Vous êtes sur la page 1sur 2

1 2 3 4

1
1.1 R R R R/S
1.2 R R R R/S
1.3 W R R R/S
2
2.1
Standards&
Specifications
S S S S
2.2 S S S S
2.3 S S S S
2.4 W W W S/R
2.5 R R R R
2.6 W W W S
2.7 W W W S/R
2.8 W W S S/R
3
3.1
Approved
Drawings
R R R R
3.2
Approved
Drawings
H W S S
3.3
Approved
Drawings
H W S S/R
S.No
1.ConstructionContractor
2.MainContractor
3.ThirdPartyInspetion
SphinxConstructionofIlmeniteSmelterPlant,JazanEconomicCity,KSA
Inspection&TestPlanforConcreteWorks
NasserS.AlHajriCorp
Outotec
TheNationalTitaniumDioxideCompanyLtd.(Cristal)
H=HoldPoint
R=RecordReview
4.Client/Owner
W=WitnessPoint
I=Inspection
ChecktheSlumptestonetestpertruck.
Ensurenowaterisaddedtoconcreteonsite.
Drawingsareapprovedandatcorrectrevision.
Reinforcement is to the correct size, shape, bent to the correct radius and is clean of
looserustandmillscale.
MaterialApproval
S=Surveillance
FormworkandReinforcementInspected.
Vibrationcarriedoutcorrectlyasrequirement.
MethodStatement
Submittals
ReinforcementSteelSupplier,ConcreteSupplierandConcreteMixDesignetc.
Testing
EnsureConcreteplacementrestrictionsregardingtemperature,conditionsandtime.
PrePourInspection
Inspections Acceptability
Criteria
Frequencyif
Applicable
Description
Ensure Laboratory Technicians are on site with the correct instrument for Sampling
andTesting.
EnsurelocationisaccessibleforConcretePlacementandPumps.
Ensure the 7 days and 28 days Cubes test reach the compressive strength
requirement.
Permeabilitytestaretobecarriedoutwithinitialsurfaceabsorbilitytestsofconcrete.
NasserS.AlHajriCorp ITP002Rev.0
1 2 3 4
S.No
1.ConstructionContractor
2.MainContractor
3.ThirdPartyInspetion
SphinxConstructionofIlmeniteSmelterPlant,JazanEconomicCity,KSA
Inspection&TestPlanforConcreteWorks
NasserS.AlHajriCorp
Outotec
TheNationalTitaniumDioxideCompanyLtd.(Cristal)
H=HoldPoint
R=RecordReview
4.Client/Owner
W=WitnessPoint
I=Inspection
S=Surveillance
Inspections Acceptability
Criteria
Frequencyif
Applicable
Description
3.4
Approved
Drawings
H W S R
3.5
Approved
Drawings
H W S S
3.6
Approved
Drawings
H W S S
3.7
Approved
Drawings
H W S S
3.8
Approved
Drawings
W S S R/S
3.9
Approved
Drawings
H W S R/S
3.1
Approved
Drawings
H W S R/S
4
4.1
AsPer
Standard&
Specification
S S R R/S
4.20 S S R R/S
4.30 W I/W R R/S EnsureConcreteRepairpriortocoverup.
Ensurecuringofconcreteforaminimumperiodof7days.
Coordinatesanddatumarecorrect.
Formworkisdimensionallycorrectandinaccordancewithapprovedconstruction
drawings.
EnsureExpansionjointsandConstructionjointsareformedcorrectlywhererequired.
PostPourActivities
Reinforcementconcretecovermeetstheminimumrequirementofapproved
drawingsandspecification.
Ensurewaterstopperareinstalled(ifrequired)atconstructionjoints.
Formworkshallberemovedafter24hours,providedconcretehardenedsufficiently.
Ensure the Reinforcement is installed as per approved design drawings, tied correctly
andsupportedbyapprovedspacers/supports.
Ensure all insert plates shall be of the material and size as shown on the drawings and
standards.
NasserS.AlHajriCorp ITP002Rev.0