0 évaluation0% ont trouvé ce document utile (0 vote)
2K vues1 page
Abengoa submission to CEC indicating that it will not need new transmission lines, and can connect the Abengoa Mojave Solar project to the grid by upgrading existing infrastructure. Southern California Edison later indicated that the Abengoa Mojave Solar project would not be viable without the Coolwater-Lugo transmission line.
Abengoa submission to CEC indicating that it will not need new transmission lines, and can connect the Abengoa Mojave Solar project to the grid by upgrading existing infrastructure. Southern California Edison later indicated that the Abengoa Mojave Solar project would not be viable without the Coolwater-Lugo transmission line.
Abengoa submission to CEC indicating that it will not need new transmission lines, and can connect the Abengoa Mojave Solar project to the grid by upgrading existing infrastructure. Southern California Edison later indicated that the Abengoa Mojave Solar project would not be viable without the Coolwater-Lugo transmission line.