Vous êtes sur la page 1sur 1

SERVICE STAIRS

ELEC. RM.
CHEF'S
ROOM
CHILLER
STORE FOR
COOKED FOOD.
1
8
0
0

M
M

W
I
D
E

C
O
R
R
I
D
O
R
1800 WIDE CORRIDOR
FISH PREP.
ROOM
MEAT PREP.
ROOM
MAIN
KITCHEN
POT WASH
BAKERY
DRY STORE
TOILET
DISH
WASH
GARBAGE
ROOM
STAFF
ROOM
STORE FOR
ONION / POTATO
TEMPORARY 100 MM WALLS
TILL PROJ ECT IS COMPLETE
FREEZER
ROOM
STORE FOR
COOKED FOOD (HOT).
FIRE EXIT
STORE
VEG.
PREP.
STORE
FOR
BEVERAGES
wash
POT STORE
FREEZER
ROOM
CHILLER
ROOM
CHILLER
ROOM
LOBBY
1800 WIDE CORRIDOR
TEMPORARY 100 MM WALLS
TILL PROJ ECT IS COMPLETE
THAWING
ROOM
(CHILLER)
EQUIPMENT LIST
SL NO. NAME OF THE EQUIPMENTS
EQUIPMENT LIST
SL NO. NAME OF THE EQUIPMENTS
EQUIPMENT LIST
SL NO. NAME OF THE EQUIPMENTS
EQUIPMENT LIST
SL NO. NAME OF THE EQUIPMENTS
EQUIPMENT LIST
SL NO. NAME OF THE EQUIPMENTS
EQUIPMENT LIST
SL NO. NAME OF THE EQUIPMENTS
Rev.
Date Checked
Checked
Date
Drawn By
Client
Project Title
Drawing Title
Scales
Drawing Number
DATE
REVISION
CHECKED
DRAWN
Drawing Status
DESCRIPTION
NOTES
P.O. Box: 1918 I Postal Code: 114
Muttrah I Sultanate of Oman.
Tel: +968 24707053 I Fax: +968 24707051
Website: www.vale.com
PROPOSED DINING &KITCHEN
AT SOHAR
KITCHEN LAYOUT
(PHASE 1)
KITCHEN EQUIPMENT PLAN
044/AR-03
PRELIMINARY DESIGN R0

Vous aimerez peut-être aussi