Vous êtes sur la page 1sur 2

S10

Pgina :

Precios y cantidades de recursos requeridos por tipo


Obra

0201001

Subpresupuesto

001
03/08/2011
131101

Fecha
Lugar

AMPLIACION Y REMODELACION DEL PARQUE LA AMISTAD, CENTRO POBLADO


GUADALUPITO, DISTRITO DE GUADALUPITO - VIRU - LA LIBERTAD
CONSTRUCCION DE CAMPO DEPORTIVO
LA LIBERTAD - VIRU - GUADALUPITO

Cdigo

Recurso

Unidad

Cantidad

Precio S/.

Parcial S/.

Presupuestado

0147000032
0147010001
0147010002
0147010003
0147010004
0147990002
0147990005

TOPOGRAFO
CAPATAZ
OPERARIO
OFICIAL
PEON
MANO DE OBRA
INSTALACION DE GRASS SINTETICO

MANO DE OBRA
hh
11.6535
hh
212.3229
hh
1,477.4941
hh
743.0028
hh
2,907.6022
est
1.0000
est
862.5000

13.08
13.68
13.08
11.65
7.00
200.00
30.80

152.38
2,904.54
19,325.57
8,655.95
20,353.20
200.00
26,565.00

145.67
2,873.19
19,329.21
8,645.82
20,354.83
200.00
26,565.00

78,156.64

78,113.72

0202000007
0202000008
0202000009
0202000010
0202010006
0202020004
0202100093
0203000032
0203000033
0203000034
0203020004
0204000000
0205000003
0205000023
0205000028
0205000029
0205010004
0205030061
0206310004
0211210032
0213000006
0213000007
0221000000
0221000002
0229770001
0229780001
0229810002
0230150043
0230630002
0237540006
0238000000
0238500001
0238500003
0239140005
0239140006
0243000024
0243010003
0245010001
0248150001
0254010018
0254020042
0254030028
0254310016
0254610002

0337010001
0348010011
0348040003
0348040036
0348840001
0349030004

MATERIALES
ALAMBRE NEGRO RECOCIDO # 16
kg
ALAMBRE NEGRO RECOCIDO # 8
kg
ALAMBRE NEGRO # 8
kg
ALAMBRE NEGRO #16
kg
CLAVOS PARA MADERA CON CABEZA DE 3"
kg
CLAVOS Fo No C/C 3"
kg
CLAVOS DE ALAMBRE PARA MADERA C/C DE kg
2"
FIERRO CORRUGADO SIDER-PERU G.60
kg
und
ARCO DE FULBITO CON F G S/DISEO CON
MAYA INC. SUMINISTRO Y COLOCACION
NET DE VOLEY SEGUN DISEO
und
kg
ACERO CORRUGADO fy=4200 kg/cm2 GRADO
60
ARENA FINA
m3
PIEDRA CHANCADA DE 1/2"
m3
PIEDRA CHANCADA DE 1/2" - 3/4"
m3
PIEDRA CHANCADA DE 3/4" - 1"
m3
PIEDRA BASE
m3
ARENA GRUESA
m3
m2
SUMINISTRO DE GRASS SINTETICO INC.
CAMA DE ARENA Y CAUCHO
CARTEL DE OBRA EN GIGANTOGRAFIA DE 3 und
.60m X 4.80m. INC. TRANSPORTE
LADRILLO KING-KONG 18 HUECOS 9x12x24cm und
ASFALTO RC-250
gln
FLETE TERRESTRE DE ASFALTO RC-250
gln
CEMENTO PORTLAND TIPO I (42.5KG)
BOL
CEMENTO PORTLAND TIPO MS (42.5KG)
BOL
AGUA
m3
LIJA PARA MADERA
und
AGUA
m3
DISOLVENTE DE PINTURA PARA TRAFICO
gln
YESO ( BOLSA 20kg )
BOL
CORDEL
m
HORMIGON
m3
AFIRMADO
m3
MATERIAL DE PRESTAMO
m3
ALQUILER DE LOCAL PARA ALMACEN
mes
CASETA PARA GUARDIANIA (2.00x3.00mts)
GLB
MADERA ANDAMIAJE
p2
MADERA TORNILLO
p2
MADERA TORNILLO INC.CORTE P/ENCOFRADO p2
MOVIMIENTO DE EQUIPO Y MAQUINARIAS
est
IMPRIMANTE SINOLIT
kg
PINTURA ESMALTE SINTETICO
gln
PINTURA LATEX VENCELATEX
gln
PINTURA PARA TRAFICO
gln
SELLADOR
gln

HERRAMIENTAS MANUALES
MEZCLADORA DE CONCRETO DE 9 -11P3
CAMION CISTERNA 4x2 (AGUA) 122 HP 2,000
CAMION VOLQUETE 15 M3
CIZALLA DE CORTE
COMPACTADOR VIBR. TIPO PLANCHA 8 HP

EQUIPOS
%MO
hm
hm
hm
hm
hm

94.2372
65.7000
121.0920
175.7358
68.6188
27.1947
7.2835

4.96
4.96
4.96
4.96
4.96
4.96
4.96

467.43
325.87
600.61
871.67
340.36
134.86
36.11

471.19
325.21
601.43
878.68
339.06
134.57
29.14

1,669.4994
2.0000

3.37
2,200.00

5,626.22
4,400.00

5,631.21
4,400.00

1.0000
3,075.3765

750.00
3.40

750.00
10,456.29

750.00
10,456.28

10.8930
67.1248
26.1820
2.4998
21.0600
73.4127
879.7500

29.50
58.50
55.50
50.50
40.35
35.40
95.80

321.26
3,926.52
1,452.99
126.25
849.77
2,598.71
84,280.05

321.35
3,928.79
1,453.09
126.55
849.98
2,598.49
84,283.50

1.0000

450.00

450.00

450.00

7,527.6500
39.6021
39.6021
929.8670
529.3069
13.3409
6.2620
76.7621
0.3089
14.5668
276.7692
41.4475
324.3148
156.1875
5.0000
1.0000
245.0925
1,361.4025
2,082.7824
1.0000
32.4250
1.6110
2.5940
2.3681
1.6110

0.79
13.25
1.50
20.15
22.50
5.00
1.50
5.00
17.25
9.00
0.25
30.40
28.50
25.50
350.00
450.00
4.90
4.90
4.90
2,192.08
3.50
55.00
32.00
65.00
30.00

5,946.84
524.70
59.40
18,736.88
11,909.48
66.70
9.39
383.80
5.35
131.13
69.19
1,260.08
9,242.84
3,982.85
1,750.00
450.00
1,200.94
6,670.86
10,205.62
2,192.08
113.47
88.55
82.88
154.05
48.30

5,946.84
524.06
59.55
18,738.02
11,911.14
66.71
9.93
383.80
5.15
131.11
72.84
1,260.13
9,249.87
3,983.53
1,750.00
450.00
1,203.67
6,674.41
10,204.02
2,192.08
113.49
89.14
83.01
154.44
48.33

193,300.33

193,333.79

1,716.03
1,921.50
2,380.80
15,228.00
177.00
1,104.25

1,716.03
1,921.51
2,383.29
15,239.42
177.02
1,104.91

76.8627
19.8405
101.5220
17.7024
44.1665

25.00
120.00
150.00
10.00
25.00

S10

Pgina :

Precios y cantidades de recursos requeridos por tipo


Obra

0201001

Subpresupuesto

001
03/08/2011
131101

Fecha
Lugar

AMPLIACION Y REMODELACION DEL PARQUE LA AMISTAD, CENTRO POBLADO


GUADALUPITO, DISTRITO DE GUADALUPITO - VIRU - LA LIBERTAD
CONSTRUCCION DE CAMPO DEPORTIVO
LA LIBERTAD - VIRU - GUADALUPITO

Cdigo

Recurso

Unidad

0349030046
0349030048
0349040034
0349040035
0349070004
0349070006
0349090000
0349090004
0349880003

RODILLO VIBR. LISO 136-170 HP, 10-12 TN.


COMPACTADOR VIBR. TIPO PLANCHA 4 HP
CARGADOR S/LLANTAS 125-115 HP 3 YD3
CARGADOR S/LLANTAS 125-155 HP 3 YD3
VIBRADOR DE CONCRETO 4 HP 2.40"
VIBRADOR DE 3/4" - 2" CONCRETO
MOTONIVELADORA DE 125 HP
MOTONIVELADORA DE 145-150 HP
TEODOLITO,NIVEL Y MIRA

hm
hm
hm
hm
hm
hm
hm
hm
hm

Cantidad

Precio S/.

Parcial S/.

Presupuestado

19.8405
6.7284
46.0386
90.8801
49.6738
18.8749
10.1622
9.6783
11.6535

150.00
25.00
190.00
190.00
15.00
15.00
180.00
180.00
7.50

2,976.00
168.25
8,747.60
17,267.20
745.05
283.05
1,828.80
1,742.40
87.38

2,976.09
168.21
8,745.33
17,262.97
744.99
283.12
1,826.79
1,742.10
87.40

56,373.31

56,379.18

327,830.28

327,826.69

Total

S/.
S/.

La columna parcial es el producto del precio por la cantidad requerida; y en la ltima columna se muestra el Monto Real que se est utilizando

327,826.69

Vous aimerez peut-être aussi