WEEK (17 DECEMBER 22 DECEMBER 2012)
Reporting to QSM (Quality System Management) Department for Industrial Training and
briefing about the Quality Policies, Quality Objectives, Standard Operating Procedure,
rules and regulation of the Company.
How the components of sub-structure being installed by the site workers.
From erecting the formwork, installing rebar, pouring concrete, curing and remove the
formwork.
Components of sub-structure are lean concrete, pad footing, and column stump.
2
nd
WEEK (24 DECEMBER 29 DECEMBER 2012)
How the Ground floor slab being process.
Compaction roller being used to ensure the soil is fully compacted.
Crusher Run is then placed onto the surface of compacted soil and be compacted
again.
Test Cube for ground floor slab have been tested.
Piping work for ground floor slab (e.g Bathroom) is installed.
3
rd
WEEK ( 31 DECEMBER 2012 5 JANUARY 2013)
How to construct non suspended slab.
How the construction progress of 1
st
Floor Beam & Slab.
How the electric conduit been installed at the 1
st
Floor Beam & Slab.
The usage of temporary structure.
How to conduct the Cube Test.

4
th
WEEK (7 JANUARY - 12 JANUUARY 2013)
How concrete mixer truck function.
Machinery in the construction site.
For example, crane, excavators and etc.
How to carry out land leveling.
Get to know the components of roof structure.
5
th
WEEK (14 JANNUARY- 19 JANUARY 2013)
How metal fabrication carry out.
Anti-termite treatment process.
How Concrete Plant process.
What are the function of lintel, exmet, and petroleum asphalt roofing felt.