Electrical Installations

Failure of PCC interlocks


Switch gear falsh and stoppage
of power supply to the
downstreams.
A D
Stoppage of equipment process, overflow
of pulp & chemicals, waste of natural
resources, loss of illumination.
2 2 No 4 1 16
Mechanical interlocks
were provided in design.
Provided apropriate
SOP's and training to the
crew. 2 2 1 1 1 4 No
Fire of MCC Stoppage of machine operations E D
Stoppage of proces, overflow of stock,
waste of natural resources, air pollution.
5 1 No 4 4 80
Switch gear bus bar
insualtion resistance will
be checked periodically.
All cable trenches are
covered with sand. 2 1 2 2 3 24 No
N=NORMAL ; A= ABNORMAL ; E= EMERGENCY ; I= INTERMITTENT
DIR = DORECT ; IND = INDIRECT
Score
Total
Score
Probability/
Occur
Controls
Score
Severity/
Impact
Score
Detect/
Prevent
Score
Total
BEFORE CONTROLS AFTER CONTROLS
Score
Scale
Score
Probability/
Occur
Legislation
Yes/No
Score
Severity/
Impact
Score
Detect/
Prevent
Applicable Act/Rules
ENVIRONMENTAL ASPECTS AND ASSOCIATED IMPACTS Date: 01.07.2013
ACTIVITY ASPECT
CONDITIO
N
N/A/E/I
DIR/IND IMPACT Score
Scale
Significant
Yes/No
Score
Controls