be adhered for rating : 5- If percentage is 91% and above 4- If percentage is between 81%-90% 3- If percentage is between 71%-80% 2- If percentage is between 71%-60% 1- If percentage is less than 60% Actual expenditure on CSR (in Rs.) Budgeted CSR amount (in Rs.) x 100 x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\43 Learning and Growth 6 Non SAP/Oracle report generation Measures the number of non SAP or Oracle reports getting generated relative to planned number of reports to be generated. Following rating scale to be adhered for rating : 5- if the number of reports generated is 91% or above of the reports to be generated 4- if the number of reports generated is between 81 to 90% of the reports to be generated 3- if the number of reports generated is between 71 to 80% of the reports to be generated 2- if the number of reports generated is between 61 to 70% of the reports to be generated 1- if the number of reports generated is less than 60% of the reports to be generated" Number of reports generated Number of reports to be generated 7 Year on year reduction in mining related inventory of non moving items (excluding non obsolete items & non insurance items) Measures the percentage reduction in inventory of non moving items (excluding non obsolete items & non insurance items) in current year as compared to previous year. Following scale to be adhered to for rating: 5- if the reduction in inventory is 10% or more 4- if the reduction in inventory is 7 to 9% or more 3- if the reduction in inventory is 4 to 6% or more 2- if the reduction in inventory is 1 to 3% or more 1- if the reduction in inventory is 0% Value of non moving items (excluding non obsolete items & non insurance items) in the start of current year Value of non moving items (excluding non obsolete items & non insurance items) at the end of year / Closing value of non moving items (excluding non obsolete items & non insurance items) in previous year x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\44 Learning and Growth 8 Year on year reduction in overall mining related inventory Measures the percentage reduction in overall inventory value in current year as compared to previous year. Following scale to be adhered to for rating: 5- if the reduction in inventory is 10% or more 4- if the reduction in inventory is 7 to 9% or more 3- if the reduction in inventory is 4 to 6% or more 2- if the reduction in inventory is 1 to 3% or more 1- if the reduction in inventory is 0% Value of overall inventory (excluding obsolete inventory) in start of the current year Value of overall inventory (excluding obsolete inventory) in end of the current year / Value of overall inventory (excluding obsolete inventory) at the end of the previous year 9 Mine Capacity addition Measures the enhancement in mine capacity over and above the previous year capacity. Following scale to be adhered to for rating: 5- if the capacity added in mines is 91% or above of the plan to be added 4- if the capacity added in mines is between 81 to 90% of the plan to be added 3- if the capacity added in mines is between 71 to 80% of the plan to be added 2- if the capacity added in mines is between 61 to 70% of the plan to be added 1- if the capacity added in mines is less than 60% of the plan to be added Additional capacity added in the current year (million tonnes) Mine capacity planned to be added (million tonnes) x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\45 Learning and Growth 10 Coal Exposure Ratio Measures the degree of exposed coal which is available at the year end as compared to beginning of the year. Note: Valid only for open cast mining. Following scale to be adhered to for rating: 5- if the closing coal exposure is more than the opening exposure ratio by more than 5% 4- if the closing coal exposure is more than the opening exposure ratio by upto 5% 3- if the closing coal exposure is equal to the opening exposure ratio (i.e. 100%) 2- if the closing coal exposure is less than opening exposure ratio by upto 5% 1- if the closing coal exposure is less than the opening exposure ratio by more than 5% Closing coal exposure ratio Opening coal exposure ratio 11 Physical possession of land Measures the actual hectares of land which has been possessed relative to the target given by head quarter. Following scale to be adhered to for rating: 5- if the actual hectares of land possessed is 91% or above of the target 4- if the actual hectares of land possessed is between 81 to 90% of the target 3- if the actual hectares of land possessed is between 71 to 80% of the target 2- if the actual hectares of land possessed is between 61 to 70% of the target 1- if the actual hectares of land possessed is less than 60% of the target Actual land possessed (in hectares) Targeted land to be possessed (in hectares) x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\46 Learning and Growth 12 Mine development Measures the degree to which the pre-planned mine development work has actually been implemented. Following scale to be adhered to for rating: 5- if the actual number of milestones achieved is 91% or above vis a vis the target 4- if the actual number of milestones achieved is between 81 to 90% of the target 3- if the actual number of milestones achieved is between 71 to 80% of the target 2- if the actual number of milestones achieved is between 61 to 70% of the target 1- if the actual number of milestones achieved is less than 60% of the target Actual number of milestones achieved Target number of milestones to be achieved 13 % Land restoration (plantation) Measures proportion of land surface that was rehabilitated to its natural form by planting saplings in the backflled & OB areas Following scale to be adhered to for rating: 5- if the number of plants sowed is 91% or above of the target 4- if the number of plants sowed is between 81 to 90% of the target 3- if the number of plants sowed is between 71 to 80% of the target 2- if the number of plants sowed is between 61 to 70% of the target 1- if the number of plants sowed is less than 60% of the target Actual plantation (in number per hectare) Targeted plantation (in number per hectare) 14 % Back fling of technically reclaimed area Measures the percentage of land which has been back fled after coal has been extracted. Following scale to be adhered to for rating: 5- if the volume of land back flled is 91% or above vis a vis the target 4- if the volume of land back flled is between 81 to 90% of the target 3- if the volume of land back flled is between 71 to 80% of the target 2- if the volume of land back flled is between 61 to 70% of the target 1- if the volume of land back flled is less than 60% of the target Actual volume (mm cube) of back flling Targeted volume (mm cube) of back flling as per EMP x 100 x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\47 Learning and Growth 15 Implementation of new projects / future projects Measures the number of milestones that have been achieved for new or future projects as against the planned number of milestones to be achieved. Following scale to be adhered to for rating: 5- if the number of milestones achieved is 91% or above of the target 4- if the number of milestones achieved is between 81 to 90% of the target 3- if the number of milestones achieved is between 71 to 80% of the target 2- if the number of milestones achieved is between 61 to 70% of the target 1- if the number of milestones achieved is less than 60% of the target Actual number of milestones achieved Target number of milestones to be achieved 16 Rehabilitation of Project afected people (PAP) Measures the total number of families which have been shifted relative to the targeted number of families. Following scale to be adhered to for rating: 5- if the number of families rehabilitated is 91% or above of the target 4- if the number of families rehabilitated is between 81 to 90% of the target 3- if the number of families rehabilitated is between 71 to 80% of the target 2- if the number of families rehabilitated is between 61 to 70% of the target 1- if the number of families rehabilitated is less than 60% of the target Actual number of families rehabilitated Targeted number of families planned to be rehabilitated x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\48 Learning and Growth 17 Scrap generation/collection Measures the increase in the value of scrap being disposed of in current year relative to the value of scrap disposed of in previous year. Following scale to be adhered to for rating: 5- if the scrap generated/collected in the current year is 2% or more than the previous year 4- if the scrap generated/collected in the current year is 1% more than the scrap generated/collected the previous year 3- if the scrap generated/collected in the current year is equal to the scrap generated/collected the previous year 2- if the scrap generated/collected in the current year is less than the scrap generated/collected the previous year 1- if no scrap has been generated Value of scrap generated in the current year Value of scrap generated in the previous year 18 Updation of employee skill Measures the percentage of achieved training Mandays out of the total planned training Mandays. Following scale to be adhered to for rating: 5- if the employees released for training by HOD is 91% and above 4- if the employees released for training by HOD is between 81 to 90% of the required number of employees to be released 3- if the employees released for training by HOD is between 71 to 80% of the required number of employees to be released 2- if the employees released for training by HOD is between 61 to 70% of the required number of employees to be released 1- if the employees released for training by HOD is less than 60% of the required number of employees to be released Number of employees released for trainings by the HOD Total number of employees nominated for trainings by HRD x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\49 Learning and Growth 19 Employee Satisfaction index Measures the employees' engagement in their work activities and responsibilities in terms of enthusiasm and commitment. Following scale to be adhered to for rating: 5- if the number of employees giving a rating of 4 or 5 is 91% and above of the total survey population 4- if the number of employees giving a rating of 4 or 5 is between 81 to 90% of the total survey population 3- if the number of employees giving a rating of 4 or 5 is between 71 to 80% of the total survey population 2- if the number of employees giving a rating of 4 or 5 is between 61 to 70% of the total survey population 1- if the number of employees giving a rating of 4 or 5 is equal to or less than 60% of the total survey population No. of employees giving a rating of 4 or 5 on a 5 point scale instrument Total survey population 20 Mandays of training undergone by each individual Measures the number of mandays spent on training by each individual relative to the nominated mandays to be spent on training. Following rating scale to be adhered for rating : 5- If percentage is 100% 4- If percentage is between 98%-99% 3-If percentage is between 96%-97% 2- If percentage is between 91%-95% 1- If percentage is less than 90% Actual Mandays spent on training Total Mandays nominated for training 21 Reduction in fatality incidence related to Mining Operation Measures the degree to which adequate provisions were undertaken to control the occurrence of fatalities. Following scale to be adhered to for rating: 5- if the number of fatal incidents in current year is zero 1- if the number of fatal incidents in current year is 1 or more Total number of fatalities per million cubic metre of material (Coal and OB) excavated in current year x 100 x 100 Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\50 Learning and Growth 22 Reduction in serious injury incidence related to Mining Operation Measures the degree to which adequate provisions were undertaken to control the occurrence of serious injuries. Following scale to be adhered to for rating: 5- if the number of serious injury incidents in current year is zero 4- if the number of serious injury incidents in current year is less than previous year 3- if the number of serious injury incidents in current year is equal to previous year 2- if the number of serious injury incidents in current year is more than previous year 1- if the number of serious injury incidents in current year is double than previous year Total number of serious injuries per million cubic metre of material (Coal and OB) excavated in current year 23 Reduction in reportable injuries related to Mining Operation Measures the degree to which adequate provisions were undertaken to control the occurrence of reportable injuries. Following scale to be adhered to for rating: 5- if the number of reportable injuries in current year is zero 4- if the number of reportable injuries in current year is less than previous year 3- if the number of reportable injuries in current year is equal to previous year 2- if the number of reportable injuries in current year is more than previous year 1- if the number of reportable injuries in current year is double than previous year Total number of reportable injuries serious injuries per million cubic metre of material (Coal and OB) excavated in current year Quadrant No. Key Performance Indicator KPI Defnition Formula Mining\51 Learning and Growth 24 Year on Year reduction in average cycle time of tendering Measures the relative efciency with which the tendering process is managed vis a vis the previous year a. Average number of days taken between ""Date of receipt of Approved Indent"" to ""Date of signing of contract of purchase"" in the previous year - Average number of days taken between Date of receipt of Approved Indent to Date of signing of contract of purchase in the current year Average number of days taken between ""Date of receipt of Approved Indent"" to ""Date of signing of contract of purchase"" in the previous year b. Actual reduction % of average cycle time of tendering Targeted reduction % of average cycle time of tendering 25 System capacity utilisation Measures the degree to which the system capacity utilisation is happening vis a vis the plan. Following rating scale to be adhered for rating : 5- If percentage is between 91% -100% 4- If percentage is between 81%-90% 3- If percentage is between 71%-80% 2- If percentage is between 61%-70% 1- If percentage is 60% or less than 60% Actual system capacity utilisation (in %) Targeted system capacity utilisation (in %) x 100 x 100 x 100