Design Information

1. Material Stress
Fcu: Concrete: 20N/mm
2
at 28 days
Fy: Steel: 410 N/mm
2


2. COVER TO MAIN REINFORCEMENT

Beam = 25mm
Slab and Staircase = 20mm
Column =40mm
Foundation = 50mm

3. Pad footing on assumed soil bearing capacity of
150 KN/M
2



Fire Resistance for 20mm Cover = 1 hour
Fire Resistance for 150mm slab = 3 hours


JUNE, 2014.


































Fire
Resistance
Ok



2

SLAB DESIGN
FIRST FLOOR SLAB

Ly = 4950mm, Lx = 4475mm

= 1.1 (Slab is two-way spanning)



Loading
Self-weight = 0.15 x 24 = 3.6KN/M
2

Partition allowance = 3.47KN/M
2

Finishes, say = 1.2KN/M
2

Total = 8.27KN/M
2


Live load = 3KN/M
2
(COMMERTIAL)

F = 8.27x1.4 + 3x1.6 = 16.4KN/M
2


B
sx
- = 0.056, B
sx
+
= 0.042, B
sy
- = 0.045, B
sy
+
= 0.034,

Moment
M = B
sx
nlx
2

M
sx
- =0.056x 16.4 x 3.425
2
= 10.8kNM
M
sx
+
=0.042x 16.4 x 3.425
2
= 8.1kNM
M
sy
- =0.045x 16.4 x 3.425
2
= 8.7kNM
M
sy
+
=0.034 x 16.4 x 3.425
2
= 6.6kNM


REINFORCEMENTS

M = 10.8 kNM, h = 150mm, d = 124mm,
b = 1000mm


K = M/bd
2
f
cu


K = 0.035

La = 0.5 +

= 0.95








































3


Z = 0.95 x 124 = 117.8mm

As =

= 236mm
2

Provide Y
12
@250mm
c
/
c
(452mm
2
) T&B
Provide Y
10
@250mm
c
/
c
(314mm
2
) Dist

CHECK FOR DEFLECTION

Fs =

x 410 x

= 142.6mm
2

M/bd
2
=

= 0.7

M. F. = 0.55 +

= 2.3 > 2, use 2



d
req
=

= 85.6 < 124




BEAM DESIGN
FIRST FLOOR BEAMS

BEAM 1

L = 3.425m, w = 17.6kN/m, M = 26kNM, h = 450mm, , k =
0.036, La = 0.95, z = 380, As = 176mm
2
,
d = 400mm, b = 225mm.
Provide 2Y
16mm
(402mm
2
) T&B
Provide Y
10mm
@ 200mm
c
/
c
Links
BEAM 2
L = 3.425m, w = 40.1kN/m, M = 59kNM, k = 0.082,
La = 0.89, z = 356, As = 425mm
2
, h = 450mm,
d = 400mm, b = 225mm.
Provide 3Y
16mm
(603mm
2
) T&B
Provide Y
10mm
@ 200mm
c
/
c
Links


















deflection is
OK
4

BEAM 3

L = 3.425m, w = 26kN/m, M = 38.2kNM,
k = 0.053, La = 0.73, z = 372mm, As = 264mm
2
,
h = 450mm, d = 400mm, b = 225mm.
Provide 2Y
16mm
(402mm
2
) T&B
Provide Y
10mm
@ 200mm
c
/
c
Links
BEAM 4

L = 3.45m, h = 450mm, d = 400mm, b = 225mm.
Provide 2Y
16mm
(402mm
2
) T&B
Provide Y
10mm
@ 200mm
c
/
c
Links
BEAM 5

L = 3.45m, h = 450mm, d = 400mm, b = 225mm.
Provide 2Y
16mm
(402mm
2
) T&B
Provide Y
10mm
@ 200mm
c
/
c
Links
BEAM 6
L = 3.45, w = 49kN/m, M = 73kNM, k = 0.1,
La = 0.87, z = 348mm, As = 539mm
2
, h = 450mm,
d = 400mm, b = 225mm.
Provide 3Y
16mm
(603mm
2
) T&B
Provide Y
10mm
@ 200mm
c
/
c
Links
5

COLUMN DESIGN
Column Type 1
N = 381KN, Asc = 276mm
2
Provide 4Y
16
(804mm
2
)
Provide Y
10mm
@175mm
2
links
Size: 225 X 225mm

Column Type 2
N = 198kN

Provide 4Y
16
(804mm
2
)
Provide Y
10mm
@175mm
2
links
Size: 225 X 225mm

PAD FOOTING DESIGN
BASE TYPE 1
N = 381kN
Assumed Earth Pressure = 150KN/m
2
Service Load = 272.2kN
Pad area required = 1.8m
2

Provide 1.4m x 1.4m (1.96m
2
) base
M = 16.6kNM, k = 0.015, La = 0.95, Z = 228mm,
As = 187mm
2
, h = 300mm, d = 240mm
Provide Y
12mm
@250mm
c
/
c
(452.4mm
2
) T&B.(MAIN)


6

BASE TYPE 2
N = 198kN
Assumed Earth Pressure = 150KN/m
2
Service Load = 41.5kN
Pad area required = 0.95m
2

Provide 1m x 1m (1m
2
) base
Provide Y
12mm
@250mm
c
/
c
(452mm
2
) T&B.(MAIN)



STAIR DESIGN

L = 3.45m, Threads = 250mm, Risers = 150mm,
Waist = 175mm , W = 15.2kN/M, M = 23KNm,
d = 124mm, K = 0.051, La = 0.94, Z = 140, As = 410.8mm
2
,
Provide Y
12mm
@ 200mm
c
/
c
(566mm
2
) T&B
Provide Y
10mm
@ 200mm
c
/
c
(392.5mm
2
) T&B DISTR.

Check For Deflection

= 1.02, fs = 198N/mm
2
, M.F = 1.76,
d
req =
=

= 98 < 149 Deflection Satisfied.