Vante Bombordo 1" 6" Ao inoxidvel

Vante Boreste 1" 6" Ao inoxidvel


R Bombordo 1" 6" Ao inoxidvel
R Boreste 1" 6" Ao inoxidvel
Vante 1/2" 2" Ao inoxidvel BOMAX 41/1
R 1/2" 2" Ao inoxidvel BOMAX 41/1
Bombordo 4" 4" Ao Carbono
Boreste 4" 4" Ao Carbono
15 mm 42 mm Ao Inox Compressor, Secadora, Membana N2
COMP. SECADORA MEMBRANA N2 1
BOMBA HIBRIDA - 120 M3/H (2.000 LPM) 1
BOMBA HIBRIDA - 120 M3/H (2.000 LPM) 1
BOMBA HIBRIDA - 300 M3/H (5.000 LPM) 1
BOMBA BOMAX - 41/1 1
BOMBA BOMAX - 41/1 1
BOMBA DE FLUSHING - 220 LPM 1
BOMBA DE FLUSHING - 300 LPM 1
BOMBA DE FLUSHING - (2X 300)= 600 LPM 1
BOMBA DE TRANSFERENCIA AGUA 2
BOMBA DE TRANSFERENCIA OLEO 3
MANGUEIRAS 2" - 20 METROS 10
MANGUEIRAS 4" - 20 METROS 6
CONTADOR DE PARTICULAS 1
KIT GUA EM LEO 1
CONTENTOR DE EFLUENTES 12
Valvulas - Tuubings DN MINIMO DN MAXIMO METALURGIA ENCAMINHAMENTO DO SISTEMA
38 Paineis
XV-134 Valvulas - 268 Tubbings
HV - 12 Valvulas - 12 Tubbings
282 - Tubbings
SDV - 02 Valvulas - 04 Tubbings
3/8" 3/8" Ao Inox Compressor de ar
ENCAMINHAM
ENTO
BY PASS FLUSHING
Unidade 01 - 30 LPM 12 1 1 1
Unidade 01 - 30 LPM 12 1 1 1
Nvel de Produo Estimado
PLANEJAMENTO - ECOVIX - ENGEVIX - LIMPEZA QUIMICA E FLUSHING - EM PARALELO
01 - MOORING SYSTEM DN MINIMO DN MAXIMO METALURGIA
BOMBA DE LIMPEZA QUIMICA (SE
REQUERIDO)
BOMBA HIBRIDA DE 300 M3/H (5.000 LPM)
BOMBA HIBRIDA DE 120 M3/H (2.000 LPM)
03 - SULZER - BOMBAS DE INCENDIO DN MINIMO DN MAXIMO METALURGIA
BOMBA DE LIMPEZA QUIMICA (SE
REQUERIDO)
02 - OFF LOADING DN MINIMO DN MAXIMO METALURGIA
BOMBA DE LIMPEZA QUIMICA (SE
REQUERIDO)
BOMBA HIBRIDA DE 120M3/H
04 - PORTABLE CARGO PUMP
DN MINIMO DN MAXIMO METALURGIA SOPRAGEM
RECURSOS - EQUIPAMENTOS MACRO
TEMPOS
PRODUO DIRIA (TUBBING)
ESTIMATIVA: 12 Tubbings por dia para cada Maquina/Equipe - 141 Tubbings/Maquinas - Tempo Total 12 dias corridos
TEMPOS
BY PASS FLUSHING
SOPRAGEM E
INSPEO
REMONTAGEM
Equipamento: 300 LPM
BOMBA 30 LMP/200 BAR 1
BOMBA 30 LMP/200 BAR 1
BOMBA 300 LPM 1
MANGUEIRAS 1/2" - LANCE 20 M 6
CONTADOR DE PARTICULAS 1
KIT GUA EM LEO 1
CLASSIFICAO E TRANSFERNCIA DE
LEO
VOLUME TEMPO TOTAL EQUIPE
Bomba Centrifuga 65 m3/h - 10 kgf/cm2
Etapa 1 - 10m3 10 M3 4.5
Etapa 2 - 10m3 10 M3 4.5
Etapa 2 - 10m3 10 M3 4.5
Locar reservatorio de > 10 m3 13.5
BOMBA DE 65 M3/H - 10 KGF/CM2 1
BOMBA DE TRANSFERENCIA OLEO 1
MANGUEIRAS 2" - LANCE 20 M 10
MANGUEIRAS 4" - LANCE 20 M 2
CONTADOR DE PARTICULAS 1
KIT GUA EM LEO 1
Bomba de 120 m3/h (2.000 LPM) 1
Bomba de 600 LPM 1
Contador de Particulas 1
Kit Agua em Oleo 1
Bomba Centrifuga 65 m3/h - 10 kgf/cm2 1
Bomba Hibrida de 120 m3/h 1
Bomba Bombax LIMPEZA QUIMICA 1
Bomba Bombax LIMPEZA QUIMICA 1
Bomba Flushing 300 LPM 1
Bomba Flushing 220 LPM 1
Carrinho de Transferencia 80 lpm 1
Carrinho de Transferencia 80 lpm 1
Carrinho de Transferencia 80 lpm 1
Bomba Flushing Tubbings 30 LPM/200 bar 1
Bomba Flushing Tubbings 30 LPM/200 bar 1
Mangueiras, Mangotes 1
Conexoes provisorias Diversas 1
Reservatrios > 10 m3 2
Linha Principal - 1"
1 2 1 2
RECURSOS - EQUIPAMENTOS MACRO
3
RECURSOS - EQUIPAMENTOS MACRO
EQUIPAMENTOS BSICOS
EQUIPAMENTOS ADICIONAIS
300 LPM 10 3
600 LPM 10 3
220 LPM 11 6
REMONTAGEM
1 4
1 4
8
PLANEJAMENTO - ECOVIX - ENGEVIX - LIMPEZA QUIMICA E FLUSHING - EM PARALELO
BOMBA DE FLUSHING TEMPO TOTAL COLABORADORES
BOMBA HIBRIDA DE 300 M3/H (5.000 LPM) 12 4
BOMBA HIBRIDA DE 120 M3/H (2.000 LPM) 12 4
TEMPO TOTAL COLABORADORES
BOMBA DE FLUSHING TEMPO TOTAL COLABORADORES
BOMBA DE FLUSHING
BOMBA HIBRIDA DE 120M3/H 10 4
BOMBA DE FLUSHING TEMPO TOTAL COLABORADORES
BOMBA DE FLUSHING
30 LPM - 200 BAR
TEMPOS
EQUIPE
ESTIMATIVA: 12 Tubbings por dia para cada Maquina/Equipe - 141 Tubbings/Maquinas - Tempo Total 12 dias corridos
TEMPOS
EQUIPE
TEMPO TOTAL
EQUIPE
6 2