TEMPORARY WORKS

CASE STUDY 3
Foundation Stability for a Temorary Ram
Fig.1 shows a proposed ramp composed of steel and timber
girders with timber planks built for the access of construction
plants and vehicles to and from ground level and lower levels
of a deep basement site. Rock of unfavorable jointing is
found at the top of the abutment where the ramp is supported.
Suggest by drawing a diagram preventive measures to guard
against the slipping of the ramp deck and the rock abutment
into the lower basement.